CN207032288U CN201720272514.1U CN201720272514U CN207032288U CN 207032288 U CN207032288 U CN 207032288U CN 201720272514 U CN201720272514 U CN 201720272514U CN 207032288 U CN207032288 U CN 207032288U
Authority
CN
China
Prior art keywords
piping lane
rope saw
depth
active
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720272514.1U
Other languages
Chinese (zh)
Inventor
尚增弟
谢艺东
雷斌
尹佳
雷帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Shenzhen Gongkan Geotechnical Group Co Ltd
Priority to CN201720272514.1U priority Critical patent/CN207032288U/en
Application granted granted Critical
Publication of CN207032288U publication Critical patent/CN207032288U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

It the utility model is related to the technical field of Urban Underground piping lane, open Urban Underground piping lane hard rock mass rope saw cut excavates structure, including piping lane basis, rope saw, active well is provided with piping lane basis, the both sides of active well are extended to outside two side sections on piping lane basis, and the depth of active well is deeper than the absolute altitude on piping lane basis;Piping lane basis is divided into multiple active sections, and faces dummy section formed with longitudinal direction between adjacent active section;The both sides of the bottom of active section have set horizontal rope saw hole respectively, and level rope saw hole communicates with facing dummy section;Rope saw saws hole through horizontal rope and faces dummy section.Piping lane basis is divided into multiple active sections, and drive to restrict using driving element and saw both sides and bottom that active section is respectively cut, so that the hard rock mass of active section departs from rock parent, construction speed is fast, and vibrations are small, on surrounding building without influence, it is safely controllable, moderate cost, good working face is provided for the construction of later stage underground pipe gallery, there is great practical value and dissemination.

Description

Urban Underground piping lane hard rock mass rope saw cut excavates structure
Technical field
It the utility model is related to the technical field of Urban Underground piping lane, more particularly to Urban Underground piping lane hard rock mass rope saw Cut digging structure open.
Background technology
At present, to adapt to the needs of urban construction and development, each big city carries out underground pipe gallery exploitation on a large scale, and pipe is wide Basic general 4~8m of buried depth, wide 4~6m, it is distributed in long and narrow bar shaped in plane.
In underground pipe gallery work progress, the excavation of hard rock stratum is frequently encountered.For the excavation method of hard rock stratum, generally Excavated using explosive blasting or static blasting mode, because underground pipe gallery construction is in densely populated city, forbid making Blow construction up with dynamite, although and use static blasting generation it is with small vibration, the quiet blast hole quantity of its Drilling is more, noise greatly, dust Environment is polluted, while the quiet quick-fried medicament reaction time is long and can not be constructed in the rainy day, causes comprehensive cost height, excavation long in time limit.
Utility model content
The purpose of this utility model is that providing Urban Underground piping lane hard rock mass rope saw cut excavates structure, it is intended to solves In the Urban Underground piping lane work progress of prior art, hard rock mass is excavated using explosive blasting or static blasting mode, existed The problem of noise is big, difficulty of construction is big, cost is high and the construction period is long.
The utility model is achieved in that Urban Underground piping lane hard rock mass rope saw cut excavates structure, including piping lane The driving element of the rope saw cut is sawed and driven on basis, rope, and active well is provided with the piping lane basis, the active well Both sides are extended to outside two side sections on the piping lane basis, and the depth of the active well is deeper than the absolute altitude on the piping lane basis;Edge The length direction on piping lane basis, the piping lane basis are divided into multiple active sections being adjacently positioned, and adjacent active section it Between formed with longitudinal direction face dummy section, the depth for facing dummy section is deeper than the depth on the piping lane basis;The active section The both sides of bottom have set horizontal rope saw hole respectively, and the horizontal rope saw hole communicates with the dummy section that faces;The rope saw runs through The horizontal rope saws hole and faces dummy section.
Further, between the depth depth 10cm-30cm on the depth ratio piping lane basis of the active well.
Further, the depth of the active well is 20cm.
Further, the both sides of the active well are extended between the outer 0.5m-1.5m of two side sections on piping lane basis.
Further, the both sides of the active well extend to the outer 1m of two side sections on piping lane basis.
Further, the flat section length of the active section on the piping lane basis is between 5m-15m.
Further, the flat section length of the active section on the piping lane basis is 10m.
Further, between the depth depth 5cm-15cm on the depth ratio piping lane basis for facing dummy section.
Further, the depth depth 10cm on the depth ratio piping lane basis for facing dummy section.
Further, between a diameter of 70mm-100mm in the horizontal rope saw hole.
Urban Underground piping lane hard rock mass rope saw cut provided by the utility model excavates structure, piping lane basis is divided into more Individual active section, and drive to restrict using driving element and saw both sides and bottom that active section is respectively cut so that the hard of active section Rock mass and rock parent depart from, and construction speed is fast, and vibrations are small, on surrounding building without influence, safely controllable, moderate cost, Good working face is provided for the construction of later stage underground pipe gallery, there is great practical value and dissemination.
Brief description of the drawings
Fig. 1 is the signal that the utility model embodiment provides piping lane foundation excavation active well and multiple active sections arrangement Figure;
Fig. 2 is the schematic front view for the active section that the utility model embodiment provides rope saw piping lane basis;
Fig. 3 is the perspective diagram for the active section that the utility model embodiment provides rope saw piping lane basis.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
Realization of the present utility model is described in detail below in conjunction with specific embodiment.
Referring to figs. 1 to shown in Fig. 3, being preferred embodiment provided by the utility model.
The Urban Underground piping lane hard rock mass rope saw cut excavation method that the present embodiment provides, for Urban Underground pipe of constructing Corridor.
Urban Underground piping lane hard rock mass rope saw cut excavation method, including following construction procedure:
1) active well 101, is excavated in advance in piping lane basis, the both sides of the active well 101 extend to the two of piping lane basis Outside side section, and the depth of active well 101 is deeper than the absolute altitude on piping lane basis;
2), along the length direction on piping lane basis, piping lane basis is divided into multiple active sections 102 being adjacently positioned, and it is adjacent Active section 102 between formed with longitudinal direction face dummy section 103, the depth for facing dummy section 103 be deeper than piping lane basis depth;
3), in active well 101, by the design size of active section 102, using rope saw cut technique paragraph by paragraph by active section 102 two sides and bottom surface carry out rope saw cut respectively, the hard rock mass in active section 102 is departed from rock parent;
4), repeat to operate according to step 3), sequentially depart from the hard rock mass in multiple active sections 102 and rock parent.
The Urban Underground piping lane hard rock mass rope saw cut excavation method of above-mentioned offer, active well is excavated in piping lane basis 101, and piping lane basis is formed into multiple adjacent active sections 102, face dummy section 103 formed with longitudinal direction between active section 102, Sequentially the hard rock mass in multiple active sections 102 and rock parent are departed from using rope saw cut construction technology, construction speed is fast, Shake small, surrounding building is provided well without influence, safely controllable, moderate cost, the also construction for later stage underground pipe gallery Working face, there is great practical value and dissemination.
In the present embodiment, after step 4), the hard rock mass that will be disengaged from out carries out Mechanical Crushing, and entrucking is transported outward, and The bottom on piping lane basis, is not required to secondary cleaning, so that it may carry out the site operation of underground pipe gallery after cleaning.
For the ease of the smooth formation of active well 101, when excavating active well 101 at the scene, the excavation of active well 101 plays sequence Point can be by the larger position of hard rock mass buried depth, first excavated along piping lane basis soil layer section, rock when excavating active well 101 to reduce The excavated volume of layer.
When active well 101 is in fill stratum and excavates deeper, excavated using ratio of slope method, and interim spray plane can be implemented to work Make well 101 and carry out supporting.
In above-mentioned construction procedure 3) in, set horizontal rope saw hole 105, and water respectively in the both sides of the bottom of active well 101 Flat rope saw hole 105 communicates with facing dummy section 103.
Rope saw 104 is sawed into hole 105 through horizontal rope and faces dummy section 103, and rope saw 104 is arranged in vertical face, sequentially Cut the both sides of active section 102 so that the both sides of the hard rock mass in active section 102 depart from rock parent respectively;Rope is sawed 104 saw holes 105 through two horizontal ropes and face dummy section 103, and saw 104 of restricting is in horizontally disposed, rope saw cut active section 102 Bottom so that the bottom of the hard rock mass of active section 102 departs from rock parent.
Present embodiments provide Urban Underground piping lane hard rock mass rope saw cut and excavate structure, including piping lane basis, rope saw 104 and driving element, active well 101 is provided with the piping lane basis, and the both sides of the active section 102 extend to the two of piping lane basis Outside side section, and the depth of active well 101 is deeper than the absolute altitude on piping lane basis;Along the length direction on piping lane basis, the piping lane base Plinth is divided into multiple active sections 102 being adjacently positioned, and faces dummy section 103 formed with longitudinal direction between adjacent active section 102, should The depth for facing dummy section 103 is deeper than the depth on piping lane basis;Set horizontal rope saw hole respectively in the both sides of the bottom of active well 101 105, and horizontal rope saw hole 105 communicates with facing dummy section 103;Rope saw 104 saws hole 105 through horizontal rope and faces dummy section 103, Driving element is used to drive the cutting active section of rope saw 104.
The Urban Underground piping lane hard rock mass rope saw cut of above-mentioned offer is excavated in structure, by rope saw 104 through horizontal rope Saw hole 105 and face dummy section 103, and be in vertical face arrangement by rope saw 104, sequentially cut the both sides of active section 102 so that work The both sides of hard rock mass in section 102 depart from rock parent respectively;Will rope saw 104 through two horizontal rope saw holes 105 and Face dummy section 103, and saw 104 of restricting is in horizontally disposed, the bottom of rope saw cut active section 102 so that the hard rock of active section 102 The bottom of body departs from rock parent.Using rope saw cut construction technology sequentially by the hard rock mass in multiple active sections 102 with Rock parent departs from, and construction speed is fast, and vibrations are small, safely controllable, moderate cost, are also the later stage on surrounding building without influence The construction of underground pipe gallery provides good working face, has great practical value and dissemination.
Between the depth depth 10cm-30cm on the depth ratio piping lane basis of active well 101, preferably 20cm;Active well 101 Both sides are extended between the outer 0.5m-1.5m of two side sections on piping lane basis, preferably 1m.
Efficiency is excavated to improve, the flat section length of the active section 102 on piping lane basis is preferably between 5m-15m 10m。
Between adjacent active section 102, longitudinal direction is formed using down-hole hammer drilling tool Drilling and faces dummy section 103, and faces dead zone Between the depth depth 5cm-15cm on the depth ratio piping lane basis in domain 103, preferably 10cm.
In the present embodiment, between a diameter of 70mm-100mm in level rope saw hole 105, preferably 90mm.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (9)

1. Urban Underground piping lane hard rock mass rope saw cut excavates structure, it is characterised in that including piping lane basis, rope saw and drives The driving element of the dynamic rope saw cut, is provided with active well in the piping lane basis, described in the both sides of the active well extend to Outside two side sections on piping lane basis, the depth of the active well is deeper than the absolute altitude on the piping lane basis, and the excavation of active well plays sequence Point can be by the larger position of hard rock mass buried depth;Along the length direction on piping lane basis, the piping lane basis is divided into multiple The active section being adjacently positioned, and the dummy section that faces formed with longitudinal direction between adjacent active section, the depth for facing dummy section are deep Depth in piping lane basis;The both sides of the bottom of the active section have set horizontal rope saw hole, the horizontal rope saw respectively Hole communicates with the dummy section that faces;The rope saw is through the horizontal rope saw hole and faces dummy section;The work on the piping lane basis Make the flat section length of section between 5m-15m.
2. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 1 excavates structure, it is characterised in that the work Make well depth ratio piping lane basis depth depth 10cm-30cm between.
3. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 2 excavates structure, it is characterised in that the work The depth for making well is 20cm.
4. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 1 excavates structure, it is characterised in that the work The both sides for making well are extended between the outer 0.5m-1.5m of two side sections on piping lane basis.
5. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 4 excavates structure, it is characterised in that the work The both sides for making well extend to the outer 1m of two side sections on piping lane basis.
6. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 1 excavates structure, it is characterised in that the pipe The flat section length of the active section on corridor basis is 10m.
7. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 1 excavates structure, it is characterised in that described to face Between the depth depth 5cm-15cm on the depth ratio piping lane basis of dummy section.
8. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 7 excavates structure, it is characterised in that described to face The depth depth 10cm on the depth ratio piping lane basis of dummy section.
9. Urban Underground piping lane hard rock mass rope saw cut as claimed in claim 1 excavates structure, it is characterised in that the water Between a diameter of 70mm-100mm in flat rope saw hole.
CN201720272514.1U 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavates structure Active CN207032288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720272514.1U CN207032288U (en) 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavates structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720272514.1U CN207032288U (en) 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavates structure

Publications (1)

Publication Number Publication Date
CN207032288U true CN207032288U (en) 2018-02-23

Family

ID=61472837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720272514.1U Active CN207032288U (en) 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavates structure

Country Status (1)

Country Link
CN (1) CN207032288U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648248A (en) * 2020-06-08 2020-09-11 浙江万里建设工程有限公司 Method for constructing cliff abutment of rhinestone

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648248A (en) * 2020-06-08 2020-09-11 浙江万里建设工程有限公司 Method for constructing cliff abutment of rhinestone

Similar Documents

Publication Publication Date Title
CN103234403B (en) Static blasting construction method for highway tunnel
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN102337919B (en) A four-period-five-purpose hole-drilling high-efficiency gas extracting process
CN104947690B (en) Grooving construction method for embedding underground continuous wall into rock
CN107023033A (en) Urban Underground piping lane hard rock mass rope saw cut excavation method
JPS626024A (en) Method and apparatus for inserting casing so as to pierce weak ground or structure
CN105155516B (en) The method of construction drill bored concrete pile before making an overall screening underground obstacle
CN103774690A (en) Grabbing, drilling and punching combined underground continuous wall grooving construction method
CN106014421B (en) A kind of limited rock tunnel excavation method of concussion of blasting
CN106194193A (en) The auxiliary excavation method of a kind of group hole, big cross section vertical shaft non-explosion large aperture
CN206644159U (en) Hard rock mass rope saw cut structure
CN108547628B (en) Quick construction method for pipe-jacking working well in upper-soft and lower-hard stratum
CN207032288U (en) Urban Underground piping lane hard rock mass rope saw cut excavates structure
CN204825923U (en) Relay formula underground structure
KR101254090B1 (en) Guide apparatus for boring
CN113047844A (en) Sinking pipe sheet type vertical shaft construction method
Calin et al. Dewatering system of a deep of excavation in urban area–Bucharest case study
CN208396651U (en) Rectangle pile foundation drilling construction equipment
JP2010522289A (en) Rock blasting method for constructing foundation of transmission tower
JP3967473B2 (en) Construction method of underground structure
KR101388101B1 (en) Constructing method of underwater anchor using diamond wiring
CN205100226U (en) Underground continuous wall goes into rock grooving construction equipment
JP2009235807A (en) Dismantling and removal construction method of underground structure
CN104762989A (en) Method for speeding up diaphragm retaining wall construction at hard rock strata
KR100997117B1 (en) Excavator used in excavation method using wire saw

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant