CN207018027U CN201720915636.8U CN201720915636U CN207018027U CN 207018027 U CN207018027 U CN 207018027U CN 201720915636 U CN201720915636 U CN 201720915636U CN 207018027 U CN207018027 U CN 207018027U
Authority
CN
China
Prior art keywords
mining area
sump
area sump
exploiting field
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720915636.8U
Other languages
Chinese (zh)
Inventor
白向东
贺坤
胡立年
段旭峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jincheng Hewei Planning And Design Group Co ltd
Original Assignee
Jincheng Coal Planning And Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jincheng Coal Planning And Design Institute filed Critical Jincheng Coal Planning And Design Institute
Priority to CN201720915636.8U priority Critical patent/CN207018027U/en
Application granted granted Critical
Publication of CN207018027U publication Critical patent/CN207018027U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fertilizing (AREA)

Abstract

A kind of simple mining area sump in underground, belongs to mining areas of mine drainage system technical field, and technical problem to be solved is to provide the mining area sump that a kind of simple structure is practical, is easy to construct and clears up, used technical scheme:Two connection roadways of mining area sump passage, exploiting field drainage point between the intake of exploiting field, drainpipe and three water pumps are provided with exploiting field drainage point, mining area sump includes the first mining area sump and the second mining area sump being arranged between the intake of exploiting field, the first mining area sump and the second mining area sump are opened on the arrangement of going down the hill of mining area sump passage, the first mining area sump and the second mining area sump with mining area sump passage junction using step simultaneously;Absorbing well, absorption well is three inclined shafts for being opened on exploiting field drainage point, and is equipped with suction hose in three inclined shafts, and water distribution drift connects absorbing well, absorption well with mining area sump, and the utility model is applied to mine drainage.

Description

A kind of simple mining area sump in underground
Technical field
A kind of simple mining area sump in underground, belongs to mining areas of mine drainage system technical field.
Background technology
Mining areas of mine should form perfect drainage system in arrangement.Current exploiting field drainage system is often with reference to main row Water system is set:Major and minor sump, pump house, water suction The Small Well etc. are arranged, the quantities of this drainage system is larger, constructional difficulties, Cleaning is also inconvenient.
Utility model content
Technical problem to be solved in the utility model is to provide that a kind of simple structure is practical, be easy to construct and that clears up adopts Area's sump.
In order to solve the above technical problems, technical scheme used by the utility model:
A kind of simple mining area sump in underground, including mining area sump passage, exploiting field drainage point, mining area sump, absorbing well, absorption well, water distribution Lane;
Two connection roadways of the mining area sump passage, exploiting field drainage point between the intake of exploiting field, in the exploiting field Drainage point is provided with drainpipe and three water pumps, the water pump are installed on foundation for water pumps;
The mining area sump includes the first mining area sump and the second mining area sump being arranged between the intake of exploiting field, and And first mining area sump and the second mining area sump each parallel to exploiting field intake;First mining area sump and the second exploiting field water simultaneously Storehouse is opened on mining area sump passage, the first mining area sump and the second mining area sump and uses step with mining area sump passage junction The arrangement of going down the hill of formula;
The absorbing well, absorption well is three inclined shafts for being opened on exploiting field drainage point, and is equipped with suction in three inclined shafts Water pipe, every suction hose provide power by a corresponding water pump of exploiting field drainage point respectively, and the water distribution drift is by absorbing well, absorption well with adopting Area's sump connection.
The junction of the water distribution drift and mining area sump is provided with partition wall.
The junction of the mining area sump passage and mining area sump is in easy flights in 24 °;
The absorbing well, absorption well is in easy flights in 45 °;
The mining area sump available capacity should meet the exploiting field norm al discharge rate for accommodating 4h.
Compared to the prior art the utility model has the advantages that.
First, the utility model has the use function of main sump, and water pump is arranged in connection roadway, saves quantities;Will Sump is arranged in parallel, lifting of being turned round when avoiding clearing up sump;Absorbing well, absorption well is in tilted layout, is easy to construction and the maintenance of water pump.Such as This design had both met the sufficient requirement of capacity of sump, in turn ensure that normal usage function, while also saved engineering cost, side Construction, general exploiting field drainage requirement can be met, underground mining area sump can be widely used in, there is significant economic benefit.
2nd, the utility model mining area sump is not preferably greater than 24 ° of cloth of going down the hill with mining area sump passage junction using the gradient Put, and step is set, be convenient to clean lifting during sump, the setting of step is also convenient for being overhauled.
3rd, the utility model sets partition wall in water distribution drift and mining area sump junction, when the first mining area sump or second During one of mining area sump cleaning of mining area sump, partition wall can be blocked, another mining area sump water burst can still pass through water distribution Lane enters absorbing well, absorption well, easy to use.
Brief description of the drawings
Fig. 1 is schematic diagram of the present utility model.
Fig. 2 is Fig. 1 A-A profiles.
Fig. 3 is water pump layout drawing.
In figure, 1 is mining area sump passage, and 2 be exploiting field drainage point, and 3 be the first mining area sump, and 4 be absorbing well, absorption well, and 5 be water distribution Lane, 6 be foundation for water pumps, and 7 be water pump, and 8 be suction hose, and 9 be drainpipe, and 10 be the second mining area sump, and 11 be exploiting field intake.
Embodiment
As shown in Figure 1-Figure 3, the simple mining area sump in a kind of underground, including mining area sump passage 1, exploiting field drainage point 2, exploiting field Sump, absorbing well, absorption well 4, water distribution drift 5;
Two connection roadways of the mining area sump passage 1, exploiting field drainage point 2 between exploiting field intake 11, described Exploiting field drainage point 2 is provided with drainpipe 9 and three water pumps 7, and the water pump 7 is installed on foundation for water pumps 6;
The mining area sump includes the first mining area sump 3 and the second mining area sump being arranged between the intake of exploiting field 10, and the first mining area sump 3 and the second mining area sump 10 are each parallel to exploiting field intake 11;First mining area sump 3 simultaneously Mining area sump passage 1, the first mining area sump 3 and the second mining area sump 10 and mining area sump are opened on the second mining area sump 10 The junction of passage 1 goes down the hill to arrange using step;
The absorbing well, absorption well 4 is three inclined shafts for being opened on exploiting field drainage point 2, and is equipped with three inclined shafts Suction hose 8, every suction hose 8 provide power by a corresponding water pump 7 of exploiting field drainage point 2 respectively, and the water distribution drift 5 will absorb water Well 4 connects with mining area sump.
The junction of the water distribution drift 5 and mining area sump is provided with partition wall.
The junction of the mining area sump passage 1 and mining area sump is in easy flights in 24 °;
The absorbing well, absorption well 4 is in easy flights in 45 °;
The mining area sump available capacity should meet the exploiting field norm al discharge rate for accommodating 4h.
The foundation for water pumps 6 is prior art, is that concreting is installed in the water pump 7 that the ground of exploiting field drainage point 2 is formed Face.
The subsidiary draining of the suction hose 8, drainpipe 9 and the function of pump water.
The utility model is simple in construction, easy to use, saving cost, easily construction, can meet that hydrogeologic condition is not multiple The mining area sump of the exploiting field drainage requirement miscellaneous, water yield is little.
Above-described embodiment is the explanation to the utility model structure and unrestricted, is not departing from the utility model principle premise Lower made deformation is also within the scope of protection of the utility model.

Claims (3)

  1. A kind of 1. simple mining area sump in underground, it is characterised in that:Including mining area sump passage(1), exploiting field drainage point(2), exploiting field Sump, absorbing well, absorption well(4), water distribution drift(5);
    The mining area sump passage(1), exploiting field drainage point(2)For exploiting field intake(11)Between two connection roadways, in institute State exploiting field drainage point(2)Provided with drainpipe(9)And three water pumps(7), the water pump(7)It is installed on foundation for water pumps(6);
    The mining area sump includes the first mining area sump being arranged between the intake of exploiting field(3)With the second mining area sump (10), and the first mining area sump(3)With the second mining area sump(10)Each parallel to exploiting field intake(11);First adopt simultaneously Area's sump(3)With the second mining area sump(10)It is opened on mining area sump passage(1), the first mining area sump(3)With the second exploiting field Sump(10)With mining area sump passage(1)Junction goes down the hill to arrange using step;
    The absorbing well, absorption well(4)To be opened on exploiting field drainage point(2)Three inclined shafts, and be equipped with three inclined shafts Suction hose(8), every suction hose(8)Respectively by exploiting field drainage point(2)A corresponding water pump(7)Power, the water distribution are provided Lane(5)By absorbing well, absorption well(4)Connected with mining area sump.
  2. A kind of 2. simple mining area sump in underground according to claim 1, it is characterised in that:In the water distribution drift(5)With adopting The junction of area's sump is provided with partition wall.
  3. A kind of 3. simple mining area sump in underground according to claim 1 or 2, it is characterised in that:The mining area sump passage (1)It is in easy flights in 24 ° with the junction of mining area sump;
    The absorbing well, absorption well(4)It is in easy flights in 45 °;
    The mining area sump available capacity should meet the exploiting field norm al discharge rate for accommodating 4h.
CN201720915636.8U 2017-07-26 2017-07-26 A kind of simple mining area sump in underground Active CN207018027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720915636.8U CN207018027U (en) 2017-07-26 2017-07-26 A kind of simple mining area sump in underground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720915636.8U CN207018027U (en) 2017-07-26 2017-07-26 A kind of simple mining area sump in underground

Publications (1)

Publication Number Publication Date
CN207018027U true CN207018027U (en) 2018-02-16

Family

ID=61481310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720915636.8U Active CN207018027U (en) 2017-07-26 2017-07-26 A kind of simple mining area sump in underground

Country Status (1)

Country Link
CN (1) CN207018027U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386224A (en) * 2018-04-27 2018-08-10 山西拓普沃特工程技术有限公司 A kind of mine sump structure and its construction method
CN110939481A (en) * 2019-12-18 2020-03-31 临沂矿业集团菏泽煤电有限公司 Coal mine underground shared water absorption system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386224A (en) * 2018-04-27 2018-08-10 山西拓普沃特工程技术有限公司 A kind of mine sump structure and its construction method
CN110939481A (en) * 2019-12-18 2020-03-31 临沂矿业集团菏泽煤电有限公司 Coal mine underground shared water absorption system
CN110939481B (en) * 2019-12-18 2022-02-25 临沂矿业集团菏泽煤电有限公司 Coal mine underground shared water absorption system

Similar Documents

Publication Publication Date Title
CN204589762U (en) A kind of floor tile splash-proof combining structure
CN207018027U (en) A kind of simple mining area sump in underground
CN206835769U (en) A kind of rainwater-collecting irrigation rig
CN106320433A (en) Urban road rainwater collection structure
CN205688460U (en) Pipe gallery system with sponge city function
CN203383854U (en) Buffering system for solving problem of tunnel local sudden water burst
CN206581977U (en) A kind of tunnel bottom discharge structure
CN206368389U (en) One kind backwash and sewage sucking system
CN204435529U (en) United villa subsurface stormwater concentrates discharge structure
CN208907237U (en) A kind of green building rainwater structure can be recycled
CN205894090U (en) Job site fire water cyclic utilization device
CN206457734U (en) A kind of double layer reinforced concrete box culvert
CN206158752U (en) A waste water pump house arrangement structure for quasi -rectangular shield tunnel
CN203383853U (en) Buffering system for solving problem of insufficient drainage ability of tunnel central ditch
CN205934836U (en) Take outlet water pool formula box culvert structure
CN210238709U (en) Reduce drainage structure of utility tunnel sump pit quantity
CN107700786A (en) A kind of energy-saving water collecting floor and its collection device
CN201620914U (en) Imitated heart structure coal mine drainage system
CN202755379U (en) Communication section working well for long-distance large-pipe-diameter underground water delivery main pipe system
CN202325677U (en) Drainage structure at position of tunnel deformation seam
CN207672364U (en) Water on urban streets tapping equipment
CN203741983U (en) Deep foundation pit rainwater detention pond
CN206801613U (en) A kind of colliery distribution well drainage system
CN208933985U (en) A kind of guiding gutter of underground engineering top plate
CN105484286A (en) Green gravity type soil retaining structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230106

Address after: No. 2079, Baishui East Street, Jincheng City, Shanxi Province, 048028

Patentee after: Jincheng Hewei planning and Design Group Co.,Ltd.

Address before: No. 1012, Huanghua street, Jincheng City, Shanxi Province 048000