CN207016808U - The shackle structure of blast furnace down-comer - Google Patents
The shackle structure of blast furnace down-comer Download PDFInfo
- Publication number
- CN207016808U CN207016808U CN201720844077.6U CN201720844077U CN207016808U CN 207016808 U CN207016808 U CN 207016808U CN 201720844077 U CN201720844077 U CN 201720844077U CN 207016808 U CN207016808 U CN 207016808U
- Authority
- CN
- China
- Prior art keywords
- comer
- shackle
- arc
- stiffener
- paired
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The shackle structure of blast furnace down-comer, including down-comer are the utility model is related to, down-comer side face is welded with a pair of arcs, and arc is fan annular, and perpendicular to down-comer shaft orientation layout;Paired stiffener is provided between paired arc, down-comer side face is welded on the downside of stiffener, and parallel to down-comer axial direction, arc is respectively welded in both ends, and the central angle of arc fan annular is 80~180 °;Shackle plate is additionally provided between paired stiffener, down-comer side face is welded on the downside of shackle plate, and arc is respectively welded parallel to down-comer axial direction, both ends, shackle plate is provided with lifting hole(eyelet).The shackle structure of above-mentioned blast furnace down-comer, can be more balanced share lifting stress, shearing force suffered by reducing tube wall, by the shackle structure, can directly be lifted, without the reinforcement of weld part in down-comer, after the completion of lifting, shackle structure can be permanently kept in pipeline periphery, save dismantlement work, it is cost-saved, reduce construction risk.
Description
Technical field
It the utility model is related to the down-comer shackle structure of blast furnace.
Background technology
In blast furnace ironmaking process, raw gas can be produced, raw gas reaches gravitational precipitator, coal by raw gas induction system
Gas holder storage is delivered to after gas dedusting again.Blast furnace down-comer be belong in crude gas system be used for connect five-way ball with again
The important feature of inertia force precipitator.
Down-comer have the characteristics that it is high, again, long, tube sheet is thin, complicated, setting angle tilts, also need to pacify on down-comer
The accessory structures such as steel loading ladder, balance pipe, this is extremely difficult when causing down-comer lifting to be installed.
For example, common downcomer structure gross weight is between 90~130 tons, and the tube plate thickness one at down-comer suspension centre
As only 16~25mm, according to mechanics check computation, the tube sheet at suspension centre can not meet lift intensity requirement.Existing solution method,
Temperature pier need to be carried out declining pipeline interior welds " rice " shaped steel at drop tee T, treat rigging out, then by " rice " font
Shaped steel is cut and disassembled, and clears up inwall.Worker is needed to enter when aforesaid operations mode, welding, removing tedious process, and removing
Operation in the pipeline of side oblique air, security risk are very high.
Utility model content
Technical problem to be solved in the utility model is:A kind of shackle structure of blast furnace down-comer is provided, it is dispersible to hang
Stress during dress, it is damaged when avoiding lifting pipeline.
Technical scheme is used by the utility model solves its technical problem:
The shackle structure of blast furnace down-comer, including down-comer, the down-comer side face are welded with a pair of parallel arcs,
The arc is the fan annular being adapted to down-comer side face, and fans annular plane perpendicular to down-comer shaft orientation layout, described
The central angle of arc fan annular is 80~180 °;
Paired stiffener is provided between the paired arc, down-comer side face is welded on the downside of stiffener, and
Parallel to down-comer axial direction, paired arc is respectively welded in stiffener both ends;
Shackle plate is additionally provided between paired stiffener, down-comer side face is welded on the downside of the shackle plate, and it is parallel
In down-comer axial direction, paired arc is respectively welded in shackle plate both ends, and shackle plate is provided with lifting hole(eyelet).
Further, the angle at the downside both ends of the stiffener, and the angle at the downside both ends of shackle plate, point
Not Ju You chamfering, osculum is formed at chamfering.
Further, it is 90~160 ° that the arc, which fans annular central angle, the spacing of the arc in pairs for 500~
800mm。
Further, two pieces of parallel shackle plates are provided between the paired stiffener, the shackle plate is set
It is equipped with two lifting hole(eyelet)s;The stiffener and shackle plate are rectangular slab.
The beneficial effects of the utility model are:The shackle structure of above-mentioned blast furnace down-comer, can be more balanced share lifting
Stress, shearing force suffered by reduction tube wall, by the shackle structure, can directly be lifted, without the reinforcement of weld in down-comer
Part, after the completion of lifting, shackle structure can be permanently kept in pipeline periphery, save dismantlement work, cost-saved, reduce construction
Risk.
Brief description of the drawings
Fig. 1 is shackle structure schematic top plan view of the present utility model;
Fig. 2 is shackle structure left view schematic diagram of the present utility model;
Reference is in figure:Down-comer 1, arc 2, stiffener 3, shackle plate 4, lifting hole(eyelet) 41.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples:
The shackle structure of blast furnace down-comer, including down-comer 1, the side face of down-comer 1 are welded with a pair of parallel arcs
Plate 2, the arc 2 is the fan annular being adapted to the side face of down-comer 1, and fans the plane of annular perpendicular to 1 axial cloth of down-comer
Office, the central angle that the arc 2 fans annular are 80~180 °;
Paired stiffener 3 is provided between the paired arc 2, the downside of stiffener 3 is welded on down-comer 1 week
Face, and, paired arc 2 is respectively welded in the both ends of stiffener 3 parallel to down-comer 1 axially;
Shackle plate 4 is additionally provided between paired stiffener 3, the downside of shackle plate 4 is welded on the side face of down-comer 1, and
Parallel to down-comer 1 axially, paired arc 2 is respectively welded in the both ends of shackle plate 4, and shackle plate 4 is provided with lifting hole(eyelet) 41.
This shackle structure, it is that arc 2, stiffener 3 and shackle plate 4, dispersible lifting are set in the outer peripheral face of down-comer 1
When stress, reduce tube wall suffered by shearing force, avoid piping failure, therefore can directly be lifted by shackle structure, no
Used in pipeline interior welds reinforcer.
Specifically, as shown in Figure 1, 2, shackle structure includes a pair of parallel arc 2, is welded on the side face of down-comer 1.Arc
Shape plate 2 fans annular, and internal diameter size is adapted to the side face external diameter of down-comer 1, and fans annular place plane perpendicular to the axial direction of down-comer 1.
As shown in Fig. 2 the inner arc end of arc 2 and the side face full weld of down-comer 1.
As shown in figure 1, paired stiffener 3, between paired arc 2, the downside of stiffener 3 and down-comer 1 are full
Weldering, the both ends of stiffener 3 respectively with the full weld of arc 2.
For shackle plate 4 between paired stiffener 3, shackle plate 4 is equally downside and the full weld of down-comer 1, and both ends are distinguished
With the full weld of arc 2.
Shackle plate 4 is provided with lifting hole(eyelet) 41 and connected for Current Collector Sleave, above-mentioned arc 2, stiffener 3, shackle plate 4 and pipeline
Weld simultaneously, stress during lifting can be shared, shearing force suffered by reduction tube wall, prevent from destroying.
According to the size of down-comer 1, the central angle that arc 2 fans annular under normal circumstances is 80~180 °, shackle structure institute
Suitable thickness is selected with steel plate, you can meets lifting requirements.Down-comer 1 can be lifted directly, be reinforced without being set in pipeline
Part, after rigging out, shackle structure does not have to remove, and escapable cost, reduces operating risk.
Shackle structure of the present utility model, it can preferably use the identical steel manufacture of down-comer.It is furthermore preferred that size can be with
It is that arc 2 fans annular central angle as 90~160 °, the spacing of the arc 2 in pairs is 500~800mm.
According to circumstances, can be the stiffener 3 downside both ends angle, and the downside both ends of shackle plate 4
Angle, respectively with chamfering, osculum is formed at chamfering.
Such as stiffener 3 is rectangular slab, then the right angle of its underpart two carries out chamfered, is on the one hand easy to welding, separately
On the one hand osculum can be used as, avoids rainwater from accumulating for a long time between the plate of shackle structure.Similarly, shackle plate 4 can also be
For rectangular slab, chamfering can also be set into osculum.
The quantity of shackle plate 4 can also be selected according to circumstances, can be preferably to set two pieces of parallel shackle plates 4, be hung
Otic placode 4 can set one or two lifting hole(eyelet) 41, be easy to connect.
Claims (4)
1. the shackle structure of blast furnace down-comer, including down-comer (1), it is characterised in that down-comer (1) side face is welded with flat
Capable a pair of arcs (2), the arc (2) is the fan annular being adapted to down-comer (1) side face, and the plane for fanning annular is hung down
Directly in down-comer (1) shaft orientation layout, the central angle of arc (2) the fan annular is 80~180 °;
Paired stiffener (3) is provided between the paired arc (2), down-comer (1) is welded on the downside of stiffener (3)
Side face, and, paired arc (2) is respectively welded in stiffener (3) both ends parallel to down-comer (1) axially;
Shackle plate (4) is additionally provided between paired stiffener (3), down-comer (1) week is welded on the downside of the shackle plate (4)
Face, and, paired arc (2) is respectively welded in shackle plate (4) both ends, and shackle plate (4) is provided with parallel to down-comer (1) axially
Lifting hole(eyelet) (41).
2. the shackle structure of blast furnace down-comer as claimed in claim 1, it is characterised in that the downside two of the stiffener (3)
The angle at end, and the angle at the downside both ends of shackle plate (4), respectively with chamfering, osculum is formed at chamfering.
3. the shackle structure of blast furnace down-comer as claimed in claim 1, it is characterised in that arc (2) the fan annular circle
Heart angle is 90~160 °, and the spacing of the arc (2) in pairs is 500~800mm.
4. the shackle structure of blast furnace down-comer as claimed in claim 1, it is characterised in that the paired stiffener (3) it
Between be provided with two pieces of parallel shackle plates (4), the shackle plate (4) is provided with two lifting hole(eyelet)s (41);It is described to put more energy into
Plate (3) and shackle plate (4) are rectangular slab.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720844077.6U CN207016808U (en) | 2017-07-12 | 2017-07-12 | The shackle structure of blast furnace down-comer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720844077.6U CN207016808U (en) | 2017-07-12 | 2017-07-12 | The shackle structure of blast furnace down-comer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207016808U true CN207016808U (en) | 2018-02-16 |
Family
ID=61484460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720844077.6U Active CN207016808U (en) | 2017-07-12 | 2017-07-12 | The shackle structure of blast furnace down-comer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207016808U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111621608A (en) * | 2020-06-17 | 2020-09-04 | 中国二十二冶集团有限公司 | Blast furnace down pipe spraying construction device and construction method |
-
2017
- 2017-07-12 CN CN201720844077.6U patent/CN207016808U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111621608A (en) * | 2020-06-17 | 2020-09-04 | 中国二十二冶集团有限公司 | Blast furnace down pipe spraying construction device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106395628B (en) | A kind of method of the aerial group pair of heavy tower equipment segmental hoisting | |
CN207016808U (en) | The shackle structure of blast furnace down-comer | |
CN105200173A (en) | Cross construction method of replacing furnace shells and cooling walls of blast furnaces | |
CN105781205B (en) | A kind of guider in place of the aerial group pair of heavy tower equipment segmental hoisting | |
CN110241285A (en) | Converter mouth petticoat pipe more changing device, replacement structure and replacing options | |
CN203284773U (en) | Pipe pile connecting structure and pipe pile foundation | |
CN209702791U (en) | Suspender is used in a kind of dismounting of blast furnace bustle pipe | |
CN203877726U (en) | Multi-hoisting-point hoisting beam for turning over and hoisting equipment | |
CN206988279U (en) | The mounting structure of glass production steel rider | |
CN103193148A (en) | Railway locomotive roof lifting component and lifting frame | |
CN206536146U (en) | A kind of magnetic absorption metal welds fire welding device | |
CN102001583A (en) | Semi-automatic brick hanging fixture | |
CN204854313U (en) | A unloading pipe for inside electric arc furnace | |
CN206701988U (en) | A kind of school sired results dress of vanadium titanium ironmaking hot-metal bottle | |
CN208234378U (en) | A kind of safty hoisting device | |
CN105712183B (en) | A kind of high angle belt conveyer special hanger | |
CN204265799U (en) | Large thin-wall rotary type steel casting heat treatment tooling | |
CN207005486U (en) | Assembled steel airduct inverted structure | |
CN206157205U (en) | Can superimposed wire rod thermal treatment work or material rest | |
CN207016828U (en) | A kind of strong convection annealing furnace pallet assembly | |
CN206635373U (en) | A kind of free movement support structures of radiant tube | |
CN201988455U (en) | Cyclone separator | |
CN101259525A (en) | Large-scale hot-metal bottle | |
CN203049569U (en) | Reinforcing structure of large-diameter filling pile reinforcement cage | |