CN207005492U - A kind of equipment that can improve gas bellows road integrated molding - Google Patents

A kind of equipment that can improve gas bellows road integrated molding Download PDF

Info

Publication number
CN207005492U
CN207005492U CN201720784664.0U CN201720784664U CN207005492U CN 207005492 U CN207005492 U CN 207005492U CN 201720784664 U CN201720784664 U CN 201720784664U CN 207005492 U CN207005492 U CN 207005492U
Authority
CN
China
Prior art keywords
gas bellows
storage groove
equipment
bellows road
integrated molding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720784664.0U
Other languages
Chinese (zh)
Inventor
周同林
韩正伟
周同生
吕俊杰
陈亮亮
李建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SHENKANG TUBE INDUSTRY Co Ltd
Original Assignee
ZHEJIANG SHENKANG TUBE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SHENKANG TUBE INDUSTRY Co Ltd filed Critical ZHEJIANG SHENKANG TUBE INDUSTRY Co Ltd
Priority to CN201720784664.0U priority Critical patent/CN207005492U/en
Application granted granted Critical
Publication of CN207005492U publication Critical patent/CN207005492U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of equipment that can improve gas bellows road integrated molding, including gas bellows road, the outside in gas bellows road is provided with pipe storage groove, the side of pipe storage groove is provided with sealing slip lid, the both ends of sealing slip lid are provided with sliding connection block, sealing strip is provided with the inside of sliding connection block, gas bellows road is internally provided with PE mould release membrances, soft metal pipe is provided with the outside of PE mould release membrances, corrosion-inhibiting coating is provided with the outside of soft metal pipe, pipe storage groove is internally provided with insulating layer, the surface of insulating layer is provided with sun-proof paint.The utility model is a kind of equipment that can improve gas bellows road integrated molding, the pipeline can be bent, eliminate the joint of centre, cost-effective resource, also just reduce gas leakage point, improve the security used, there is good corrosion resistance, it will not be cracked, the structure of bellows also plays the effect of anti-settling antidetonation.

Description

A kind of equipment that can improve gas bellows road integrated molding
Technical field
A kind of gas bellows road is the utility model is related to, more particularly to one kind can improve gas bellows road and integrally be melted into The equipment of type.
Background technology
Gas bellows road is exactly the pipeline of transporting combustible gases, and it is different according to the medium of conveying, and dosage is different, and root The material of conveyance conduit, bore, specification etc. is determined according to needing, some special gases also want particular design, combustion gas ripple During pipeline construction, to avoid body weld seam should carry out mark in advance towards metope, the unconspicuous pipeline of weld seam, be laid in pipeline The installation of copper pipe or corrugated stainless steel tubing in vertical shaft, carried out after map and other pipeline constructions, Pipeline Crossing Program erects Jacketed pipe is answered during partition panel in well, there should be the spacing not less than 5mm between sleeve pipe and pipeline, the combustion gas copper pipe or stainless secretly buried Corrugated steel pipe should not be in contact with various metals and electric wire, when that can not avoid, be separated using insulating materials, gas bellows road The hole of passing through floors preferably from top drilling downwards, successively vertically determines lower floor's hole location, because of upper strata and lower floor with weight Wall wall thickness is different and when can not fall in a line, preferably make that second word is curved to be allowed to avoid being turned to pipe fitting by wall, interior is bright to set gaseous combustion wave It the japanning of line pipeline and its conduit fittings, should carry out after real pressing lattice are examined, during using steel-pipe welding, should be carried out after derusting Japanning, first by whole commissure brush twice anti-corrosive primers, then in comprehensive brushing twice anti-corrosive primer and twice finish paint, using plating When zinc steel tube screw thread connects, one of anti-corrosive primer should be first brushed after the installation of remaining pipe fitting junction, then comprehensive brushing twice face again Paint.
On the basis of the technical conditions in existing gas bellows road, scope and convenience in pipeline using installation On many deficiencies still be present, most gas bellows road still based on galvanized pipe, using bright dress, is walked outside wall, but with Growth in the living standard, it is found that so dress greatly can all influence attractive in appearance, the conduit hardness is stronger, bending place Transition joint is also required to, will be declined using lower corrosion resistance for a long time while the generation of cracking situation easily occurs, shorten combustion gas The service life of corrugated conduit.
Utility model content
The technical problems to be solved in the utility model is the defects of overcoming prior art, there is provided one kind can improve combustion gas ripple The equipment of pipeline integrated molding, the pipeline can be bent, and eliminated the joint of centre, improved the security used, be had good Good corrosion resistance, will not be cracked, the advantage of long lifespan, and the structure of bellows also plays the effect of anti-settling antidetonation.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:
A kind of equipment that can improve gas bellows road integrated molding of the utility model, including gas bellows road, institute The outside for stating gas bellows road is provided with pipe storage groove, and the side of the pipe storage groove is provided with sealing slip lid, described The both ends of sealing slip lid are provided with sliding connection block, and sealing strip, the gaseous combustion wave are provided with the inside of the sliding connection block Line pipeline is internally provided with PE mould release membrances, and soft metal pipe, the soft metal pipe are provided with the outside of the PE mould release membrances Outside be provided with corrosion-inhibiting coating, the pipe storage groove is internally provided with insulating layer, and the surface of the insulating layer is provided with Sun-proof paint.
As a kind of optimal technical scheme of the present utility model, the gas bellows road socket-connects with pipe storage groove.
As a kind of optimal technical scheme of the present utility model, the pipe storage groove is with sealing slip lid by being slidably connected Block is flexibly connected.
As a kind of optimal technical scheme of the present utility model, the corrosion-inhibiting coating has highdensity polythene material to make Form.
As a kind of optimal technical scheme of the present utility model, the insulating layer is made by silicide heat insulation foam.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model is a kind of equipment that can improve gas bellows road integrated molding, can effectively improve combustion gas Corrugated conduit uses fitting limit and convenience, and the pipeline can be bent, eliminate centre joint, cost-effective resource, Also just reduce gas leakage point, improve the security used, there is good corrosion resistance, will not be cracked, the advantage of long lifespan, The structure of bellows also plays the effect of anti-settling antidetonation.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and a part for constitution instruction, with this practicality New embodiment is used to explain the utility model together, does not form to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is one of internal structure schematic diagram of the present utility model;
Fig. 3 is the two of internal structure schematic diagram of the present utility model;
Fig. 4 is partial structural diagram of the present utility model;
In figure:1st, gas bellows road;2nd, pipe storage groove;3rd, slip lid is sealed;4th, sliding connection block;5th, PE mould release membrances; 6th, soft metal pipe;7th, corrosion-inhibiting coating;8th, insulating layer;9th, sun-proof paint;10th, sealing strip.
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
Embodiment 1
As Figure 1-4, the utility model provides a kind of equipment that can improve gas bellows road integrated molding, including Gas bellows road 1, the outside in gas bellows road 1 are provided with pipe storage groove 2, and the side of pipe storage groove 2 is provided with close Slip lid 3 is sealed, the both ends of sealing slip lid 3 are provided with sliding connection block 4, and the inner side of sliding connection block 4 is provided with sealing strip 10, combustion Gas corrugated conduit 1 is internally provided with PE mould release membrances 5, and the outside of PE mould release membrances 5 is provided with soft metal pipe 6, soft metal pipe 6 Outside be provided with corrosion-inhibiting coating 7, pipe storage groove 2 is internally provided with insulating layer 8, and the surface of insulating layer 8 is provided with sun-proof Paint 9.
Further, gas bellows road 1 socket-connects with pipe storage groove 2, and gas bellows road 1 is deposited and pipe storage It is convenient that it is protected inside groove 2.
Pipe storage groove 2 is flexibly connected with sealing slip lid 3 by sliding connection block 4, convenient to enter line slip to sealing slip lid 3 Split, operation is very convenient.
Corrosion-inhibiting coating 7 has highdensity polythene material to be made, high density polyethylene (HDPE) to be nontoxic, tasteless, odorless, it With good heat resistance and cold resistance, chemical stability is good, insoluble in any organic solvent, acid and alkali resistance and various salts Corrosion.
Insulating layer 8 is made by silicide heat insulation foam, is had excellent chemical stability, can be resisted most of corrosion The invasion and attack of agent, there is stabilization, high-low temperature resistant, the good feature of heat insulating effect.
Specifically, pipe storage groove 2 when using installing, can carry out inside wall by the utility model in advance Installation, can be installed in gas bellows road 1 after installing inside pipe storage groove 2, because the pipeline can be bent, The joint of centre is eliminated, cost-effective resource, also just reduces gas leakage point, security is improved, can pacify after installing Dress sealing slip lid 3, can be sealed by sliding connection block 4 in the 2 enterprising line slip of pipe storage groove by sealing strip 10, Pipeline can improve the corrosion resistance of pipeline by corrosion-inhibiting coating 7, can carry out thermal insulation by insulating layer 8 on pipe storage groove 2, use During may can locally carry out Exposure to Sunlight, can play anti-sunlight function by the sun-proof paint 9 of setting, keep internal temperature.
The equipment can effectively improve gas bellows road and use fitting limit and convenience, and the pipeline can be with curved Song, the joint of centre is eliminated, cost-effective resource, also just reduces gas leakage point, improves the security used, had good Good corrosion resistance, will not be cracked, the advantage of long lifespan, and the structure of bellows also plays the effect of anti-settling antidetonation.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Carry out equivalent substitution.All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc., It should be included within the scope of protection of the utility model.

Claims (5)

1. a kind of equipment that can improve gas bellows road integrated molding, including gas bellows road(1), it is characterised in that The gas bellows road(1)Outside be provided with pipe storage groove(2), the pipe storage groove(2)Side be provided with it is close Seal slip lid(3), the sealing slip lid(3)Both ends be provided with sliding connection block(4), the sliding connection block(4)Inner side It is provided with sealing strip(10), the gas bellows road(1)Be internally provided with PE mould release membrances(5), the PE mould release membrances(5)'s Outside is provided with soft metal pipe(6), the soft metal pipe(6)Outside be provided with corrosion-inhibiting coating(7), the pipe storage Groove(2)Be internally provided with insulating layer(8), the insulating layer(8)Surface be provided with sun-proof paint(9).
A kind of 2. equipment that can improve gas bellows road integrated molding according to claim 1, it is characterised in that institute State gas bellows road(1)With pipe storage groove(2)Socket-connect.
A kind of 3. equipment that can improve gas bellows road integrated molding according to claim 1, it is characterised in that institute State pipe storage groove(2)With sealing slip lid(3)Pass through sliding connection block(4)It is flexibly connected.
A kind of 4. equipment that can improve gas bellows road integrated molding according to claim 1, it is characterised in that institute State corrosion-inhibiting coating(7)There is highdensity polythene material to be made.
A kind of 5. equipment that can improve gas bellows road integrated molding according to claim 1, it is characterised in that institute State insulating layer(8)It is made by silicide heat insulation foam.
CN201720784664.0U 2017-07-01 2017-07-01 A kind of equipment that can improve gas bellows road integrated molding Expired - Fee Related CN207005492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720784664.0U CN207005492U (en) 2017-07-01 2017-07-01 A kind of equipment that can improve gas bellows road integrated molding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720784664.0U CN207005492U (en) 2017-07-01 2017-07-01 A kind of equipment that can improve gas bellows road integrated molding

Publications (1)

Publication Number Publication Date
CN207005492U true CN207005492U (en) 2018-02-13

Family

ID=61449694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720784664.0U Expired - Fee Related CN207005492U (en) 2017-07-01 2017-07-01 A kind of equipment that can improve gas bellows road integrated molding

Country Status (1)

Country Link
CN (1) CN207005492U (en)

Similar Documents

Publication Publication Date Title
CN101907206B (en) Steel-belt occlusion welding plastic-coated composite pipe and preparation method thereof
CN207005492U (en) A kind of equipment that can improve gas bellows road integrated molding
CN208816887U (en) A kind of high intensity two-ply plastic
CN204328250U (en) A kind of compound thermal insulation pipe
CN207112198U (en) A kind of steel strip reinforced PE helical bellowses for being easy to connection
CN213839886U (en) Anti-oxidation high-temperature-resistant seamless steel pipe
CN204493922U (en) A kind of insulation antiseptic petroleum pipeline
CN204358277U (en) A kind of anti-corrosion heat insulation pipe
CN203585598U (en) Mineral methane gas drainage pipe
CN201198928Y (en) Seal device of building wall through hole with guarding tube
CN2620810Y (en) Axial sealing anticorrusive internal and external covered non polar plastic steel pipe
CN204328242U (en) A kind of new type compound Glass Steel Tube
CN106764118A (en) A kind of intelligent heat preserving pipe
CN2537877Y (en) Plastic lining composite pipe
CN206432640U (en) A kind of HGCO hollow cables protection pipe
CN206874981U (en) A kind of gas steel pipeline anticorrosive heat-shrinkable double-wall pipe
CN205173750U (en) Stainless steel covers moulds hose
CN206582419U (en) A kind of anticorrosion HDPE double-wall corrugated pipes
CN216952178U (en) Composite connection high-strength wear-resistant drain pipe
CN218378365U (en) Prefabricated pipe fitting of heat supply plastic pipeline interface
CN205669654U (en) Interior anticorrosion pipeline joint connecting structure
CN212270211U (en) Corrosion-resistant galvanized steel wire
CN218153057U (en) Anticorrosive heat preservation steel pipe
CN213900347U (en) Direct-buried heat-insulation steel pipe
CN218032024U (en) Anticorrosive heat preservation elbow

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Can improve fashioned equipment of gas corrugated pipe integration

Effective date of registration: 20190131

Granted publication date: 20180213

Pledgee: Puyuan Branch of Zhejiang Tongxiang Rural Commercial Bank Co., Ltd.

Pledgor: Zhejiang Shenkang Tube Industry Co., Ltd.

Registration number: 2019330000053

PE01 Entry into force of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

Termination date: 20200701

CF01 Termination of patent right due to non-payment of annual fee