CN206999274U - One kind, which is used to preparing original state ardealite, lays bricks model forming machine - Google Patents

One kind, which is used to preparing original state ardealite, lays bricks model forming machine Download PDF

Info

Publication number
CN206999274U
CN206999274U CN201720786772.1U CN201720786772U CN206999274U CN 206999274 U CN206999274 U CN 206999274U CN 201720786772 U CN201720786772 U CN 201720786772U CN 206999274 U CN206999274 U CN 206999274U
Authority
CN
China
Prior art keywords
dual
core
core pulling
purpose pipe
forming machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720786772.1U
Other languages
Chinese (zh)
Inventor
王汉桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720786772.1U priority Critical patent/CN206999274U/en
Application granted granted Critical
Publication of CN206999274U publication Critical patent/CN206999274U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

It the utility model is related to and a kind of be used to preparing original state ardealite and lay bricks model forming machine, including lower operation layer, lower operation layer includes hydraulic base, bearing frame, Horizontal load-bearing plate, multigroup core pulling jacking apparatus, bearing frame is fixedly installed on the square flange of hydraulic base by screw rod, Horizontal load-bearing plate is fixedly installed on bearing frame by screw rod, and multigroup core pulling jacking apparatus is uniformly arranged on Horizontal load-bearing plate;Four vibrators are arranged with the surrounding of bearing frame;Core pulling jacking apparatus described in every group includes multiple core pullings and jacks dual-purpose pipe and multiple drawing core pipes, and multiple core pullings jack the both sides that dual-purpose pipe is arranged on multiple drawing core pipes;The top that dual-purpose pipe is jacked in each core pulling is equipped with dome brick card, and the top that dome brick card jacks dual-purpose pipe with core pulling is rotatably assorted;The dome brick card is T-shaped.The beneficial effects of the utility model are:High intensity, water-fast moistureproof light gypsum are prepared using original state ardealite, desulfurated plaster (direct use need not be pre-processed) to lay bricks model.

Description

One kind, which is used to preparing original state ardealite, lays bricks model forming machine
Technical field
Gypsum bricklaying production line equipment technical field is the utility model is related to, more particularly to it is a kind of for preparing original state phosphorus stone Cream is laid bricks model forming machine.
Background technology
Gypsum block is a kind of novel building internal partition wall material of function admirable, has the characteristics such as insulation, energy-conservation and fire prevention, Therefore it is used widely in building material industry.Gypsum block forming machine, refer to gypsum slurry in die cavity natural coagulation shaping after, Again by hydraulic cylinder by the plant equipment of building block ejection device.Because building block is nature shaping, its low strength, particularly work as gypsum Slurry is more sticky, poor fluidity when, slurry skewness in die cavity, the block strength produced is relatively low.
Main material building gypsum plaster used in conventional gypsum brick laying forming machines is poured after adding water stirring by convertible batcher Build in mould, die cavity is ejected by hydraulic cylinder after 24 pieces, ten minutes of disposal molding, then transfer into maintenance journey through mechanical clamp Sequence, so circulation.Gypsum is laid bricks with lot of advantages, such as lightweight, can adjust room air, fire prevention, sound insulation, construction it is convenient, As a kind of new wall material, there are wide market prospects.But it is unsatisfactory through effect from the point of view of the practical application of walling market, wherein There is the reason for following three aspects:
1st, do not possess moisture-proof function, intensity is unstable, can only do internal partition wall use, reduces its use value, also hinders Its space further developed to building materials market;
2nd, it must carry out pre-process-calcining or washing before technical grade solid waste ardealite, desulfurated plaster production, not only make Into secondary environmental pollution, unit cost also add;
3rd, twenties pieces can only be once molded, is yielded poorly, does not adapt to large-scale production.
Utility model content
Technical problem to be solved in the utility model is the defects of being directed to existing gypsum brick laying forming machines, there is provided Yi Zhongyong Laid bricks model forming machine in preparing original state ardealite, utilize original state ardealite, desulfurated plaster (direct use need not be pre-processed) High intensity, water-fast moistureproof light gypsum is prepared to lay bricks model.
The technical scheme that the utility model solves above-mentioned technical problem is as follows:One kind, which is used to preparing original state ardealite, lays bricks sample Panel moulding apparatus, including lower operation layer, the lower operation layer include hydraulic base, bearing frame, Horizontal load-bearing plate, multigroup core pulling jacking Device, the bearing frame are fixedly installed on the square flange of the hydraulic base by screw rod, and the Horizontal load-bearing plate passes through Screw rod is fixedly installed on the bearing frame, and described multigroup core pulling jacking apparatus is uniformly arranged on the Horizontal load-bearing plate; Four vibrators are arranged with the surrounding of the bearing frame;Core pulling jacking apparatus described in every group includes multiple core pullings jacking two With pipe and multiple drawing core pipes, described multiple core pullings jack the both sides that dual-purpose pipe is arranged on described multiple drawing core pipes;Each The top that the core pulling jacks dual-purpose pipe is equipped with dome brick card, and the top that the dome brick card jacks dual-purpose pipe with the core pulling rotates Coordinate;The dome brick card is T-shaped.
The beneficial effects of the utility model are:Screw rod can accurately adjust the degree of balance of bearing frame and Horizontal load-bearing plate, Ensure quality and size that gypsum is laid bricks;Vibrator makes the raw material rapid densification in die cavity, prevents bubble, influences gypsum block The intensity and structural stability of brick, solve existing gypsum and lay bricks and easily produce bubble in process of production and intensity is bad asks Topic;Core pulling jacks dual-purpose pipe and drawing core pipe and is used to the core pulling processing that gypsum is laid bricks, and core pulling jacks dual-purpose pipe and is additionally operable to shaping block The demoulding jacking process of brick;Dome brick card is set by the top that dual-purpose pipe is jacked in core pulling, for being laid bricks the demoulding in molding of gypsum When prop up gypsum and lay bricks, it is smoothly left die cavity.
On the basis of above-mentioned technical proposal, the utility model can also do following improvement.
Further:The dome brick card includes transverse bar and vertical bar, and one end of the vertical bar is fixed on the transverse bar Middle part;The top that the transverse bar jacks dual-purpose pipe with the core pulling is rotatably assorted.
Further:The length of the transverse bar is less than the diameter that the core pulling jacks dual-purpose pipe.
Further:The length of the vertical bar is more than core pulling described in the middle part distance of the transverse bar and jacks dual-purpose pipe side Minimum length.
It is above-mentioned enter three step schemes beneficial effect be:Before molding of gypsum lays bricks the demoulding, dome brick card can be located at core pulling In the border circular areas for jacking dual-purpose tube top end, the programs such as formwork erection, lower slurry are not interfered with;And before first time is stripped, only need Vertical bar is turned to transverse bar distance core-pulling and jacks the shorter side in dual-purpose pipe side, vertical bar jacks dual-purpose pipe in core pulling It can obliquely decline during decline along the lay bricks inwall of emptying aperture of gypsum, be jacked in core pulling after dual-purpose pipe departs from die cavity, Vertical bar can prop up removable bottom plate, and during second demoulding (i.e. molding of gypsum lay bricks the demoulding), the conduct of dome brick card is pushed up Device is risen to use.
Further:Gypsum model forming machine of laying bricks also includes upper operation layer, and the upper operation layer is fixedly installed on institute State the upper end of lower operation layer;The upper operation layer includes mould, and the mould is arranged on the Horizontal load-bearing plate;In the mould Multiple die cavitys are evenly distributed with tool, one piece of removable bottom plate is equipped with the bottom of each die cavity;Can described in every piece Core pulling jacking apparatus described in one group is equipped with below movable base plate, multiple and institute is equipped with every piece of removable bottom plate Multiple core pullings for stating jack dual-purpose pipe and the corresponding through hole of multiple drawing core pipes.
The above-mentioned further beneficial effect of scheme is:It is convenient to shaping by setting removable bottom plate in the bottom of die cavity Gypsum lay bricks and carry out demoulding processing;Through hole facilitates core pulling jacking apparatus to rise or decline.
Further:The core pulling that the diameter of each through hole is all higher than corresponding thereto jacks dual-purpose pipe or described The diameter of drawing core pipe.
The above-mentioned further beneficial effect of scheme is:Core pulling is reduced to jack dual-purpose pipe and drawing core pipe rising or decline process In resistance, the demoulding for making gypsum lay bricks is more smooth.
Brief description of the drawings
Fig. 1 is the structural representation of operation layer under the utility model;
Fig. 2 is the sectional view of operation layer under the utility model;
Fig. 3 is the structural representation of operation layer on the utility model;
Fig. 4 is the structural representation of the utility model Horizontal load-bearing plate;
Fig. 5 is the structural representation that the utility model core pulling jacks dual-purpose pipe;
In accompanying drawing, the component names representated by each label are as follows:
100th, upper operation layer, 110, mould bearing frame, 120, mould, 121, die cavity, 122, removable bottom plate, 123, logical Hole, 124, framed, 200, lower operation layer, 210, core pulling jacking apparatus, 211, core pulling jack dual-purpose pipe, 212, drawing core pipe, 220, Horizontal load-bearing plate, 221, vertical orientation guide rod, 230, bearing frame, 240, hydraulic base, 250, vibrator, 260, dome brick card, 261st, vertical bar, 262, transverse bar.
Embodiment
Principle of the present utility model and feature are described below in conjunction with accompanying drawing, example is served only for explaining this practicality It is new, it is not intended to limit the scope of the utility model.
As shown in Figure 1, Figure 2 and Figure 3, a kind of to be used to preparing original state ardealite and lay bricks model forming machine, it includes lower operation Layer 200, the lower operation layer 200 include hydraulic base 240, bearing frame 230, Horizontal load-bearing plate 220, multigroup core pulling jacking apparatus 210, the bearing frame 230 is fixedly installed on by screw rod on the square flange of the hydraulic base 240, the Horizontal load-bearing plate 220 are fixedly installed on the bearing frame 230 by screw rod, and described multigroup core pulling jacking apparatus 210 is uniformly arranged on described On Horizontal load-bearing plate 220.Screw rod with silk mouth can accurately adjust the degree of balance of bearing frame 230 and Horizontal load-bearing plate 220.
Core pulling jacking apparatus 210 described in every group includes multiple core pullings and jacks dual-purpose pipe 211 and multiple drawing core pipes 212, institute The multiple core pullings stated jack the both sides that dual-purpose pipe 211 is arranged on described multiple drawing core pipes 212.
Each core pulling jacks the size shape all same of dual-purpose pipe 211 and each drawing core pipe 212.In this implementation In example, the quantity that core pulling jacks dual-purpose pipe 211 and drawing core pipe 212 is two, and two drawing core pipes 212 are arranged on two institutes State the centre that core pulling jacks dual-purpose pipe 211;Each core pulling jacks the height of dual-purpose pipe 211 and each drawing core pipe 212 Scope is 750mm to 800mm, and each core pulling jacks dual-purpose pipe 211 and the diameter of each drawing core pipe 212 is 52mm.In the present embodiment, each core pulling jacks dual-purpose pipe 211 and the height of each drawing core pipe 212 is both preferably 760mm。
As shown in figure 5, it is equipped with dome brick card 260, the dome brick card on the top that each core pulling jacks dual-purpose pipe 211 260 tops that dual-purpose pipe 211 is jacked with the core pulling are rotatably assorted;The dome brick card 260 is T-shaped.
The dome brick card 260 includes transverse bar 262 and vertical bar 261, and one end of the vertical bar 261 is fixed on the horizontal stroke To the middle part of bar 262;The top that the transverse bar 262 jacks dual-purpose pipe 211 with the core pulling is rotatably assorted, the transverse bar 262 length is less than the diameter that the core pulling jacks dual-purpose pipe 211;The length of the vertical bar 261 is more than the transverse bar 262 Middle part distance described in core pulling jack the minimum length of the dual-purpose side of pipe 211.
Gypsum model forming machine of laying bricks also includes upper operation layer 100, and the upper operation layer 100 is fixedly installed on described The upper end of lower operation layer 200;The upper operation layer 100 includes mould 120 and mould bearing frame 110, the mould bearing frame 110 The bottom of the mould 120 is arranged on, the mould 120 is arranged on the Horizontal load-bearing plate 220.
Framed 124 are provided with the periphery of the mould 120, for stablizing the mould 120, and then stablizes what gypsum was laid bricks Size;Multiple die cavitys 121 are evenly distributed with the mould 120, being equipped with one piece in the bottom of each die cavity 121 can Movable base plate 122;Core pulling jacking apparatus 210 described in one group is equipped with the lower section of every piece of removable bottom plate 122, at every piece It is equipped with the removable bottom plate 122 multiple relative with the described dual-purpose pipe 211 of multiple core pullings jacking and multiple drawing core pipes 212 The through hole 123 answered.
The core pulling that the diameter of each through hole 123 is all higher than corresponding thereto jacks dual-purpose pipe 211 or described The diameter of drawing core pipe 212, reduce core pulling and jack the resistance that dual-purpose pipe 211 and the drawing core pipe 212 rise or declined, make gypsum The demoulding laid bricks is more smooth.
In the present embodiment, the size of every piece of removable bottom plate 122 is 296 (mm) * 96 (mm) * 10 (mm);Institute The quantity for stating through hole 123 is four, and the diameter of each through hole 123 is 54mm;Each through hole 123 arrives removable bottom The distance of the both sides of plate 122 is 22mm, and the distance between two neighboring described through hole 123 is 6mm, respectively close to removable bottom The distance at two through holes 123 at the both ends of plate 122 to the removable both ends of bottom plate 122 is 28mm.The size of each die cavity 121 It is 300 (mm) * 100 (mm) * 620 (mm), the thickness of the peripheral housing of each die cavity 121 is 7mm.
When initial, the dome brick card 260 is located at the core pulling and jacked within the scope of the dual-purpose top circle of pipe 211, carries out first During the secondary demoulding, vertical bar 261 is turned to the distance core-pulling of transverse bar 262 using thin bar and jacks shorter one in the dual-purpose side of pipe 211 Side, vertical bar 261 obliquely can be laid bricks during core pulling jacks the decline of dual-purpose pipe 211 along gypsum in emptying aperture Wall declines, and after core pulling jacks the dual-purpose disengaging of pipe 211 die cavity 121, vertical bar 261 can prop up removable bottom plate 122, second In secondary knockout course, dome brick card 260 uses as jacking device.
As shown in figure 4, being equipped with vertical orientation guide rod 221 in four corners of the Horizontal load-bearing plate 220, there is orientation The effect of guiding;Four vibrators 250 are arranged with the surrounding of the bearing frame 230, make the raw material in die cavity 121 quickly close It is real, bubble is prevented, influences quality and structural stability that gypsum is laid bricks.
In the present embodiment, 4*15=60 die cavity 121 is shared on one group of mould 120, on one block of Horizontal load-bearing plate 220 10 groups of moulds 120 are shared, that is, there are 600 die cavitys 121, in time processing circulation, 600 formation of lots can be produced simultaneously and laid bricks, And time processing circulation is 12h, laid bricks compared to existing hollow forming, yield is high, can adapt to large-scale production, and quality is more Good, the strength stability laid bricks is more preferable.
Embodiment:Check that forming machine whether there is failure, if equipment is normal, start formwork erection program, if equipment Problem be present, then overhauled in time;Under hydraulic drive, core pulling is jacked into dual-purpose pipe 211 and drawing core pipe 212 and determined along vertical Height when maintaining an equal level with the height of die cavity 121 is pushed to the direction of guide rod 221, completes formwork erection program;Then toward in die cavity 121 Lower slurry, while Vibration on Start-up device 250, make slurry rapid densification, after the completion of blanking, close vibrator 250, make slurry naturally solidifying Gu;When slurry reaches it is a certain degree of pre-hardening when, the vertical bar 261 of dome brick card 260 is turned to the distance of transverse bar 262 with thin bar Core pulling jacks the shorter side in the dual-purpose side of pipe 211, starts hydraulic system, and core pulling jacks dual-purpose pipe 211 and drawing core pipe 212 and started Decline, depart from until with removable bottom plate 122, complete to be stripped for the first time.
During core pulling jacks dual-purpose pipe 211 and drawing core pipe 212 decline, dome brick card 260 tilts what is laid bricks against gypsum Hollow hole declines, when core pulling, which jacks dual-purpose pipe 211, drops to the 10mm places of the removable lower section of bottom plate 122, dome brick card 260 and can Movable base plate 122 departs from and horizontal, and core pulling is jacked into dual-purpose pipe 211 and risen, dome brick card 260 is propped up removable bottom plate 122 bottom;Slurry continues natural coagulation, and when slurry reaches the intensity that shaping is laid bricks, core pulling jacks dual-purpose pipe 211 and risen, Dome brick card 260 drives removable bottom plate 122 to jack upwards, and when 600mm height is arrived in jacking, shaping is laid bricks to be departed from die cavity 121, Complete second to be stripped, shaping, which is laid bricks, to complete, and takes shaping away and lays bricks, is circulated next time.
In the above-described embodiments, the size that the gypsum processed is laid bricks is 600 (mm) * 300 (mm) * 100 (mm), and has been thrown Enter to use;, can using the mould of different size and this forming machine is not limited in the processing that a kind of this gypsum of size is laid bricks Laid bricks with processing various sizes of gypsum, it is applied widely.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in Within the scope of shield.

Claims (6)

1. one kind is used to preparing original state ardealite and laid bricks model forming machine, it is characterised in that:It is described including lower operation layer (200) Lower operation layer (200) includes hydraulic base (240), bearing frame (230), Horizontal load-bearing plate (220), multigroup core pulling jacking apparatus (210), the bearing frame (230) is fixedly installed on by screw rod on the square flange of the hydraulic base (240), the level Bearing plate (220) is fixedly installed on the bearing frame (230) by screw rod, and described multigroup core pulling jacking apparatus (210) is equal It is even to be arranged on the Horizontal load-bearing plate (220);Four vibrators (250) are arranged with the surrounding of the bearing frame (230); Core pulling jacking apparatus (210) described in every group includes multiple core pullings and jacks dual-purpose pipe (211) and multiple drawing core pipes (212), described Multiple core pullings jack the both sides that dual-purpose pipe (211) is arranged on described multiple drawing core pipes (212);Jacked in each core pulling The top of dual-purpose pipe (211) is equipped with dome brick card (260), and the dome brick card (260) jacks dual-purpose pipe (211) with the core pulling Top is rotatably assorted;The dome brick card (260) is T-shaped.
2. a kind of according to claim 1 be used to preparing original state ardealite and lay bricks model forming machine, it is characterised in that:The top Brick card (260) includes transverse bar (262) and vertical bar (261), and one end of the vertical bar (261) is fixed on the transverse bar (262) middle part;The top that the transverse bar (262) jacks dual-purpose pipe (211) with the core pulling is rotatably assorted.
3. a kind of according to claim 2 be used to preparing original state ardealite and lay bricks model forming machine, it is characterised in that:The horizontal stroke It is less than the diameter of the dual-purpose pipe (211) of core pulling jacking to the length of bar (262).
4. a kind of according to claim 2 be used to preparing original state ardealite and lay bricks model forming machine, it is characterised in that:It is described perpendicular It is more than the minimum of dual-purpose pipe (211) side of core pulling jacking described in the middle part distance of the transverse bar (262) to the length of bar (261) Length.
5. a kind of according to claim 1 be used to preparing original state ardealite and lay bricks model forming machine, it is characterised in that:The stone Cream model forming machine of laying bricks also includes upper operation layer (100), and the upper operation layer (100) is fixedly installed on the lower operation layer (200) upper end;The upper operation layer (100) includes mould (120), and the mould (120) is arranged on the Horizontal load-bearing plate (220) on;Multiple die cavitys (121) are evenly distributed with the mould (120), it is equal in the bottom of each die cavity (121) Provided with one piece of removable bottom plate (122);Core pulling described in one group is equipped with below every piece of removable bottom plate (122) to jack Device (210), multiple and described multiple core pullings are equipped with every piece of removable bottom plate (122) and jack dual-purpose pipe And the corresponding through hole (123) of multiple drawing core pipes (212) (211).
6. a kind of according to claim 5 be used to preparing original state ardealite and lay bricks model forming machine, it is characterised in that:Each institute The diameter for stating through hole (123) is all higher than the core pulling corresponding thereto and jacks dual-purpose pipe (211) or the drawing core pipe (212) Diameter.
CN201720786772.1U 2017-06-29 2017-06-29 One kind, which is used to preparing original state ardealite, lays bricks model forming machine Active CN206999274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720786772.1U CN206999274U (en) 2017-06-29 2017-06-29 One kind, which is used to preparing original state ardealite, lays bricks model forming machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720786772.1U CN206999274U (en) 2017-06-29 2017-06-29 One kind, which is used to preparing original state ardealite, lays bricks model forming machine

Publications (1)

Publication Number Publication Date
CN206999274U true CN206999274U (en) 2018-02-13

Family

ID=61449422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720786772.1U Active CN206999274U (en) 2017-06-29 2017-06-29 One kind, which is used to preparing original state ardealite, lays bricks model forming machine

Country Status (1)

Country Link
CN (1) CN206999274U (en)

Similar Documents

Publication Publication Date Title
CN106985263A (en) A kind of die station supporting construction of precast concrete building element and application
CN104827548A (en) Pressing forming device and method for building wallboards
CN206999274U (en) One kind, which is used to preparing original state ardealite, lays bricks model forming machine
CN107214819B (en) Building constructional column shaping moulding box
CN207915713U (en) A kind of block forming machine
CN212170779U (en) Partition plate mould trowelling mechanism
CN215202525U (en) Prefabricated part horizontal molding device for architectural decoration
CN213471604U (en) Mould for manufacturing and repairing adobe for historic building
CN204844409U (en) Superstructure suppression takes shape quick -wittedly and forming die thereof
CN213165969U (en) Autoclaved aerated concrete block forming die
CN209987124U (en) Concrete dense-rib floor formwork production equipment
CN202292996U (en) Die for manufacturing combined cavity member by using machine
CN207290398U (en) A kind of building structural post molding machine
CN203622631U (en) Wallboard production line
CN106166790B (en) A kind of horizontal multiple-chamber assembly piping lane mold
CN220409114U (en) Profiling machine for producing external wall boards
CN206428978U (en) Toilet wall lower concrete leads wall bracing means
CN219806237U (en) Forming device for processing foaming concrete
CN220261364U (en) Forming die of prefabricated case roof beam
CN214520882U (en) Manufacturing device for aluminum mould wall bolt hole plugging block
CN215790681U (en) Concrete prefabricated component pouring equipment
CN219006484U (en) Light wallboard circulation production facility
CN217552666U (en) Adjustable U-shaped concrete block mold
CN207934463U (en) cast-in-place concrete board thickness control device
CN218965699U (en) Building concrete prefabricated plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant