CN206997264U - A kind of auxiliary vapour purging system not restricted before unit starting by steam - Google Patents

A kind of auxiliary vapour purging system not restricted before unit starting by steam Download PDF

Info

Publication number
CN206997264U
CN206997264U CN201720800678.7U CN201720800678U CN206997264U CN 206997264 U CN206997264 U CN 206997264U CN 201720800678 U CN201720800678 U CN 201720800678U CN 206997264 U CN206997264 U CN 206997264U
Authority
CN
China
Prior art keywords
auxiliary vapour
pipeline
steam
auxiliary
header
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720800678.7U
Other languages
Chinese (zh)
Inventor
张中正
许怀志
韩庆华
陈奇
唐峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongshi Yitong Group Co Ltd
Original Assignee
Shandong Zhongshi Yitong Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongshi Yitong Group Co Ltd filed Critical Shandong Zhongshi Yitong Group Co Ltd
Priority to CN201720800678.7U priority Critical patent/CN206997264U/en
Application granted granted Critical
Publication of CN206997264U publication Critical patent/CN206997264U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Turbine Rotor Nozzle Sealing (AREA)

Abstract

The utility model discloses the auxiliary vapour purging system not restricted before a kind of unit starting by steam, and it solves the problems, such as that purging pipeline installation workload is big in the prior art, waste of steam is more, the beneficial effect of steam saving few with installation, and its scheme is as follows:Auxiliary vapour purging system includes auxiliary vapour header, and auxiliary vapour header is connected by steam turbine pre-warm pipeline with steam turbine, and auxiliary vapour header is also connected to pipeline with steam turbine again by cold, and steam turbine is connected with cold again to the interim main pipe pipeline of auxiliary vapour purging;Auxiliary vapour header is connected by axle envelope pipeline with axle envelope purging system, and auxiliary vapour header is connected by auxiliary vapour to oxygen-eliminating device pipeline with oxygen-eliminating device, and auxiliary vapour header is evacuated to auxiliary steam pipe road by four and is connected with oxygen-eliminating device, and oxygen-eliminating device is connected with four and takes out pipeline.

Description

A kind of auxiliary vapour purging system not restricted before unit starting by steam
Technical field
Band steam feed pump Turbo-generator Set is the utility model is related to, more particularly to not steamed before a kind of unit starting The auxiliary vapour purging system that vapour restricts.
Background technology
Common steam system of the unit Auxiliary Steam as whole plant, the system sets an auxiliary vapour header, for unit Each user's vapour.The auxiliary vapour user in steam turbine side mainly has:Oxygen-eliminating device heating vapour, feed pump turbine debugging vapour, axle envelope are used Vapour etc..The main vapour source of Auxiliary Steam is from cold section of reheating, four sections of steam turbine draws gas, starting trouble and as the occasion requires or old factory carrys out vapour, Start vapour source from starting trouble, as the occasion requires or old factory's auxiliary steam, steam parameter are generally pressure 0.8-1.2MPa, temperature 300 DEG C or so.Auxiliary Steam, because Auxiliary Steam inner surface of pipeline produces corrosion, is welded to connect simultaneously before coming into operation Inner surface residual welding slag, dust and dirt etc. afterwards, the user such as steam turbine gland system, feed pump turbine debugging vapour, oxygen-eliminating device vapour Higher is required to steam quality, therefore steam blowing must be carried out to Auxiliary Steam in the installation and debugging stage, due to auxiliary Vapour system user is more, and each user pipe connection is more complicated, when general unit purges to Auxiliary Steam, takes each use Family individually purges, and waits a user to purge and completes, could be this user isolation after externally emptying temporary pipeline cooling, will be external Emptying temporary pipeline is attached to next user and purged, and this is that steam blowing brings larger difficulty, not only increases auxiliary and steams Vapour system purges pipeline installation workload temporarily, even more wastes a large amount of steam.
Utility model content
For overcome the deficiencies in the prior art, the utility model provide before a kind of unit starting do not restricted by steam it is auxiliary Vapour purging system, simplifies temporary system Pipe installing before the auxiliary vapour system purge in unit steam turbine side, simplifies sweeping process during purging, Save a large amount of steam.
A kind of concrete scheme for the auxiliary vapour purging system not restricted before unit starting by steam is as follows:
A kind of auxiliary vapour purging system not restricted before unit starting by steam, including:
Auxiliary vapour header, auxiliary vapour header are connected by steam turbine pre-warm pipeline with steam turbine, auxiliary vapour header also by it is cold again extremely Pipeline is connected with steam turbine, and steam turbine is connected with cold again to the interim main pipe pipeline of auxiliary vapour purging;Auxiliary vapour header passes through auxiliary vapour to axle Tube sealing road is connected with axle envelope purging system, and auxiliary vapour header is connected by auxiliary vapour to oxygen-eliminating device pipeline with oxygen-eliminating device, and auxiliary vapour header leads to Cross four and be evacuated to auxiliary steam pipe road and be connected with oxygen-eliminating device, oxygen-eliminating device is connected with four and takes out pipeline, and auxiliary vapour to oxygen-eliminating device pipeline and four takes out pipeline Pipeline temporary pipeline is taken out by auxiliary vapour to oxygen-eliminating device pipeline to four to connect, four take out pipeline by small machine low-pressure admission pipeline with being connected It is cold to purge interim main pipe pipeline connection to auxiliary vapour again.
Above-mentioned purging system, power plant's Auxiliary Steam pipeline cloth is taken into full account before unit Auxiliary Steam purging Put, all auxiliary vapour users are only connected together carry out steam blowing by main pipe in the confined space, not only simplify interim pipe Road is arranged, more disposably can all have been blown all auxiliary steam users in steam turbine side when auxiliary steam purges, and saves a large amount of steam Vapour.
Small machine low-pressure admission pipeline purges interim main pipe pipeline by the first pipeline and small machine high-pressure admission pipeline to auxiliary vapour Connection;
Further, control for convenience, the first pipeline sets four to be evacuated to the small machine non-return flaps of A, four to be evacuated to A small electromechanical dynamic Isolating door and the small machine high-pressure admission electric isolating valves of A.
The small machine low-pressure admission pipeline is also purged interim female by second pipe and small machine high-pressure admission pipeline to auxiliary vapour Pipeline connects;
Further, set four to be evacuated to the small machine non-return flaps of B in second pipe, four be evacuated to the small machine electric isolating valves of B and the small machines of B High-pressure admission electric isolating valve.
The auxiliary vapour header is connected with small machine debugging steam pipe road, and small machine debugging is set between steam pipe road and the first pipeline There is auxiliary vapour header to the manual isolating door of the small machines of A and auxiliary vapour header to the small machine non-return flaps of A.
The auxiliary vapour header is connected with small machine debugging steam pipe road, and small machine debugging is set between steam pipe road and second pipe There is auxiliary vapour header to the manual isolating door of the small machines of B and auxiliary vapour header to the small machine non-return flaps of B, non-return flap is used to prevent steam anti-after opening To flowing.
The auxiliary vapour header is connected with starting jet chimney, is started jet chimney and is connected with starting trouble or heat engine, or Start jet chimney to connect with old factory's auxiliary steam pipeline;
Further, jet chimney is being started provided with startup jet chimney to auxiliary vapour header electrically operated gate.
The axle envelope purging system purges interim main pipe pipeline with cold again to auxiliary by gland seal system steam exhaust piping to auxiliary vapour Vapour purges interim main pipe pipeline communication, and form exhaust outlet after UNICOM communicates with air.
It is described cold again to the interim main pipe pipeline of auxiliary vapour purging provided with the interim low-lying place's drain water piping of main pipe of auxiliary vapour purging, auxiliary vapour Purge the low-lying place's drain water piping of interim main pipe and be provided with the hydrophobic manually operated door of temporary pipeline.
Described four, which are evacuated to auxiliary steam pipe road, is evacuated to auxiliary vapour header manually operated door and four provided with four and is evacuated to auxiliary vapour header non-return flap;
Further, steam turbine pre-warm pipeline is provided with auxiliary vapour header to the manual isolating door of steam turbine pre-warm pipeline;
Further, it is cold be provided with again to pipeline it is cold again to the manual isolating door of auxiliary vapour header, cold again to auxiliary vapour header non-return flap With cold again to auxiliary vapour header electric isolating valve.
In auxiliary vapour to oxygen-eliminating device pipeline from auxiliary vapour header to being sequentially provided with electricity before auxiliary vapour header to oxygen-eliminating device oxygen-eliminating device Dynamic door, auxiliary vapour header to electrically operated gate after oxygen-eliminating device and auxiliary vapour header to oxygen-eliminating device non-return flap, auxiliary vapour is taken out to oxygen-eliminating device pipeline to four Pipeline temporary pipeline sets four to be evacuated to the oxygen-eliminating device fast valve and four that draws gas and is evacuated to oxygen-eliminating device non-return flap;In small machine debugging steam pipe road Auxiliary vapour header is set to small machine debugging vapour manually operated door;Auxiliary vapour header is set gradually to gland seal system electricity in auxiliary vapour to axle envelope pipeline Door and auxiliary vapour header are moved to gland seal system non-return flap.
Using the auxiliary vapour blowing method not restricted before a kind of unit starting of said system by steam, comprise the following steps that:
1) company of all parts is carried out according to the auxiliary vapour purging system not restricted before a kind of described unit starting by steam Connect;
2) confirm that starting jet chimney to auxiliary vapour header electrically operated gate is closed;
3) confirm that four are evacuated to oxygen-eliminating device non-return flap, four are evacuated to auxiliary vapour header non-return flap, cold again to auxiliary vapour header non-return flap, It is counter to fill and remove valve element, confirm auxiliary vapour header to oxygen-eliminating device non-return flap, auxiliary vapour header to gland seal system non-return flap, auxiliary vapour header To the small machines of A (A steam feed pumps steam turbine) non-return flap, auxiliary vapour header to the small machines of B (B steam feed pumps steam turbine) non-return flap, four The small machine non-return flaps of A are evacuated to, four are evacuated to the small machine non-return flaps of B, have removed valve element;Non-return valve anti-the reason for filling is:Non-return valve has The unidirectional function of crossing vapour, because there is pipeline all to need to be reversed purging, it is therefore desirable to counter to fill non-return valve;
4) confirm that gland seal system enters steam exhaust piping short circuit, all filter screens have removed;Unit is in axle envelope construction stage, axle Envelope steam inlet pipe road is equipped with the filter screen for preventing impurity from entering turbine shaft seal, to ensure that this filter screen has been removed in purge stages, otherwise The resistance of ducting, which can be increased, influences purging effect, and more serious meeting blows filter screen bad;
5) the first hydrophobic manually operated door of standard-sized sheet temporary pipeline, then remaining electrically operated gate and manually operated door in gradual standard-sized sheet system;
6) it is crack to open dynamic jet chimney to auxiliary vapour header electrically operated gate to whole system progress heating coil;
7) steam drain and all tube wall temperatures are tested, when steam drain and tube wall temperature are all higher than 200 DEG C, system Heating coil terminates, and fully closed auxiliary vapour header to oxygen-eliminating device bypasses electrically operated gate, auxiliary vapour header to electrically operated gate before oxygen-eliminating device, auxiliary vapour header to axle Envelope system electrically operated gate, for auxiliary vapour header to small machine debugging vapour manually operated door, four are evacuated to auxiliary vapour header manually operated door, cold again to auxiliary vapour header Manual isolating door, auxiliary vapour header to the manual isolating door of steam turbine pre-warm pipeline;
8) by rate-determining steps 7) valve closed, each branch road is purged successively, each branch road purges 3-5 times, often The time of secondary purging setting, until steam drain steam free from admixture is taken i.e. purging out of and completed.
Compared with prior art, the beneficial effects of the utility model are:
1) the utility model can be before unit steam turbine side Auxiliary Steam purging, by each user of steam turbine side auxiliary steam Short circuit is carried out by temporary pipeline, steam is discharged into air after auxiliary vapour header by each user, then by discharging main pipe temporarily, Can be by corrosion caused by Auxiliary Steam inner surface of pipeline, while rear inner surface residual welding slag, dust and dirt etc. are welded to connect, all Blow away.
2) the utility model purging system is simple in construction, quickly can carry out steam blowing to auxiliary vapour user, saves a large amount of steam Vapour.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its illustrate be used for explain the application, do not form the improper restriction to the application.
Fig. 1 is the utility model structure diagram;
In figure:1 starts jet chimney to auxiliary vapour header electrically operated gate;2 auxiliary vapour headers to oxygen-eliminating device bypasses electrically operated gate;3 auxiliary vapour Header is to oxygen-eliminating device non-return flap;4 auxiliary vapour headers are to electrically operated gate after oxygen-eliminating device;5 auxiliary vapour headers are to electrically operated gate before oxygen-eliminating device, 6 auxiliary vapour Header is to gland seal system electrically operated gate, 7 auxiliary vapour headers to gland seal system non-return flap, 8 auxiliary vapour headers to small machine debugging vapour manually operated door, 9 four, which are evacuated to oxygen-eliminating device, draws gas fast valve, and 10 4 are evacuated to oxygen-eliminating device non-return flap, and 11 4 are evacuated to auxiliary vapour header non-return flap, and 12 4 are evacuated to Auxiliary vapour header manually operated door, the small machine high-pressure admission electric isolating valves of 13A, the small machine high-pressure admission electric isolating valves of 14B, 15 auxiliary vapour headers To the manual isolating door of the small machines of A, 16 auxiliary vapour headers to the small machine non-return flaps of A, 17 is cold again to the auxiliary manual isolating door of vapour header, 18 auxiliary vapour connection Case is inverse to the small machines of B to the manual isolating door of steam turbine pre-warm pipeline, 19 auxiliary vapour headers to the manual isolating door of the small machines of B, 20 auxiliary vapour headers Only door, 21 it is cold again to auxiliary vapour header non-return flap, 22 4 are evacuated to the small machine electric isolating valves of A, and 23 4 are evacuated to the small machine electric isolating valves of B, 24 is cold again to auxiliary vapour header electric isolating valve, and 25 4 are evacuated to the small machine non-return flaps of A, and 26 4 are evacuated to the small machine non-return flaps of B, 27 temporary pipelines Hydrophobic manually operated door, 28 small machine high-pressure admission pipelines to auxiliary vapour purge interim main pipe pipeline (carbon steel material), and 29 cold extremely auxiliary vapour again blow Interim main pipe pipeline (carbon steel material) is swept, 30 auxiliary vapour purge the interim low-lying place's drain water piping (carbon steel material) of main pipe, and 31 auxiliary vapour are extremely Oxygen-eliminating device pipeline takes out pipeline temporary pipeline (carbon steel material) to four, and 32 gland seal system steam exhaust piping to auxiliary vapour purge interim main pipe pipe Road (carbon steel material), 33 4 take out pipeline, and 34 4 are evacuated to auxiliary steam pipe road, and 35 steam turbine pre-warm pipelines, 36 is cold again to pipeline, 37 small machines Low-pressure admission pipeline, 38 auxiliary vapour headers, 39 small machine debugging steam pipe roads, 40 first pipelines, 41 second pipes, 42 axle envelopes purging system System, 43 gland seal system steam exhaust piping, 44 start jet chimney.
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, the deficiencies in the prior art, in order to solve technical problem as above, this Shen It please propose the auxiliary vapour purging system not restricted before a kind of unit starting by steam.
In a kind of typical embodiment of the application, as shown in figure 1, not by the auxiliary of steam restriction before a kind of unit starting Vapour purging system, including:Auxiliary vapour header, auxiliary vapour header are connected by steam turbine pre-warm pipeline 35 with steam turbine, and auxiliary vapour header is also It is connected again to pipeline 36 with steam turbine by cold, steam turbine, which is connected with, cold to be purged interim main pipe pipeline to auxiliary vapour again and (use carbon steel Material) 29;Auxiliary vapour header is connected by auxiliary vapour to axle envelope pipeline with axle envelope purging system, and auxiliary vapour header passes through auxiliary vapour to oxygen-eliminating device Pipeline is connected with oxygen-eliminating device, and auxiliary vapour header is evacuated to auxiliary steam pipe road by four and is connected with oxygen-eliminating device, and oxygen-eliminating device is connected with four and takes out pipeline, Auxiliary vapour to oxygen-eliminating device pipeline and four, which takes out pipeline and take out pipeline temporary pipeline by auxiliary vapour to oxygen-eliminating device pipeline to four, (uses carbon steel material Matter) 31 connections, four take out pipeline by small machine low-pressure admission pipeline 37 and be connecteds that cold again extremely the interim main pipe pipeline 29 of auxiliary vapour purging connects Connect.
Above-mentioned purging system, power plant's Auxiliary Steam pipeline cloth is taken into full account before unit Auxiliary Steam purging Put, all auxiliary vapour users are only connected together carry out steam blowing by main pipe in the confined space, not only simplify interim pipe Road is arranged, more disposably can all have been blown all auxiliary steam users in steam turbine side when auxiliary steam purges, and saves a large amount of steam Vapour.
Small machine low-pressure admission pipeline purges interim main pipe pipe by the first pipeline 40 with small machine high-pressure admission pipeline to auxiliary vapour Road (carbon steel material) 28 connects;
In order to facilitate control, set four to be evacuated to the small machine non-return flaps 25, four of A in the first pipeline 40 and be evacuated to the small electromechanical dynamic isolation of A The door small machine high-pressure admission electric isolating valves 13 of 22 and A.
The small machine low-pressure admission pipeline is also purged interim by second pipe 41 and small machine high-pressure admission pipeline to auxiliary vapour Main pipe pipeline connects;Setting four to be evacuated in second pipe 41, the small machine non-return flaps 26, four of B are evacuated to the small machine electric isolating valves 23 of B and B is small Machine high-pressure admission electric isolating valve 14.
The auxiliary vapour header is connected with small machine debugging steam pipe road 39, and small machine debugging is used between the pipeline of steam pipe road 39 and first Auxiliary vapour header is provided with to the manual isolating door 15 of the small machines of A and auxiliary vapour header to the small machine non-return flaps 16 of A.
The auxiliary vapour header is connected with small machine debugging steam pipe road, and small machine debugging is set between steam pipe road and second pipe There is auxiliary vapour header to the manual isolating door 19 of the small machines of B and auxiliary vapour header to the small machine non-return flaps 20 of B, non-return flap is used to prevent to steam after opening Vapour reverse flow.
The auxiliary vapour header is connected with starting jet chimney 44, is started jet chimney 44 and is connected with starting trouble or heat engine, Or start jet chimney and connected with old factory's auxiliary steam pipeline;
Startup jet chimney is provided with to auxiliary vapour header electrically operated gate 1 starting jet chimney 44.
The axle envelope purging system 42 purges interim main pipe pipeline (carbon steel material by gland seal system steam exhaust piping 43 to auxiliary vapour Matter) 32 interim main pipe pipeline communication is purged to auxiliary vapour again with cold, form exhaust outlet after UNICOM communicates with air.
It is described cold again to the interim main pipe pipeline of auxiliary vapour purging provided with the interim low-lying place's drain water piping of the main pipe (use of auxiliary vapour purging Carbon steel material) 30, auxiliary vapour purges the interim low-lying place's drain water piping of main pipe and is provided with the hydrophobic manually operated door 27 of temporary pipeline.
Described four, which are evacuated to auxiliary steam pipe road, is evacuated to auxiliary vapour header manually operated door 12 and four provided with four and is evacuated to auxiliary vapour header non-return flap 11; Steam turbine pre-warm pipeline is provided with auxiliary vapour header to the manual isolating door 18 of steam turbine pre-warm pipeline;It is cold be provided with again to pipeline it is cold again to auxiliary It is the manual isolating door 17 of vapour header, cold again to auxiliary vapour header non-return flap 21 and cold again to auxiliary vapour header electric isolating valve 24.
In auxiliary vapour to oxygen-eliminating device pipeline from auxiliary vapour header to being sequentially provided with electricity before auxiliary vapour header to oxygen-eliminating device oxygen-eliminating device Door 5, auxiliary vapour header to electrically operated gate after oxygen-eliminating device 6 and auxiliary vapour header are moved to oxygen-eliminating device non-return flap 3, auxiliary vapour to oxygen-eliminating device pipeline to four Take out pipeline temporary pipeline and set four to be evacuated to the oxygen-eliminating device fast valve 9 and four that draws gas and be evacuated to oxygen-eliminating device non-return flap 10;Debug and use in small machine Steam pipe road sets auxiliary vapour header to small machine debugging vapour manually operated door 8;Auxiliary vapour header is set gradually to axle in auxiliary vapour to axle envelope pipeline Envelope system electrically operated gate 6 and auxiliary vapour header are to gland seal system non-return flap 7.
When Auxiliary Steam purges:
The first step confirms that starting jet chimney to auxiliary vapour header electrically operated gate 1 closes;
Second step, confirm that four are evacuated to oxygen-eliminating device non-return flap 10, four are evacuated to auxiliary vapour header non-return flap 11, cold again to auxiliary vapour header Non-return flap 21, it is counter to fill and remove valve element, confirm that auxiliary vapour header is inverse to gland seal system to oxygen-eliminating device non-return flap 3, auxiliary vapour header Only door 7, auxiliary vapour header to the small machine non-return flaps 16 of A, for auxiliary vapour header to the small machine non-return flaps 20 of B, four are evacuated to the small machine non-return flaps 25 of A, and four The small machine non-return flaps 26 of B are evacuated to, have removed valve element;
3rd step, confirmation gland seal system enters steam exhaust piping, and all filter screens of short circuit have removed;
4th step, confirm the system installation as shown in upper figure;
5th step confirms that remaining all electronic and manually-operated gate operates normally in upper figure;
All draining valves of the 6th step elder generation formal system of standard-sized sheet and the hydrophobic manually operated door 27 of temporary pipeline, then gradual standard-sized sheet system In remaining other electrically operated gates and manually operated door;
7th step, it is crack to open dynamic jet chimney to auxiliary vapour header electrically operated gate 1 to whole system progress heating coil;
8th step, steam drain and all tube wall temperatures are tested:Treat that steam drain and all tube wall temperatures are all higher than 200 DEG C when system heating coil terminate, fully closed auxiliary vapour header to oxygen-eliminating device bypasses electrically operated gate 2, and auxiliary vapour header is auxiliary to electrically operated gate before oxygen-eliminating device 5 Vapour header is to gland seal system electrically operated gate 6, and for auxiliary vapour header to small machine debugging vapour manually operated door 8, four are evacuated to auxiliary vapour header manually operated door 12, It is cold again to the manual isolating door 17 of auxiliary vapour header, auxiliary vapour header to the manual isolating door 18 of steam turbine pre-warm pipeline;
9th step is purged, each branch road purges 3-5 to each branch road successively by controlling the valve that the 8th step is closed Secondary, purging 10 minutes or so, range estimation steam drain steam free from admixture are taken out of as purging completion every time.
The preferred embodiment of the application is the foregoing is only, is not limited to the application, for the skill of this area For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair Change, equivalent substitution, improvement etc., should be included within the protection domain of the application.

Claims (10)

  1. A kind of 1. auxiliary vapour purging system not restricted before unit starting by steam, it is characterised in that including:
    Auxiliary vapour header, auxiliary vapour header are connected by steam turbine pre-warm pipeline with steam turbine, and auxiliary vapour header is also by cold again to pipeline It is connected with steam turbine, steam turbine is connected with cold again to the interim main pipe pipeline of auxiliary vapour purging;Auxiliary vapour header passes through axle envelope pipeline and axle Purging system connection is sealed, auxiliary vapour header is connected by auxiliary vapour to oxygen-eliminating device pipeline with oxygen-eliminating device, and auxiliary vapour header is evacuated to auxiliary by four Steam pipe road is connected with oxygen-eliminating device, and oxygen-eliminating device is connected with four and takes out pipeline, and auxiliary vapour to oxygen-eliminating device pipeline and four takes out pipeline by auxiliary vapour extremely Oxygen-eliminating device pipeline to four take out pipeline temporary pipeline connection, four take out pipeline by small machine low-pressure admission pipeline and be connected it is cold again extremely auxiliary vapour Purge interim main pipe pipeline connection.
  2. 2. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 1 by steam, it is characterised in that The small machine low-pressure admission pipeline purges interim main pipe pipeline with small machine high-pressure admission pipeline to auxiliary vapour by the first pipeline and is connected;
    Further, set four to be evacuated to the small machine non-return flaps of A in the first pipeline, four be evacuated to the small machine electric isolating valves of A and the small machine high pressures of A Enter vapour electric isolating valve.
  3. 3. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 1 by steam, it is characterised in that The small machine low-pressure admission pipeline also purges interim main pipe pipeline by second pipe and small machine high-pressure admission pipeline to auxiliary vapour and connected Connect;
    Further, set four to be evacuated to the small machine non-return flaps of B in second pipe, four be evacuated to the small machine electric isolating valves of B and the small machine high pressures of B Enter vapour electric isolating valve.
  4. 4. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 2 by steam, it is characterised in that The auxiliary vapour header is connected with small machine debugging steam pipe road, and small machine debugging is joined with auxiliary vapour is provided between steam pipe road and the first pipeline Case is to the manual isolating door of the small machines of A and auxiliary vapour header to the small machine non-return flaps of A.
  5. 5. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 3 by steam, it is characterised in that The auxiliary vapour header is connected with small machine debugging steam pipe road, and small machine debugging is joined with auxiliary vapour is provided between steam pipe road and second pipe Case is to the manual isolating door of the small machines of B and auxiliary vapour header to the small machine non-return flaps of B.
  6. 6. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 1 by steam, it is characterised in that The auxiliary vapour header is connected with starting jet chimney, is started jet chimney and is connected with starting trouble or heat engine;
    Further, jet chimney is being started provided with startup jet chimney to auxiliary vapour header electrically operated gate.
  7. 7. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 1 by steam, it is characterised in that The axle envelope purging system purges interim main pipe pipeline by gland seal system steam exhaust piping to auxiliary vapour and faced again to auxiliary vapour purging with cold When main pipe pipeline communication, exhaust outlet is formed after UNICOM and is communicated with air.
  8. 8. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 1 by steam, it is characterised in that It is described cold interim provided with the interim low-lying place's drain water piping of main pipe of auxiliary vapour purging, auxiliary vapour purging to the interim main pipe pipeline of auxiliary vapour purging again The low-lying place's drain water piping of main pipe is provided with the hydrophobic manually operated door of temporary pipeline.
  9. 9. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 1 by steam, it is characterised in that Described four, which are evacuated to auxiliary steam pipe road, is evacuated to auxiliary vapour header manually operated door and four provided with four and is evacuated to auxiliary vapour header non-return flap;
    Further, steam turbine pre-warm pipeline is provided with auxiliary vapour header to the manual isolating door of steam turbine pre-warm pipeline;
    Further, it is cold be provided with again to pipeline it is cold again to the manual isolating door of auxiliary vapour header, cold again to auxiliary vapour header non-return flap and cold Again to auxiliary vapour header electric isolating valve.
  10. 10. the auxiliary vapour purging system not restricted before a kind of unit starting according to claim 9 by steam, its feature exist In, auxiliary vapour to oxygen-eliminating device pipeline from auxiliary vapour header to be sequentially provided with oxygen-eliminating device auxiliary vapour header to electrically operated gate before oxygen-eliminating device, Auxiliary vapour header to electrically operated gate after oxygen-eliminating device and auxiliary vapour header to oxygen-eliminating device non-return flap, auxiliary vapour to oxygen-eliminating device pipeline to four is taken out pipeline and faced Shi Guandao sets four to be evacuated to the oxygen-eliminating device fast valve and four that draws gas and is evacuated to oxygen-eliminating device non-return flap;
    Further, auxiliary vapour header is set gradually to gland seal system electrically operated gate and auxiliary vapour header to axle envelope in auxiliary vapour to axle envelope pipeline System non-return flap.
CN201720800678.7U 2017-07-04 2017-07-04 A kind of auxiliary vapour purging system not restricted before unit starting by steam Expired - Fee Related CN206997264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720800678.7U CN206997264U (en) 2017-07-04 2017-07-04 A kind of auxiliary vapour purging system not restricted before unit starting by steam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720800678.7U CN206997264U (en) 2017-07-04 2017-07-04 A kind of auxiliary vapour purging system not restricted before unit starting by steam

Publications (1)

Publication Number Publication Date
CN206997264U true CN206997264U (en) 2018-02-13

Family

ID=61452351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720800678.7U Expired - Fee Related CN206997264U (en) 2017-07-04 2017-07-04 A kind of auxiliary vapour purging system not restricted before unit starting by steam

Country Status (1)

Country Link
CN (1) CN206997264U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107150055A (en) * 2017-07-04 2017-09-12 山东中实易通集团有限公司 The auxiliary vapour purging system and method not restricted before a kind of unit starting by steam
CN111744901A (en) * 2020-07-17 2020-10-09 三门核电有限公司 Method for jointly purging auxiliary steam of nuclear power station and steam pipeline of steam turbine shaft seal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107150055A (en) * 2017-07-04 2017-09-12 山东中实易通集团有限公司 The auxiliary vapour purging system and method not restricted before a kind of unit starting by steam
CN111744901A (en) * 2020-07-17 2020-10-09 三门核电有限公司 Method for jointly purging auxiliary steam of nuclear power station and steam pipeline of steam turbine shaft seal

Similar Documents

Publication Publication Date Title
CN109441575B (en) Method for operating heat supply network system of steam combined cycle generator set in heat supply period
CN107150055A (en) The auxiliary vapour purging system and method not restricted before a kind of unit starting by steam
CN106640235A (en) Subcritical direct air cooling unit cold starting method
CN105352361B (en) For steam-line blowing method of the ultra supercritical without stove water pump direct current cooker
CN206997264U (en) A kind of auxiliary vapour purging system not restricted before unit starting by steam
CN108999653B (en) Shaft seal device for adjustable extraction steam turbine and working method of shaft seal device
CN107597747B (en) Small-flow long-distance steam pipeline purging mechanism with two furnaces and one machine and purging method
CN208870644U (en) A kind of adjustable steam extraction formula steam turbine gland seal device
CN105781631B (en) A kind of coal-fired power plant's steam turbine red switch activation system and its startup method
CN111911252B (en) Supercritical heat supply unit and cold starting method thereof
CN205977283U (en) Coal -fired power plant's steam turbine dashes changes start -up system
CN210004376U (en) series double-valve steam blowpipe structure of utility boiler
CN208146590U (en) The blowpipe temporary system of three discard heat boilers
CN205717266U (en) A kind of double reheat station boiler series process three stage blow tube construction of 1000WM grade
CN106384613B (en) A kind of nuclear power plant's Auxiliary Steam and processing method
CN210087412U (en) Condensate system for steam turbine generator unit
CN105972623B (en) A kind of double reheat station boiler three stage of series process blow tube construction of 1000WM grades
CN103267425B (en) Method and device for solving condenser low vacuum in combined cycle unit starting process
CN111076565B (en) Steam discharge pipeline system for sterilization room and control method thereof
CN209558312U (en) A kind of blow pipe system of power plant boiler
CN114382558B (en) Steam seal heater device capable of exhausting steam and control method thereof
CN214536285U (en) Three-parameter steam air preheater of waste incineration power station
CN206188781U (en) Lees exhaust treatment device that cools down by force
CN110030046A (en) A kind of condensate system and operation method for Turbo-generator Set
CN113790910B (en) System for be used for rubbish environmental protection power plant steam turbine performance test

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

Termination date: 20200704

CF01 Termination of patent right due to non-payment of annual fee