CN110030046A - A kind of condensate system and operation method for Turbo-generator Set - Google Patents

A kind of condensate system and operation method for Turbo-generator Set Download PDF

Info

Publication number
CN110030046A
CN110030046A CN201910242379.XA CN201910242379A CN110030046A CN 110030046 A CN110030046 A CN 110030046A CN 201910242379 A CN201910242379 A CN 201910242379A CN 110030046 A CN110030046 A CN 110030046A
Authority
CN
China
Prior art keywords
gate
water
cut
inlet
electrically operated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910242379.XA
Other languages
Chinese (zh)
Other versions
CN110030046B (en
Inventor
李万军
李肖霞
黄天琪
牛庆良
张得科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN201910242379.XA priority Critical patent/CN110030046B/en
Publication of CN110030046A publication Critical patent/CN110030046A/en
Application granted granted Critical
Publication of CN110030046B publication Critical patent/CN110030046B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/14Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for responsive to other specific conditions
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/32Collecting of condensation water; Drainage ; Removing solid particles

Abstract

The present invention relates to a kind of condensate system and operation method for Turbo-generator Set, the auxiliary systems of thermal power plant.In the present invention, No.1 entrance electrically operated gate and No. two entrance electrically operated gates pass through two-way branch pipe respectively and connect with condenser, No.1 inlet screen is connect with No.1 entrance electrically operated gate, No.1 entrance expansion joint is connect with No.1 inlet screen, the import of No.1 condensate pump is connect with No.1 entrance expansion joint, No.1 outlet non-return door is connect with the outlet of No.1 condensate pump, No.1 outlet electrically operated gate is connect with No.1 outlet non-return door, No. two inlet screens are connect with No. two entrance electrically operated gates, No. two entrance expansion joints are connect with No. two inlet screens, the import of No. two condensate pumps is connect with No. two entrance expansion joints, No. two outlet non-return doors are connect with the outlet of No. two condensate pumps, No. two outlet electrically operated gates are connect with No. two outlet non-return doors, No.1 outlet electrically operated gate and No. two outlet electrically operated gates are connect with condensed water main pipe.

Description

A kind of condensate system and operation method for Turbo-generator Set
Technical field
The present invention relates to a kind of condensate system and operation method for Turbo-generator Set, the auxiliary systems of thermal power plant System.
Background technique
The condensate system of existing Turbo-generator Set, is provided with two condensate pumps, and entrance is respectively arranged with filter Net and expansion joint etc., unit run a period of time after, strainer easily blocks, often close condensate pump entrance electrically operated gate and Electrically operated gate is exported, carries out dismantling maintenance after isolating strainer, to condensate pump entrance electrically operated gate and outlet electricity after service work It is filled the water between dynamic door, after water source is exports electrically operated gate for the demineralized water or condensate pump of condensate pump mechanical seal Condensed water.Because the pressure of the condensed water after the demineralized water for condensate pump mechanical seal or condensate pump outlet electrically operated gate is past Toward in 0.5MPa or more, being easy in the injecting process because of hypertonia, the design pressure of super high expansion section, so that expansion joint occurs Permanent deformation causes condensate pump entrance water flow unsmooth, causes condensate pump cavitation or vibration increases, influence unit safety Stable operation.
In view of this, being disclosed in the patent document application No. is 2016102435577 a kind of for steam turbine generator The condensate system of the high security of group.
Summary of the invention
It is an object of the invention to overcome the above deficiencies in the existing technologies, and provide a kind of reasonable in design Condensate system and operation method for Turbo-generator Set.
Technical solution used by the present invention solves the above problems is: this is used for the condensate system of Turbo-generator Set, Its design feature is: including condenser, No.1 safety valve, No.1 entrance electrically operated gate, No.1 inlet screen, No.1 inlet pressure Table, No.1 condensate pump, No.1 outlet non-return door, No.1 export electrically operated gate, No. two safety valves, No. two entrance electrically operated gates, No. two Inlet screen, No. two entrance expansion joints, No. two inlet pressure gauges, No. two condensate pumps, No. two outlet non-return doors, No. two outlet electricity Dynamic door, No.1 entrance expansion joint, No.1 shut-off valve and No. two shut-off valves.
The No.1 entrance electrically operated gate and No. two entrance electrically operated gates pass through two-way branch pipe respectively and connect with condenser.
The No.1 inlet screen is connect with No.1 entrance electrically operated gate, the No.1 entrance expansion joint and No.1 inlet screen Connection, the import of the No.1 condensate pump are connect with No.1 entrance expansion joint, and the No.1 outlet non-return door and No.1 condense The outlet of water pump connects, and the No.1 outlet electrically operated gate is connect with No.1 outlet non-return door, one end of the No.1 safety valve and Pipeline connection between No.1 inlet screen and No.1 entrance electrically operated gate, the other end and condenser of the No.1 safety valve connect It connecing, certain operating pressure is arranged in No.1 safety valve, after No.1 inlet screen on-bne repair, No.1 entrance electrically operated gate and No.1 When pipeline between outlet electrically operated gate is filled the water, prevent from damaging No.1 entrance expansion joint because of pipeline superpressure.
No. two inlet screens are connect with No. two entrance electrically operated gates, No. two entrance expansion joints and No. two inlet screens Connection, the import of No. two condensate pumps are connect with No. two entrance expansion joints, No. two outlet non-return doors and No. two condensations The outlet of water pump connects, and No. two outlet electrically operated gates are connect with No. two outlet non-return doors, one end of No. two safety valves and Pipeline connection between No. two inlet screens and No. two entrance electrically operated gates, the other end and condenser of No. two safety valves connect It connecing, certain operating pressure is arranged in No. two safety valves, after No. two inlet screen on-bne repairs, No. two entrance electrically operated gates and No. two When pipeline between outlet electrically operated gate is filled the water, prevent from damaging No. two entrance expansion joints because of pipeline superpressure.
The No.1 outlet electrically operated gate and No. two outlet electrically operated gates are connect with condensed water main pipe.
One end of the No.1 shut-off valve and one end of No. two shut-off valve respectively with No.1 condensate pump and No. two condensed waters Pump connection, the other end of the No.1 shut-off valve and the other end of No. two shut-off valves are connect with condenser.
Further, No.1 entrance pressure is installed on the pipeline between the No.1 condensate pump and No.1 entrance expansion joint Power table, for monitoring the condensation water pressure of No.1 condensate pump inlet duct, No. two condensate pumps and No. two entrances expand No. two inlet pressure gauges are installed, for monitoring the condensation water pressure of No. two condensate pump inlet ducts on the pipeline between section.
Further, the condensate system further includes No.1 water inlet cut-off gate A, No.1 inlet gage, No.1 water inlet Non-return flap A, No.1 water inlet cut-off gate B, No.1 water inlet non-return flap B, No.1 water inlet cut-off gate C, No. two water inlet cut-off gate A, No. two Inlet gage, No. two water inlet non-return flap A, No. two water inlet non-return flap B, No. two water inlet cut-off gate B and No. two water inlet cut-off gate C.
The import of the No.1 water inlet cut-off gate B and the import of No. two water inlet cut-off gate B are connected to DW system demineralized water system pipe Road.
The outlet of the No.1 water inlet cut-off gate B is connect with the import of No.1 water inlet non-return flap A, the No.1 water inlet check The outlet of door A is connect with the import of No.1 water inlet cut-off gate A, the outlet of the No.1 water inlet cut-off gate A and No.1 condensate pump Import connection, after mechanical seal water enters double mechanical seal chamber, compresses seal, prevent outside air leak into No.1 condensation Water pump, while preventing No.1 condensate pump from leaking out condensed water.
The import of No.1 water inlet cut-off gate C is connect with the condensing water conduit that No.1 exports electrically operated gate, the No.1 into The import of the outlet of water cut-off gate C and No.1 water inlet non-return flap B connects, the No.1 intake non-return flap B outlet and No.1 into The import of water pressure table connects, the outlet of the No.1 inlet gage and No.1 water inlet non-return flap A and No.1 water inlet cut-off gate A Between pipeline connection, No.1 inlet gage be used for monitor seal waterpipe pressure.
The outlet of No. two water inlets cut-off gate B is connect with the import of No. two non-return flap A of intaking, No. two water inlets check The outlet of door A is connect with the import of No. two cut-off gate A of intaking, the outlet of No. two water inlets cut-off gate A and No. two condensate pumps Import connection, after mechanical seal water enters double mechanical seal chamber, compresses seal prevents outside air from leaking into No. two condensations Water pump, while preventing No. two condensate pumps from leaking out condensed water.
It is described No. two water inlet cut-off gate C import with No. two outlet electrically operated gates condensing water conduit connect, described No. two into Water cut-off gate C outlet with No. two water inlet non-return flap B import connect, it is described No. two intake non-return flap B outlet and No. two into The import of water pressure table connects, the outlet of No. two inlet gages and No. two water inlet non-return flap A and No. two water inlet cut-off gate A Between pipeline connection, No. two inlet gages are used to monitor the pressure for sealing waterpipe.
Further, the condensate system further includes No.1 pressure of return water table, No.1 return water cut-off gate, No.1 cooling Water cut-off gate A, No.1 cooling water cut-off gate B, No. two cooling water cut-off gate A, No. two pressure of return water tables, No. two return water cut-off gates and No. two cooling water cut-off gate B.
The No.1 return water cut-off gate, No.1 cooling water cut-off gate A and No.1 cooling water cut-off gate B with No.1 condensed water Pump connection, the No.1 pressure of return water table are mounted on the pipeline between No.1 return water cut-off gate and No.1 condensate pump, are used for The pressure of mechanical seal return water is monitored, No.1 return water cut-off gate is welded to connect by pipeline to condensation puddle.
No. two return water cut-off gates, No. two cooling water cut-off gate A and No. two cooling water cut-off gate B with No. two condensed waters Pump connection, No. two pressure of return water tables are mounted on the pipeline between No. two return water cut-off gates and No. two condensate pumps, are used for The pressure of mechanical seal return water is monitored, No. two return water cut-off gates are welded to connect by pipeline to condensation puddle.
Further, another technical purpose of the invention is to provide a kind of condensation water system for Turbo-generator Set The operation method of system.
Above-mentioned technical purpose of the invention technical scheme is that.
A kind of operation method of the condensate system for Turbo-generator Set, it is characterized in that: the operation method is such as Under:
(1), before the operation of No.1 condensate pump, No.1 cooling water cut-off gate A and No.1 cooling water cut-off gate B, investment condensation are opened Water pump bearing cooling water reduces bearing temperature after No.1 condensate pump opens machine;Open No.1 water inlet cut-off gate A and No.1 into Water cut-off gate B closes No.1 water inlet cut-off gate C, carries out machine using No.1 water inlet cut-off gate B of the demineralized water to No.1 condensate pump Tool sealing, observation monitoring No.1 inlet gage after pressure is normal, slowly open No.1 return water cut-off gate, observation monitoring No.1 Pressure of return water table, it is ensured that pressure is between 0.2-0.4MPa, after the completion of aforesaid operations, starts No.1 condensate pump, condenses water system It unites after normal operation, the mechanical seal water of No.1 condensate pump is switched over, slowly open No.1 water inlet cut-off gate C, simultaneously Slowly closing No.1 water inlet cut-off gate B, observation monitoring No.1 pressure of return water table and No.1 inlet gage, until No.1 water inlet section Only door B is closed entirely, keeps No.1 water inlet cut-off gate C aperture constant, and so far the mechanical seal water switching of No.1 condensate pump finishes.
(2), before No. two condensate pump operations, No. two cooling water cut-off gate A and No. two cooling water cut-off gate B is opened, are put into Condensate pump bearing cooling water reduces bearing temperature after No. two condensate pumps open machine;Open No. two water inlet cut-off gate A and two Number water inlet cut-off gate B, closes No. two water inlet cut-off gate C, using demineralized water to No. two water inlet cut-off gate B of No. two condensate pumps into Row mechanical seal, observation No. two inlet gages of monitoring after pressure is normal, slowly open No. two return water cut-off gates, observation monitoring No. two pressure of return water tables, it is ensured that pressure is between 0.2-0.4MPa, after the completion of aforesaid operations, starts No. two condensate pumps, condensation After water system normal operation, the mechanical seal water of No. two condensate pumps is switched over, slowly opens No. two water inlet cut-off gate C, No. two water inlet cut-off gate B of slowly closing simultaneously, observation monitoring No. two pressure of return water tables and No. two inlet gages, up to No. two into Water cut-off gate B is closed entirely, keeps No. two water inlet cut-off gate C apertures constant, so far the mechanical seal water of No. two condensate pumps has switched Finish.
Further, in described (one), when blocking occurs in No.1 inlet screen, and on-bne repair is needed to clean, No.1 is needed Entrance electrically operated gate and No.1 outlet electrically operated gate are closed, and the cylinder wicket of No.1 inlet screen, the condensation in discharge tube are opened Water is disassembled the cover of No.1 inlet screen, is reassembled after cleaning strainer is qualified, then electronic to No.1 entrance electrically operated gate and No.1 outlet Pipeline is filled the water between door, utilizes mechanical seal water (external demineralized water or the No.1 outlet electrically operated gate of No.1 condensate pump Condensed water), observation monitoring No.1 pressure of return water table and No.1 inlet gage and No.1 inlet pressure gauge, while filling the water The cylinder air-discharging cut-off gate for opening No.1 inlet screen in the process closes strainer cylinder after the air in pipeline drains Air-discharging cut-off gate, slowly opens No.1 entrance electrically operated gate and No.1 exports electrically operated gate, so far the strainer inspection of No.1 condensate pump Cleaning is repaired to finish.
In (two), when blocking occur in No. two inlet screens, and on-bne repair is needed to clean, need No. two entrances electronic Door and No. two outlet electrically operated gates are closed, and the cylinder wicket of No. two inlet screens, the condensed water in discharge tube, dismantling two are opened The cover of number inlet screen is reassembled after cleaning strainer is qualified, then is managed between No. two entrance electrically operated gates and No. two outlet electrically operated gates Road is filled the water, and the mechanical seal water (condensation of external demineralized water or No. two outlet electrically operated gates of No. two condensate pumps is utilized Water), observation monitors No. two pressure of return water tables and No. two inlet gages and No. two inlet pressure gauges, while in the injecting process The cylinder air-discharging cut-off gate for opening No. two inlet screens closes the air-discharging of strainer cylinder after the air in pipeline drains Cut-off gate slowly opens No. two entrance electrically operated gates and No. two outlet electrically operated gates, and so far the strainer of No. two condensate pumps overhauls cleaning It finishes.
Further, in described (one), the pipeline between No.1 entrance electrically operated gate and No.1 inlet screen is provided with one Number safety valve, and certain protection act pressure is set, after the cleaning of No.1 inlet screen on-bne repair in the injecting process, prevent pipe Condensed water hypertonia in road causes expansion joint to deform more than the design pressure of condensate pump expansion joint, influences No.1 condensed water Pump and condensate system safe and stable operation.
In (two), the pipeline between No. two entrance electrically operated gates and No. two inlet screens is provided with No. two safety valves, And certain protection act pressure is set, after No. two inlet screen on-bne repair cleanings in the injecting process, prevent from condensing in pipeline Water pressure is excessively high, more than the design pressure of condensate pump expansion joint, expansion joint is caused to deform, and influences No. two condensate pumps and condensation Water system security stable operation.
Compared with prior art, the invention has the following advantages that the condensate system and operation that are used for Turbo-generator Set Method, structure is simple, easy to operate, and performance safety is reliable, and condensate system safety valve is arranged, can guarantee condensate pump strainer When on-bne repair cleans, condensing water conduit superpressure is prevented, guarantees condensate pump and condensate system normal safe operation.
Detailed description of the invention
Fig. 1 is the connection relationship diagram of the condensate system of the embodiment of the present invention.
Label declaration: condenser 1, No.1 safety valve 2, No.1 entrance electrically operated gate 3, No.1 inlet screen 4, No.1 entrance pressure Power table 5, No.1 condensate pump 6, No.1 pressure of return water table 7, No.1 return water cut-off gate 8, No.1 outlet non-return door 9, No.1 outlet Electrically operated gate 10, No.1 cooling water cut-off gate A11, No.1 cooling water cut-off gate B12, No.1 water inlet cut-off gate A13, No.1 influent pressure Power table 14, No.1 water inlet non-return flap A15, No.1 water inlet cut-off gate B16, No.1 water inlet non-return flap B17, No.1 water inlet cut-off gate C18, No. two entrance pressures of entrance expansion joint 22, two of inlet screen 21, two of entrance electrically operated gate 20, two of safety valve 19, two The condensate pump 24, two of power table 23, two cooling water cut-off gate A25,26, No. two return water cut-off gates 27 of No. two pressure of return water tables, No. two outlet non-return doors 28, No. two outlet 29, No. two cooling water cut-off gate B30 of electrically operated gate, No. two water inlet cut-off gate A31, No. two 32, No. two water inlet non-return flap A33 of inlet gage, No. two water inlet non-return flap B34, No. two water inlet cut-off gate B35, No. two water inlets are cut Only 38, No. two door C36, No.1 entrance expansion joint 37, No.1 shut-off valve shut-off valves 39.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawing and by embodiment, and following embodiment is to this hair Bright explanation and the invention is not limited to following embodiments.
Embodiment.
It is shown in Figure 1, it should however be clear that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to match The revealed content of specification is closed, so that those skilled in the art understands and reads, is not intended to limit the invention implementable Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, In the case where not influencing the effect of present invention can be generated and the purpose that can reach, should all still fall in disclosed technology In the range of appearance can cover.Meanwhile if with reference such as "upper", "lower", "left", "right", " centre " and " one " in this specification Term, be merely convenient to being illustrated for narration, rather than to limit the scope of the invention, the change of relativeness or Adjustment, under the content of no substantial changes in technology, when being also considered as the enforceable scope of the present invention.
The condensate system for Turbo-generator Set in the present embodiment steams water for condensing the steam discharge of steam turbine Vapour carries out heat exchange cooling and becomes condensed water comprising condenser 1, No.1 safety valve 2, No.1 entrance electrically operated gate 3, the filter of No.1 entrance Net 4, No.1 inlet pressure gauge 5, No.1 condensate pump 6, No.1 outlet non-return door 9, No.1 export 10, No. two safety valves of electrically operated gate 19, No. two inlet pressure gauge 23, two of entrance expansion joint 22, two of inlet screen 21, two of entrance electrically operated gate 20, two condensations The outlet non-return door 28, two of water pump 24, two outlet electrically operated gate 29, No.1 entrance expansion joint 37, No.1 shut-off valve 38 and No. two Shut-off valve 39.
No.1 entrance electrically operated gate 3 and No. two entrance electrically operated gates 20 in the present embodiment pass through two-way branch pipe and condenser respectively 1 connection is connect after can also being converged by two-way branch pipe with condensed water main pipe with condenser 1.
No.1 inlet screen 4 in the present embodiment is connect with No.1 entrance electrically operated gate 3, No.1 entrance expansion joint 37 and No.1 Inlet screen 4 connects, and the import of No.1 condensate pump 6 is connect with No.1 entrance expansion joint 37, No.1 outlet non-return door 9 and No.1 The outlet of condensate pump 6 connects, and No.1 outlet electrically operated gate 10 is connect with No.1 outlet non-return door 9, one end of No.1 safety valve 2 and Pipeline connection between No.1 inlet screen 4 and No.1 entrance electrically operated gate 3, the other end and condenser 1 of No.1 safety valve 2 connect It connects.
No. two inlet screens 21 in the present embodiment are connect with No. two entrance electrically operated gates 20, No. two entrance expansion joints 22 and two Number inlet screen 21 connects, and the import of No. two condensate pumps 24 is connect with No. two entrance expansion joints 22, No. two outlet non-return doors 28 It is connect with the outlet of No. two condensate pumps 24, No. two outlet electrically operated gates 29 are connect with No. two outlet non-return doors 28, No. two safety valves Pipeline connection between 19 one end and No. two inlet screens 21 and No. two entrance electrically operated gates 20, the other end of No. two safety valves 19 It is connect with condenser 1.
No.1 outlet electrically operated gate 10 and No. two outlet electrically operated gates 29 in the present embodiment are connect with condensed water main pipe.
One end of No.1 shut-off valve 38 in the present embodiment and one end of No. two shut-off valve 39 respectively with No.1 condensate pump 6 It is connected with No. two condensate pumps 24, the other end of the other end of No.1 shut-off valve 38 and No. two shut-off valve 39 connects with condenser 1 It connects.
No.1 entrance is installed on pipeline between No.1 condensate pump 6 in the present embodiment and No.1 entrance expansion joint 37 Pressure gauge 5 is equipped with No. two inlet pressure gauges 23 on the pipeline between No. two condensate pumps 24 and No. two entrance expansion joints 22.
Condensate system in the present embodiment further includes No.1 water inlet cut-off gate A13, No.1 inlet gage 14, No.1 Water inlet non-return flap A15, No.1 water inlet cut-off gate B16, No.1 water inlet non-return flap B17, No.1 water inlet cut-off gate C18, No. two water inlets Cut-off gate A31,32, No. two water inlet non-return flap A33 of No. two inlet gages, No. two water inlet non-return flap B34, No. two water inlet cut-off gates B35 and No. two water inlet cut-off gate C36.
The import of No.1 water inlet cut-off gate B16 and the import of No. two water inlet cut-off gate B35 in the present embodiment are connected to DW system demineralized water system pipeline.
The outlet of No.1 water inlet cut-off gate B16 in the present embodiment is connect with the import of No.1 water inlet non-return flap A15, No.1 The outlet of water inlet non-return flap A15 is connect with the import of No.1 water inlet cut-off gate A13, the outlet and one of No.1 water inlet cut-off gate A13 The import connection of number condensate pump 6.
The import of No.1 water inlet cut-off gate C18 in the present embodiment and the condensing water conduit of No.1 outlet electrically operated gate 10 connect It connects, the outlet of No.1 water inlet cut-off gate C18 is connect with the import of No.1 water inlet non-return flap B17, and No.1 water inlet non-return flap B17's goes out Mouth is connect with the import of No.1 inlet gage 14, the outlet of No.1 inlet gage 14 and No.1 water inlet non-return flap A15 and one Number water inlet cut-off gate A13 between pipeline connection.
The outlet of No. two water inlet cut-off gate B35 in the present embodiment is connect with the import of No. two non-return flap A33 of intaking, and No. two The outlet of water inlet non-return flap A33 is connect with the import of No. two cut-off gate A31 of intaking, the outlet and two of No. two water inlet cut-off gate A31 The import connection of number condensate pump 24.
The import of No. two water inlet cut-off gate C36 in the present embodiment and the condensing water conduit of No. two outlet electrically operated gates 29 connect Connect, No. two water inlet cut-off gate C36 outlet with No. two water inlet non-return flap B34 import connect, No. two intake non-return flap B34 out Mouth is connect with the import of No. two inlet gages 32, the outlet of No. two inlet gages 32 and No. two water inlet non-return flap A33 and two Number water inlet cut-off gate A31 between pipeline connection.
Condensate system in the present embodiment further includes No.1 pressure of return water table 7, No.1 return water cut-off gate 8, No.1 cooling 26, No. two water cut-off gate A11, No.1 cooling water cut-off gate B12, No. two cooling water cut-off gate A25, No. two pressure of return water tables return water Cut-off gate 27 and No. two cooling water cut-off gate B30.
No.1 return water cut-off gate 8, No.1 cooling water cut-off gate A11 and No.1 cooling water cut-off gate B12 in the present embodiment It is connect with No.1 condensate pump 6, No.1 pressure of return water table 7 is mounted between No.1 return water cut-off gate 8 and No.1 condensate pump 6 Pipeline on.
No. two return water cut-off gates 27, No. two cooling water cut-off gate A25 and No. two cooling water cut-off gate B30 in the present embodiment It is connect with No. two condensate pumps 24, No. two pressure of return water tables 26 are mounted on No. two return water cut-off gates 27 and No. two condensate pumps 24 Between pipeline on.
The operation method of the condensate system for Turbo-generator Set in the present embodiment, as follows:
(1), before No.1 condensate pump 6 is run, No.1 cooling water cut-off gate A11 and No.1 cooling water cut-off gate B12 is opened, is thrown Enter condensate pump bearing cooling water, after No.1 condensate pump 6 opens machine, reduces bearing temperature;Open No.1 water inlet cut-off gate A13 With No.1 water inlet cut-off gate B16, No.1 water inlet cut-off gate C18 is closed, is intake using No.1 of the demineralized water to No.1 condensate pump 6 Cut-off gate B16 carries out mechanical seal, and observation monitoring No.1 inlet gage 14 after pressure is normal, is slowly opened No.1 return water and cut Only door 8, observation monitoring No.1 pressure of return water table 7, it is ensured that pressure is between 0.2-0.4MPa, after the completion of aforesaid operations, starting one Number condensate pump 6 after condensate system normal operation, the mechanical seal water of No.1 condensate pump 6 is switched over, is slowly opened No.1 water inlet cut-off gate C18, while slowly closing No.1 water inlet cut-off gate B16, observation monitoring No.1 pressure of return water table 7 and No.1 Inlet gage 14 keeps No.1 water inlet cut-off gate C18 aperture constant, so far No.1 until No.1 water inlet cut-off gate B16 is closed entirely The mechanical seal water switching of condensate pump 6 finishes.
(2), before No. two condensate pumps 24 are run, No. two cooling water cut-off gate A25 and No. two cooling water cut-off gates are opened B30 puts into condensate pump bearing cooling water, after No. two condensate pumps 24 open machine, reduces bearing temperature;No. two water inlets are opened to cut Only door A31 and No. two water inlet cut-off gate B35, closes No. two water inlet cut-off gate C36, using demineralized water to No. two condensate pumps 24 No. two water inlet cut-off gate B35 carry out mechanical seal, and observation No. two inlet gages 32 of monitoring after pressure is normal, slowly open two Number return water cut-off gate 27, observation No. two pressure of return water tables 26 of monitoring, it is ensured that pressure between 0.2-0.4MPa, complete by aforesaid operations Afterwards, start No. two condensate pumps 24, after condensate system normal operation, the mechanical seal water of No. two condensate pumps 24 is cut It changes, slowly opens No. two water inlet cut-off gate C36, while No. two water inlet cut-off gate B35 of slowly closing, observation No. two return water pressures of monitoring Power table 26 and No. two inlet gages 32 keep No. two water inlet cut-off gate C36 apertures until No. two water inlet cut-off gate B35 are closed entirely Constant, so far the mechanical seal water switching of No. two condensate pumps 24 finishes.
In (one) of the present embodiment, when blocking occurs in No.1 inlet screen 4, and on-bne repair is needed to clean, No.1 is needed to enter Mouth electrically operated gate 3 and No.1 outlet electrically operated gate 10 are closed, and the cylinder wicket of No.1 inlet screen 4 is opened, solidifying in discharge tube It bears water, disassembles the cover of No.1 inlet screen 4, reassembled after cleaning strainer is qualified, then No.1 entrance electrically operated gate 3 and No.1 are exported Pipeline is filled the water between electrically operated gate 10, utilizes the mechanical seal water observation monitoring No.1 pressure of return water table 7 of No.1 condensate pump 6 With No.1 inlet gage 14 and No.1 inlet pressure gauge 5, while in the injecting process open No.1 inlet screen 4 cylinder Air-discharging cut-off gate closes the air-discharging cut-off gate of strainer cylinder, slowly opens No.1 entrance after the air in pipeline drains Electrically operated gate 3 and No.1 export electrically operated gate 10, and so far the strainer maintenance cleaning of No.1 condensate pump 6 finishes.
In (two) of the present embodiment, when blocking occur in No. two inlet screens 21, and on-bne repair is needed to clean, No. two are needed Entrance electrically operated gate 20 and No. two outlet electrically operated gates 29 are closed, and open the cylinder wicket of No. two inlet screens 21, in discharge tube Condensed water, disassemble the cover of No. two inlet screens 21, reassembled after cleaning strainer is qualified, then to No. two entrance electrically operated gates 20 and two Pipeline is filled the water between number outlet electrically operated gate 29, utilizes mechanical seal water observation No. two return water of monitoring of No. two condensate pumps 24 Pressure gauge 26 and No. two inlet gages 32 and No. two inlet pressure gauges 23, while No. two entrance filters are opened in the injecting process The cylinder air-discharging cut-off gate of net 21 is closed the air-discharging cut-off gate of strainer cylinder, is slowly beaten after the air in pipeline drains No. two entrance electrically operated gates 20 and No. two outlet electrically operated gates 29 are opened, so far the strainer maintenance cleaning of No. two condensate pumps 24 finishes.
In (one) of the present embodiment, the pipeline between No.1 entrance electrically operated gate 3 and No.1 inlet screen 4 is provided with No.1 Safety valve 2, and certain protection act pressure is set, after the cleaning of 4 on-bne repair of No.1 inlet screen in the injecting process, prevent pipe Condensed water hypertonia in road causes expansion joint to deform more than the design pressure of condensate pump expansion joint, influences No.1 condensed water Pump 6 and condensate system safe and stable operation.
In (two) of the present embodiment, the pipeline between No. two entrance electrically operated gates 20 and No. two inlet screens 21 is provided with two Number safety valve 19, and certain protection act pressure is set, after No. two 21 on-bne repairs of inlet screen cleanings in the injecting process, prevent Only condensed water hypertonia more than the design pressure of condensate pump expansion joint causes expansion joint to deform in pipeline, influence No. two it is solidifying Bear water pump 24 and condensate system safe and stable operation.
Condensate system in this implementation can be suitable for the condensate system of different types of Turbo-generator Set.
In addition, it should be noted that, the specific embodiments described in this specification, the shape of parts and components are named Title etc. can be different, and above content is only to structure of the invention example explanation described in this specification.It is all according to According to equivalence changes or simple change that the invention patent design structure, feature and principle is done, it is included in this hair In the protection scope of bright patent.Those skilled in the art can do described specific embodiment various The mode that the modify or supplement or adopt of various kinds is similar substitutes, and without departing from structure of the invention or surmounts present claims Range defined in book, is within the scope of protection of the invention.

Claims (7)

1. a kind of condensate system for Turbo-generator Set, it is characterised in that: including condenser (1), No.1 safety valve (2), No.1 entrance electrically operated gate (3), No.1 inlet screen (4), No.1 inlet pressure gauge (5), No.1 condensate pump (6), No.1 Outlet non-return door (9), No.1 outlet electrically operated gate (10), No. two safety valves (19), No. two entrance electrically operated gates (20), No. two entrance filters Net (21), No. two entrance expansion joints (22), No. two inlet pressure gauges (23), No. two condensate pumps (24), No. two outlet non-return doors (28), No. two outlet electrically operated gates (29), No.1 entrance expansion joint (37), No.1 shut-off valve (38) and No. two shut-off valves (39);
The No.1 entrance electrically operated gate (3) and No. two entrance electrically operated gates (20) are connect by two-way branch pipe with condenser (1) respectively,
The No.1 inlet screen (4) connect with No.1 entrance electrically operated gate (3), and the No.1 entrance expansion joint (37) enters with No.1 Mouth strainer (4) connects, and the import of the No.1 condensate pump (6) is connect with No.1 entrance expansion joint (37), the No.1 outlet Non-return flap (9) is connect with the outlet of No.1 condensate pump (6), No.1 outlet electrically operated gate (10) and No.1 outlet non-return door (9) it connects, the pipeline between one end and No.1 inlet screen (4) and No.1 entrance electrically operated gate (3) of the No.1 safety valve (2) Connection, the other end of the No.1 safety valve (2) are connect with condenser (1),
No. two inlet screens (21) connect with No. two entrance electrically operated gates (20), No. two entrance expansion joints (22) with No. two Inlet screen (21) connection, the import of No. two condensate pumps (24) are connect with No. two entrance expansion joints (22), and described No. two Outlet non-return door (28) is connect with the outlet of No. two condensate pumps (24), and No. two outlet electrically operated gates (29) and No. two outlets are inverse Only door (28) connects, one end of No. two safety valves (19) and No. two inlet screens (21) and No. two entrance electrically operated gates (20) it Between pipeline connection, the other end of No. two safety valves (19) connect with condenser (1),
No.1 outlet electrically operated gate (10) and No. two outlet electrically operated gates (29) connect with condensed water main pipe,
One end of the No.1 shut-off valve (38) and one end of No. two shut-off valves (39) respectively with No.1 condensate pump (6) and No. two The other end of condensate pump (24) connection, the other end of the No.1 shut-off valve (38) and No. two shut-off valves (39) is and condenser (1) it connects.
2. the condensate system according to claim 1 for Turbo-generator Set, it is characterised in that: the No.1 condensation It is equipped on pipeline between water pump (6) and No.1 entrance expansion joint (37) No.1 inlet pressure gauge (5), No. two condensed waters No. two inlet pressure gauges (23) are installed on pipeline between pump (24) and No. two entrance expansion joints (22).
3. the condensate system according to claim 1 for Turbo-generator Set, it is characterised in that: the condensation water system System, further include No.1 water inlet cut-off gate A(13), No.1 inlet gage (14), No.1 water inlet non-return flap A(15), No.1 water inlet Cut-off gate B(16), No.1 intake non-return flap B(17), No.1 intake cut-off gate C(18), No. two water inlet cut-off gate A(31), No. two Inlet gage (32), No. two water inlet non-return flap A(33), No. two water inlet non-return flap B(34), No. two water inlet cut-off gate B(35) and No. two water inlet cut-off gate C(36);
The No.1 is intake cut-off gate B(16) import and No. two water inlet cut-off gate B(35) import be connected to desalination water system Road under the overall leadership,
The No.1 is intake cut-off gate B(16) outlet and No.1 intake non-return flap A(15) import connect, the No.1 is intake Non-return flap A(15) outlet and No.1 intake cut-off gate A(13) import connect, the No.1 is intake cut-off gate A(13) out Mouth is connect with the import of No.1 condensate pump (6),
The No.1 is intake cut-off gate C(18) import connect with the condensing water conduit that No.1 exports electrically operated gate (10), described one Number water inlet cut-off gate C(18) outlet and No.1 intake non-return flap B(17) import connect, the No.1 water inlet non-return flap B (17) outlet is connect with the import of No.1 inlet gage (14), the outlet of the No.1 inlet gage (14) and No.1 into Water non-return flap A(15) and No.1 intake cut-off gate A(13) between pipeline connection,
It is described No. two water inlet cut-off gate B(35) outlet with No. two water inlet non-return flap A(33) import connect, it is described No. two intake Non-return flap A(33) outlet with No. two intake cut-off gate A(31) import connect, it is described No. two water inlet cut-off gate A(31) out Mouth is connect with the import of No. two condensate pumps (24),
It is described No. two water inlet cut-off gate C(36) import with No. two outlets electrically operated gate (29) condensing water conduit connect, described two Number water inlet cut-off gate C(36) outlet with No. two water inlet non-return flap B(34) import connect, No. two water inlet non-return flaps B (34) outlet is connect with the import of No. two inlet gages (32), the outlet of No. two inlet gages (32) with No. two into Water non-return flap A(33) and No. two water inlet cut-off gate A(31) between pipeline connection.
4. the condensate system according to claim 1 for Turbo-generator Set, it is characterised in that: the condensation water system System, further include No.1 pressure of return water table (7), No.1 return water cut-off gate (8), No.1 cooling water cut-off gate A(11), No.1 cooling water Cut-off gate B(12), No. two cooling water cut-off gate A(25), No. two pressure of return water tables (26), No. two return water cut-off gates (27) and No. two Cooling water cut-off gate B(30);
The No.1 return water cut-off gate (8), No.1 cooling water cut-off gate A(11) and No.1 cooling water cut-off gate B(12) with one The connection of number condensate pump (6), the No.1 pressure of return water table (7) are mounted on No.1 return water cut-off gate (8) and No.1 condensate pump (6) on the pipeline between,
No. two return water cut-off gates (27), No. two cooling water cut-off gate A(25) and No. two cooling water cut-off gate B(30) with two The connection of number condensate pump (24), No. two pressure of return water tables (26) are mounted on No. two return water cut-off gates (27) and No. two condensed waters It pumps on the pipeline between (24).
5. a kind of based on the condensate system for being used for Turbo-generator Set described in any one of claim 1-4 claim Operation method, it is characterised in that: the operation method is as follows:
(1), before No.1 condensate pump (6) operation, No.1 cooling water cut-off gate A(11 is opened) and No.1 cooling water cut-off gate B (12), condensate pump bearing cooling water is put into, in No.1 condensate pump (6) Qi Jihou, reduces bearing temperature;Open No.1 water inlet Cut-off gate A(13) and No.1 water inlet cut-off gate B(16), close No.1 water inlet cut-off gate C(18), No.1 is condensed using demineralized water The No.1 water inlet cut-off gate B(16 of water pump (6)) mechanical seal is carried out, observation monitoring No.1 inlet gage (14), pressure is normal Afterwards, slowly open No.1 return water cut-off gate (8), observation monitoring No.1 pressure of return water table (7), it is ensured that pressure 0.2-0.4MPa it Between, after the completion of aforesaid operations, start No.1 condensate pump (6), after condensate system normal operation, by No.1 condensate pump (6) Mechanical seal water switch over, slowly open No.1 intake cut-off gate C(18), while slowly closing No.1 intake cut-off gate B (16), observation monitoring No.1 pressure of return water table (7) and No.1 inlet gage (14), the cut-off gate B(16 until No.1 is intake) it is complete Close, No.1 kept to intake cut-off gate C(18) aperture is constant, and so far the mechanical seal water switching of No.1 condensate pump (6) finishes;
(2), before No. two condensate pump (24) operations, No. two cooling water cut-off gate A(25 are opened) and No. two cooling water cut-off gate B (30), condensate pump bearing cooling water is put into, in No. two condensate pump (24) Qi Jihou, reduces bearing temperature;Open No. two into Water cut-off gate A(31) and No. two water inlet cut-off gate B(35), close No. two water inlet cut-off gate C(36), it is solidifying to No. two using demineralized water Bear water No. two water inlet cut-off gate B(35 of pump (24)) mechanical seal is carried out, observation No. two inlet gages (32) of monitoring, pressure is just Chang Hou slowly opens No. two return water cut-off gates (27), observation No. two pressure of return water tables (26) of monitoring, it is ensured that pressure is in 0.2- Between 0.4MPa, after the completion of aforesaid operations, start No. two condensate pumps (24), it is solidifying by No. two after condensate system normal operation The mechanical seal water for bearing water pump (24) switches over, and slowly opens No. two water inlet cut-off gate C(36), at the same slowly closing two into Water cut-off gate B(35), observation No. two pressure of return water tables (26) of monitoring and No. two inlet gages (32), until No. two water inlet cut-offs Door B(35) it is complete close, keep No. two water inlet cut-off gate C(36) aperture is constant, the so far mechanical seal water of No. two condensate pumps (24) Switching finishes.
6. the operation method of the condensate system according to claim 5 for Turbo-generator Set, it is characterised in that:
In (one), when blocking occur in No.1 inlet screen (4), and on-bne repair is needed to clean, No.1 entrance electrically operated gate is needed (3) it is closed with No.1 outlet electrically operated gate (10), opens the cylinder wicket of No.1 inlet screen (4), the condensation in discharge tube Water is disassembled the cover of No.1 inlet screen (4), is reassembled after cleaning strainer is qualified, then go out to No.1 entrance electrically operated gate (3) and No.1 Pipeline is filled the water between mouth electrically operated gate (10), utilizes the mechanical seal water observation monitoring No.1 return water of No.1 condensate pump (6) Pressure gauge (7) and No.1 inlet gage (14) and No.1 inlet pressure gauge (5), while opening No.1 in the injecting process and entering The cylinder air-discharging cut-off gate of mouth strainer (4) closes the air-discharging cut-off gate of strainer cylinder after the air in pipeline drains, No.1 entrance electrically operated gate (3) and No.1 outlet electrically operated gate (10) are slowly opened, so far the strainer maintenance of No.1 condensate pump (6) is clear It washes complete;
In (two), when blocking occur in No. two inlet screens (21), and on-bne repair is needed to clean, need No. two entrances electronic Door (20) and the closings of No. two outlet electrically operated gates (29), open the cylinder wicket of No. two inlet screens (21), in discharge tube Condensed water, disassembles the cover of No. two inlet screens (21), reassembles after cleaning strainer is qualified, then to No. two entrance electrically operated gates (20) and Pipeline is filled the water between No. two outlet electrically operated gates (29), utilizes the mechanical seal water observation monitoring two of No. two condensate pumps (24) Number pressure of return water table (26) and No. two inlet gages (32) and No. two inlet pressure gauges (23), while being beaten in the injecting process The cylinder air-discharging cut-off gate for opening No. two inlet screens (21) closes the emptying of strainer cylinder after the air in pipeline drains Gas cut-off gate slowly opens No. two entrance electrically operated gates (20) and No. two outlet electrically operated gates (29), so far No. two condensate pumps (24) Strainer maintenance cleaning finish.
7. the operation method of the condensate system according to claim 5 for Turbo-generator Set, it is characterised in that:
In (one), the pipeline between No.1 entrance electrically operated gate (3) and No.1 inlet screen (4) is provided with No.1 safety valve (2), and certain protection act pressure is set, after the cleaning of No.1 inlet screen (4) on-bne repair in the injecting process, prevents pipeline Middle condensed water hypertonia causes expansion joint to deform more than the design pressure of condensate pump expansion joint, influences No.1 condensate pump (6) and condensate system safe and stable operation;
In (two), the pipeline between No. two entrance electrically operated gates (20) and No. two inlet screens (21) is provided with No. two safety Valve (19), and certain protection act pressure is set, after No. two inlet screen (21) on-bne repair cleanings in the injecting process, prevent Condensed water hypertonia in pipeline causes expansion joint to deform more than the design pressure of condensate pump expansion joint, influences No. two condensations Water pump (24) and condensate system safe and stable operation.
CN201910242379.XA 2019-03-28 2019-03-28 Condensate water system for steam turbine generator unit and operation method Active CN110030046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910242379.XA CN110030046B (en) 2019-03-28 2019-03-28 Condensate water system for steam turbine generator unit and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910242379.XA CN110030046B (en) 2019-03-28 2019-03-28 Condensate water system for steam turbine generator unit and operation method

Publications (2)

Publication Number Publication Date
CN110030046A true CN110030046A (en) 2019-07-19
CN110030046B CN110030046B (en) 2023-11-28

Family

ID=67236822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910242379.XA Active CN110030046B (en) 2019-03-28 2019-03-28 Condensate water system for steam turbine generator unit and operation method

Country Status (1)

Country Link
CN (1) CN110030046B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352942A (en) * 2021-12-09 2022-04-15 华电国际电力股份有限公司天津开发区分公司 Water pump mechanical sealing system capable of automatically switching sealing water source and adjusting pressure

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4287718A (en) * 1977-11-30 1981-09-08 Offshore Power Systems Condenser vacuum load compensating system
JPS6456905A (en) * 1987-08-26 1989-03-03 Hitachi Ltd Steam turbine for driving boiler feed pump
US5020589A (en) * 1990-07-19 1991-06-04 Westinghouse Electric Corp. System for removing uncondensed products from a steam turbine condenser
JPH10252417A (en) * 1997-03-14 1998-09-22 Toshiba Eng Co Ltd Protection device of steam turbine exhaust hood
CN201723258U (en) * 2010-07-14 2011-01-26 中冶东方工程技术有限公司 Drained water recovery system with steam pipelines
CN103775329A (en) * 2013-12-25 2014-05-07 华电国际电力股份有限公司山东分公司 Feed water pump seal water system with heating mode and pure condensing mode
CN207145024U (en) * 2017-09-08 2018-03-27 河钢股份有限公司承德分公司 Steam turbine condensate delivery device
US20180187566A1 (en) * 2015-06-23 2018-07-05 Turboden S.R.L. Seal arrangement in a turbine and method for confining the operating fluid
CN207583448U (en) * 2017-09-26 2018-07-06 山东中实易通集团有限公司 A kind of upper steam discharge feed pump turbine cylinder draining system
CN208502852U (en) * 2018-07-03 2019-02-15 内蒙古大唐国际托克托发电有限责任公司 Generating set heat pump shaft end seal water automatic voltage regulating system
CN210087412U (en) * 2019-03-28 2020-02-18 华电电力科学研究院有限公司 Condensate system for steam turbine generator unit

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4287718A (en) * 1977-11-30 1981-09-08 Offshore Power Systems Condenser vacuum load compensating system
JPS6456905A (en) * 1987-08-26 1989-03-03 Hitachi Ltd Steam turbine for driving boiler feed pump
US5020589A (en) * 1990-07-19 1991-06-04 Westinghouse Electric Corp. System for removing uncondensed products from a steam turbine condenser
JPH10252417A (en) * 1997-03-14 1998-09-22 Toshiba Eng Co Ltd Protection device of steam turbine exhaust hood
CN201723258U (en) * 2010-07-14 2011-01-26 中冶东方工程技术有限公司 Drained water recovery system with steam pipelines
CN103775329A (en) * 2013-12-25 2014-05-07 华电国际电力股份有限公司山东分公司 Feed water pump seal water system with heating mode and pure condensing mode
US20180187566A1 (en) * 2015-06-23 2018-07-05 Turboden S.R.L. Seal arrangement in a turbine and method for confining the operating fluid
CN207145024U (en) * 2017-09-08 2018-03-27 河钢股份有限公司承德分公司 Steam turbine condensate delivery device
CN207583448U (en) * 2017-09-26 2018-07-06 山东中实易通集团有限公司 A kind of upper steam discharge feed pump turbine cylinder draining system
CN208502852U (en) * 2018-07-03 2019-02-15 内蒙古大唐国际托克托发电有限责任公司 Generating set heat pump shaft end seal water automatic voltage regulating system
CN210087412U (en) * 2019-03-28 2020-02-18 华电电力科学研究院有限公司 Condensate system for steam turbine generator unit

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
余波: "燃煤电厂循环水回水系统扩大单元制运行研究与应用", 中国电力, vol. 52, no. 03, pages 115 - 119 *
张琼;郭育民;王国栋;闫志华;: "300MW直接空冷机组空冷凝汽器的清洗方式介绍", 内蒙古电力技术, no. 05, pages 11 - 14 *
李万军; 常磊; 王军: "CCI液压旁路异常跳机的分析与控制策略优化", 电力安全技术, vol. 19, no. 8, pages 28 - 31 *
王璐;: "660MW机组启动中凝结水系统故障及处理", 华电技术, no. 04, pages 52 - 53 *
高运;陈云峰;刘磊;袁龙;: "间接空冷机组循环水系统清洗措施", 华电技术, no. 03, pages 47 - 48 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352942A (en) * 2021-12-09 2022-04-15 华电国际电力股份有限公司天津开发区分公司 Water pump mechanical sealing system capable of automatically switching sealing water source and adjusting pressure
CN114352942B (en) * 2021-12-09 2023-07-25 华电国际电力股份有限公司天津开发区分公司 Water pump mechanical sealing system capable of automatically switching sealing water source and adjusting pressure

Also Published As

Publication number Publication date
CN110030046B (en) 2023-11-28

Similar Documents

Publication Publication Date Title
US7516755B2 (en) System for producing and distributing compressed air
CN108999653A (en) A kind of adjustable steam extraction formula steam turbine gland seal device and its working method
CN110080834B (en) Low-pressure cylinder optimization system for ultra-low load operation of coal burner unit
CN110030046A (en) A kind of condensate system and operation method for Turbo-generator Set
CN208870644U (en) A kind of adjustable steam extraction formula steam turbine gland seal device
CN210087412U (en) Condensate system for steam turbine generator unit
CN209041164U (en) Steam turbine condensate pump self sealing structure
CN111911252B (en) Supercritical heat supply unit and cold starting method thereof
CN204187056U (en) Turbine high-pressure admission safety check
CN209726852U (en) A kind of heated-air drying cleaning raising condenser vacuum device
CN209254283U (en) It is a kind of can on-line automatic blowdown y-type filter
CN208817100U (en) The gas booster system of horizontal well
CN208950952U (en) The sealing system of condensate pump
CN208416621U (en) Low pressure (LP) cylinder gland seal system, steam turbine and turbine LP rotors
CN217400972U (en) Auxiliary engine heating steam structure based on steam seal steam leakage
CN212671880U (en) 200MW ultrahigh-pressure three-cylinder three-exhaust back pressure modified steam turbine
CN2751029Y (en) Gas displacement device of gas tight box
CN2773314Y (en) Desalted water recovering device of power plant
CN213183286U (en) Multistage water seal working principle demonstration device for shaft seal heater
CN112049697A (en) 200MW ultrahigh-pressure three-cylinder three-exhaust back pressure modified steam turbine
CN220890270U (en) High-pressure cylinder ventilation assembly of steam turbine of garbage incineration plant
CN114382558B (en) Steam seal heater device capable of exhausting steam and control method thereof
CN214403692U (en) Low-position arranged drainage system of gas turbine
CN215979523U (en) Cylinder body leaks vapour processing structure
CN217783743U (en) Sealing water supply and return system of steam feed pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant