CN206986880U - A kind of steel fixer for controlling reinforcing bar putting position - Google Patents
A kind of steel fixer for controlling reinforcing bar putting position Download PDFInfo
- Publication number
- CN206986880U CN206986880U CN201720981302.0U CN201720981302U CN206986880U CN 206986880 U CN206986880 U CN 206986880U CN 201720981302 U CN201720981302 U CN 201720981302U CN 206986880 U CN206986880 U CN 206986880U
- Authority
- CN
- China
- Prior art keywords
- bolt
- steel plate
- steel
- scale
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 120
- 239000010959 steel Substances 0.000 title claims abstract description 120
- 230000003014 reinforcing effect Effects 0.000 title claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 47
- 239000011241 protective layer Substances 0.000 claims description 2
- 230000001105 regulatory effect Effects 0.000 claims 3
- 230000001276 controlling effect Effects 0.000 claims 2
- 239000004744 fabric Substances 0.000 claims 2
- 210000003205 muscle Anatomy 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种控制钢筋摆放位置的钢筋定位器,该定位器包括间距调节螺栓、刻度钢板、连接筋和高度调节螺栓,间距调节螺栓和高度调节螺栓将连接筋安装在刻度钢板上,间距调节螺栓用以调节连接筋的间隔,高度调节螺栓用以调节连接筋的高度;本实用新型组成构件简单,安拆方便,成本低,普通焊工便能加工完成。能够在横向与纵向上控制钢筋笼的位置,通过调节U型螺栓或定位钢板位置可控制相邻钢筋间距。本实用新型施工方便,节省人力。普通钢筋笼钢筋绑扎时通常需要5至7人才能完成钢筋摆放绑扎工作,该定位器最多只需两人便能轻松完成操作。
The utility model discloses a steel bar locator for controlling the placing position of the steel bar. The locator comprises a distance adjusting bolt, a scale steel plate, a connecting rib and a height adjusting bolt, and the space adjusting bolt and the height adjusting bolt install the connecting bar on the scale steel plate , The spacing adjusting bolt is used to adjust the interval of the connecting ribs, and the height adjusting bolt is used to adjust the height of the connecting ribs; the utility model has simple components, convenient installation and disassembly, low cost, and ordinary welders can complete the processing. The position of the steel cage can be controlled horizontally and vertically, and the distance between adjacent steel bars can be controlled by adjusting the position of U-shaped bolts or positioning steel plates. The utility model has convenient construction and saves manpower. It usually takes 5 to 7 people to complete the work of placing and binding the steel bars when binding the steel bars of the ordinary steel cage. This positioner can easily complete the operation with only two people at most.
Description
技术领域technical field
本实用新型为一种调节钢筋摆放间距及高度的钢筋定位器,属于钢筋笼制作工艺技术领域。The utility model relates to a steel bar positioner for adjusting the spacing and height of steel bars, which belongs to the technical field of steel cage manufacturing technology.
背景技术Background technique
目前钢筋笼制作时钢筋摆放均是通过拉线绳或在地面画标线的方式进行作业。该种方法能够在一定程度上控制钢筋间距,但在钢筋绑扎过程中容易移动,导致偏位,若钢筋绑扎达到一定数量,如需要在后期重新纠正钢筋笼位置,必须通过吊车等大型机器才能办到,不仅耗时耗工,而且准确度也不高。At present, when the reinforcement cage is made, the placement of the reinforcement is carried out by pulling wire ropes or drawing marking lines on the ground. This method can control the spacing of the steel bars to a certain extent, but it is easy to move during the binding process of the steel bars, resulting in deviation. If the number of steel bars bound reaches a certain amount, if the position of the steel cage needs to be corrected later, it must be done by a large machine such as a crane It is not only time-consuming and labor-intensive, but also the accuracy is not high.
实用新型内容Utility model content
为了解决和优化钢筋笼制作过程中钢筋间距的偏位和减少人工,本实用新型提出了一种钢筋定位器,有效解决钢筋笼制作过程中钢筋间距的偏位和减少人工,节约资源,减少偏差。In order to solve and optimize the deviation of the steel bar spacing and reduce labor in the process of making the steel cage, the utility model proposes a steel bar locator, which can effectively solve the deviation of the steel bar spacing and reduce labor in the process of making the steel cage, save resources and reduce deviation .
为实现上述目的,本实用新型采用的技术方案为一种控制钢筋摆放位置的钢筋定位器,该定位器包括间距调节螺栓、刻度钢板、连接筋和高度调节螺栓,间距调节螺栓和高度调节螺栓将连接筋安装在刻度钢板上,间距调节螺栓用以调节连接筋的间隔,高度调节螺栓用以调节连接筋的高度。In order to achieve the above purpose, the technical solution adopted by the utility model is a steel bar locator for controlling the placement of steel bars. The connecting ribs are installed on the scale steel plate, the spacing adjusting bolts are used to adjust the spacing of the connecting ribs, and the height adjusting bolts are used to adjust the height of the connecting ribs.
该定位器分为方形钢筋笼定位器和桩基钢筋笼定位器两种形式;方形钢筋笼定位器包括底、顶板钢筋定位刻度钢板1、水平筋定位刻度钢板2、底、顶板带刻度固定螺栓钢板3、第一U型螺栓4、钢垫板5和半U型螺栓6;底、顶板钢筋定位刻度钢板1水平布置,水平筋定位刻度钢板2竖直布置,底、顶板钢筋定位刻度钢板1和水平筋定位刻度钢板2通过底、顶板带刻度固定螺栓钢板3和半U型螺栓6固定,底、顶板带刻度固定螺栓钢板3设置在水平筋定位刻度钢板2的底部,半U型螺栓6设置在底、顶板钢筋定位刻度钢板1的端部;第一U型螺栓4将连接筋安装在底、顶板钢筋定位刻度钢板1和水平筋定位刻度钢板2上。The locator is divided into two forms: the square reinforcement cage locator and the pile foundation reinforcement cage locator; the square reinforcement cage locator includes bottom and top plate reinforcement positioning scale plate 1, horizontal bar positioning scale plate 2, bottom and top plate with scale fixing bolts Steel plate 3, first U-bolt 4, steel backing plate 5 and half U-bolt 6; bottom and top plate reinforcement positioning scale steel plate 1 is arranged horizontally, horizontal reinforcement positioning scale steel plate 2 is vertically arranged, bottom and top plate reinforcement positioning scale steel plate 1 And the horizontal rib positioning scale steel plate 2 is fixed by the bottom and top plate with scale fixed bolt steel plate 3 and half U-shaped bolt 6, the bottom and top plate with scale fixed bolt steel plate 3 is arranged on the bottom of the horizontal rib positioning scale steel plate 2, and the half U-shaped bolt 6 It is arranged at the end of the steel bar positioning scale steel plate 1 on the bottom and the top plate;
桩基钢筋笼定位器包括支架7、刻度圆盘8、定位钢板9、定位钢板固定螺栓11、第二U型螺栓10、圆盘固定螺栓12和圆盘合并螺栓13。刻度圆盘8由两个半圆形刻度盘组成,刻度圆盘8的中间设有圆盘合并螺栓孔,沿圆盘合并螺栓孔的上下对称设有圆盘固定螺栓孔,圆盘合并螺栓13与圆盘合并螺栓孔相配合将两个半圆形刻度盘组合成刻度圆盘8,圆盘固定螺栓12与圆盘固定螺栓孔相配合并安装在支架7上;定位钢板固定螺栓11将定位钢板9固定在刻度圆盘8上,定位钢板9沿刻度圆盘8的圆周方向布置,定位钢板9上设有缝隙,第二U型螺栓10设置在缝隙处并将连接筋安装在刻度圆盘8上。The pile foundation reinforcement cage locator includes a bracket 7, a scale disc 8, a positioning steel plate 9, a positioning plate fixing bolt 11, a second U-shaped bolt 10, a disc fixing bolt 12 and a disc combining bolt 13. The scale disc 8 is made up of two semicircular dials, the middle of the scale disc 8 is provided with a disc merged bolt hole, along the upper and lower symmetry of the disc merged bolt hole is provided with a disc fixing bolt hole, and the disc merged bolt 13 Cooperate with the combined bolt holes of the disk to combine the two semicircular scales into a scale disk 8, and the disk fixing bolts 12 are matched with the disk fixing bolt holes and installed on the bracket 7; the positioning plate fixing bolts 11 will position the plate 9 is fixed on the scale disc 8, the positioning steel plate 9 is arranged along the circumferential direction of the scale disc 8, the positioning steel plate 9 is provided with a gap, the second U-bolt 10 is arranged at the gap and the connecting rib is installed on the scale disc 8 superior.
刻度圆盘8的半径=桩基半径-保护层厚度-箍筋直径-主筋直径/2The radius of the scale disc 8 = pile foundation radius - protective layer thickness - stirrup diameter - main reinforcement diameter /2
本实用新型具有以下优点:The utility model has the following advantages:
1、组成构件简单,安拆方便,成本低,普通焊工便能加工完成。1. The components are simple, easy to install and disassemble, low cost, and can be processed by ordinary welders.
2、能够在横向与纵向上控制钢筋笼的位置,通过调节U型螺栓4或定位钢板位置可控制相邻钢筋间距。2. The position of the steel cage can be controlled horizontally and vertically, and the distance between adjacent steel bars can be controlled by adjusting the position of the U-shaped bolt 4 or positioning the steel plate.
3、本实用新型施工方便,节省人力。普通钢筋笼钢筋绑扎时通常需要5至7人才能完成钢筋摆放绑扎工作,该定位器最多只需两人便能轻松完成操作。3. The utility model is convenient for construction and saves manpower. It usually takes 5 to 7 people to complete the work of placing and binding the steel bars when binding the steel bars of the ordinary steel cage. This positioner can easily complete the operation with only two people at most.
附图说明Description of drawings
图1为方形钢筋笼钢筋定位器装置正视图;Fig. 1 is the front view of the square reinforcement cage reinforcement locator device;
图2为方形钢筋笼钢筋定位器装置侧视图;Fig. 2 is a side view of the square reinforcing cage reinforcing bar locator device;
图3为方形钢筋笼钢筋定位器装置零部件细部图一;Fig. 3 is a detail diagram one of parts and components of the square reinforcement cage reinforcement locator device;
图4为方形钢筋笼钢筋定位器装置零部件细部图二;Fig. 4 is the detail drawing 2 of the spare parts of the square reinforcement cage reinforcement locator device;
图5为方形钢筋笼钢筋定位器装置零部件细部图三;Fig. 5 is the detailed drawing three of parts and components of the square reinforcement cage reinforcement locator device;
图6为桩基钢筋笼钢筋定位器装置正视图;Fig. 6 is the front view of the reinforcing bar locator device of the pile foundation reinforcement cage;
图7为桩基钢筋笼钢筋定位器装置侧视图;Fig. 7 is a side view of a pile foundation reinforcement cage reinforcement locator device;
图8为桩基钢筋笼钢筋定位器装置零部件细部图一;Fig. 8 is a detail drawing 1 of the parts and components of the reinforcement cage reinforcement locator device of the pile foundation;
图9为桩基钢筋笼钢筋定位器装置零部件细部图二;Fig. 9 is a detail drawing 2 of parts of the reinforcement cage reinforcement locator device for pile foundation;
图10为桩基钢筋笼钢筋定位器装置零部件细部图三;Fig. 10 is the detail drawing three of parts and components of the reinforcement cage reinforcement locator device for pile foundation;
图11为桩基钢筋笼钢筋定位器装置零部件细部图四;Fig. 11 is detail drawing 4 of the parts and components of the reinforcement cage reinforcement locator device for pile foundation;
图12为桩基钢筋笼钢筋定位器装置零部件细部图五;Fig. 12 is a detail drawing five of the parts of the reinforcement cage reinforcement locator device for the pile foundation;
具体实施方式detailed description
下面结合附图对本实用新型进行具体说明:Below in conjunction with accompanying drawing, the utility model is described in detail:
如图1-5所示,一种方形钢筋笼钢筋摆放定位器,该定位器包括底、顶板钢筋定位刻度钢板1、水平筋定位刻度钢板2、底、顶板带刻度固定螺栓钢板3、第一U型螺栓4、钢垫板5和半U型螺栓6。As shown in Figure 1-5, a square reinforcement cage steel bar placement locator, the locator includes bottom and top plate reinforcement positioning scale steel plate 1, horizontal bar positioning scale steel plate 2, bottom and top plate with scale fixing bolt steel plate 3, the first A U-shaped bolt 4, a steel backing plate 5 and a half U-shaped bolt 6.
一块宽6.2cm、厚1cm、长为满足钢筋摆放总长度要求的顶、底板钢筋定位刻度钢板1,中间有一条宽1.2cm的缝隙,足够直径为1cm的U型螺栓4及半U型螺栓6自由滑动,缝隙两侧标有刻度;一块宽6.2cm、厚1cm、高为冠梁等结构物高度的水平筋定位刻度钢板2,中间有一条宽1.2cm的缝隙,足够直径为1cm的U型螺栓4及底、顶板带刻度固定螺栓钢板3自由滑动;U型螺栓4及半U型螺栓6的内径为所要固定钢筋的直径。本实用新型使用时顶、底板钢筋定位刻度钢板1置于底、顶板刻度钢板固定螺栓钢板3之上,用半U型螺栓6将两个构件连接在一起,通过滑动底、顶板刻度钢板固定螺栓钢板3在水平筋定位刻度钢板2上的位置,可控制底板钢筋的混凝土保护层厚度。通过两块顶、底板钢筋定位刻度钢板1和两块水平筋定位刻度钢板2组合成的矩形即为本实用新型钢筋定位器。A 6.2cm-wide, 1cm-thick, top-and-bottom steel bar positioning scale steel plate 1 that is long enough to meet the requirements of the total length of steel bar placement, with a 1.2cm-wide gap in the middle, enough for U-bolts 4 and half-U-bolts with a diameter of 1cm 6 Sliding freely, scales are marked on both sides of the gap; a horizontal rib positioning scale steel plate 2 with a width of 6.2cm, a thickness of 1cm, and the height of structures such as crown beams 2, with a gap of 1.2cm in the middle, enough for a U with a diameter of 1cm Type bolt 4 and bottom, top plate band scale fixed bolt steel plate 3 slides freely; The inner diameter of U-shaped bolt 4 and semi-U-shaped bolt 6 is the diameter of the steel bar to be fixed. When the utility model is in use, the top and bottom plate reinforcement positioning scale steel plates 1 are placed on the bottom and top plate scale steel plate fixing bolt steel plates 3, and the two components are connected together with half U-shaped bolts 6, and the bottom and top plate scale steel plates are fixed by sliding the bolts. The position of the steel plate 3 on the horizontal rib positioning scale steel plate 2 can control the concrete cover thickness of the bottom plate reinforcement. The rectangle formed by two top and bottom steel bar positioning scale steel plates 1 and two horizontal rib positioning scale steel plates 2 is the steel bar locator of the present utility model.
操作时,底板钢筋放置在底板钢筋定位刻度钢板1下方、顶板钢筋放置在顶板钢筋定位刻度钢板1上方、水平筋放置在水平筋定位刻度钢板2内侧,滑动固定第一U型螺栓4或半U型螺栓6便可控制钢筋摆放位置。底、顶板钢筋定位刻度钢板1、水平筋定位刻度钢板2中间均设有一道缝隙,足够U型螺栓4及半U型刻度螺栓6在空隙中自由滑动,通过刻度线可定位螺栓位置,进而达到调控钢筋摆放间距的目的;图2刻度圆盘2及定位钢板3留有相同宽度的一条缝隙,大小足够定位钢板固定螺栓4自由滑动,通过在刻度圆盘2上固定定位钢板3的位置,达到调控钢筋笼相邻主筋间的距离。During operation, the bottom plate steel bar is placed below the bottom plate steel bar positioning scale steel plate 1, the top plate steel bar is placed above the top plate steel bar positioning scale steel plate 1, the horizontal bar is placed inside the horizontal bar positioning scale steel plate 2, and the first U-bolt 4 or half U is fixed by sliding Type bolt 6 just can control reinforcing bar placement. There is a gap in the middle of the bottom and top steel bar positioning scale steel plate 1 and the horizontal rib positioning scale steel plate 2, enough for U-shaped bolt 4 and half U-shaped scale bolt 6 to slide freely in the gap, and the position of the bolt can be positioned through the scale line, thereby achieving The purpose of adjusting the distance between the steel bars; Figure 2. The scale disc 2 and the positioning steel plate 3 leave a gap of the same width, which is large enough to allow the positioning plate fixing bolt 4 to slide freely. By fixing the position of the positioning steel plate 3 on the scale disc 2, To achieve the regulation of the distance between the adjacent main bars of the reinforcement cage.
如图6-12所示,一种桩基钢筋笼主筋摆放定位器,该定位器包括:支架7、刻度圆盘8、定位钢板9、定位钢板固定螺栓11、第二U型螺栓10、圆盘固定螺栓12、圆盘合并螺栓13。As shown in Figure 6-12, a locator for placing the main reinforcement of the pile foundation reinforcement cage, the locator includes: a bracket 7, a scale disc 8, a positioning steel plate 9, a fixing bolt 11 for the positioning steel plate, a second U-shaped bolt 10, Disc fixing bolt 12, disc merging bolt 13.
一块厚1cm、直径为满足钢筋笼直径要求的刻度钢板8,是通过两块相同的半圆盘合并在一起组合而成,距离半圆盘边缘上、下15cm位置各有一个直径为1cm的螺栓孔,可使直径1cm的圆盘合并螺栓13通过;合并在一起的刻度圆盘8正中间有一直径5cm的螺栓孔,通过螺栓孔将刻度圆盘8与支架7连接在一起组合成桩基筋笼主筋摆放定位器。距离圆盘边缘5cm位置有宽1.2cm的弧形缝隙,缝隙长整个圆盘共有13个弧形缝隙,缝隙间距为定位钢板8为厚1cmm的直角钢板,一侧的弧形缝隙与圆盘弧形缝隙一致,通过定位钢板固定螺栓11可将定位钢板9固定在刻度圆盘8上,另一侧有宽1.2cm的直线缝隙,足够第二U型螺栓10自由滑动。A scale steel plate 8 with a thickness of 1cm and a diameter meeting the diameter of the steel cage is formed by merging two identical semi-discs together. There is a bolt with a diameter of 1cm at a position 15cm above and below the edge of the semi-disc. The hole can make the disc with a diameter of 1 cm combined with the bolt 13 pass through; there is a bolt hole with a diameter of 5 cm in the middle of the combined scale disc 8, and the scale disc 8 and the bracket 7 are connected together through the bolt hole to form a pile foundation reinforcement Cage main reinforcement placement locator. There is an arc-shaped gap with a width of 1.2 cm at a distance of 5 cm from the edge of the disc, and the gap is long There are 13 arc-shaped gaps in the whole disk, and the gap spacing is The positioning steel plate 8 is a right-angled steel plate with a thickness of 1 cmm. The arc-shaped gap on one side is consistent with the arc-shaped gap of the disc. The positioning steel plate 9 can be fixed on the scale disc 8 by the positioning plate fixing bolt 11, and the other side has a width of 1.2 cm. The linear gap is enough for the second U-bolt 10 to slide freely.
操作时先将定位钢板9调至所需的位置固定,通过第二U型螺栓10固定钢筋笼主筋,进而达到控制钢筋笼主筋摆放间距的目的;通过调节圆盘固定螺栓12可达到转动和固定刻度圆盘8的目的;通过圆盘合并螺栓可达到拆卸刻度圆盘8的目的。During operation, the positioning steel plate 9 is first adjusted to the required position and fixed, and the main reinforcement of the reinforcement cage is fixed by the second U-shaped bolt 10, so as to achieve the purpose of controlling the placement distance of the main reinforcement of the reinforcement cage; by adjusting the disc fixing bolt 12, rotation and The purpose of fixing the scale disc 8; the purpose of disassembling the scale disc 8 can be achieved by combining the disc with bolts.
Claims (2)
- A kind of 1. steel fixer for controlling reinforcing bar putting position, it is characterised in that:The locator includes spacing regulating bolt, carved Dowel is arranged on scale steel plate by degree steel plate, dowel and height adjustment bolt, spacing regulating bolt and height adjustment bolt On, spacing regulating bolt is to adjust the interval of dowel, and height adjustment bolt is adjusting the height of dowel;The locator is divided into square two kinds of forms of steel reinforcement cage locator and pile foundation steel bar cage locator;Square steel reinforcement cage locator bag Include bottom, roof steel bar location graduation steel plate (1), horizontal bar location graduation steel plate (2), bottom, top plate fixing bolt steel plate with a scale (3), the first U-bolt (4), billet (5) and half U type bolt (6);Bottom, roof steel bar location graduation steel plate (1) horizontal cloth Put, horizontal bar location graduation steel plate (2) is arranged vertically, bottom, roof steel bar location graduation steel plate (1) and horizontal bar location graduation steel Plate (2) is fixed by bottom, top plate fixing bolt steel plate (3) with a scale and half U type bolt (6), bottom, top plate fixing bolt with a scale Steel plate (3) is arranged on the bottom of horizontal bar location graduation steel plate (2), and half U type bolt (6) is arranged on bottom, roof steel bar positioning is carved Spend the end of steel plate (1);Dowel is arranged on bottom, roof steel bar location graduation steel plate (1) and level by the first U-bolt (4) On muscle location graduation steel plate (2);Pile foundation steel bar cage locator include support (7), dial disc (8), fixing steel plate (9), fixing steel plate fixing bolt (11), Second U-bolt (10), disk fixing bolt (12) and disk merge bolt (13);Dial disc (8) is by two semicircle quarters Scale forms, and the centre of dial disc (8) is provided with disk and merges bolt hole, and merging the symmetrical above and below of bolt hole along disk is provided with circle Disk fixed bolt hole, disk merging bolt (13) are engaged with disk merging bolt hole two fan dials being combined into quarter Disk (8) is spent, disk fixing bolt (12) matches with disk fixed bolt hole and merged on support (7);Fixing steel plate is consolidated Determine bolt (11) fixing steel plate (9) is fixed on dial disc (8), circumferencial direction cloth of the fixing steel plate (9) along dial disc 8 Put, fixing steel plate (9) is provided with gap, and the second U-bolt (10) is arranged at gap and dowel is arranged on into dial disc (8) on.
- A kind of 2. steel fixer for controlling reinforcing bar putting position according to claim 1, it is characterised in that:Dial disc (8) radius=pile foundation radius-protective layer thickness-stirrup diameter-cage bar diameter/2.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720981302.0U CN206986880U (en) | 2017-08-08 | 2017-08-08 | A kind of steel fixer for controlling reinforcing bar putting position |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720981302.0U CN206986880U (en) | 2017-08-08 | 2017-08-08 | A kind of steel fixer for controlling reinforcing bar putting position |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206986880U true CN206986880U (en) | 2018-02-09 |
Family
ID=61418989
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720981302.0U Expired - Fee Related CN206986880U (en) | 2017-08-08 | 2017-08-08 | A kind of steel fixer for controlling reinforcing bar putting position |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206986880U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109025317A (en) * | 2018-08-22 | 2018-12-18 | 天津市管道工程集团有限公司 | A kind of controllable reinforcing bar molding away from device |
| CN111644545A (en) * | 2020-06-10 | 2020-09-11 | 广东博智林机器人有限公司 | Positioning and clamping device and reinforcement cage processing robot |
| CN114319326A (en) * | 2022-02-25 | 2022-04-12 | 四川路航建设工程有限责任公司 | Support for positioning steel reinforcement cage section |
-
2017
- 2017-08-08 CN CN201720981302.0U patent/CN206986880U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109025317A (en) * | 2018-08-22 | 2018-12-18 | 天津市管道工程集团有限公司 | A kind of controllable reinforcing bar molding away from device |
| CN111644545A (en) * | 2020-06-10 | 2020-09-11 | 广东博智林机器人有限公司 | Positioning and clamping device and reinforcement cage processing robot |
| CN114319326A (en) * | 2022-02-25 | 2022-04-12 | 四川路航建设工程有限责任公司 | Support for positioning steel reinforcement cage section |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104088461B (en) | Y type cast-in-situ concrete columns template system and construction method thereof | |
| CN201649633U (en) | Steel formwork for forming building stair treads | |
| CN106065681B (en) | It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method | |
| CN203783165U (en) | Multi-directional accurate adjusting device for embedded part | |
| CN208219413U (en) | A kind of bridge pad pinner adjustable template device | |
| CN109397489B (en) | An adjustable precast fair-faced concrete production mold | |
| CN110394884A (en) | A kind of prefabricated post adjustable mold and prefabricated column production method | |
| CN203891058U (en) | Built-in foundation bolt positioning tool for fixed type tower crane foundation | |
| CN106400690A (en) | Manufacturing method of steel bar segment and used adjustable steel bar segment assembled tire frame | |
| CN206109991U (en) | Adjustable steel segment assembled tire frame | |
| CN208396321U (en) | A kind of detachable prefabricated stand column bar reinforcement positioning device | |
| CN110295754A (en) | A kind of detachable prefabricated stand column bar reinforcement positioning device and its installation method | |
| CN203209591U (en) | Standard processing device for big-diameter extra-long pile foundation full pre-assembly reinforcement cage | |
| CN210152251U (en) | A device using prefabricated laminated floor slabs as cast-in-place beam side form supports | |
| CN216341060U (en) | Bracket structure for quickly and accurately positioning, installing and leveling suspended heavy embedded part | |
| CN209384652U (en) | A kind of prefabricated architectural stair die station | |
| CN208235969U (en) | A kind of assembled architecture conversion layer adjustable steel bar positioning device | |
| CN103243731A (en) | Mould supporting method for trapezoid cross section base of shear wall | |
| CN204849604U (en) | Section closure was with rear -mounted strength nature skeleton concrete arch rib festival | |
| KR102198889B1 (en) | Variable Type Concrete Beam Form | |
| CN204262761U (en) | Numerical control cutting platform | |
| CN110757626A (en) | A prefabricated building tower base making mold | |
| CN206495329U (en) | Adjustable high-precision foundation bolt reinforcing mold and reinforcing system | |
| CN204019070U (en) | Derrick assembling combination steelframe | |
| CN202787300U (en) | Control form for positions of foundation bolts of fixed tower crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180209 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |