CN207878275U - A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device - Google Patents

A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device Download PDF

Info

Publication number
CN207878275U
CN207878275U CN201721164876.5U CN201721164876U CN207878275U CN 207878275 U CN207878275 U CN 207878275U CN 201721164876 U CN201721164876 U CN 201721164876U CN 207878275 U CN207878275 U CN 207878275U
Authority
CN
China
Prior art keywords
upright bar
slope
hollow pier
thickness
outer vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721164876.5U
Other languages
Chinese (zh)
Inventor
蔡福海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201721164876.5U priority Critical patent/CN207878275U/en
Application granted granted Critical
Publication of CN207878275U publication Critical patent/CN207878275U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Revetment (AREA)

Abstract

A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device,Including outer vertical rod,Interior upright bar,Locating rod under upright bar,Upright bar upper connecting rod,Connect bolt,Attaching nut,Outer vertical rod,Interior upright bar is positioned at by locating rod under upright bar to be become slope hollow pier exterior sheathing flange and becomes at the top of the hollow pier inner template flange of slope,Outer vertical rod,It is connected by upright bar upper connecting rod at the top of interior upright bar,Outer vertical rod,Interior upright bar is set to by locating rod under upright bar to be become outside the hollow pier of slope,On inner template,Pass through outer vertical rod,The gradient of interior upright bar and position control thickness of concrete cover,Pass through outer vertical rod,Stirrup spacing card slot on interior upright bar controls stirrup spacing,Utilize the adjusting card slot on locating rod under upright bar,Adapt to become the requirement of wall thickness change at the hollow pier different height of slope,With easy to operate,It is at low cost,Work efficiency is high,Stability is good,The characteristics of safety and environmental protection,Change slope hollow pier stirrup spacing after construction is uniform,Thickness of concrete cover error meets code requirement,Disposable qualification rate reaches 100%,It can be widely applied to become the construction of slope hollow pier.

Description

A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device
Technical field
The utility model, which belongs to, becomes slope hollow pier technical field of construction, and in particular between a kind of hollow pier stirrup of change slope Away from and thickness of concrete cover control device.
Background technology
Change slope hollow pier is small with area of section, section modulus is big, preferably special from heavy and light, the rigidity of structure and intensity Point and Solid gravity pier compare, and can generally reduce quantity of masonry 40%~60%, the application on high bridge or higher bridge It is increasingly extensive.
It is to become a quality control of slope hollow pier construction to become slope hollow pier stirrup spacing and thickness of concrete cover control Difficult point processed also directly influences the durability of pier shaft structure, uneven using there are stirrup spacings in conventional method work progress, Thickness of concrete cover transfinites equal common quality defects, need to develop it is a kind of it is novel be suitable for becoming slope hollow pier stirrup spacing and The device of thickness of concrete cover control.
Invention content
In order to overcome the above-mentioned deficiencies of the prior art, the purpose of this utility model is to provide a kind of change slope hollow pier stirrup Spacing and the device of thickness of concrete cover control overcome the prior art uneven and mixed to becoming slope hollow pier stirrup spacing The exceeded disadvantage of solidifying protective soil layer thickness deviation, with easy to operate, at low cost, work efficiency is high, stability is good, safety and environmental protection spy Point.
To achieve the above object, the technical solution of the utility model is as follows:
A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device, including outer vertical rod, interior upright bar, Locating rod, upright bar upper connecting rod, connection bolt, attaching nut under upright bar, outer vertical rod, interior upright bar are positioned by locating rod under upright bar In becoming slope hollow pier exterior sheathing flange and becoming at the top of the hollow pier inner template flange of slope, by vertical at the top of outer vertical rod, interior upright bar Bar upper connecting rod connects;
The outer vertical rod control outer net steel wire binding bar spacing and thickness of concrete cover, interior upright bar control Intranet reinforcing bar Stirrup spacing and thickness of concrete cover.
Below the outer vertical rod, interior upright bar by connecting bolt, attaching nut is fixed under upright bar in locating rod, top By connecting bolt, attaching nut's connecting upright pole upper connecting rod.
The outer vertical rod uses angle steel, diagonally disposed, and slope is than identical with outside change slope hollow pier for tilting slope ratio, outer vertical rod Length=change slope hollow pier exterior sheathing merogenesis height+10cm, outer vertical rod distance become width=reinforcing bar of slope hollow pier outer profile Net protective layer thickness+outer stirrup diameter.
The interior upright bar uses angle steel, diagonally disposed, and slope is than identical with outside change slope hollow pier for tilting slope ratio, interior upright bar Length=change slope hollow pier inner template merogenesis height+10cm, interior upright bar distance become width=reinforcing bar of slope hollow pier Internal periphery Net protective layer thickness+interior stirrup diameter.
It is carved with card slot identical with stirrup spacing in the outer vertical rod, interior upright bar, for controlling stirrup spacing.
Under the upright bar locating rod by connect bolt, attaching nut be fixed on become slope hollow pier exterior sheathing flange and Become at the top of the hollow pier exterior sheathing flange of slope, which is provided with it is fixed and adjust outer vertical rod, interior upright bar position card slot, be suitable for becoming The requirement of wall thickness change at the hollow pier different height of slope.
The card slot that the upright bar upper connecting rod is equipped with adaptation outer vertical rod, interior upright bar spacing changes is suitable for becoming slope sky The requirement of wall thickness change at heart bridge pier different height is played the role of increasing upright bar rigidity.
The utility model has the beneficial effects that:
The utility model is compared with construction technology at this stage, with easy to operate, at low cost, work efficiency is high, stability is good, peace The characteristics of loopful is protected, change slope hollow pier stirrup spacing after construction is uniformly, thickness of concrete cover error meets specification and want It asks, disposable qualification rate reaches 100%, can be widely applied to become the construction of slope hollow pier.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure along the circumferentially disposed schematic diagram of hollow pier.
Wherein, 1 is outer vertical rod;2 be interior upright bar;3 be locating rod under upright bar;4 be upright bar upper connecting rod;5 be connection bolt; 6 be attaching nut;7 be change slope hollow pier exterior sheathing;8 be change slope hollow pier inner template.
Specific implementation mode
The utility model is further discussed below below in conjunction with attached drawing.
As shown in Figure 1, 2, a kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device, including it is outer Locating rod 3, upright bar upper connecting rod 4, connection bolt 5, attaching nut 6, outer vertical rod 1, interior upright bar 2 under upright bar 1, interior upright bar 2, upright bar It is positioned at by locating rod under upright bar 3 and becomes 7 flange of slope hollow pier exterior sheathing and become at the top of 8 flange of slope hollow pier inner template, Outer vertical rod 1,2 top of interior upright bar are connected by upright bar upper connecting rod 4;
The outer vertical rod 1 controls outer net steel wire binding bar spacing and thickness of concrete cover, and interior upright bar 2 controls Intranet steel Muscle stirrup spacing and thickness of concrete cover.
The outer vertical rod 1,2 lower section of interior upright bar by connecting bolt 5, attaching nut 6 is fixed on locating rod 3 under upright bar On, top is by connecting bolt 5,6 connecting upright pole upper connecting rod 4 of attaching nut.
The outer vertical rod 1 uses angle steel, diagonally disposed, and tilting slope ratio and slope outside change slope hollow pier are outer to stand than identical 1 length of bar=change slope hollow pier exterior sheathing, 7 merogenesis height+10cm, outer vertical rod 1 apart from become slope hollow pier outer profile width= The net protective layer thickness of reinforcing bar+outer stirrup diameter.
The interior upright bar 2 uses angle steel, diagonally disposed, and tilting slope ratio and slope outside change slope hollow pier are interior to stand than identical 2 length of bar=change slope hollow pier inner template, 8 merogenesis height+10cm, interior upright bar 2 apart from become slope hollow pier Internal periphery width= The net protective layer thickness of reinforcing bar+interior stirrup diameter.
It is carved with card slot identical with stirrup spacing in the outer vertical rod 1, interior upright bar 2, for controlling stirrup spacing.
Locating rod 3 is fixed on by connection bolt 5, attaching nut 6 under the upright bar becomes 7 method of slope hollow pier exterior sheathing It is blue and become at the top of 7 flange of slope hollow pier exterior sheathing, which is provided with it is fixed and adjust outer vertical rod 1,2 position of interior upright bar card slot, It is suitable for becoming the requirement of wall thickness change at the hollow pier different height of slope.
The card slot that the upright bar upper connecting rod 4 is equipped with adaptation outer vertical rod 1,2 spacing of interior upright bar changes is suitable for becoming slope The requirement of wall thickness change at hollow pier different height is played the role of increasing upright bar rigidity.
The operation principle of the utility model is:
Outer vertical rod 1, interior upright bar 2 are set to by locating rod under upright bar 3 to be become slope hollow pier exterior sheathing, becomes slope hollow pier On inner template, thickness of concrete cover is controlled by outer vertical rod 1, the gradient of interior upright bar 2 and position, by outer vertical rod 1, interior Stirrup spacing card slot on upright bar 2 controls stirrup spacing, using the adjusting card slot on locating rod under upright bar 3, adapts to become slope The requirement of wall thickness change at hollow pier different height.

Claims (7)

1. a kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device, including outer vertical rod(1), interior upright bar (2), locating rod under upright bar(3), upright bar upper connecting rod(4), connection bolt(5), attaching nut(6), which is characterized in that outer vertical rod (1), interior upright bar(2)Pass through locating rod under upright bar(3)It is positioned at and becomes slope hollow pier exterior sheathing(7)Flange and change slope hollow pier Inner template(8)At the top of flange, outer vertical rod(1), interior upright bar(2)Top passes through upright bar upper connecting rod(4)Connection;
The outer vertical rod(1)Control outer net steel wire binding bar spacing and thickness of concrete cover, interior upright bar(2)Control Intranet steel Muscle stirrup spacing and thickness of concrete cover.
2. a kind of change slope hollow pier stirrup spacing according to claim 1 and thickness of concrete cover control device, It is characterized in that, the outer vertical rod(1), interior upright bar(2)Lower section is by connecting bolt(5), attaching nut(6)It is fixed on upright bar Lower locating rod(3)On, top is by connecting bolt(5), attaching nut(6)Connecting upright pole upper connecting rod(4).
3. a kind of change slope hollow pier stirrup spacing according to claim 1 and thickness of concrete cover control device, It is characterized in that, the outer vertical rod(1)It is diagonally disposed using angle steel, tilting slope ratio with become the outer slope of slope hollow pier than identical, Outer vertical rod(1)Length=change slope hollow pier exterior sheathing(7)Merogenesis height+10cm, outer vertical rod(1)Distance becomes outside the hollow pier of slope The net protective layer thickness of width=reinforcing bar+outer stirrup diameter of profile.
4. a kind of change slope hollow pier stirrup spacing according to claim 1 and thickness of concrete cover control device, It is characterized in that, the interior upright bar(2)It is diagonally disposed using angle steel, tilting slope ratio with become the outer slope of slope hollow pier than identical, Interior upright bar(2)Length=change slope hollow pier inner template(8)Merogenesis height+10cm, interior upright bar(2)Distance becomes in the hollow pier of slope The net protective layer thickness of width=reinforcing bar+interior stirrup diameter of profile.
5. a kind of change slope hollow pier stirrup spacing according to claim 1 and thickness of concrete cover control device, It is characterized in that, the outer vertical rod(1), interior upright bar(2)On be carved with card slot identical with stirrup spacing, for controlling between stirrup Away from.
6. a kind of change slope hollow pier stirrup spacing according to claim 1 and thickness of concrete cover control device, It is characterized in that, locating rod under the upright bar(3)By connecting bolt(5), attaching nut(6)It is fixed on and becomes slope hollow pier Exterior sheathing(7)Flange and change slope hollow pier inner template(8)At the top of flange, it which is provided with fixed and adjust outer vertical rod(1), it is interior vertical Bar(2)The card slot of position is suitable for becoming the requirement of wall thickness change at the hollow pier different height of slope.
7. a kind of change slope hollow pier stirrup spacing according to claim 1 and thickness of concrete cover control device, It is characterized in that, the upright bar upper connecting rod(4)It is equipped with and adapts to outer vertical rod(1), interior upright bar(2)The card slot of spacing variation, It is suitable for becoming the requirement of wall thickness change at the hollow pier different height of slope, plays the role of increasing upright bar rigidity.
CN201721164876.5U 2017-09-12 2017-09-12 A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device Expired - Fee Related CN207878275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721164876.5U CN207878275U (en) 2017-09-12 2017-09-12 A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721164876.5U CN207878275U (en) 2017-09-12 2017-09-12 A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device

Publications (1)

Publication Number Publication Date
CN207878275U true CN207878275U (en) 2018-09-18

Family

ID=63500162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721164876.5U Expired - Fee Related CN207878275U (en) 2017-09-12 2017-09-12 A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device

Country Status (1)

Country Link
CN (1) CN207878275U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469124A (en) * 2019-08-13 2019-11-19 武汉一冶建筑安装工程有限责任公司 Steel hoop reinforcement in concrete construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469124A (en) * 2019-08-13 2019-11-19 武汉一冶建筑安装工程有限责任公司 Steel hoop reinforcement in concrete construction method

Similar Documents

Publication Publication Date Title
CN105908902B (en) Precast Pier Columns steel reinforcement cage locating rack and pier stud steel reinforcement cage construction method
CN102767288A (en) Method and structure for mounting precast reinforced concrete stairs
CN207844900U (en) A kind of tower crane monitoring camera mounting device
CN101294443A (en) High altitude platform mounting method
CN207878275U (en) A kind of change slope hollow pier stirrup spacing and thickness of concrete cover control device
CN206873916U (en) The Shimizu concrete template level control device of Measurement of Elevator tower
CN207244452U (en) A kind of suspension bridge vice saddle adjusting apparatus in place
CN206467991U (en) The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN107386119A (en) A kind of variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device
CN205954482U (en) Construction structures of " people " style of calligraphy cable tower entablature support
CN207686147U (en) Floor and double steel bar protective layer thickness control device
CN107476603A (en) A kind of gardens wayside pavilion construction method
CN207277689U (en) Reinforcement covering layer thickness positioner
CN107620317A (en) Piping lane construction foundation pit supporting supporting device
CN104878926B (en) One kind hangs template system construction method and can have enough to meet the need rest
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN206902768U (en) A kind of post-cast strip adjustable supporting
CN114717956A (en) Bridge pier column diaphragm construction umbrella-type support system
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN206144127U (en) Simple and easy butt clamp integral type operation platform
CN205294616U (en) Z shaped steel hoisting machine constructs
CN203879014U (en) Cast-in-situ concrete floor thickness control device
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN208379893U (en) A kind of concrete prefabricated element for building
CN206205457U (en) A kind of steel reinforcement cage aids in colligation frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180918

CF01 Termination of patent right due to non-payment of annual fee