CN206986701U - A kind of steel box girder bridge Program for structural Transformation system - Google Patents

A kind of steel box girder bridge Program for structural Transformation system Download PDF

Info

Publication number
CN206986701U
CN206986701U CN201720952006.8U CN201720952006U CN206986701U CN 206986701 U CN206986701 U CN 206986701U CN 201720952006 U CN201720952006 U CN 201720952006U CN 206986701 U CN206986701 U CN 206986701U
Authority
CN
China
Prior art keywords
steel box
girder
pier
jack
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720952006.8U
Other languages
Chinese (zh)
Inventor
王磊
韩之江
吴佳佳
刘志华
赵雷
汪永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201720952006.8U priority Critical patent/CN206986701U/en
Application granted granted Critical
Publication of CN206986701U publication Critical patent/CN206986701U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of steel box girder bridge Program for structural Transformation system, including:Steel box-girder, end bay bridge pier, permanent bearing, auxiliary pier, Temporary Piers, jack, temporary support;Permanent bearing is fixedly installed on end bay bridge pier;Auxiliary pier is located at mid-span span centre position, and is provided with temporary support on the auxiliary pier, for aiding in the installation of steel box-girder in place;Temporary Piers are located on the end bay bridge pier, and jack is provided with the Temporary Piers, and the jack is used to uniformly apply top lift lifting steel box-girder and the position for steel box-girder after load removal is recovered.The final internal force status of Program for structural Transformation system described in the utility model, which reaches, once falls rack-like state, and whole process is simple to operate, and construction is quick, and system stress is clear and definite, structure is safe and reliable.

Description

A kind of steel box girder bridge Program for structural Transformation system
Technical field
The utility model belongs to technical field of bridge engineering, specifically, discloses a kind of steel box girder bridge structural system and turns Change system.
Background technology
The construction of Mid and minor spans steel box girder bridge typically passes through factory process, component conveying, the integral Cheng Qiao of joint connection in site.By existing Field be welded to connect work progress influence, under dead load, unit control Section Forces with once fall to put up bridge compare it is unreasonable, Tension is bigger than normal, under bridge cyclic load, structural fatigue easily occurs, structural bearing capacity and durability is produced very big Influence.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of steel box girder bridge Program for structural Transformation system, it is applicable The structure safety stock during steel box girder bridge operation is improved.
A kind of steel box girder bridge Program for structural Transformation system, including:Steel box-girder (1), end bay bridge pier (2), permanent bearing (3), Auxiliary pier (4), Temporary Piers (5), jack (6), temporary support (8);Wherein:
Permanent bearing (3) is fixedly installed on end bay bridge pier (2);Auxiliary pier (4) is located at mid-span span centre position, and described Temporary support (8) is installed, for aiding in the installation of steel box-girder (1) in place on auxiliary pier (4);Temporary Piers (5) are located at the side On bridge pier (2), and jack (6) is installed on the Temporary Piers (5), the jack (6), which is used to uniformly apply, to be jacked Power lifting steel box-girder (1) and the position recovery for being used for steel box-girder (1) after load removal.
Preferably, the steel box girder bridge Program for structural Transformation system also includes leveling steel plate (7), jack (6) upper and It is close to by leveling steel plate (7) levelling, up-regulation plain plate with the bottom surface of steel box-girder (1) down.
Compared with prior art, the final internal force status of Program for structural Transformation system described in the utility model reaches once to fall Rack-like state, and whole process is simple to operate, construction is quick, and system stress is clear and definite, structure is safe and reliable.
Brief description of the drawings
Fig. 1 is the initial mounting structure schematic diagram of steel box-girder.
Fig. 2 is jack position view.
Fig. 3 is jack jacking schematic diagram.
Fig. 4 is Program for structural Transformation schematic diagram.
Fig. 5 is structural system into bridge schematic diagram.
Fig. 6 is the final internal force schematic diagram of structural system.
Description of reference numerals:
1- steel box-girders, 2- bridge piers, the permanent bearings of 3-, 4- auxiliary piers, 5- Temporary Piers, 6- jack, 7- leveling steel plate, 8- face When bearing.
Embodiment
To make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings to this reality It is described in detail with the steel box girder bridge Program for structural Transformation system of new offer.
A kind of steel box girder bridge Program for structural Transformation system, including:Steel box-girder 1, bridge pier 2, permanent bearing 3, auxiliary pier 4, face When pier 5, jack 6, leveling steel plate 7, temporary support 8.
End bay bridge pier 2 construct after the completion of, permanent bearing 3 is installed on bridge pier 2, after the permanent installation of bearing 3, mid-span across It is middle to set up auxiliary pier 4, temporary support 8 is installed on auxiliary pier 4.
After the completion of the splicing of the scene of steel box-girder 1, welding, after correct lifting is attached to bridge location, temporary support 8 is removed.End bay bridge Dun2Chu sets Temporary Piers 5, installs jack 6 on Temporary Piers 5, jack 6 it is upper and lower with the levelling of leveling steel plate 7, upper steel plate with It is close at the bottom of steel box-girder 1.After jack 6 is installed in place, auxiliary pier 4 can be removed;Each jack 6 uniformly exerts a force, and jacks steel box-girder 1 To computed altitude, the welding of the mid-span of steel box-girder 1 is closed up.Respectively across jack 6, removal load, steel box-girder 1 force falling to jack-up simultaneously Front position.After steel box-girder 1 sets back, jack 6 and Temporary Piers 5 are removed.
When in use, can carry out in accordance with the following steps:
(1) permanent bearing is installed after the completion of Bridge Pier Construction, on bridge pier;
(2) mid-span span centre sets up auxiliary pier, and temporary support is installed on auxiliary pier;
(3) after the completion of the splicing of steel box-girder scene, welding, correct lifting is attached to bridge location, sees Fig. 1;
(4) temporary support is removed, sees Fig. 2;
(5) Temporary Piers are set at end bay bridge pier, jack is installed on Temporary Piers, jack is upper and lower to use leveling steel plate levelling, Upper steel plate is close to steel box-girder bottom;
(6) auxiliary pier is removed;
(7) each jack uniformly exerts a force, and steel box-girder is jacked to computed altitude;
(8) steel box-girder mid-span welding is closed up;
(9) while removal is respectively across jack load, and steel box-girder forces falling to jack-up front position;
(10) jack and Temporary Piers are removed.
Compared with prior art, the final internal force status of Program for structural Transformation system described in the utility model reaches once to fall Rack-like state, and whole process is simple to operate, construction is quick, and system stress is clear and definite, structure is safe and reliable.
It is understood that embodiment of above is merely to illustrate that principle of the present utility model and used exemplary Embodiment, but the utility model is not limited thereto.For those skilled in the art, this is not being departed from In the case of the spirit and essence of utility model, various changes and modifications can be made therein, and these variations and modifications are also considered as this reality With new protection domain.

Claims (2)

  1. A kind of 1. steel box girder bridge Program for structural Transformation system, it is characterised in that including:It is steel box-girder (1), end bay bridge pier (2), permanent Bearing (3), auxiliary pier (4), Temporary Piers (5), jack (6), temporary support (8);Wherein:
    Permanent bearing (3) is fixedly installed on end bay bridge pier (2);Auxiliary pier (4) is located at mid-span span centre position, and the auxiliary Temporary support (8) is installed, for aiding in the installation of steel box-girder (1) in place on pier (4);Temporary Piers (5) are located at the end bay bridge On pier (2), and jack (6) is installed on the Temporary Piers (5), the jack (6) is used to uniformly apply top lift lift Rise steel box-girder (1) and the position for steel box-girder (1) after load removal is recovered.
  2. 2. steel box girder bridge Program for structural Transformation system according to claim 1, it is characterised in that the steel box girder bridge structure System transform system also includes leveling steel plate (7), and the upper and lower of jack (6) passes through leveling steel plate (7) levelling, up-regulation plain plate It is close to the bottom surface of steel box-girder (1).
CN201720952006.8U 2017-07-28 2017-07-28 A kind of steel box girder bridge Program for structural Transformation system Expired - Fee Related CN206986701U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720952006.8U CN206986701U (en) 2017-07-28 2017-07-28 A kind of steel box girder bridge Program for structural Transformation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720952006.8U CN206986701U (en) 2017-07-28 2017-07-28 A kind of steel box girder bridge Program for structural Transformation system

Publications (1)

Publication Number Publication Date
CN206986701U true CN206986701U (en) 2018-02-09

Family

ID=61418277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720952006.8U Expired - Fee Related CN206986701U (en) 2017-07-28 2017-07-28 A kind of steel box girder bridge Program for structural Transformation system

Country Status (1)

Country Link
CN (1) CN206986701U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922097A (en) * 2022-03-08 2022-08-19 中国建筑第六工程局有限公司 Reinforcing and modifying method for changing line shape of existing steel box girder continuous beam bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922097A (en) * 2022-03-08 2022-08-19 中国建筑第六工程局有限公司 Reinforcing and modifying method for changing line shape of existing steel box girder continuous beam bridge
CN114922097B (en) * 2022-03-08 2024-02-13 中国建筑第六工程局有限公司 Reinforcing transformation method for changing line shape of continuous girder bridge of existing steel box girder

Similar Documents

Publication Publication Date Title
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN202247688U (en) Aerodynamic force prevention protecting shed frame for overpassing of high-speed railways
CN106894346B (en) A kind of the continuous beam bridge construction method
CN103967284B (en) The steel column installation method of reserved stigma docking
CN104947606A (en) Correcting method for bridge superstructure
CN112554250A (en) Pile foundation building micro composite steel pipe pile underpinning inclination correcting structure and construction method thereof
CN108221711A (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN206986701U (en) A kind of steel box girder bridge Program for structural Transformation system
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN107245954B (en) A kind of Mid and minor spans steel box girder bridge construction method
CN105155418A (en) Construction method for bridge horizontal movement
CN107524093A (en) A kind of bridge jacking method
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN106758888A (en) A kind of quick method for dismounting for multispan concrete arch-type bridge waterborne
CN112761081B (en) Replacement structure and construction method for active ultra-wide beam body support
CN214328579U (en) Replacement structure for active ultra-wide beam body support
TWI542756B (en) Bridge jack jack support bracket
CN203113515U (en) Slip form jacking integrated device
CN110258679B (en) Jacking and inclination correcting method for fan foundation
CN208088151U (en) A kind of plate girder bridge jacking auxiliary steel member
CN203188123U (en) Hydraulic jack device for lowering whole bridge anticollision steel cofferdam synchronously
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN202509414U (en) Construction device for jacking bridge broken column
CN207714162U (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN112813852A (en) Repairing and reinforcing method for bridge deck subsidence of in-service bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

Termination date: 20190728

CF01 Termination of patent right due to non-payment of annual fee