CN206986701U - A kind of steel box girder bridge Program for structural Transformation system - Google Patents
A kind of steel box girder bridge Program for structural Transformation system Download PDFInfo
- Publication number
- CN206986701U CN206986701U CN201720952006.8U CN201720952006U CN206986701U CN 206986701 U CN206986701 U CN 206986701U CN 201720952006 U CN201720952006 U CN 201720952006U CN 206986701 U CN206986701 U CN 206986701U
- Authority
- CN
- China
- Prior art keywords
- steel box
- girder
- pier
- jack
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of steel box girder bridge Program for structural Transformation system, including:Steel box-girder, end bay bridge pier, permanent bearing, auxiliary pier, Temporary Piers, jack, temporary support;Permanent bearing is fixedly installed on end bay bridge pier;Auxiliary pier is located at mid-span span centre position, and is provided with temporary support on the auxiliary pier, for aiding in the installation of steel box-girder in place;Temporary Piers are located on the end bay bridge pier, and jack is provided with the Temporary Piers, and the jack is used to uniformly apply top lift lifting steel box-girder and the position for steel box-girder after load removal is recovered.The final internal force status of Program for structural Transformation system described in the utility model, which reaches, once falls rack-like state, and whole process is simple to operate, and construction is quick, and system stress is clear and definite, structure is safe and reliable.
Description
Technical field
The utility model belongs to technical field of bridge engineering, specifically, discloses a kind of steel box girder bridge structural system and turns
Change system.
Background technology
The construction of Mid and minor spans steel box girder bridge typically passes through factory process, component conveying, the integral Cheng Qiao of joint connection in site.By existing
Field be welded to connect work progress influence, under dead load, unit control Section Forces with once fall to put up bridge compare it is unreasonable,
Tension is bigger than normal, under bridge cyclic load, structural fatigue easily occurs, structural bearing capacity and durability is produced very big
Influence.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of steel box girder bridge Program for structural Transformation system, it is applicable
The structure safety stock during steel box girder bridge operation is improved.
A kind of steel box girder bridge Program for structural Transformation system, including:Steel box-girder (1), end bay bridge pier (2), permanent bearing (3),
Auxiliary pier (4), Temporary Piers (5), jack (6), temporary support (8);Wherein:
Permanent bearing (3) is fixedly installed on end bay bridge pier (2);Auxiliary pier (4) is located at mid-span span centre position, and described
Temporary support (8) is installed, for aiding in the installation of steel box-girder (1) in place on auxiliary pier (4);Temporary Piers (5) are located at the side
On bridge pier (2), and jack (6) is installed on the Temporary Piers (5), the jack (6), which is used to uniformly apply, to be jacked
Power lifting steel box-girder (1) and the position recovery for being used for steel box-girder (1) after load removal.
Preferably, the steel box girder bridge Program for structural Transformation system also includes leveling steel plate (7), jack (6) upper and
It is close to by leveling steel plate (7) levelling, up-regulation plain plate with the bottom surface of steel box-girder (1) down.
Compared with prior art, the final internal force status of Program for structural Transformation system described in the utility model reaches once to fall
Rack-like state, and whole process is simple to operate, construction is quick, and system stress is clear and definite, structure is safe and reliable.
Brief description of the drawings
Fig. 1 is the initial mounting structure schematic diagram of steel box-girder.
Fig. 2 is jack position view.
Fig. 3 is jack jacking schematic diagram.
Fig. 4 is Program for structural Transformation schematic diagram.
Fig. 5 is structural system into bridge schematic diagram.
Fig. 6 is the final internal force schematic diagram of structural system.
Description of reference numerals:
1- steel box-girders, 2- bridge piers, the permanent bearings of 3-, 4- auxiliary piers, 5- Temporary Piers, 6- jack, 7- leveling steel plate, 8- face
When bearing.
Embodiment
To make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings to this reality
It is described in detail with the steel box girder bridge Program for structural Transformation system of new offer.
A kind of steel box girder bridge Program for structural Transformation system, including:Steel box-girder 1, bridge pier 2, permanent bearing 3, auxiliary pier 4, face
When pier 5, jack 6, leveling steel plate 7, temporary support 8.
End bay bridge pier 2 construct after the completion of, permanent bearing 3 is installed on bridge pier 2, after the permanent installation of bearing 3, mid-span across
It is middle to set up auxiliary pier 4, temporary support 8 is installed on auxiliary pier 4.
After the completion of the splicing of the scene of steel box-girder 1, welding, after correct lifting is attached to bridge location, temporary support 8 is removed.End bay bridge
Dun2Chu sets Temporary Piers 5, installs jack 6 on Temporary Piers 5, jack 6 it is upper and lower with the levelling of leveling steel plate 7, upper steel plate with
It is close at the bottom of steel box-girder 1.After jack 6 is installed in place, auxiliary pier 4 can be removed;Each jack 6 uniformly exerts a force, and jacks steel box-girder 1
To computed altitude, the welding of the mid-span of steel box-girder 1 is closed up.Respectively across jack 6, removal load, steel box-girder 1 force falling to jack-up simultaneously
Front position.After steel box-girder 1 sets back, jack 6 and Temporary Piers 5 are removed.
When in use, can carry out in accordance with the following steps:
(1) permanent bearing is installed after the completion of Bridge Pier Construction, on bridge pier;
(2) mid-span span centre sets up auxiliary pier, and temporary support is installed on auxiliary pier;
(3) after the completion of the splicing of steel box-girder scene, welding, correct lifting is attached to bridge location, sees Fig. 1;
(4) temporary support is removed, sees Fig. 2;
(5) Temporary Piers are set at end bay bridge pier, jack is installed on Temporary Piers, jack is upper and lower to use leveling steel plate levelling,
Upper steel plate is close to steel box-girder bottom;
(6) auxiliary pier is removed;
(7) each jack uniformly exerts a force, and steel box-girder is jacked to computed altitude;
(8) steel box-girder mid-span welding is closed up;
(9) while removal is respectively across jack load, and steel box-girder forces falling to jack-up front position;
(10) jack and Temporary Piers are removed.
Compared with prior art, the final internal force status of Program for structural Transformation system described in the utility model reaches once to fall
Rack-like state, and whole process is simple to operate, construction is quick, and system stress is clear and definite, structure is safe and reliable.
It is understood that embodiment of above is merely to illustrate that principle of the present utility model and used exemplary
Embodiment, but the utility model is not limited thereto.For those skilled in the art, this is not being departed from
In the case of the spirit and essence of utility model, various changes and modifications can be made therein, and these variations and modifications are also considered as this reality
With new protection domain.
Claims (2)
- A kind of 1. steel box girder bridge Program for structural Transformation system, it is characterised in that including:It is steel box-girder (1), end bay bridge pier (2), permanent Bearing (3), auxiliary pier (4), Temporary Piers (5), jack (6), temporary support (8);Wherein:Permanent bearing (3) is fixedly installed on end bay bridge pier (2);Auxiliary pier (4) is located at mid-span span centre position, and the auxiliary Temporary support (8) is installed, for aiding in the installation of steel box-girder (1) in place on pier (4);Temporary Piers (5) are located at the end bay bridge On pier (2), and jack (6) is installed on the Temporary Piers (5), the jack (6) is used to uniformly apply top lift lift Rise steel box-girder (1) and the position for steel box-girder (1) after load removal is recovered.
- 2. steel box girder bridge Program for structural Transformation system according to claim 1, it is characterised in that the steel box girder bridge structure System transform system also includes leveling steel plate (7), and the upper and lower of jack (6) passes through leveling steel plate (7) levelling, up-regulation plain plate It is close to the bottom surface of steel box-girder (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720952006.8U CN206986701U (en) | 2017-07-28 | 2017-07-28 | A kind of steel box girder bridge Program for structural Transformation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720952006.8U CN206986701U (en) | 2017-07-28 | 2017-07-28 | A kind of steel box girder bridge Program for structural Transformation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206986701U true CN206986701U (en) | 2018-02-09 |
Family
ID=61418277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720952006.8U Expired - Fee Related CN206986701U (en) | 2017-07-28 | 2017-07-28 | A kind of steel box girder bridge Program for structural Transformation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206986701U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922097A (en) * | 2022-03-08 | 2022-08-19 | 中国建筑第六工程局有限公司 | Reinforcing and modifying method for changing line shape of existing steel box girder continuous beam bridge |
-
2017
- 2017-07-28 CN CN201720952006.8U patent/CN206986701U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922097A (en) * | 2022-03-08 | 2022-08-19 | 中国建筑第六工程局有限公司 | Reinforcing and modifying method for changing line shape of existing steel box girder continuous beam bridge |
CN114922097B (en) * | 2022-03-08 | 2024-02-13 | 中国建筑第六工程局有限公司 | Reinforcing transformation method for changing line shape of continuous girder bridge of existing steel box girder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437300A (en) | Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket | |
CN202247688U (en) | Aerodynamic force prevention protecting shed frame for overpassing of high-speed railways | |
CN106894346B (en) | A kind of the continuous beam bridge construction method | |
CN103967284B (en) | The steel column installation method of reserved stigma docking | |
CN104947606A (en) | Correcting method for bridge superstructure | |
CN112554250A (en) | Pile foundation building micro composite steel pipe pile underpinning inclination correcting structure and construction method thereof | |
CN108221711A (en) | Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus | |
CN206986701U (en) | A kind of steel box girder bridge Program for structural Transformation system | |
CN104775363B (en) | The spelling method of upper king-post strut reinforcing bar sections | |
CN107245954B (en) | A kind of Mid and minor spans steel box girder bridge construction method | |
CN105155418A (en) | Construction method for bridge horizontal movement | |
CN107524093A (en) | A kind of bridge jacking method | |
CN205242238U (en) | Be applied to self anchored suspension bridge's main girder structure | |
CN106758888A (en) | A kind of quick method for dismounting for multispan concrete arch-type bridge waterborne | |
CN112761081B (en) | Replacement structure and construction method for active ultra-wide beam body support | |
CN214328579U (en) | Replacement structure for active ultra-wide beam body support | |
TWI542756B (en) | Bridge jack jack support bracket | |
CN203113515U (en) | Slip form jacking integrated device | |
CN110258679B (en) | Jacking and inclination correcting method for fan foundation | |
CN208088151U (en) | A kind of plate girder bridge jacking auxiliary steel member | |
CN203188123U (en) | Hydraulic jack device for lowering whole bridge anticollision steel cofferdam synchronously | |
CN108342984B (en) | Soft foundation trestle for mudflat and installation and sedimentation method thereof | |
CN202509414U (en) | Construction device for jacking bridge broken column | |
CN207714162U (en) | Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus | |
CN112813852A (en) | Repairing and reinforcing method for bridge deck subsidence of in-service bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180209 Termination date: 20190728 |
|
CF01 | Termination of patent right due to non-payment of annual fee |