CN206986662U - One kind moulds ecological curb - Google Patents

One kind moulds ecological curb Download PDF

Info

Publication number
CN206986662U
CN206986662U CN201720844936.1U CN201720844936U CN206986662U CN 206986662 U CN206986662 U CN 206986662U CN 201720844936 U CN201720844936 U CN 201720844936U CN 206986662 U CN206986662 U CN 206986662U
Authority
CN
China
Prior art keywords
curb
packing area
block
ecological
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720844936.1U
Other languages
Chinese (zh)
Inventor
吴福宝
朱孟君
何晖
瞿晓浩
柏威伟
罗群
薛利海
陈海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201720844936.1U priority Critical patent/CN206986662U/en
Application granted granted Critical
Publication of CN206986662U publication Critical patent/CN206986662U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of ecological curb of molding, including along the spaced curb packing area of road direction, pass through lateral block interval between the two neighboring curb packing area, the curb packing area sets horizontal block close to runway side, lateral block of the horizontal block both ends respectively with curb packing area both sides is connected, and curb filler is filled in the curb packing area.Curb packing area is as artificial ridging curb in the molding ecology curb, edge sidewise restraint is provided by lateral block and horizontal block simultaneously, earth shoulder is hardened, outward appearance is neat, it is not only notable with afforestation ecological environment protecting, and the construction quality of road surface edge construction greatly improved.

Description

One kind moulds ecological curb
Technical field
The utility model belongs to the road traffic technical field such as highway, railway, town road, and in particular to one kind molding life State curb.
Background technology
The curb of highway engineering is the edge construction on road surface, is the important part in road surface, has and exclude road table rainwater With the double action of road surface structare layer infiltration, greening earth shoulder and hardening two kinds of forms of curb are generally divided into.
Greening earth shoulder is constructed after the completion of road surface structare layer construction, therefore during road surface structare layer construction, its edge does not have Sidewise restraint, compactness cannot be controlled effectively, more loosely.Due to excluding infiltration demand between pavement structure, it is necessary on road surface After the edge of structure sheaf manually sets pervious bed, then artificial ridging forms earth shoulder.The pervious bed and ridging manually filled is formed Earth shoulder, width is small and thickness of thin, can only hand compaction, due to no sidewise restraint, afforest the outer contour shape of earth shoulder It can not ensure with compactness, often be destroyed by rush of water during heavy rains by rainwater on road surface.
Hardening curb is first constructed before road surface structare layer construction, plays a part of sidewise restraint, is advantageous to improve road surface The construction quality of structure edge.Hardening curb typically has two kinds of shapes of mortar flag stone curb and concrete precast block assembly curb again Formula, curb, concrete precast block assembly shoulder work efficiency are hardened relative to mortar flag stone, but cost is higher, and hardening curb is Masonry structure, reliable in quality, but cost are high, unsightly.
Therefore, it is necessary to which designing one kind both can guarantee that road surface structare layer edge construction quality, there is afforestation ecological environmental protection effect again The curb of fruit.
Utility model content
The purpose of this utility model is to overcome existing earth shoulder to be unfavorable for road surface structare layer edge quality control on construction, and Harden that curb cost is high, inaesthetic problem.
Therefore, the utility model embodiment provides a kind of ecological curb of molding, including it is spaced along road direction Curb packing area, pass through lateral block interval between the two neighboring curb packing area, the curb packing area is close to driving Road side sets horizontal block, and lateral block of the horizontal block both ends respectively with curb packing area both sides is connected, described Fill curb filler in curb packing area.
Further, draining section, the draining section and curb filler are provided between the two neighboring curb packing area Lateral block is set between area.
Further, the draining section uses dank material, the draining section along the width along road direction for 5~ 30cm。
Further, the lateral block includes right-angled trapezium plate and is arranged on the L-type plate of right-angled trapezium plate side, described The horizontal segment of L-type plate is parallel with the base of right-angled trapezium plate, and the vertical section of L-type plate is parallel with the straight waist of right-angled trapezium plate;It is described Right-angled trapezium plate is connected with draining section, and L-type plate is connected with curb packing area.
Further, the lateral block between the two neighboring curb packing area has two, and on two lateral blocks Lower superposition is set, and the oblique waist of the right-angled trapezium plate of two lateral blocks is generally aligned in the same plane.
Further, the horizontal block is sequentially spliced by the prefabricated block of several blocks.
Further, the prefabricated block includes transverse slat and riser, and transverse slat and riser form L-type structure;The transverse slat with Curb packing area connects.
Further, the outward flange of the curb packing area sets geotechnological gauze pad, and the geotechnological gauze pad is close to laterally Block and horizontal block are set.
Further, the useless side that the curb filler is clear table soil or roadbed substrate is excavated.
Compared with prior art, the beneficial effects of the utility model:
(1) curb packing area is used as artificial ridging curb in this ecological curb of molding provided by the utility model, simultaneously Edge sidewise restraint is provided by lateral block and horizontal block, earth shoulder is hardened, not only with afforestation ecological environment protecting Significantly, and it greatly improved the construction quality of road surface edge construction.
(2) this ecological curb outward appearance of molding provided by the utility model is neat, and road is filled using the discarded clear table earthwork Shoulder, ecological, environmental protective, cost is saved, while lateral block and horizontal block can be prefabricated, efficiency of construction is high.
The utility model is described in further details below with reference to accompanying drawing.
Brief description of the drawings
Fig. 1 is the cross-sectional configuration schematic diagram that the utility model moulds ecological curb;
Fig. 2 is the planar structure schematic diagram that the utility model moulds ecological curb;
Fig. 3 is the structural representation that the utility model moulds lateral block in ecological curb;
Fig. 4 is the structural representation that the utility model moulds prefabricated block in ecological curb;
Description of reference numerals:1st, lateral block;2nd, curb packing area;3rd, prefabricated block;4th, draining section;11st, right-angled trapezium Plate;12nd, L-type plate;31st, transverse slat;32nd, riser.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The all other embodiment obtained, belong to the scope of the utility model protection.
As depicted in figs. 1 and 2, a kind of ecological curb of molding is present embodiments provided, including is arranged at intervals along road direction Curb packing area 2, be spaced by lateral block 1 between the two neighboring curb packing area 2, the curb packing area 2 is leaned on Nearly runway side sets horizontal block, and lateral block 1 of the horizontal block both ends respectively with the both sides of curb packing area 2 is connected Connect, curb filler is filled in the curb packing area 2.Curb is filled wherein and is filled out as artificial ridging curb in curb packing area 2 Material, for afforesting, ecological, environmental protective effect is improved, while edge sidewise restraint is provided by lateral block 1 and horizontal block, by soil Curb hardens, and the construction quality of road surface edge construction greatly improved.
The embodiment of refinement, as shown in Fig. 2 being provided with draining section 4, institute between the two neighboring curb packing area 2 State and lateral block 1 is set between draining section 4 and curb packing area 2, passing away of the draining section 4 as construction period rainwater, institute State and drainage channel of the dank material as road surface structare layer is backfilled in draining section 4, have and exclude road table rainwater and pavement structure The double action of layer infiltration, the draining section 4 are 5~30cm along the width along road direction.
In the present embodiment lateral block 1 and horizontal block be provided as that road surface structare layer and curb banket important isolate Component, it can be made up of materials such as armored concrete, plain concrete, pervious concrete, foam concrete or other materials.Lateral gear Block 1 and horizontal block mould the stereotyped structure of ecological curb as the present embodiment, the structure of the lateral block 1 as shown in figure 3, Including right-angled trapezium plate 11 and the L-type plate 12 for being arranged on the side of right-angled trapezium plate 11, horizontal segment and the right angle ladder of the L-type plate 12 The base of shape plate 11 is parallel, and the vertical section of L-type plate 12 is parallel with the straight waist of right-angled trapezium plate 11;The right-angled trapezium plate 11 and row Water section 4 is connected, and L-type plate 12 is connected with curb packing area 2, and L-type plate 12 forms overall structure with the curb filler after compacting.It is adjacent Lateral block 1 between two curb packing areas 2 has two, and two lateral blocks are superimposed setting about 1, and two lateral The oblique waist of the right-angled trapezium plate 11 of block 1 is generally aligned in the same plane, and lateral block 1 is stacked on top of one another to be added to put and reduce lateral block 1 Difficulty of construction, reduce the weight manually carried.And the horizontal block sequentially spliced by the prefabricated block 3 of several blocks and Into prefabricated block 3 can be prefabricated in advance, effectively increases its efficiency of construction;The structure of the prefabricated block 3 as shown in figure 4, including Transverse slat 31 and riser 32, transverse slat 31 and riser 32 form L-type structure;The transverse slat 31 is connected with curb packing area 2, transverse slat 31 with Curb filler after compacting forms overall structure.The present embodiment is by the setting of lateral block 1 and horizontal block, to manually filling Be used for afforest curb filler provide sidewise restraint, the outer contour shape and compactness of curb has been effectively ensured, has overcome The shortcomings of existing artificial ridging curb exists inefficient and is difficult to tamp, damaged or destroyed by flood is serious during heavy rain.
In addition, the material such as useless side that curb filler can be excavated using clear table soil, roadbed substrate in the present embodiment, at utmost Engineering digging soil is reduced, ecological, environmental protective, its afforestation effect is more preferable than in general greening earth shoulder, and can use small rammer tool Or manually tamped, compactness can be controlled by heavy type 85%.
The process that ecological curb progress road surface edge construction construction is moulded using the present embodiment is as follows:As shown in figure 1, on road After bed IMM algorithm, the molding ecology curb setting-out of lower floor is carried out, first template is placed in the inner side of curb and both ends, then distinguishes The template for being close to outside and both ends places horizontal block and lateral block 1, then the outside shuttering in curb, by interior outside and two The curb packing area 2 for forming lower floor is fixed in the template at end, and curb filler is filled into the curb packing area of the lower floor and is rammed The template at outside and both ends in being removed after reality, so as to form lower floor's curb segmentation, lower floor's curb section length can be 2~30m, under Wide 5~30cm drainings section is set between layer curb segmentation;The understructure of above-mentioned work formation curb, road are repeated along road direction Paving concrete pavement underlayment and gone to a grassroots level after the understructure of shoulder is completed, in road surface structare layer work progress, draining section use with The identical material of road surface structare layer is backfilling and compacted, the top surface absolute altitude of lower floor's curb with go to a grassroots level pave after the completion of absolute altitude it is consistent;Finally According to the work progress of the understructure of curb, the superstructure of formation curb on the understructure gone to a grassroots level with curb, Pave upper basic unit and road surface after the completion of the superstructure of curb, completes the construction construction of road surface edge.
Wherein, the template in interior outside and both ends can use steel form, plastic formwork or other materials in above-mentioned work progress Template, two Side Templates are typified form, and size is determined by design requirement, and inner side and outer side template is Spliced type template, template Between by lock fix;After the completion of model sheetinstallat, cross spacing frame is set between interior outboard template, prevented while fixed form Only template deformation during earth filling tamping, influence curb outward appearance.And when curb filler is sandy soil, can be in the curb packing area 2 Outward flange geotechnological gauze pad is set, the geotechnological gauze pad is close to lateral block 1 and horizontal block is set, for increasing antiscour energy Power, the rebasing portion's inflection of geonet are embedded under curb filler, while are fitted on the inside of outboard template, and diffraction length is reserved on top.
In summary, this ecological curb outward appearance of molding provided by the utility model is neat, utilizes the discarded clear table earthwork Fill curb, ecological, environmental protective, its afforestation effect is more preferable than in general greening earth shoulder;For curb is hardened, cost is excellent Gesture is obvious, greening and environmental protection significant effect, convenient, reliable in quality of constructing.
Exemplified as above is only for example, not forming to the scope of protection of the utility model to of the present utility model Limitation, it is every to be belonged to the same or analogous design of the utility model within protection scope of the present invention.

Claims (9)

1. one kind moulds ecological curb, it is characterised in that:It is adjacent including the spaced curb packing area (2) of suitable road direction It is spaced between two curb packing areas (2) by lateral block (1), the curb packing area (2) is close to runway side Horizontal block is set, and lateral block (1) of the horizontal block both ends respectively with curb packing area (2) both sides is connected, described Fill curb filler in curb packing area (2).
2. ecological curb is moulded as claimed in claim 1, it is characterised in that:Between the two neighboring curb packing area (2) Draining section (4) is provided with, lateral block (1) is set between the draining section (4) and curb packing area (2).
3. ecological curb is moulded as claimed in claim 2, it is characterised in that:The draining section (4) uses dank material, institute It is 5~30cm that draining section (4), which is stated, along the width along road direction.
4. ecological curb is moulded as claimed in claim 2, it is characterised in that:The lateral block (1) includes right-angled trapezium plate (11) the L-type plate (12) of right-angled trapezium plate (11) side, the horizontal segment and right-angled trapezium plate of the L-type plate (12) are arranged on and (11) base is parallel, and the vertical section of L-type plate (12) is parallel with the straight waist of right-angled trapezium plate (11);The right-angled trapezium plate (11) It is connected with draining section (4), L-type plate (12) is connected with curb packing area (2).
5. ecological curb is moulded as claimed in claim 4, it is characterised in that:Between the two neighboring curb packing area (2) Lateral block (1) have two, and two lateral blocks (1) are superimposed setting, the right-angled trapezium plate of two lateral blocks (1) up and down (11) oblique waist is generally aligned in the same plane.
6. ecological curb is moulded as claimed in claim 1, it is characterised in that:The horizontal block is by the prefabricated block of several blocks (3) sequentially it is spliced.
7. ecological curb is moulded as claimed in claim 6, it is characterised in that:The prefabricated block (3) include transverse slat (31) and Riser (32), transverse slat (31) and riser (32) form L-type structure;The transverse slat (31) is connected with curb packing area (2).
8. ecological curb is moulded as claimed in claim 1, it is characterised in that:The outward flange of the curb packing area (2) is set Geotechnological gauze pad, the geotechnological gauze pad is close to lateral block (1) and horizontal block is set.
9. ecological curb is moulded as claimed in claim 1, it is characterised in that:The curb filler is clear table soil or roadbed substrate The useless side excavated.
CN201720844936.1U 2017-07-13 2017-07-13 One kind moulds ecological curb Active CN206986662U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720844936.1U CN206986662U (en) 2017-07-13 2017-07-13 One kind moulds ecological curb

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720844936.1U CN206986662U (en) 2017-07-13 2017-07-13 One kind moulds ecological curb

Publications (1)

Publication Number Publication Date
CN206986662U true CN206986662U (en) 2018-02-09

Family

ID=61405197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720844936.1U Active CN206986662U (en) 2017-07-13 2017-07-13 One kind moulds ecological curb

Country Status (1)

Country Link
CN (1) CN206986662U (en)

Similar Documents

Publication Publication Date Title
CN107558480B (en) The construction method of the reinforced ecological slope protection structure of roadbed three-dimensional water discharge
CN203188065U (en) Ballastless track railway expansion soil cutting bedding and slope protection structure
CN104532857A (en) Flexible expansion reduced ecological slope protection construction
CN109736291A (en) One kind owing consolidation and blows on the base of alluvial plain that biological cement is reinforcing road bed and its construction method
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN106560559B (en) A kind of leakage preventing structure and construction method for city river
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN107805987A (en) The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section
CN113445396A (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN107313456A (en) A kind of municipal inspection shaft and its anti-excavation construction method
CN104234034A (en) First water discharge and then sealing and blocking plate carrying type road embankment and construction method
CN111778941A (en) High-standard farmland channel construction method and structure
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN109371910B (en) Ground-cushion height-filling protection and construction method
CN204356788U (en) Flexibility subtracts swollen ecological revetment structure
CN109487641A (en) A kind of high-speed railway monoblock type cable slot structure and surface layer of subgrade bed construction method
CN212405094U (en) High water content clay fill foundation drainage system
CN210946329U (en) High embankment structure of filling up in subway top
CN112012064A (en) Technology for treating road soft soil foundation by using geotextile bags
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN207878440U (en) A kind of reinforcement composite foundation structure suitable for soft soil foundation
CN108867614B (en) Construction method for paving road on debris flow soft foundation
CN206986662U (en) One kind moulds ecological curb
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN215758302U (en) High liquid limit soil roadbed structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant