CN206957037U - 一种预制钢平板组合剪力墙 - Google Patents
一种预制钢平板组合剪力墙 Download PDFInfo
- Publication number
- CN206957037U CN206957037U CN201720488649.1U CN201720488649U CN206957037U CN 206957037 U CN206957037 U CN 206957037U CN 201720488649 U CN201720488649 U CN 201720488649U CN 206957037 U CN206957037 U CN 206957037U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- plate
- concrete
- shear wall
- main steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 75
- 239000010959 steel Substances 0.000 title claims abstract description 75
- 239000004567 concrete Substances 0.000 claims abstract description 33
- 239000003351 stiffener Substances 0.000 claims abstract description 16
- 238000010008 shearing Methods 0.000 claims abstract description 9
- 239000011210 fiber-reinforced concrete Substances 0.000 claims description 3
- 238000005187 foaming Methods 0.000 claims description 3
- 239000011376 self-consolidating concrete Substances 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 2
- 238000005266 casting Methods 0.000 abstract description 4
- 239000004566 building material Substances 0.000 abstract description 2
- 239000011248 coating agent Substances 0.000 abstract description 2
- 238000000576 coating method Methods 0.000 abstract description 2
- 230000007797 corrosion Effects 0.000 abstract description 2
- 238000005260 corrosion Methods 0.000 abstract description 2
- 239000003973 paint Substances 0.000 abstract description 2
- 230000002265 prevention Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000002421 anti-septic effect Effects 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000004079 fireproofing Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720488649.1U CN206957037U (zh) | 2017-05-04 | 2017-05-04 | 一种预制钢平板组合剪力墙 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720488649.1U CN206957037U (zh) | 2017-05-04 | 2017-05-04 | 一种预制钢平板组合剪力墙 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206957037U true CN206957037U (zh) | 2018-02-02 |
Family
ID=61374643
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720488649.1U Active CN206957037U (zh) | 2017-05-04 | 2017-05-04 | 一种预制钢平板组合剪力墙 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206957037U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108571095A (zh) * | 2018-06-15 | 2018-09-25 | 浙江绿筑集成科技有限公司 | 一种组合剪力墙及其拼接方法 |
CN108775098A (zh) * | 2018-06-15 | 2018-11-09 | 浙江绿筑集成科技有限公司 | 跨楼层pec剪力墙-钢连梁连肢墙连接节点的制作方法 |
CN110359581A (zh) * | 2019-04-03 | 2019-10-22 | 浙江越宫钢结构有限公司 | 铝合金剪力墙及预制构件及建筑单体 |
-
2017
- 2017-05-04 CN CN201720488649.1U patent/CN206957037U/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108571095A (zh) * | 2018-06-15 | 2018-09-25 | 浙江绿筑集成科技有限公司 | 一种组合剪力墙及其拼接方法 |
CN108775098A (zh) * | 2018-06-15 | 2018-11-09 | 浙江绿筑集成科技有限公司 | 跨楼层pec剪力墙-钢连梁连肢墙连接节点的制作方法 |
CN108571095B (zh) * | 2018-06-15 | 2023-09-01 | 浙江绿筑集成科技有限公司 | 一种组合剪力墙及其拼接方法 |
CN108775098B (zh) * | 2018-06-15 | 2023-12-05 | 浙江绿筑集成科技有限公司 | 跨楼层pec剪力墙-钢连梁连肢墙连接节点的制作方法 |
CN110359581A (zh) * | 2019-04-03 | 2019-10-22 | 浙江越宫钢结构有限公司 | 铝合金剪力墙及预制构件及建筑单体 |
CN110359581B (zh) * | 2019-04-03 | 2024-04-12 | 浙江越宫钢结构有限公司 | 铝合金剪力墙及预制构件及建筑单体 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206957037U (zh) | 一种预制钢平板组合剪力墙 | |
CN205688655U (zh) | 预制装配式墙面板构件 | |
CN109083308B (zh) | 一种抗震预制装配式的墙体及其施工方法 | |
CN105133731B (zh) | 一种装配式钢与混凝土组合结构 | |
CN201695515U (zh) | 轻钢轻混凝土结构体系 | |
CN106869567A (zh) | 一种耗能型冷弯薄壁钢管混凝土抗侧力体系 | |
CN206693492U (zh) | 一种装配式住宅钢结构体系 | |
CN208009698U (zh) | 一种结合剪力墙和框架结构的模块化建筑结构 | |
CN206385682U (zh) | 一种由矩形钢管和c型钢组成的模块式钢板组合剪力墙 | |
CN102003030A (zh) | 预制煤矸石混凝土空心剪力墙板 | |
CN107090938A (zh) | 一种装配式住宅钢结构体系 | |
CN206752754U (zh) | 一种由h型钢和t型钢组成的组合剪力墙 | |
CN206581456U (zh) | 带有加强管的钢结构墙体构件 | |
CN206752819U (zh) | 一种型钢带肋可扩展的钢混组合预制墙 | |
CN107060192A (zh) | 一种由h型钢和钢板组成的钢板组合剪力墙及制作方法 | |
CN204919963U (zh) | 具有加强连接结构的墙块 | |
CN107201782A (zh) | 一种装配式建筑的墙体、楼板连接节点及方法 | |
CN209227757U (zh) | 模块化钉合层积木保温多功能结构板 | |
CN203546908U (zh) | 一种装配式建筑墙梁稳定连接结构 | |
CN206752820U (zh) | 一种由h型钢和钢板组成的模块式钢板组合剪力墙 | |
CN207048117U (zh) | 一种预制型钢混凝土剪力墙 | |
CN206737195U (zh) | 一种装配式建筑的墙体结构 | |
CN207063236U (zh) | 一种新型建筑墙体 | |
CN206815667U (zh) | 一种易起吊的磷石膏复合墙体 | |
CN103790268B (zh) | 数字式多功能模块房屋组合墙体 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Dongyue Green Building Integrated Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2019330000016 Denomination of utility model: Dull and stereotyped compound shear wall of prefabricated steel Granted publication date: 20180202 License type: Common License Record date: 20190917 Assignee: Qinhuangdao Seiko Green Building Integrated Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2019330000017 Denomination of utility model: Dull and stereotyped compound shear wall of prefabricated steel Granted publication date: 20180202 License type: Common License Record date: 20190917 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Henan Green Building Technology Development Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2019330000015 Denomination of utility model: Dull and stereotyped compound shear wall of prefabricated steel Granted publication date: 20180202 License type: Common License Record date: 20190919 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Anhui changgu New Construction Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2020330000055 Denomination of utility model: A prefabricated steel plate composite shear wall Granted publication date: 20180202 License type: Common License Record date: 20200806 |
|
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shandong Tianyuan Jinggong Green Integrated Building Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2020330000115 Denomination of utility model: A prefabricated steel plate composite shear wall Granted publication date: 20180202 License type: Common License Record date: 20201216 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2023990000037 Denomination of utility model: A prefabricated steel plate composite shear wall Granted publication date: 20180202 License type: Common License Record date: 20230113 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2023980034645 Denomination of utility model: A prefabricated steel plate composite shear wall Granted publication date: 20180202 License type: Common License Record date: 20230413 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2023980034833 Denomination of utility model: A prefabricated steel plate composite shear wall Granted publication date: 20180202 License type: Common License Record date: 20230421 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Weinan Guokong Jinggong Green Building Technology Co.,Ltd. Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd. Contract record no.: X2024980009941 Denomination of utility model: A prefabricated steel slab composite shear wall Granted publication date: 20180202 License type: Common License Record date: 20240717 |