CN206945556U CN201720811526.7U CN201720811526U CN206945556U CN 206945556 U CN206945556 U CN 206945556U CN 201720811526 U CN201720811526 U CN 201720811526U CN 206945556 U CN206945556 U CN 206945556U
Authority
CN
China
Prior art keywords
karst
ground
slip casting
monitoring system
time monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720811526.7U
Other languages
Chinese (zh)
Inventor
曹元平
徐守亮
刘宝平
汪浩
唐鹤明
王军辉
刘卫斌
甘传奇
舒磊
聂力功
王平
宋林芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201720811526.7U priority Critical patent/CN206945556U/en
Application granted granted Critical
Publication of CN206945556U publication Critical patent/CN206945556U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

It the utility model is related to a kind of karst cavity area slip casting state real-time monitoring system.Karst foundation, which collapses, threatens railway operation safety, injects cement grout to karst foundation for this.Due to using any investigation way at present, method there is no to investigate thoroughly situations such as being connected with each other passage between the solution cavity, fluid bowl, solution cavity of solvable rock stratum.The utility model sets injected hole from ground to karst cave, and Grouting Pipe is set in injected hole;Camera in Grouting Pipe bottom mounting apertures, ground monitor is set at ground, and deep dynamic consolidation head passes through cable and accesses ground surveillance instrument.Using the utility model, filling, the wastage of grouting serous fluid can be monitored in real time, to the passage for causing grouting serous fluid to be lost in, accelerated cement slurry, batch (-type) injection medium coarse sand, the timely leak stopping of cement mortar can be used, to control construction investment, reducing environmental pollution has great importance.

Description

A kind of karst cavity area slip casting state real-time monitoring system
Technical field
The utility model belongs to karst area road building technology field, and in particular to a kind of karst cavity area slip casting state is real-time Monitoring system.
Background technology
Karst foundation, which collapses, threatens railway operation safety, injects cement grout to karst foundation for this.Due to using at present Any investigation way, method there is no to investigate thoroughly situations such as being connected with each other passage between the solution cavity, fluid bowl, solution cavity of solvable rock stratum.Karst region During base injecting treatment, especially in karst area, grouting serous fluid is very serious along the passage loss between solution cavity, both causes work The waste of journey material, pollutes environment again.
Construction technical staff is in the case of no equipment, instrument, it is difficult to grasp the filling of underground slurries in time, be lost in feelings Condition.Due to not knowing about the wastage of grouting slurries, effective reply engineering measure can not be used, is blocked along between solution cavity Passage, solves the losing issue of grouting serous fluid in time.
The content of the invention
The purpose of this utility model is to provide a kind of karst cavity area slip casting state real-time monitoring system, can monitor rock in real time The filling of molten hole area grouting serous fluid, wastage.
Technical scheme is used by the utility model:
A kind of karst cavity area slip casting state real-time monitoring system, it is characterised in that:
Injected hole is set from ground to karst cave, Grouting Pipe is set in injected hole;
Camera in Grouting Pipe bottom mounting apertures, ground monitor is set at ground, and deep dynamic consolidation head is accessed by cable Ground surveillance instrument.
Deep dynamic consolidation head is installed on more than slip casting bottom of the tube at 2 ~ 3m.
Injected hole is set to 2m below karst cave bottom plate.
The utility model has advantages below:
Relative to the grouting equipment of routine, the utility model can monitor karst cavity area in real time during foundation grouting Grouting serous fluid filling, wastage, construction technical staff take counter-measure in time according to the situation of monitoring.
Brief description of the drawings
Fig. 1 the utility model schematic cross-sectional views.
In figure, 1- Grouting Pipes, 2- deep dynamic consolidation heads, 3- ground surveillance instrument.
Embodiment
The utility model is described in detail with reference to embodiment.
A kind of karst cavity area slip casting state real-time monitoring system is the utility model is related to, is set from ground to karst cave Injected hole, injected hole are set to 2m below karst cave bottom plate.Grouting Pipe 1 is set in injected hole;In the bottom mounting apertures of Grouting Pipe 1 Camera 2, deep dynamic consolidation first 2 are installed on more than the bottom of Grouting Pipe 1 at 2 ~ 3m.Ground monitor 3, deep dynamic consolidation are set at ground First 2 access ground surveillance instrument 3 by cable.
During construction:
Step 1:Drill to 2m below solution cavity bottom plate.
Step 2:At away from the vertical 2 ~ 3m of Grouting Pipe more than 1, camera 2 in mounting hole.
Step 3:Deep dynamic consolidation first 2 is connected with ground surveillance instrument 3 by cable.
Step 4:After vertical Grouting Pipe 1 inserts foot of hole, vertical Grouting Pipe 1 is connected with grouting pump.
Step 5:Ground surveillance instrument 3 is opened, opens grouting pump.
Step 6:By ground surveillance instrument 3, the grouting serous fluid filling of karst cavity area, wastage are monitored in real time.
Step 7:To prevent slip casting face from flooding deep dynamic consolidation first 2, vertical Grouting Pipe 1 should be protected with the progressively lifting of slip casting face Deep dynamic consolidation head is held away from slip casting face 2m, until this bored grouting is completed.
Content of the present utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and any equivalent conversion taken technical solutions of the utility model, are claim institute of the present utility model Cover.

Claims (3)

  1. A kind of 1. karst cavity area slip casting state real-time monitoring system, it is characterised in that:
    Injected hole is set from ground to karst cave, Grouting Pipe is set in injected hole(1);
    Grouting Pipe(1)Camera in bottom mounting apertures(2), ground monitor is set at ground(3), deep dynamic consolidation head(2)Pass through Cable accesses ground surveillance instrument(3).
  2. A kind of 2. karst cavity area slip casting state real-time monitoring system according to claim 1, it is characterised in that:
    Deep dynamic consolidation head(2)It is installed on Grouting Pipe(1)More than bottom at 2 ~ 3m.
  3. A kind of 3. karst cavity area slip casting state real-time monitoring system according to claim 1, it is characterised in that:
    Injected hole is set to 2m below karst cave bottom plate.
CN201720811526.7U 2017-07-06 2017-07-06 A kind of karst cavity area slip casting state real-time monitoring system Active CN206945556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720811526.7U CN206945556U (en) 2017-07-06 2017-07-06 A kind of karst cavity area slip casting state real-time monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720811526.7U CN206945556U (en) 2017-07-06 2017-07-06 A kind of karst cavity area slip casting state real-time monitoring system

Publications (1)

Publication Number Publication Date
CN206945556U true CN206945556U (en) 2018-01-30

Family

ID=61367109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720811526.7U Active CN206945556U (en) 2017-07-06 2017-07-06 A kind of karst cavity area slip casting state real-time monitoring system

Country Status (1)

Country Link
CN (1) CN206945556U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610427A (en) * 2018-11-22 2019-04-12 中铁第勘察设计院集团有限公司 Karst foundation visits the slip casting construction method for filling that combination, slurries are controllable, monitor in real time

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610427A (en) * 2018-11-22 2019-04-12 中铁第勘察设计院集团有限公司 Karst foundation visits the slip casting construction method for filling that combination, slurries are controllable, monitor in real time

Similar Documents

Publication Publication Date Title
CN108060908B (en) Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group
CN103556579B (en) A kind of comprehensive grouting pressurize adds the box culvert pushing construction method of pipe curtain supporting
CN105040775B (en) Deep layer pressure-bearing artesian well plugging system and method
CN105201448A (en) Method for water-stopping grouting plugging in high-pressure high-flow water gush channel
CN106917409A (en) A kind of rock lid weight consolidation grouting construction method
CN103147442A (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN206945556U (en) A kind of karst cavity area slip casting state real-time monitoring system
CN106677161A (en) Treatment method for soft soil foundation of existing shield rectangular tunnel
CN102817361B (en) Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN109610427A (en) Karst foundation visits the slip casting construction method for filling that combination, slurries are controllable, monitor in real time
CN101343988B (en) Deep layer cement-soil mixing pile grouting water-blocking method for artesian area
CN103276645B (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN106703836A (en) Treatment method of the bedding soft soil of existing circular shield tunnel
CN110206561A (en) Disease in Tunnel Base point processing method
CN107313305B (en) The processing method of type sinkhole is lain concealed under the railway bed of karst area
CN102644266B (en) Method utilizing fracture anchor rod piles for reinforcing soft soil stratum pavements in abutment areas
CN106149726B (en) The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure
CN205276249U (en) Hot reinforcing pile
CN204059396U (en) Fixed infrastructure bottom tower crane
CN207245724U (en) Tunnel support grouting equipment
CN111577381A (en) Goaf filling structure and goaf treatment method
CN202787264U (en) Double-bushing top cover for use in curtain grouting of fractured rock masses
CN105220695A (en) Close sand ovum layer moves water slip casting solidification construction