CN206941655U - Sand structure is gushed suitable for the diaphragm wall seam waterproof of weak rich water arenaceous stratum - Google Patents
Sand structure is gushed suitable for the diaphragm wall seam waterproof of weak rich water arenaceous stratum Download PDFInfo
- Publication number
- CN206941655U CN206941655U CN201720801622.3U CN201720801622U CN206941655U CN 206941655 U CN206941655 U CN 206941655U CN 201720801622 U CN201720801622 U CN 201720801622U CN 206941655 U CN206941655 U CN 206941655U
- Authority
- CN
- China
- Prior art keywords
- wall
- stage
- diaphram wall
- steel plate
- diaphram
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model provides a kind of diaphragm wall seam waterproof suitable for weak rich water arenaceous stratum and gushes sand structure.The diaphragm wall seam waterproof, which gushes sand structure, includes a phase diaphram wall and the second stage of diaphram wall, is connected between two phase diaphram walls using I-shaped steel joint, it is characterised in that:Sealing steel plate is provided with the outside of I-shaped steel joint, described sealing steel plate a portion is close to the wing plate outer wall of I-shaped steel joint, and welded with the wing plate of I-shaped steel joint, another part is stretched into the second stage of diaphram wall, and be connected by multiple setscrews with the second stage of diaphram wall, the seam between I-shaped steel joint and the second stage of diaphram wall is completely covered the sealing steel plate after connection;Waterproof mortar course is coated with the outside of sealing steel plate.The utility model harmful effect simple in construction that can effectively stop outside Water And Earth Pressures abutment joint, the possibility that infiltration leak occurs again after excavation of foundation pit in diaphram wall seaming position is reduced, adds safety coefficient during excavation of foundation pit.
Description
Technical field
It the utility model is related to hypogee construction field, and in particular to a kind of company suitable for weak rich water arenaceous stratum
Continuous wall seam waterproof gushes sand structure.
Background technology
With the quickening of national urbanization process, large quantities of underground engineerings and underground structure spread overwide areas, and underground connects
Continuous wall construction noise, vibrations are smaller, on close on ground and fabric structure influence it is little, therefore suitably urban architecture is intensive and people
Region construction of the stream more and more than pipeline.
In construction of diaphragm wall, the seam connected mode of its diaphram wall mainly have junction block (case), shelf type,
I-steel formula, prefabricated etc. are several, and the diaphragm wall of some areas also reserves Grouting Pipe and outside increase sealing churning in the joint.
Diaphram wall joint quality control it is extremely important, no matter using what form joint, due to construction when objective error
In the presence of, the possibility of seam seepage, particularly a phase and the second stage of groove section joint location being all present, the possibility for occurring seeping water is maximum,
It is small and once diaphragm wall seam construction quality goes wrong, influence engineering underground structure and Seepage also occur, greatly then in base
There is hole in the digging process of hole and ruin the especially big quality accidents that people dies.
Particularly in the construction of diaphragm wall of some weak arenaceous stratums, more there is the continuous wall connector when excavating and do not leaked
Water, but excavation of foundation pit on earth after, the situation of Sand occurs again for the diaphragm wall seam on foundation ditch top, and when excavation of foundation pit arrives
Oozed after substrate for continuous wall connector, loss zone difficulty it is very big, can also spend larger engineering cost during processing.
The content of the invention
The purpose of this utility model is the weak point according to existing continuous wall connector processing mode, there is provided Yi Zhongshi
For the anti-swelling sand structure of weak grittiness water rich strata diaphram wall seam, constructing structure installation rate is fast, construction technology
Simply, it can effectively stop the harmful effect of outside Water And Earth Pressures abutment joint, and diaphram wall seaming position can be reduced in foundation ditch
Occur the possibility of infiltration leak after excavation again, increase safety coefficient during excavation of foundation pit.
Technical scheme provided by the utility model:A kind of diaphragm wall seam suitable for weak rich water arenaceous stratum is prevented
Swelling sand structure, including a phase diaphram wall and the second stage of diaphram wall, the phase diaphram wall and the second stage of underground connect
Connected between continuous wall using I-shaped steel joint, it is characterised in that:It is provided with the outside of the I-shaped steel joint of two phase diaphram walls close
Steel plate is sealed, described sealing steel plate a portion is close to the wing plate outer wall of I-shaped steel joint, and is welded with the wing plate of I-shaped steel joint
Connect, another part is stretched into the second stage of diaphram wall, and is connected by multiple setscrews with the second stage of diaphram wall, after connection
Sealing steel plate the seam between I-shaped steel joint and the second stage of diaphram wall is completely covered;It is coated with the outside of sealing steel plate
Waterproof mortar course.
The utility model preferably technical scheme:The height of the sealing steel plate is equal with the height of diaphram wall, thick
Spend for 4-8mm, width 350-500mm.
The utility model preferably technical scheme:The multiple setscrew uses model M20 setscrew, erects
To arrangement, and the spacing between two adjacent setscrews is 250-350mm.
The utility model preferably technical scheme:The waterproof mortar course is to smear 2-4cm after linked network on sealing steel plate
The coating that thick waterproof mortar is formed.
The beneficial effects of the utility model:
1st, the utility model is docked using closing steel plate measure in advance at the phase of diaphragm wall seam one and the second stage of groove segment interface
Seam weak location has carried out a reinforcement processing, effectively stops the harmful effect of outside Water And Earth Pressures abutment joint;
2nd, closing steel plate of the present utility model and waterproof mortar comprehensive function, effectively reduce diaphram wall seam position
The possibility for occurring infiltration leak again after excavation of foundation pit is put, adds safety coefficient during excavation of foundation pit;
3rd, construction of the present utility model can be constructed with earth excavation process, and the speed that it is installed is fast, work of constructing
Skill is simple, but positive effect.
Brief description of the drawings
Fig. 1 is planar structure schematic diagram of the present utility model;
Fig. 2 is facade structures schematic diagram of the present utility model.
In figure:1- mono- phase diaphragm walls, 2- second phase diaphragm walls, 3- closing steel plates, 4- I-shaped steel joints, 4-1-wing plate, 5- are swollen
Swollen screw, 6- linked network mortar waterproof layers.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.One kind as depicted in figs. 1 and 2 is applicable
Gush sand structure in the diaphragm wall seam waterproof of weak rich water arenaceous stratum, including a phase diaphram wall 1 and the second stage of underground it is continuous
Wall 2, connected between the phase diaphram wall 1 and the second stage of diaphram wall 2 using I-shaped steel joint 4, it is characterised in that:
The outside of I-shaped steel joint 4 of two phase diaphram walls is provided with sealing steel plate 4, the height and diaphram wall of the sealing steel plate 4
Height it is equal, thickness 4-8mm, width 350-500mm, its optimum size is the wide 400mm of thickness 5mm, the sealing steel
The a portion of plate 4 is close to the wing plate 4-1 outer walls of I-shaped steel joint 4, and is welded with I-shaped steel joint wing plate 4-1, and it is away from work
One end of word steel is stretched into the second stage of diaphram wall 2, and is connected by multiple setscrews 5 with the second stage of diaphram wall 2, described
Multiple setscrews 5 use model M20 setscrew, vertical array, and the spacing between two adjacent setscrews 5 is
250-350mm, optimal spacing are 300mm;Sealing steel plate 4 after connection is by between I-shaped steel joint 4 and the second stage of diaphram wall 2
Seam be completely covered;And the waterproof mortar course 6 that the thick waterproof mortars of 2-4cm are formed is smeared after the outside linked network of steel plate 4 is sealed
Antiseep and anti-corrosion processing are carried out, the optimum thickness of the waterproof mortar course 6 is 3cm.
Embodiment 1, as shown in Fig. 1~Fig. 2, certain city underground station is 2 layers of underground station, station thickness of earth covering about 3m, is enclosed
Protection structure uses the support pattern of diaphram wall+bracing members of twice concrete support+one, and continuous wall connector uses I-steel
Joint, the continuous wall construction penetrating ground under the support of station second concrete is mostly weak rich water sand bed, in Excavation Process
Repeatedly there occurs Sand accident, repeatedly speedily carry out rescue work, also generate huge processing cost, it is rear using the present invention, effective solution
Certainly the problem of station continuous wall connector Sand, following working procedure is used in work progress:
(1) the diaphragm wall seam that is prepared in advance uses closing steel plate 3, and is pre-designed position according to setscrew 5
The equidistant perforate on steel plate;
(2) first construct station inner supporting structure, according to first support dig afterwards construction principle progress earth excavation, opened in the earthwork
During digging, slotting processing first is carried out to diaphragm wall seaming position;
(3) the diaphragm wall seaming position dug out is cleared up, removed on the surface dust and the position of a phase diaphragm wall 1 on surface
Diaphragm wall I-steel wing plate 4-1;
(4) drilled using electric drill on the second stage of position of diaphragm wall 2, and the expanding screw of dimension is installed as requested
Silk 5;
(5) by the nut of setscrew 5, closing steel plate 3 is attached on setscrew 5, with the diaphragm wall I-steel wing
The position that plate 4 contacts is by the way of being welded to connect;
(6) after the installation of steel plate 3 being closed, linked network and linked network mortar waterproof layer 6 of constructing on closing steel plate 3;
(7) after diaphragm wall closing steel plate construction, this layer of earthwork is excavated;
(8) repeat step (1)-(7) item work, completes the earth excavation engineering in foundation ditch.
The utility model is described in detail above example, but the content is only the preferable implementation of the present invention
Example, it is impossible to be considered as the practical range for limiting the present invention.All equivalent changes made according to the present patent application scope and improvement
Deng, all should still belong to the present invention patent covering scope within.
Claims (4)
1. a kind of diaphragm wall seam waterproof suitable for weak rich water arenaceous stratum gushes sand structure, including a phase diaphram wall
(1) I-steel and the second stage of diaphram wall (2), is used between the phase diaphram wall (1) and the second stage of diaphram wall (2)
Joint (4) connects, it is characterised in that:Sealing steel plate (3), institute are provided with the outside of the I-shaped steel joint (4) of two phase diaphram walls
State sealing steel plate (3) a portion and be close to wing plate (4-1) outer walls of I-shaped steel joint (4), and with I-shaped steel joint wing plate (4-
1) weld, another part is stretched into the second stage of diaphram wall (2), and passes through multiple setscrews (5) and the second stage of diaphram wall
(2) connect, the sealing steel plate (3) after connection covers the seam between I-shaped steel joint (4) and the second stage of diaphram wall (2) completely
Lid;Waterproof mortar course (6) is coated with the outside of sealing steel plate (3).
2. a kind of diaphragm wall seam waterproof suitable for weak rich water arenaceous stratum according to claim 1 gushes sand structure,
It is characterized in that:The height of the sealing steel plate (3) is equal with the height of diaphram wall, thickness 4-8mm, width 350-
500mm。
3. a kind of diaphragm wall seam waterproof suitable for weak rich water arenaceous stratum according to claim 1 gushes sand structure,
It is characterized in that:The multiple setscrew (5) uses model M20 setscrew, vertical array, and two adjacent expansions
Spacing between screw (5) is 250-350mm.
4. a kind of diaphragm wall seam waterproof suitable for weak rich water arenaceous stratum according to claim 1 gushes sand structure,
It is characterized in that:The waterproof mortar course (6) is to smear the thick waterproof mortars of 2-4cm after linked network on sealing steel plate (3) to be formed
Coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720801622.3U CN206941655U (en) | 2017-07-04 | 2017-07-04 | Sand structure is gushed suitable for the diaphragm wall seam waterproof of weak rich water arenaceous stratum |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720801622.3U CN206941655U (en) | 2017-07-04 | 2017-07-04 | Sand structure is gushed suitable for the diaphragm wall seam waterproof of weak rich water arenaceous stratum |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206941655U true CN206941655U (en) | 2018-01-30 |
Family
ID=61366918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720801622.3U Expired - Fee Related CN206941655U (en) | 2017-07-04 | 2017-07-04 | Sand structure is gushed suitable for the diaphragm wall seam waterproof of weak rich water arenaceous stratum |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206941655U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316311A (en) * | 2018-02-10 | 2018-07-24 | 浙江泉峰建筑园林有限公司 | A kind of supporting construction suitable for civic building foundation pit and foundation trench |
-
2017
- 2017-07-04 CN CN201720801622.3U patent/CN206941655U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316311A (en) * | 2018-02-10 | 2018-07-24 | 浙江泉峰建筑园林有限公司 | A kind of supporting construction suitable for civic building foundation pit and foundation trench |
CN108316311B (en) * | 2018-02-10 | 2020-05-19 | 浙江泉峰建筑园林有限公司 | Supporting construction suitable for municipal building foundation ditch and foundation trench |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020173100A1 (en) | Reinforcement apparatus and construction method for local freezing reinforcement of deep foundation pit in water-rich sand gravel stratum | |
CN101429764B (en) | Infiltration water detection and plugging renovation devices and methods for underground continuous wall groove segment seam | |
CN103469817B (en) | Existing subway station main structure broadening construction method | |
WO2022083096A1 (en) | Tunnel excavation method for upper-soft and lower-hard stratum | |
CN203174616U (en) | Clay foundation rain falling and water saving system | |
CN103485790A (en) | Shallow tunneling method for pipe-proof-supporting structure combined system | |
CN207892653U (en) | Decompression hydrophobic structure suitable for Weathering-residual soil layer fissure zone | |
CN108661078B (en) | Comprehensive tunnel design construction method | |
CN109026020B (en) | Water-rich tunnel karst cave treatment and excavation method | |
US11566390B2 (en) | Construction method of reclaiming land from the sea based on basement utilization | |
CN203924137U (en) | A kind of diaphragm wall serious leakage plugging structure | |
CN109723089A (en) | Protect structure and method in a kind of high-tension electricity pipe culvert original place | |
CN106592600B (en) | Construction method of early warning support system adjacent to complex environment of subway running | |
CN104863183B (en) | Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction | |
CN201424658Y (en) | Water leakage detection of underground continuous wall groove seams and block repair device | |
CN104099946A (en) | Novel jacking pipe intersegment overhaul well | |
CN206941655U (en) | Sand structure is gushed suitable for the diaphragm wall seam waterproof of weak rich water arenaceous stratum | |
CN212641468U (en) | Pit-in-pit rapid construction structure | |
CN209941754U (en) | High-voltage power pipe culvert in-situ protection structure | |
CN207111094U (en) | Ultra-deep shield launching in a kind of water/hang out well construction | |
CN110700390A (en) | Construction method of cyclone well under complex geological conditions | |
CN215858114U (en) | Open caisson integrated configuration to existing pipeline transformation that dams | |
CN212202065U (en) | Tunnel structure suitable for composite stratum with upper soft layer and lower hard layer | |
CN112031778B (en) | Construction method for shaft excavation based on multi-angle pre-reinforcement | |
CN108252327A (en) | The construction method of Large Underground high voltage substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |