- CN206941626U CN206941626U CN201720917513.8U CN201720917513U CN206941626U CN 206941626 U CN206941626 U CN 206941626U CN 201720917513 U CN201720917513 U CN 201720917513U CN 206941626 U CN206941626 U CN 206941626U
- Authority
- CN
- China
- Prior art keywords
- timber
- dividing plate
- soil
- cofferdam
- breach
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model discloses a kind of timber cofferdam of water conservancy projects temporary construction, including the timber in insertion riverbed and the beam being fixed on timber, the lower end of the timber is arranged to taper, the inboard of the timber is provided with dividing plate, plain soil is filled between the dividing plate, the inboard insertion river bed of the lower end edge timber of the dividing plate, the timber side offer reinforcing breach, and the reinforcing breach includes baseplane and ramp.By above-mentioned setting, after timber inserts bottom, due to the soil of top or the extruding at noon, have soil and enter in reinforcing breach.When timber is rocked, the soil having with surrounding ground one is reinforced on the baseplane of breach, rising to timber stops, timber is in uphill process is rocked simultaneously, baseplane contacts with soil, and resistance is more preferable relative to frictional force blocking effect perpendicular to baseplane, the structural stability of timber cofferdam is improved, improves the service life of timber cofferdam.
Description
Technical field
It the utility model is related to a kind of water conservancy projects temporary construction cofferdam, more particularly to a kind of timber cofferdam.
Background technology
Publication No. CN204139185U Chinese patent discloses a kind of river course slope protection cofferdam, it is characterised in that it is wrapped
The pile foundation that two rows of left and right are longitudinally arranged is included, is provided with the connection steel wire that bending is set in pile foundation from front to back, connects steel wire by phase
Adjacent timber and piling bar connection, the top outer of pile foundation are provided with the purlin wood being longitudinally arranged, are provided with the inside of pile foundation vertical
To the splash guard of arrangement, the campshed base of left and right two is equipped with waterproof cloth from the top down, waterproof cloth be close to pile foundation the left and right sides and
Riverbed face between the campshed base of left and right two, is connected with more taut wires between the campshed base of left and right two, between the campshed base of left and right two
Waterproof cloth on be provided with and banket.
The pile foundation in above-mentioned cofferdam is smooth timber, when being impacted and rocked in cofferdam, the portion in timber insertion soil
Partial volume produces gap easily during rocking between the soil of timber and riverbed bottom, timber can gradually deviate from soil due to buoyancy
Earth, during the use of cofferdam, because of situations such as flood tide, cofferdam can be often subject to impact, and cofferdam service life is shorter.
Utility model content
The purpose of this utility model is to provide a kind of timber cofferdam, and it has the long advantage of service life.
Above-mentioned technical purpose of the present utility model technical scheme is that:
Timber and the beam being fixed on timber in a kind of timber cofferdam, including insertion riverbed, the lower end of the timber is set
Taper is set to, the inboard of the timber is provided with dividing plate, and plain soil is filled between the dividing plate, the lower end edge timber of the dividing plate
Inboard insertion river bed, the timber side offer reinforcing breach, and the reinforcing breach includes baseplane and ramp.
By using above-mentioned technical proposal, the timber with reinforcing breach is when inserting soil, the side of ramp and timber
Face contacts friction with soil, and ramp has the active force squeezed to both sides to soil so that the insertion of timber is more smooth.Wood
Behind stake insertion bottom, due to the soil of top or the extruding at noon, have soil and enter in reinforcing breach.Timber is rocked
When, the soil having with surrounding ground one is reinforced on the baseplane of breach, and the rising to timber stops, while timber exists
Rock in uphill process, baseplane contacts with soil, and resistance is more preferable relative to frictional force blocking effect perpendicular to baseplane, carries
The structural stability of high timber cofferdam, improve the service life of timber cofferdam.
Further set:The reinforcing breach is set in a ring.
By using above-mentioned technical proposal, the convenient processing of reinforcing breach that annular is set, and all directions active force phase
Deng when mounted, easier for installation without adjusting installation direction.
Further set:The dividing plate is formed by thin bamboo strips used for weaving and reinforcing bar colligation.
By using above-mentioned technical proposal, thin bamboo strips used for weaving has stronger toughness, and it is stronger to bear the ability of pressure, but structural strength
Relatively low, during water impact, edge is easily damaged, by reinforcing bar colligation in the end of thin bamboo strips used for weaving so that impulse force directly with
Reinforcing bar acts on, and reduces the abrasion of thin bamboo strips used for weaving, improves the intensity and service life of dividing plate.
Further set:The hook being provided with the dividing plate on the beam hung over, the welding hook is in dividing plate
On reinforcing bar.
By using above-mentioned technical proposal, the hook hung on beam is provided with dividing plate, conveniently to position during installation
It is determined that while when dividing plate bears ambient pressure, hook can produce pulling force to dividing plate, avoid dividing plate and timber from departing from, improve every
The stability of the connection of plate.
Further set:One layer of geotextiles are equipped with the dividing plate, mud face is stretched into the lower end of the geotextiles from both sides
At least 1m.
By using above-mentioned technical proposal, geotextiles are protected to the plain soil between dividing plate, avoid plain soil from passing through dividing plate
It is lost in, ensures the Stability Analysis of Structures of timber cofferdam, service life length.Mud face is stretched into the lower end of geotextiles, to plain soil in encirclement shape
Structure, stop that protecting effect is stronger.The intensity of geotextiles is higher, and enough intensity can be kept under dry and wet state;It is corrosion-resistant,
It is antimicrobial, it is less likely to be damaged in use.
Further set:The beam passes through on binding reinforcing bars to timber.
By using above-mentioned technical proposal, beam is installed by way of binding reinforcing bars, is connected firmly, and beam connects
Timber interfixed, avoid single timber run-off the straight or deviate from soil situation.
Further set:Pass through reinforcing bar drawknot between beam described in both sides.
By using above-mentioned technical proposal, two seat side rails pass through reinforcing bar drawknot so that the distance between two seat side rails are kept
It is constant, so as to avoid the situation of the timber run-off the straight of one side failure.
Further set:The top end cover of the dividing plate is provided with packeted soil.
By using above-mentioned technical proposal, the top of dividing plate is arranged at using packed figure so that dividing plate and timber upper end
Gravity is bigger so that what dividing plate and timber can be more stable is inserted in soil, improves structural stability, also avoid geotextiles with
Occur to tilt between dividing plate to depart from.
In summary, the utility model has the advantages that:
1st, the side of timber is provided with the reinforcing breach of annular so that fixation of the timber in soil is more firm, avoids wood
Stake loosens;
2nd, a large amount of reinforcing bars are connected with overall dividing plate and beam, improve overall construction intensity, service life length.
Brief description of the drawings
Fig. 1 is example structure schematic diagram;
Fig. 2 is enlarged drawing at A in Fig. 1.
In figure, 1, timber;2nd, beam;3rd, dividing plate;4th, element soil;5th, breach is reinforced;6th, baseplane;7th, ramp;8th, link up with;
9th, geotextiles;10th, packeted soil.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment 1:
A kind of timber cofferdam, referring to Figures 1 and 2, including insertion riverbed in timber 1 and by binding reinforcing bars on timber 1
Beam 2.The lower end of timber 1 is arranged to taper, convenient to insert in soil, and the side of timber 1 is provided with the reinforcing breach 5 of annular,
Reinforcing breach 5 is included perpendicular to the baseplane 6 of timber 1 and the ramp 7 towards side-lower.It is connected between beam 2 some
Steel tie.
Reference picture 1, the dividing plate 3 that the inboard of timber 1 is provided with reinforcing bar and thin bamboo strips used for weaving colligation forms, welded on reinforcing bar in dividing plate 3
There are the hook 8 being articulated on beam 2, the inboard insertion river bed of the lower end edge timber 1 of dividing plate 3.The inboard of dividing plate 3 is equipped with one layer
Geotextiles 9, the lower end of geotextiles 9 stretch into the length of 1m within mud face from side.Plain soil 4 is filled between geotextiles 9.Dividing plate 3
Top and the top of timber 1 are contour, and the upper end of dividing plate 3 and timber 1 is pressed with packeted soil 10.
During installation, first the fixed point of timber 1 is plugged in soil, it is horizontal then by beam 2 by binding reinforcing bars to timber 1
Wood 2 is horizontal after tying up, and some tension ribs are connected between two seat side rails 2.Then by the dividing plate 3 with hook 8 along beam 2
Inboard insertion lower section soil in, while link up with 8 and hang over the installations that dividing plate 3 is completed on beam 2.Again by geotextiles 9 be laid on every
The inboard of plate 3, the lower end embedment soil 1m of geotextiles 9.Between plain soil 4 is inserted into geotextiles 9 again, finally packeted soil 10 is pressed in
Dividing plate 3 and the top of timber 1.
When being shaken by water impact, reinforce on the baseplane 6 of breach 5 has and surrounding ground one timber 1
Soil, the rising to timber 1 stops, while timber 1, in uphill process is rocked, baseplane 6 contacts with soil, resistance
Perpendicular to baseplane 6, the rising of timber 1 is prevented, avoids timber 1 from deviating from soil.The impulsive force that dividing plate 3 receives can be linked up with
The reaction force of 8 pulling force and internal element soil 4 is offset jointly.
The above embodiments are only that it is not to limitation of the present utility model, ability to explanation of the present utility model
Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but
As long as all protected in right of the present utility model by Patent Law.
Claims (8)
1. a kind of timber cofferdam, including the timber (1) inserted in riverbed and the beam (2) being fixed on timber (1), the timber
(1) lower end is arranged to taper, and the inboard of the timber (1) is provided with dividing plate (3), the lower end edge timber (1) of the dividing plate (3)
Inboard insertion river bed, be filled with plain native (4) between the dividing plate (3), it is characterised in that:Timber (1) side, which offers, to be added
Gu breach (5), the reinforcing breach (5) includes baseplane (6) and ramp (7).
2. timber cofferdam according to claim 1, it is characterised in that:The reinforcing breach (5) is set in a ring.
3. timber cofferdam according to claim 1, it is characterised in that:The dividing plate (3) is formed by thin bamboo strips used for weaving and reinforcing bar colligation.
4. timber cofferdam according to claim 3, it is characterised in that:It is provided with the dividing plate (3) on the beam (2) hung over
Hook (8), it is described hook (8) be welded on the reinforcing bar in dividing plate (3).
5. timber cofferdam according to claim 1, it is characterised in that:Dividing plate (3) inboard is equipped with one layer of geotextiles
(9), mud face at least 1m is stretched into the lower end of the geotextiles (9) from both sides.
6. timber cofferdam according to claim 1, it is characterised in that:The beam (2) passes through binding reinforcing bars to timber (1)
On.
7. the timber cofferdam according to claim 1 or 6, it is characterised in that:Beam described in both sides is drawn between (2) by reinforcing bar
Knot.
8. timber cofferdam according to claim 1, it is characterised in that:The top end cover of the dividing plate (3) is provided with packeted soil (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720917513.8U CN206941626U (en) | 2017-07-26 | 2017-07-26 | A kind of timber cofferdam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720917513.8U CN206941626U (en) | 2017-07-26 | 2017-07-26 | A kind of timber cofferdam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206941626U true CN206941626U (en) | 2018-01-30 |
Family
ID=61370070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720917513.8U Expired - Fee Related CN206941626U (en) | 2017-07-26 | 2017-07-26 | A kind of timber cofferdam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206941626U (en) |
-
2017
- 2017-07-26 CN CN201720917513.8U patent/CN206941626U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA3013981C (en) | Fiber block system | |
CN204703179U (en) | A kind of composite geo-membrane sloping core cofferdam | |
CN104196037B (en) | A kind of environmental protection slope reinforcement structure | |
RU188394U1 (en) | REINFORCED CONSTRUCTION FROM GABIONS | |
CN205591237U (en) | A make up and prevent and treat structure for mountain area height is filled | |
KR20110031861A (en) | Block for reinforcement and construction method | |
CN209227563U (en) | High steep weathering seriously with the rock side slope supporting construction of joints development | |
CN107711657B (en) | Stagger double-column flexible shallow sea aquaculture purse seine | |
CN206941626U (en) | A kind of timber cofferdam | |
KR101024071B1 (en) | Wall for interfering wind | |
CN110117966B (en) | Retaining wall structure with geotechnical bags stacked and fixed | |
JP5281974B2 (en) | Drain structure | |
JP5407995B2 (en) | Filling reinforcement structure | |
CN201314030Y (en) | Series herringbone sand trapping cylinder mould | |
CN204023587U (en) | A kind of novel environment friendly slope reinforcement structure | |
CN110219281A (en) | A kind of dyke levee toe erosion control flexibility protecting pad structure | |
CN212956611U (en) | Protection structure for underground pipeline | |
CN213709654U (en) | Foundation cushion block reinforcing structure in building deviation rectifying process | |
CN213389556U (en) | Double-deck geogrid of structure strenghthened type | |
CN212477800U (en) | Anchoring gabion retaining wall | |
CN105256763A (en) | Diking method based on bamboo raft frame structure | |
CN205329632U (en) | Utilize geotechnique to fill provisional manger plate dykes and dams of irritating bag and construction of steelframe support system | |
CN102425177B (en) | Safe slope structure | |
CN212001166U (en) | Highway side slope protector | |
KR20030011206A (en) | Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 Termination date: 20190726 |