CN206940260U - The shaping equipment that a kind of building engineering construction scene tower crane cable is fixed - Google Patents
The shaping equipment that a kind of building engineering construction scene tower crane cable is fixed Download PDFInfo
- Publication number
- CN206940260U CN206940260U CN201720933120.6U CN201720933120U CN206940260U CN 206940260 U CN206940260 U CN 206940260U CN 201720933120 U CN201720933120 U CN 201720933120U CN 206940260 U CN206940260 U CN 206940260U
- Authority
- CN
- China
- Prior art keywords
- cable
- tower crane
- shaped card
- card head
- fixtures
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model belongs to construction tower crane and uses technical field, in order to solve the problems, such as that be unfavorable for cable existing for existing tower crane cable fixing device adjusts use at any time, the utility model provides the shaping equipment that a kind of building engineering construction scene tower crane cable is fixed, including two sets of fixtures being used cooperatively, two sets of fixtures are parallel, interval is installed on tower crane skeleton, fixture is mutually perpendicular to tower crane skeleton, and strain relief clamp is loaded in the installation gap between two sets of fixtures and cable can be in the installation gap interior edge cable length direction freely dragging;Described fixture includes U-shaped card head, and the tail end of U-shaped card head is connected with insulator, and two insulators form the assembly pulley of clamping cable, and tower crane skeleton is installed in the notch of U-shaped card head and fastens the opening termination of U-shaped card head.The device is coordinated using two fixtures can also serve as an assembly pulley, cable can be moved up and down flexibly beyond cable position, cable unloading, Unloading Effect to fix when vertical cable needs lifting.
Description
Technical field
The utility model belongs to construction tower crane and uses technical field, and in particular to a kind of building engineering construction scene
The shaping equipment that tower crane cable is fixed.
Background technology
With the development of architectural engineering, tower crane is a kind of crane gear the most frequently used in construction, and construction is hung for transporting
The construction materials such as reinforcing bar, the lumps of wood, sheet material, steel pipe.Vertical fix of existing tower crane cable lacks the safety such as fixed and off-load
Measure, colligation only is carried out with rope sometimes, lack unloading, off-load fixing point and fix not firm enough, work progress presence safety
Hidden danger.
The defects of in order to overcome existing tower crane cable vertical technique for fixing and deficiency, gradually start fixed to fill using specific
Put to fix cable, such as the fixing device described in patent 201420215628.9 and 201320507704.9, but such device
It is come banded cable simply using the groove carried on insulator, during actual use, the cable dragging difficulty after colligation is unfavorable
Cable adjustment during tower crane use uses.
The content of the invention
The utility model is in order to solve to be unfavorable for cable existing for existing tower crane cable fixing device to adjust what is used at any time
Problem, and then provide the shaping equipment that a kind of new building engineering construction scene tower crane cable is fixed.
The utility model adopts the following technical scheme that:
The shaping equipment that a kind of building engineering construction scene tower crane cable is fixed, including two sets of fixtures being used cooperatively, two
Set fixture is parallel, interval is installed on tower crane skeleton, and fixture is mutually perpendicular to tower crane skeleton, and strain relief clamp is loaded between two sets of fixtures
Installation gap in and cable can be in the installation gap interior edge cable length direction freely dragging;Described fixture includes U-shaped card
Head, the tail end of U-shaped card head are connected with insulator, and two insulators form the assembly pulley of clamping cable, and tower crane skeleton is installed in U-shaped
The notch of dop is interior and fastens the opening termination of U-shaped card head.
The U-shaped card head is formed by band iron bending, is provided with adjustment hole on the band iron of openend, be can adjust using adjustment hole
The restraint location of bolt, the device is set to be applicable on the tower crane skeleton for being installed on different shape specification.
In order to fully ensure that the bonding strength of the device, while consider to adjust fitting limit, the length of the U-shaped card head is not
Less than 150mm, width is not less than 40mm.
The insulator is shackle insulator, and two shackle insulators can coordinate composition assembly pulley.
The utility model has the advantages that:
1st, the device is coordinated using two fixtures come fix beyond cable position, cable unloading, Unloading Effect can also be
When vertical cable needs lifting, an assembly pulley is served as, cable can be moved up and down flexibly;And when the horizontal stroke for needing change cable
During to unloaded position, it is only necessary to which loose bolts translate the device and fixed again, it is not necessary to dismantle the device completely;
2nd, the restraint location of the device is adjustable, can use and be installed on the tower crane skeleton of different size;
3rd, also can be used alone one of fixture, realizes fixed cable position and plays cable unloading, Unloading Effect.
Brief description of the drawings
Fig. 1 is use state figure of the present utility model;
Fig. 2 is the structural representation of fixture;
In figure:1- tower cranes skeleton, 2- fixtures, 3- cables, 4- adjustment holes;21- bolts, 22-U types dop, 23- insulators.
Embodiment
With reference to accompanying drawing, specific embodiment of the present utility model is described further:
The defects of in order to overcome existing tower crane cable vertical technique for fixing and deficiency, the utility model provide a kind of tower crane electricity
Cable vertically fixes unloading, off-load fixing device, applied in tower crane equipment, has effective fixing point and unloading, off-loading point, prevents
Only tower crane cable is swung with the wind, is avoided cable breakdown, damaged equivalent risk caused by extraneous stress, is avoided construction safety accident
Occur.
The utility model uses the U-shaped card head of 40*4mm band irons processing;Insulator;2 bolts of φ 10, nut, pads;Tool
The dunnage for having certain rigidity, intensity is assembled.U-shaped card tool is installed to the skeleton of standard section of tower crane(Angle steel or cylinder)
Position, the space between fixture are stoppered with the dunnage with certain rigidity, intensity, are adjusted to correct position and are carried out tightly with bolt
Gu tightened with tie, it is fixed.
By adjusting height, the length that U-shaped card has, the tower crane of any shape is adapted to.
The diameter of bolt, length can have height according to the U-shaped card of actual use and be adjusted.
Processed using scale, save time, convenient to assemble and disassemble, attractive and durable, can be used in turn with model tower crane, improve it is existing
Field safety management and the integral level of civilized construction.
Claims (4)
1. the shaping equipment that a kind of building engineering construction scene tower crane cable is fixed, it is characterised in that:It is used cooperatively including two sets
Fixture(2), two sets of fixtures(2)Parallel, interval is installed on tower crane skeleton(1)On, fixture(2)With tower crane skeleton(1)Mutually hang down
Directly, strain relief clamp is loaded on two sets of fixtures(2)Between installation gap in and cable can be in the installation gap interior edge cable length direction
Freely dragging;Described fixture(2)Including U-shaped card head(22), U-shaped card head(22)Tail end be connected with insulator(23), two
Insulator(23)Form the assembly pulley of clamping cable, tower crane skeleton(1)It is installed in U-shaped card head(22)Notch in and fasten U-shaped
Dop(22)Opening termination.
2. the shaping equipment that building engineering construction scene according to claim 1 tower crane cable is fixed, it is characterised in that:Institute
State U-shaped card head(22)It is to be formed by band iron bending, adjustment hole is provided with the band iron of openend(4).
3. the shaping equipment that building engineering construction scene according to claim 2 tower crane cable is fixed, it is characterised in that:Institute
State U-shaped card head(22)Length be not less than 150mm, width is not less than 40mm.
4. the shaping equipment that building engineering construction scene according to claim 3 tower crane cable is fixed, it is characterised in that:Institute
State insulator(23)For shackle insulator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720933120.6U CN206940260U (en) | 2017-07-29 | 2017-07-29 | The shaping equipment that a kind of building engineering construction scene tower crane cable is fixed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720933120.6U CN206940260U (en) | 2017-07-29 | 2017-07-29 | The shaping equipment that a kind of building engineering construction scene tower crane cable is fixed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206940260U true CN206940260U (en) | 2018-01-30 |
Family
ID=61371910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720933120.6U Expired - Fee Related CN206940260U (en) | 2017-07-29 | 2017-07-29 | The shaping equipment that a kind of building engineering construction scene tower crane cable is fixed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206940260U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110601086A (en) * | 2019-10-21 | 2019-12-20 | 中国电建集团重庆工程有限公司 | Cable head fixing device for track construction |
CN111828594A (en) * | 2020-07-24 | 2020-10-27 | 上海外高桥造船有限公司 | Air pipe pulling pulley |
-
2017
- 2017-07-29 CN CN201720933120.6U patent/CN206940260U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110601086A (en) * | 2019-10-21 | 2019-12-20 | 中国电建集团重庆工程有限公司 | Cable head fixing device for track construction |
CN111828594A (en) * | 2020-07-24 | 2020-10-27 | 上海外高桥造船有限公司 | Air pipe pulling pulley |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206458918U (en) | A kind of adjustable subway suspension and support | |
CN206521197U (en) | A kind of adjustable balance hoisting beam | |
CN206940260U (en) | The shaping equipment that a kind of building engineering construction scene tower crane cable is fixed | |
CN202467183U (en) | Clamping and fixing device of reinforced concrete beam steel formwork | |
CN204897151U (en) | Transmission line tower integral hoisting specialized tool that acts as go -between | |
CN201813110U (en) | Special clamp for drawing cable machine | |
CN204038849U (en) | A kind of cable drum lifting device | |
CN205116524U (en) | Adjustable jib | |
CN103089010B (en) | The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method | |
CN207326472U (en) | A kind of large gear box body machining tool fixture | |
CN203475318U (en) | Cable-clamp-free hanging appliance used for anchoring stay cable at tower end in cable bent tower steel anchor beam area | |
CN205294616U (en) | Z shaped steel hoisting machine constructs | |
CN204592562U (en) | A kind of suspention suppot hanger of duct | |
CN204897154U (en) | Big board handling auxiliary fixtures | |
CN104609293B (en) | A kind of stator hoisting frock | |
CN201695968U (en) | Pipeline holding clamp | |
CN204281129U (en) | Hoisting crane and counterbalanced weight thereof | |
CN201915619U (en) | Falling protector | |
CN204751890U (en) | Hoist and mount specialized tool with adjustable large capacity coke oven protection shield | |
CN204573344U (en) | A kind of factory building house beam pipeline elevator | |
CN103422440B (en) | Cable-clamp-less hanging tool for cable bent tower steel anchor beam zone stay cable bent tower end anchoring | |
CN203447667U (en) | Interval-adjustable safety belt suspension device for maintaining isolating switch | |
CN204481425U (en) | Novel high ferro cable climbing frame | |
CN203259397U (en) | Bracket used in anchorage device static loading anchorage performance test | |
CN102815368B (en) | In ship building process, fixed segments falls terraced device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||