CN206934817U - A kind of concrete sedimentation basin - Google Patents

A kind of concrete sedimentation basin Download PDF

Info

Publication number
CN206934817U
CN206934817U CN201720590212.9U CN201720590212U CN206934817U CN 206934817 U CN206934817 U CN 206934817U CN 201720590212 U CN201720590212 U CN 201720590212U CN 206934817 U CN206934817 U CN 206934817U
Authority
CN
China
Prior art keywords
partition wall
flap
sedimentation basin
chamber
dividing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720590212.9U
Other languages
Chinese (zh)
Inventor
区文光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Strong Strength Concrete Co Ltd
Original Assignee
Guangdong Strong Strength Concrete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Strong Strength Concrete Co Ltd filed Critical Guangdong Strong Strength Concrete Co Ltd
Priority to CN201720590212.9U priority Critical patent/CN206934817U/en
Application granted granted Critical
Publication of CN206934817U publication Critical patent/CN206934817U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of concrete sedimentation basin,Its drip irrigation device is to include roof,Side wall and chamber,Partition wall is arranged at intervals with chamber,Chamber is separated into multiple precipitation chambers by partition wall,The connected entrance for connecting each precipitation chamber is provided with partition wall,It is provided with to horizontally rotate on partition wall and has flap,The dividing plate for separating sedimentation basin is provided on flap,The cylinder of driving dividing plate lifting is provided with flap,Connected entrance is disposed on partition wall,When needing to carry out clearing and retrieving to the cement for precipitating intracavitary,The separation realized to precipitating chamber can will be turned under dividing plate,Can now clearing and retrieving be carried out to cement of the precipitation chamber away from inlet side,Connected entrance is arranged at intervals on partition wall simultaneously,Therefore precipitation chamber still can be used in precipitating close to inlet,So as to when clearing up precipitation intracavitary cement,Sedimentation basin can be with normal use,Can synchronously it carry out,Improve operating efficiency,During without using dividing plate,It is accommodated in by rotating dividing plate above partition wall,Save space-consuming.

Description

A kind of concrete sedimentation basin
Technical field
Sedimentation basin field is the utility model is related to, more particularly to a kind of concrete sedimentation basin.
Background technology
Sedimentation basin is a kind of structures that suspension in water removal is removed using precipitation, is entered at present to concrete mixer truck Substantial amounts of concrete can be mixed with its liquid after row cleaning, is recycled generally for it, it is separated by sandstone After machine is separated, liquid is passed in sedimentation basin and precipitated, and the cement in liquid can be deposited in sedimentation basin, and wherein moisture It can be recycled, so as to reach the recycling for moisture and concrete, such as Fig. 1 for coagulation in the prior art Native sedimentation basin, it includes roof and side wall 2 and surrounds chamber 3, and inlet 6 is set in the side of chamber 3, and in chamber 3 It is arranged at intervals partition wall 4 to be separated in multiple precipitation chambers 5, and connected entrance 41 is provided with partition wall 4, it is multistage heavy so as to realize Form sediment, cement that can preferably in precipitating liquid, and the cement deposited in sedimentation basin needs cleaning to handle, during cleaning The use of stopping sedimentation basin being needed, and then have impact on the efficiency of work.
Utility model content
The purpose of this utility model is to provide a kind of concrete sedimentation basin have the advantages of can improving operating efficiency.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of concrete sedimentation basin, including bottom wall, side wall and chamber, partition wall is arranged at intervals with the chamber, it is described Chamber is separated into multiple precipitation chambers by partition wall, is provided with the partition wall and is connected each connected entrance for precipitating chamber, on the partition wall The flap horizontally rotated is provided with, the dividing plate for separating sedimentation basin is provided on the flap, driving is provided with the flap The cylinder of dividing plate lifting, the connected entrance are disposed on partition wall.
By that in this way, when needing to carry out clearing and retrieving to the cement for precipitating intracavitary, realization can will be turned under dividing plate Separation to precipitating chamber, can now clearing and retrieving be carried out to cement of the precipitation chamber away from inlet side, while between connected entrance Every set partition wall on, therefore precipitate chamber still can be used in precipitating close to inlet, wherein liquid can from connected entrance flow into it is next The precipitation intracavitary of level, so as to which when clearing up precipitation intracavitary cement, sedimentation basin can be carried out synchronously with normal use, Improve operating efficiency, and cylinder driving dividing plate pushes can possess good stabilization, in addition when dividing plate need not be used, It can be accommodated in by rotating dividing plate above partition wall, save space-consuming.
The utility model is further set:Mounting blocks for flap installation are set on the partition wall, set on the partition wall There is the chute slided for mounting blocks, the actuator of drive installation block slip is provided with the partition wall, is provided with the flap Drive the first motor that it horizontally rotates.
By the way that mounting blocks sliding is connected on partition wall, so as to which dividing plate can be slided into the position of needs when in use Afterwards, then by the first motor drive and turned under dividing plate to separate precipitation chamber, while so when needing to clear up the cement of precipitation intracavitary, Can be when dividing plate be in precipitation intracavitary, actuator drive installation block movement, the process median septum can will be in precipitation intracavitary Cement sweep, easily facilitate follow-up clearing and retrieving
The utility model is further set:The actuator includes synchronizing wheel and timing belt, and the mounting blocks are fixed on On timing belt, the second motor of its rotation of driving is provided with one of synchronizing wheel.
The movement of mounting blocks is driven by the mode of timing belt and synchronizing wheel, is glued even if so occurring cement when in use It is attached on timing belt and does not interfere with its work still, suitable for this kind of severe occasion, and after being adhered to the cement on timing belt Continuous cleaning will not also bother.
The utility model is further set:The scraper plate abutted with timing belt is provided with the flap.
Due on the middle surface that can have cement and be adhered to timing belt used, by the setting of scraper plate, in the first motor When driving flap rotation storage, the scraper plate on flap can scrape the cement being adhered in synchronization, realize the cement to adhesion Cleared up.
The utility model is further set:The lifting groove with scraping plate lifting is offered on the flap, is turned on the flap It is dynamic to be connected with screw rod, projection is provided with the flap, the screw flight is connected on projection.
Regulation to wiper positions is on the one hand realized by so setting, the surface with timing belt that can not be well in scraper plate During contact, by rotating screw rod scraping plate lifting regulation can be driven to arrive suitable position, and it is easy to operate.
The utility model is further set:Support is provided with the partition wall, vertical direction slides connection on the support There is sliding block, the gear hobbing for being connected to lower section timing belt inwall is rotatably connected on the sliding block, drive is threaded with the support The screw that movable slider pushes.
Because timing belt can there is a situation where to release in long-term use, its operation stability so can be not only influenceed, The scraper of follow-up scraper plate can be influenceed, therefore by the setting of gear hobbing, when there is situation about releasing, screw can be rotated by under gear hobbing Move, so as to realize the regulation of timing belt tensile force, can stablize work.
The utility model is further set:The two bottom sides of the dividing plate are provided with inclined-plane and form tapering.
The bottom of dividing plate is tapered, and it is more prone to water of the incision in sedimentation basin so when turning under overturning dividing plate Mud, the resistance being subject to during upset are smaller.
The utility model is further set:The bottom wall is obliquely installed, and is provided with the top of the dividing plate towards bottom wall lower The inclined extension board in direction.
Bottom wall is obliquely installed first, and so as to enter precipitation intracavitary in liquid, it is more easy to lower stream under gravity Move and flow to next precipitation intracavitary by connected entrance, in addition when dividing plate movement sweeps the cement of precipitation intracavitary, top is prolonged Stretch plate and can play to push and stop cement effect, so as to which the cement for effectively avoiding sweeping drops down onto the situation of opposite side at the top of dividing plate Occur.
Brief description of the drawings
Fig. 1 is the structure chart of concrete sedimentation basin in the prior art;
Fig. 2 is the structure chart at the visual angle of the present embodiment first;
Fig. 3 is the enlarged drawing at A in Fig. 2;
Fig. 4 is the structure chart at the visual angle of the present embodiment second;
Fig. 5 is the enlarged drawing at B in Fig. 4.
Reference:1st, bottom wall;2nd, side wall;3rd, chamber;4th, partition wall;41st, connected entrance;5th, chamber is precipitated;6th, inlet;7th, it is sliding Groove;8th, mounting blocks;81st, flap;9th, dividing plate;91st, tapering;10th, the first motor;11st, synchronizing wheel;12nd, timing belt;13rd, the second electricity Machine;14th, scraper plate;15th, lifting groove;16th, screw rod;17th, projection;18th, support;19th, sliding block;20th, gear hobbing;21st, screw;22nd, extend Plate;23rd, cylinder.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.
A kind of concrete sedimentation basin, as shown in Fig. 2 the side wall 2 including bottom wall 1 and surrounding, so as to form chamber at middle part 3, at the same it is spaced and parallel in chamber 3 be provided with two block walls 4, chamber 3 is separated into a precipitation chamber 5 by partition wall 4, is precipitated in edge The side of chamber 5 is provided with inlet 6, and is provided with partition wall 4 connected entrance 41 for connecting each precipitation chamber 5, hence into Liquid in chamber 3 can pass through 3 grades of precipitations of 3 precipitation chambers 5, the recycling to cement in liquid be realized, wherein connecting Mouth 41 is disposed on partition wall 4, and chute 7 is offered on partition wall 4, is slid on chute 7 and is connected with mounting blocks 8, in mounting blocks 8 On horizontally rotate the flap 81 of connection, and vertical lifting has the dividing plate 9 for separating precipitation chamber 5, while flap on flap 81 The cylinder 23 that driving dividing plate 9 lifts is provided with 81, the first motor that driving flap 81 rotates is provided with additionally mounted piece 8 10, the actuator that drive installation block 8 slides in chute 7 is provided with partition wall 44, the actuator includes synchronizing wheel 11, synchronization The motor 13 of band 12 and second, mounting blocks 8 are fixed on timing belt 12, and mounting blocks can be driven so as to be rotated by the second motor 13 8 slide and realize the regulation of its position, so run into need to clear up the cement in precipitation chamber 5 when, synchronization can be passed through Mounting blocks 8 are moved to the position of needs with 12, then horizontally rotated by the first motor 10 driving flap 81, then cylinder 23 drives Dynamic dividing plate 9 moves down to be separated to precipitation chamber 5, and the two bottom sides of dividing plate 9 are provided with inclined-plane and form tapering 91, so can The resistance being subject to when dividing plate 9 moves down is reduced, is more easy to cut in cement, now can be to precipitating water of the chamber 5 away from the side of inlet 6 Mud carries out clearing and retrieving, while connected entrance 41 is arranged at intervals on partition wall 4, therefore precipitates chamber 5 and still can be used in sinking close to inlet 6 Form sediment, wherein liquid can be flowed into the precipitation chamber 5 of next stage from connected entrance 41, so as to which cement is cleared up in precipitation chamber 5 When, sedimentation basin can be carried out synchronously with normal use, improve operating efficiency, and when that need not use dividing plate 9, can be with It is stowed on partition wall 4;And so when needing to clear up the cement in precipitation chamber 5, precipitation chamber 5 can be in dividing plate 9 When interior, actuator drive installation block 8 is moved, and the process median septum 9 will can be swept in cement, easily facilitate follow-up cleaning Recovery, the situation for dropping down onto opposite side in order to avoid occurring the cement swept during this occur, are provided with the top of dividing plate 9 Inclined extension board 22, extension board 22 can play a part of pushing the cement for stopping and sweeping.
As shown in figure 3, because timing belt 12 can there is a situation where to release in long-term use, its fortune so can be not only influenceed Row stability, therefore support 18 is provided with partition wall 4, vertical direction, which slides, on support 18 is connected with sliding block 19, turns on sliding block 19 It is dynamic to be connected with the gear hobbing 20 for being connected to the lower section inwall of timing belt 12, and it is threaded with what driving sliding block 19 pushed on support 18 Screw 21, therefore can be moved down gear hobbing 20 by rotating screw 21, so as to realize the regulation of the tensile force of timing belt 12, can stablize Work.
As shown in Figure 4 and Figure 5, the surface for being adhered to timing belt 12 due to that can have cement in use, therefore in flap 81 On be provided with scraper plate 14 for being abutted with the upper surface of timing belt 12, so as to rotate storage in the first motor 10 driving flap 81 When, the scraper plate 14 on flap 81 can scrape the cement being adhered in synchronization, realize and the cement of adhesion is cleared up, without Manually further go to clear up;And the lifting groove 15 for the sliding of the vertical direction of scraper plate 14 is offered on flap 81, while turning Projection 17 is provided with plate 81, screw rod 16 is rotatably connected on scraper plate 14, the screw rod 16 is threaded on projection 17, passes through this Sample realizes regulation for the position of scraper plate 14, when running into scraper plate 14 and well can not carry out scraper to timing belt 12, can rotate Screw rod 16 is adjusted, simple to operate.

Claims (8)

1. a kind of concrete sedimentation basin, including bottom wall (1), side wall (2) and chamber (3), the chamber (3) is interior to be arranged at intervals with Chamber (3) is separated into multiple precipitation chambers (5), it is each heavy that connection is provided with the partition wall (4) by partition wall (4), the partition wall (4) The connected entrance (41) of shallow lake chamber (5), it is characterized in that:The flap (81) horizontally rotated, the flap are provided with the partition wall (4) (81) dividing plate (9) for separating sedimentation basin is provided on, the cylinder of driving dividing plate (9) lifting is provided with the flap (81) (23), the connected entrance (41) is disposed on partition wall (4).
2. concrete sedimentation basin according to claim 1, it is characterized in that:Set on the partition wall (4) and pacify for flap (81) The mounting blocks (8) of dress, the chute (7) slided for mounting blocks (8) is provided with the partition wall (4), is provided with the partition wall (4) The actuator that drive installation block (8) slides, driving its first motor (10) for horizontally rotating is provided with the flap (81).
3. concrete sedimentation basin according to claim 2, it is characterized in that:The actuator is including synchronizing wheel (11) and together Step band (12), the mounting blocks (8) are fixed on timing belt (12), and driving is provided with one of synchronizing wheel (11), and it is rotated The second motor (13).
4. concrete sedimentation basin according to claim 3, it is characterized in that:It is provided with the flap (81) and timing belt (12) scraper plate (14) abutted.
5. concrete sedimentation basin according to claim 4, it is characterized in that:Offered on the flap (81) and scraper plate (14) The lifting groove (15) of lifting, screw rod (16) is rotatably connected on the flap (81), projection is provided with the flap (81) (17), the screw rod (16) is threaded on projection (17).
6. concrete sedimentation basin according to claim 5, it is characterized in that:Support (18), institute are provided with the partition wall (4) State vertical direction sliding on support (18) and be connected with sliding block (19), be rotatably connected on the sliding block (19) and be connected to lower section synchronously The gear hobbing (20) of band (12) inwall, the screw (21) that driving sliding block (19) pushes is threaded with the support (18).
7. concrete sedimentation basin according to claim 1, it is characterized in that:The two bottom sides of the dividing plate (9) are provided with Inclined-plane simultaneously forms tapering (91).
8. concrete sedimentation basin according to claim 1, it is characterized in that:The bottom wall (1) is obliquely installed, the dividing plate (9) top is provided with towards the inclined extension board in bottom wall (1) lower direction (22).
CN201720590212.9U 2017-05-24 2017-05-24 A kind of concrete sedimentation basin Expired - Fee Related CN206934817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720590212.9U CN206934817U (en) 2017-05-24 2017-05-24 A kind of concrete sedimentation basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720590212.9U CN206934817U (en) 2017-05-24 2017-05-24 A kind of concrete sedimentation basin

Publications (1)

Publication Number Publication Date
CN206934817U true CN206934817U (en) 2018-01-30

Family

ID=61362054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720590212.9U Expired - Fee Related CN206934817U (en) 2017-05-24 2017-05-24 A kind of concrete sedimentation basin

Country Status (1)

Country Link
CN (1) CN206934817U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108218044A (en) * 2018-03-06 2018-06-29 湖南文理学院 A kind of sponge city water treatment facility
CN114960906A (en) * 2022-06-22 2022-08-30 广西交科集团有限公司 Highway runoff emergency treatment structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108218044A (en) * 2018-03-06 2018-06-29 湖南文理学院 A kind of sponge city water treatment facility
CN114960906A (en) * 2022-06-22 2022-08-30 广西交科集团有限公司 Highway runoff emergency treatment structure

Similar Documents

Publication Publication Date Title
CN208440340U (en) Mud-scraping apparatus for sedimentation basin
CN206934817U (en) A kind of concrete sedimentation basin
CN208473022U (en) A kind of green building wall
CN203996814U (en) Voltage transformer leakage of oil cleaning plant
CN106890784B (en) A kind of traffic route asphalt concrete pavement surface building stones exclusion device
CN208049464U (en) A kind of road and bridge construction with can clear up multi-functional sedimentation basin automatically
CN113634536A (en) Ore screening belt cleaning device
CN209500904U (en) A kind of sedimentation basin being convenient to clean pool bottom sludge
CN105314073A (en) Greasy dirt clearing ship
CN204078024U (en) Oil combatting vessel
CN206934818U (en) Concrete sedimentation basin
CN208426802U (en) A kind of multitube eddy flow temperature formula water deduster
CN207042069U (en) A kind of three-level sedimentation basin of concrete mixing plant
CN214714576U (en) Concrete sedimentation tank
CN206796183U (en) Horizontal concrete mixer
CN112357627B (en) TBM continuous slag tapping mechanism for coal mine inclined shaft
CN112275106B (en) Flue gas desulfurization and denitrification integrated tower
CN210915996U (en) Device for separating essential oil from water
CN210730433U (en) Multistage sand and stone separator
CN100577917C (en) Electric road sweeping vehicle
CN112081014A (en) Waterproof coating construction device suitable for bridge floors with different corrosion degrees
CN111298515B (en) Concrete system is retrieved in tank car carwash
CN113769465A (en) Water conservancy water inlet mud real-time cleaning device
CN206950812U (en) A kind of gas cleaning plant for being used to remove dust and tar
CN207950901U (en) A kind of settling pit for water and soil conservation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

CF01 Termination of patent right due to non-payment of annual fee