CN206921327U - A kind of gas cylinder hydraulic pressure test experience actual training device - Google Patents

A kind of gas cylinder hydraulic pressure test experience actual training device Download PDF

Info

Publication number
CN206921327U
CN206921327U CN201720459684.0U CN201720459684U CN206921327U CN 206921327 U CN206921327 U CN 206921327U CN 201720459684 U CN201720459684 U CN 201720459684U CN 206921327 U CN206921327 U CN 206921327U
Authority
CN
China
Prior art keywords
water
inlet pipe
motor
water inlet
gas cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720459684.0U
Other languages
Chinese (zh)
Inventor
侍寿永
成建生
关士岩
刘家骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaian Vocational College of Information Technology
Original Assignee
Huaian Vocational College of Information Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaian Vocational College of Information Technology filed Critical Huaian Vocational College of Information Technology
Priority to CN201720459684.0U priority Critical patent/CN206921327U/en
Application granted granted Critical
Publication of CN206921327U publication Critical patent/CN206921327U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a kind of gas cylinder hydraulic pressure test experience actual training device, including storage tank(1), Experimental Water Tank, valve, motor and water pump A(2), motor and water pump B(29), liquid level sensor(20), cooling-water temperature sensor(19), motor(11)And water temperature heating(18)And control device;The technical problems to be solved in the utility model is to provide a kind of gas cylinder hydraulic pressure test experience actual training device, the utility model solves the specialized courses such as existing electric information, electrical category experimental real-training apparatus and can open up training program and can not meet that correlated curriculum lectures content needs to greatest extent, it is impossible to the infinite approach of fast-developing manufacturing industry and processing industry automation control appliance with China.The device can meet that more subjects carry out the needs of related experiment practical training project, be easy to lift Students ' Comprehensive practical operating abilities, and device is cost-effective, convenient operating maintenance, it may also be used for teacher carries out related scientific research intermediate item.

Description

A kind of gas cylinder hydraulic pressure test experience actual training device
Technical field
It the utility model is related to vehicle gas cylinder detection technique field, and in particular to a kind of use for laboratory gas cylinder hydraulic pressure detection is real Test actual training device.
Background technology
Automobile using natural gas as power fuel, worldwide by most people the advantages that because of fuel clean environment firendly Favor, and automobile with compressed natural gas is most widely used in China.As country is vigorously advocated using gas-fueled vehicles, storage The gas cylinder usage amount of compressed natural gas is even more growing day by day, and such gas cylinder belongs to the high-pressure bottle for storing inflammable and explosive medium, With high risk, the compressed natural gas stored will be once irreparable damage will be caused by revealing, in order to reduce gas cylinder leakage Or blast caused by the possibility of property loss and casualties, national regulation must to dispatch from the factory the gas cylinder before coming into operation and The gas cylinder of military service carries out periodic detection.Because detection gas cylinder automaticity is not high enough, supervision department can not carry out real-time whole process Monitoring, causes that part vehicle gas cylinder can not be detected periodically or detection process is not strict enough, causes the non-periodic detection gas in part Bottle and the unqualified gas cylinder of detection are still using, this invisible probability for adding the security incidents such as gas cylinder leakage or blast and occurring.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of gas cylinder hydraulic pressure test experience actual training device and control system System, the utility model, which solves the specialized courses such as existing electric information, electrical category experimental real-training apparatus, can open up training program not It can meet that correlated curriculum lectures content needs to greatest extent, it is impossible to which fast-developing manufacturing industry and processing industry are automatic with China Change the infinite approach of control device.The device and control system can meet that more subjects carry out the need of related experiment practical training project Will, it is easy to lift Students ' Comprehensive practical operating abilities, and device is cost-effective, convenient operating maintenance, it may also be used for teacher Carry out related scientific research intermediate item.
The utility model is achieved through the following technical solutions:
A kind of gas cylinder hydraulic pressure test experience actual training device, it is characterised in that:Including storage tank(1), Experimental Water Tank, valve, Motor and water pump A(2), motor and water pump B(29), motor(11)And control device, the Experimental Water Tank include interior Casing(13), outer case(14), internal box(13)With outer case(14)Etc. high setting, and volume is equal, internal box(13)With it is outer Casing(14)Pass through water inlet pipe, outlet pipe and storage tank respectively(1)Connection, internal box(13)With storage tank(1)The water inlet of connection Pressure gauge is set on pipe, and water inlet pipe, outlet pipe are provided with valve, and motor and water pump A are provided with water inlet pipe(2), it is electronic Machine and water pump B(29), internal box(13)Inside it is provided with stirring vane(30), inwall bottom is respectively arranged with liquid level sensor (20), cooling-water temperature sensor(19)And water temperature heating(18), outer case(14)Side wall passes through outlet pipe and weighing container(16) Connection, weighing container(16)Bottom sets electronic scale(17), valve, motor and water pump A(2), motor and water pump B(29)、 Pressure gauge, liquid level sensor(20), cooling-water temperature sensor(19)And electronic scale(17), motor(11)Connect with control device signal Connect, storage tank(1)Bottom is provided with roller more than two(34);
The control device includes PC ends, PLC, analog quantity and digital quantity modular converter, frequency converter VVVF, PC End is connected by Ethernet through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF;PLC is also Pass through RS485 buses and touch-screen HMI, frequency converter VVVF, electronic scale(17)It is connected, data volume input/output port is with pressing Button, switch, motor driver, indicator lamp, auxiliary reclay, frequency converter VVVF are connected;The cooling-water temperature sensor, liquid level pass Sensor and the converted switch of the analog signalses of pressure gauge output are connected with frequency converter VVVF or matched with PLC The analog quantity of set is connected with digital quantity modular converter, and analog quantity is controlled with digital quantity modular converter by expansion cable and PLC Device is connected, while is connected with frequency converter VVVF analog output port, and PLC passes through driver and motor (11)Connection, is connected with valve by auxiliary reclay, passes through A.C. contactor and motor and water pump A(2)With motor and Water pump B(29)Connection.
The further Technological improvement plan of the utility model is:
The water inlet pipe includes water inlet pipe A(3), water inlet pipe B(27), water inlet pipe C(10), outlet pipe includes relief tube (28), drainpipe A(15), drainpipe B(25), drainpipe C(22), drainpipe D(33), storage tank(1)Pass through water inlet pipe B (27), drainpipe B(25)With outer case(14)Connection, passes through water inlet pipe A(3), water inlet pipe C(10), drainpipe C(22)And let out Pressure pipe(28)With internal box(13)Connection, drainpipe D(33)It is arranged at storage tank(1)Bottom;
The valve includes hand-operated valve A(5), hand-operated valve B(21), hand-operated valve C(24), hand-operated valve D(32), magnetic valve A (4), magnetic valve B(6), magnetic valve C(7), magnetic valve D(23), magnetic valve E(26);
Water inlet pipe A(3)On be correspondingly arranged motor and water pump A(2), magnetic valve A(4), water inlet pipe B(27)On be correspondingly arranged Motor and water pump B(29), magnetic valve C(7), relief tube(28)On be correspondingly arranged on magnetic valve B(6), drainpipe B(25)For simultaneously Connection formula drainpipe is correspondingly arranged magnetic valve E respectively(26), hand-operated valve C(24), drainpipe C(22)It is right respectively for parallel drainpipe Magnetic valve D should be set(23), hand-operated valve C(24)Hand-operated valve B(21), water inlet pipe C(10), drainpipe D(33)It is correspondingly arranged respectively Hand-operated valve A(5), hand-operated valve D(32).
The further Technological improvement plan of the utility model is:
The pressure gauge includes simulated pressure table(8), electro connecting pressure gauge(9), pressure gauge is arranged at water inlet pipe C(10) On.
The further Technological improvement plan of the utility model is:
The stirring vane(30)Pass through connecting shaft(12)With motor(11)Connection.
The further Technological improvement plan of the utility model is:
The water inlet pipe A(3), relief tube(28)Pass through water inlet pipe C(10)With internal box(13)Connection.
The further Technological improvement plan of the utility model is:
The driver is driving stepper motor machine or is servomotor driving machine.
The further Technological improvement plan of the utility model is:
The water inlet pipe, outlet pipe are transparent water pipe made of plastic material.
The further Technological improvement plan of the utility model is:
The internal box(13), outer case(14)For the cylindrical transparent containers being arranged concentrically.
The further Technological improvement plan of the utility model is:
The PLC uses west gate S7-200 SMART CPU ST40, touch-screen HMI to use Siemens SMART 700IE, frequency converter VVVF use the G120 of Siemens, and analog quantity is simulated with digital quantity modular converter using Siemens EM AM06 Input and output mixing module is measured, Ethernet switch uses CSM1277.
The utility model compared with prior art, has following obvious advantage:
First, the utility model can realize slitless connection with modern enterprise engineer applied, be infinitely close to gas cylinder detection enterprise Used automation control appliance, cost-effective, small volume, it is easy to school and realizes that one to two student operates an equipment, It is easy to improve student's independence, independence, the experimental real-training operational capacity of novelty;
2nd, the utility model can realize the experimental real-training project of more subjects, such as programmable controller in set of device The courses such as PLC, frequency converter, configuration technology, industrial stokehold, industrial networking technology, reduce school's input experimental real-training equipment Cost, experimental real-training hold facility experimental real-training number of chambers amount is reduced, improve school experiment Practical training equipment utilization rate to greatest extent;
3rd, several operable, Yi Shi can be achieved by the flexible combination of different components on the device in the utility model Existing experimental real-training project;
4th, all input and output connecting lines of electric information component used in the utility model, which draw, is connected in terminal block, just Teaching efficiency when experimental real-training is improved.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model experimental real-training apparatus;
Fig. 2 is the schematic diagram of the utility model control system.
Embodiment
As shown in Figure 1 and Figure 2, the utility model includes storage tank 1, test water tank, water inlet pipe, water outlet tube valve, motor And water pump A 2, motor and water pump B 29, liquid level sensor 20, cooling-water temperature sensor 19, pressure gauge, water temperature heating 18, stirring Blade 30, electronic scale 17, PC ends, PLC, touch-screen HMI, frequency converter VVVF, analog quantity and digital quantity modular converter, with Too network switch, button, switch, indicator lamp, change-over switch, auxiliary reclay, A.C. contactor and power supply, the storage tank 1 For plastic, transparent cuboid, there are the running water 31 of hydraulic pressure detection, lower right and drainpipe D 33 and hand-operated valve D 32 in the inside It is connected;It is that inside and outside double-layer plastic transparent cylinder includes internal box 13, outer case 14 to test plastic cistern, and ectonexine is respectively marked with Even graduation mark, the only upper bottom surface of ectonexine are connected, and surrounding communicates, and ectonexine volume is equal, outer layer and outer layer water inlet pipe and water outlet pipe It is connected, internal layer is connected with internal layer water inlet pipe and water outlet pipe, and bottom is provided with liquid level sensor 20, cooling-water temperature sensor 19, water temperature in internal layer Heater 18 and agitator 30, the gas cylinder when simulated water pressure of internal box 13 detects, the water jacket when simulated water pressure of outer case 14 detects; Water inlet pipe and water outlet pipe is plastic, transparent water pipe, and so as to the flow direction and water level of operator's energy Real Time Observation water, water inlet pipe and water outlet pipe is included city Water is incorporated into the water inlet pipe C 10 of internal box 13, the water 31 in storage tank 1 injected to the water inlet pipe A 3 of internal box 13, by water storage The reclaimed water 31 of case 1 is injected into the water inlet pipe B 27 of outer case 14, the water in internal box 13 is incorporated into the drainpipe C of storage tank 1 22nd, the water in outer case 14 is incorporated into the drainpipe B 25 of storage tank 1, will be used when gas cylinder deformation is determined in hydraulic pressure detection process In outer case 14 overflow draining drainpipe A 15, by release in hydraulic pressure detection process when be used for by the water under high pressure of internal box 13 discharge Relief tube 28, one end of water inlet pipe C 10 for introducing city's water is connected with the upper surface of internal box 13, and the other end connects with city's water Mouth is connected, and for being connected to one end of water inlet pipe A 3 of the water filling of internal box 13 with storage tank 1, the other end introduces city's water with being used for Water inlet pipe C 10 carries out T fonts and is connected, another for being connected to one end of water inlet pipe B 27 of the water filling of outer case 14 with storage tank 1 End is connected with the upper surface of outer case 14, for one end of drainpipe C 22 that the reclaimed water of internal box 13 is incorporated into storage tank 1 and interior case The lower surface of body 13 is connected, and the other end is connected with storage tank 1, for the reclaimed water of outer case 14 to be incorporated into the drainpipe B of storage tank 1 25 one end are connected with the lower surface of outer case 14, and the other end is connected with storage tank 1, for determining gas cylinder deformation in hydraulic pressure detection process When displacement the one end of drainpipe A 15 and the side of outer case 14 above be connected, the other end extends to spilling water weighing container 16 Interior, one end of relief tube 28 for release in hydraulic pressure detection process is connected with introducing the progress of the water inlet pipe C 10 T fonts of city's water, The other end is connected with storage tank 1;The valve includes hand-operated valve and magnetic valve, and hand-operated valve, which includes moving city sailor, is incorporated into interior case Hand-operated valve A 5 in body 13, for the water in internal box 13 is incorporated into storage tank 1 hand-operated valve B 21, for by outer container Hand-operated valve C 24, the hand-operated valve D 32 for the reclaimed water 31 of storage tank 1 to be emptied that water in body 14 is incorporated into storage tank 1, electricity Magnet valve includes being used for toward the magnetic valve A 4 of water filling in internal box 13, for toward the magnetic valve C 7 of water filling in outer case 14, be used for The magnetic valve D 23 and hydraulic pressure of the draining of internal box 13 detect the magnetic valve B 6 of ending phase release, for the draining of outer case 14 Magnetic valve E 26, hand-operated valve are separately positioned on the water inlet pipe C 10 that Jiang Shishui is incorporated into internal box 13, by internal box 13 The drainpipe C 22 that is incorporated into storage tank 1 of water on, the water in outer case 14 be incorporated into drainpipe B 25 in storage tank 1 Above, on the drainpipe D 33 emptied the water 31 in storage tank 1, magnetic valve, which is separately positioned on, is injected into the reclaimed water 31 of storage tank 1 It is injected on water inlet pipe A 3 in internal box 13, by the reclaimed water 31 of storage tank 1 on the water inlet pipe B 27 in outer case 14, by interior case The draining in storage tank 1 is incorporated on the drainpipe C 22 that water in body 13 is incorporated into storage tank 1, by the water in outer case 14 On pipe B 25, by during detection process ending phase in internal box 13 water under high pressure carry out release relief tube 28 on, hand-operated valve 21 by the way that water pipe is in parallel with magnetic valve 23, hand-operated valve 24 is in parallel with magnetic valve E 26 by water pipe, and magnetic valve D 23 is opening degree Can electricity regulation magnetic valve, be connected with the supporting analog quantity of PLC with digital quantity modular converter;The motor and water Pump includes the reclaimed water 31 of storage tank 1 being injected into common adjustable frequency motor and water pump A 2 in internal box 13, outer case 14, electronic Machine and water pump B 29 and the stepping being stirred to the water in internal box 13 or servomotor 11, for by the reclaimed water of storage tank 1 The 31 common adjustable frequency motors and water pump being injected into internal box 13, outer case 14 are separately positioned on corresponding water inlet pipe A 3, entered On water pipe B 27, internal box 13 is arranged on for the stepping being stirred to the water in internal box 13 or servomotor 11 Side, is connected by connecting shaft 12 with the agitator 30 being arranged in internal box 13;The sensor includes being arranged on internal box 13 Liquid level sensor 20, the cooling-water temperature sensor 19 of bottom, its detecting element are arranged on the bottom of internal box 13, and data signal line is arranged on It is external to test plastic cistern;The pressure gauge includes simulated water pressure table 8 and electric contact water pressure gauge 9, is both connected to and introduces city's water Onto the water inlet pipe C 10 of internal box 13, simulated pressure table 8 can be in simulation gas cylinder hydraulic pressure detection in real-time display internal box 13 Pressure size, electro connecting pressure gauge 9 is used for exceeding system settings when actual hydraulic pressure(The inspection applied during simulation gas cylinder detection Survey the hydraulic pressure upper limit)When, instruction is sent to PLC, makes it stop detection work, plays a protective role;The water temperature heating Device 18 is arranged on the bottom of internal box 13, for being heated to the water of internal box 13;The agitator 30 is arranged on internal box 13 In, for being stirred to the water of internal box 13;The electronic scale 17 is arranged on the side of outer case 14, is placed on storage tank 1, For to overflowing water in outer case 14 because internal box 13 expands in gas cylinder hydraulic pressure detection process and it being weighed, electricity Sub- scale 17 should have peeling function, while answer existing analog output interface circuit, also there is RS485 communication interfaces;The PC ends pass through Ethernet is connected through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF, for PLC program Download monitored with operation, the input of the configuration of touch-screen HMI pictures and dynamic data and output, frequency converter VVVF parameters are set Put;The PLC is also connected by RS485 buses with touch-screen HMI, frequency converter VVVF, electronic scale, data volume input Output port is connected with button, switch, motor driver, indicator lamp, auxiliary reclay, frequency converter;The water temperature sensing The converted switch of analog signalses of device, liquid level sensor and the output of simulated pressure table is connected with frequency converter VVVF, or with The analog quantity that PLC matches is connected with digital quantity modular converter, and analog quantity passes through extension with digital quantity modular converter Cable is connected with PLC, is also connected with frequency converter VVVF analog output port;If the button is extra dry red wine Color, green band button, it is easy to reduce component installation dimension, reduces the device and taken up space, including starting button, stopping is pressed Button, drain button, release button;The PLC, frequency converter VVVF, touch-screen HMI can realize what is opened up on the apparatus Some experimental real-training projects;The motor, magnetic valve, pressure gauge, sensor, heater 18,17 all electric informations of electronic scale The input and output connecting line of component draw be connected to installation on the apparatus and have a dominant component mark be easily attached operation Terminal block on, the connection of electric wiring when being easy to experimental real-training;The experimental real-training project opened up should at least include compiling Several electric informations, the Mechatronics specialities such as range controller PLC, frequency converter, configuration technology, industrial stokehold, industrial networking technology Core curriculum.
Utility model works process is sketched with reference to Fig. 1, Fig. 2:
Utility model works process is introduced so that gas cylinder hydraulic pressure detects comprehensive practical training project as an example:Carrying out gas cylinder Before hydraulic pressure detection, should first be ready work, preparation comprise at least by all motor and water pump A 2 in the present apparatus, Motor and water pump B 29, valve, pressure gauge, liquid level sensor 20, cooling-water temperature sensor 19, water temperature heating 18, electronic scale 17 Deng component and corresponding controller(Such as controller PLC, frequency converter VVVF and programming monitoring PC ends and touch-screen HMI) Equipment is connected, and is connected between controller by Ethernet switch or serial communication RS485 bus ports, controller PLC's 121 it is Ethernet interface, 122 is RS485 serial bus interfaces, by PC end by under associated control procedures, parameter, configuration interface It is downloaded in programmable controller PLC, frequency converter VVVF and touch-screen HMI(Frequency converter VVVF parameter setting can also pass through face Plate is set);Then open hand-operated valve A 5 and city's water is incorporated into storage tank 1 by hand-operated valve B 21, treat the water 31 in storage tank 1 When adding to 80% or so of storage tank 1, hand-operated valve A 5 and hand-operated valve B 21 is closed(If have during experimental real-training in storage tank 1 for real This step need not then be operated by testing the water of practical training project needs);All hand-operated valves close in advance under, pass through PC ends or touch-screen The starting button that water filling is carried out to internal box 13 on HMI or control device, the magnetic valve A controlled by controller PLC program 4 openings and motor and water pump A 2 bring into operation, rapidly to the water filling of internal box 13, when liquid level sensor 20 detects interior case Water in body 13 is full, then closes magnetic valve A 4 and stop motor and water pump A 2 operation, the water temperature entered as noted is not up to To gas cylinder testing conditions, then system sends police instruction, while starts stepping or the servo electricity of water temperature heating 18 and stirring Motivation 11 is started and is stirred, and water temperature heating 18 keeps the water temperature in internal box 13 to meet testing conditions, or the reclaimed water of storage tank 1 Temperature has met testing conditions, then controller PLC opens magnetic valve C 7 by programme-control and makes motor and the works of water pump B 29 Make, the water 31 in storage tank 1 starts to be rapidly injected outer case 14, treats that the water in outer case 14 fills(Water is from drainpipe A 15 Overflow, the reclaimed water of weighing container 16 increased again)When close magnetic valve C 7 and stop motor and water pump B 29, operator is led to The peeling function button crossed on PC ends or touch-screen HMI or electronic scale 17 makes electronic scale 17 realize peeling function, or passes through program It is arranged to perform peeling function automatically;The gas cylinder hydraulic pressure detection that operator is pressed on PC ends or touch-screen HMI starts button or control Starting button on control equipment starts to carry out pressurization detection to internal box 13, now the stepping for stirring or servomotor 11 are stopped, and magnetic valve A 4 opens to be run again with motor and water pump A 2, quickly(Middling speed)Enter into internal box 13 Row water filling, at this moment simulated pressure table 8 show internal box 13 in real time hydraulic pressure value can gradually increase, the finger of electro connecting pressure gauge 9 Pin also can be rotated clockwise gradually, and to show, hydraulic pressure is gradually increasing in internal box 13, when hydraulic pressure gradually rises to examine in internal box 13 90% or so of measuring pressure arranges value, motor and the slower water fillings into internal box 13 of water pump A 2, when hydraulic pressure in internal box 13 When reaching detection pressure arranges value, close magnetic valve A 4 and stop motor and water pump A 2 work, in the process, interior case The hydraulic pressure of body 13 expands internal box 13 because constantly raising, and so as to extrude outer case 14, the reclaimed water of outer case 14 is overflowed and is passed through Drainpipe A 15 is flowed into weighing container 16, and then gas cylinder detection process enters packing stage, and after pressurize 2 minutes, gas cylinder detects Process enters the release stage, and magnetic valve B 6 is opened, and carries out release to the water under high pressure in internal box 13, water under high pressure passes through relief tube 28 flow into storage tank 1, and internal box 13 causes the inside points water suck-back of weighing container 16 to enter in outer case 14 again because release is shunk, After the completion of release(The display data of simulated pressure table 8 is 0, and the pointer of electro connecting pressure gauge 9 goes back to original position), it is remaining in weighing container 16 Water detect remaining displacement for gas cylinder hydraulic pressure;Electronic scale 17 in real time passes through displacement certainly in gas cylinder hydraulic pressure detection process The analog signal line or communication data line of body send controller PLC to, and controller PLC is bent by hydraulic pressure-time by data processing Real-time hydraulic pressure value in line, displacement-time graph, displacement-hydraulic curve, internal box 13, displacement, maximum displacement, Remaining displacement is shown by touch-screen HMI or PC ends, if simulated pressure table 8 is damaged or controlled in hydraulic pressure detection process The analog quantity that device PLC processed matches and digital quantity modular converter(For receiving the module of sensor output signal)Damage or number According to communication failure, the hydraulic pressure of internal box 13 is caused to exceed system detectio arranges value, now the upper limit normally opened contact of electro connecting pressure gauge 9 closes Close, stopping detection instruction is sent to controller PLC, now detection process stops, when abnormal conditions occurring in detection process, behaviour Author can by press the gas cylinder hydraulic pressure on PC ends or touch-screen HMI detection stop key or control device on stop button, Also detection process can be stopped;After release terminates, water temperature heating 18 stops heating, by case in display on touch-screen HMI or PC ends Body 13(Simulate gas cylinder)The full deformation rate of volume and the information such as whether rate of residual and hydraulic pressure testing result qualified, gas cylinder hydraulic pressure After detection terminates, operator presses the row on gas cylinder hydraulic pressure detection draining button or control device on PC ends or touch-screen HMI Water button, magnetic valve D 23(Opening degree is adjusted to maximum), magnetic valve E 26 open, the water in internal box 13, outer case 14 Its internal water is discharged in storage tank 1 by drainpipe C 22, drainpipe B 25, is 0 when liquid level sensor 20 detects data And after extending a period of time, magnetic valve D 23, magnetic valve E 26 are closed, and now drainage procedure terminates;Hand-operated valve B 21 and manually The water that valve C 24 is used in manual internal box 13, outer case 14 is discharged in storage tank 1 by drainpipe C 22, drainpipe B 25, Hand-operated valve 32 and drainpipe D 33 are used for the hand-held evacuation of water 31 in storage tank 1;The opening degrees of magnetic valve D 23, which can adjust, to be used for In the experimental real-training project such as the constant pressure water supply PID control of internal box 13 or permanent liquid level PID control;Roller below device 34 are used for the movement of the device.
Motor 1 in motor and water pump A 2 is stepping or servomotor, if stepping motor, then driver For driving stepper motor machine;If servomotor, then driver is servomotor driving machine;Motor and water pump B 29 include Motor 2.
The present apparatus opens up experimental real-training project and inputs experimental real-training project, control including at least controller PLC digital quantity Device PLC processed digital output experimental real-training project, controller PLC analog input experimental real-training project, controller PLC The communication of analog output experimental real-training project, controller PLC pulsed quantity output experimental real-training project, controller PLC(Such as with Too Network Communication, serial communication, PROFIBUS-DP communications etc.)Experimental real-training project, controller PLC sequence design method experimental real-trainings Project, frequency converter VVVF On-off signal experimental real-trainings project, frequency converter VVVF output switch parameter experimental real-trainings project, frequency converter VVVF analog input experimental real-trainings project, frequency converter VVVF analog output experimental real-trainings project, frequency converter VVVF communications are real Test practical training project, configuration switching value control experimental real-training project, the various domain experimental real-training projects of configuration, Combining soft control process interface Experimental real-training project, controller PLC and frequency converter VVVF and the comprehensive switching values of touch-screen HMI or analog quantity or communication etc. are tested Practical training project, by the flexible combination of different components on device, several experimental real-training items that are operable, easily realizing can be achieved Mesh, specific experiment practical training project title and content and complexity should be awarded in teaching according to the basic and each course of each college student Appearance is opened up or secondary research and development, meanwhile, this device and control system teachers and students can be additionally used in the related religion scientific research intermediate item of exploitation, Lift teachers and students and teach scientific research level and ability.
Technological means disclosed in the utility model is not limited only to the technological means disclosed in above-mentioned embodiment, also Including being combined formed technical scheme by above technical characteristic.It should be pointed out that the ordinary skill for the art For personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these are improved and profit Decorations are also considered as the scope of protection of the utility model.

Claims (9)

  1. A kind of 1. gas cylinder hydraulic pressure test experience actual training device, it is characterised in that:Including storage tank(1), Experimental Water Tank, valve, electricity Motivation and water pump A(2), motor and water pump B(29), motor(11)And control device, the Experimental Water Tank include interior case Body(13), outer case(14), internal box(13)With outer case(14)Etc. high setting, and volume is equal, internal box(13)With outer container Body(14)Pass through water inlet pipe, outlet pipe and storage tank respectively(1)Connection, internal box(13)With storage tank(1)The water inlet pipe of connection Upper setting pressure gauge, water inlet pipe, outlet pipe are provided with valve, and motor and water pump A are provided with water inlet pipe(2), motor And water pump B(29), internal box(13)Inside it is provided with stirring vane(30), inwall bottom is respectively arranged with liquid level sensor(20)、 Cooling-water temperature sensor(19)And water temperature heating(18), outer case(14)Side wall passes through outlet pipe and weighing container(16)Connection, Weighing container(16)Bottom sets electronic scale(17), valve, motor and water pump A(2), motor and water pump B(29), pressure Table, liquid level sensor(20), cooling-water temperature sensor(19)And electronic scale(17), motor(11)It is connected with control device signal, Storage tank(1)Bottom is provided with roller more than two(34);
    The control device includes PC ends, PLC, analog quantity and digital quantity modular converter, frequency converter VVVF, PC ends lead to Ethernet is crossed through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF to be connected;PLC also passes through RS485 buses and touch-screen HMI, frequency converter VVVF, electronic scale(17)It is connected, data volume input/output port and button, opens Pass, motor driver, indicator lamp, auxiliary reclay, frequency converter VVVF are connected;The cooling-water temperature sensor, liquid level sensor Switch converted with the analog signalses of pressure gauge output is connected with frequency converter VVVF or matched with PLC Analog quantity is connected with digital quantity modular converter, and analog quantity passes through expansion cable and PLC phase with digital quantity modular converter Connection, while be connected with frequency converter VVVF analog output port, PLC passes through driver and motor(11)Even Connect, be connected by auxiliary reclay with valve, pass through A.C. contactor and motor and water pump A(2)With motor and water pump B (29)Connection.
  2. A kind of 2. gas cylinder hydraulic pressure test experience actual training device according to claim 1, it is characterised in that:The water inlet pipe bag Include water inlet pipe A(3), water inlet pipe B(27), water inlet pipe C(10), outlet pipe includes relief tube(28), drainpipe A(15), drainpipe B (25), drainpipe C(22), drainpipe D(33), storage tank(1)Pass through water inlet pipe B(27), drainpipe B(25)With outer case(14) Connection, passes through water inlet pipe A(3), water inlet pipe C(10), drainpipe C(22)And relief tube(28)With internal box(13)Connection, row Water pipe D(33)It is arranged at storage tank(1)Bottom;
    The valve includes hand-operated valve A(5), hand-operated valve B(21), hand-operated valve C(24), hand-operated valve D(32), magnetic valve A(4), electricity Magnet valve B(6), magnetic valve C(7), magnetic valve D(23), magnetic valve E(26);
    Water inlet pipe A(3)On be correspondingly arranged motor and water pump A(2), magnetic valve A(4), water inlet pipe B(27)On be correspondingly arranged it is electronic Machine and water pump B(29), magnetic valve C(7), relief tube(28)On be correspondingly arranged on magnetic valve B(6), drainpipe B(25)To be parallel Drainpipe is correspondingly arranged magnetic valve E respectively(26), hand-operated valve C(24), drainpipe C(22)Correspond to and set respectively for parallel drainpipe Put magnetic valve D(23), hand-operated valve C(24)Hand-operated valve B(21), water inlet pipe C(10), drainpipe D(33)It is correspondingly arranged respectively manually Valve A(5), hand-operated valve D(32).
  3. A kind of 3. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The pressure Table includes simulated pressure table(8), electro connecting pressure gauge(9), pressure gauge is arranged at water inlet pipe C(10)On.
  4. A kind of 4. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The stirring Blade(30)Pass through connecting shaft(12)With motor(11)Connection.
  5. A kind of 5. gas cylinder hydraulic pressure test experience actual training device according to claim 2, it is characterised in that:The water inlet pipe A (3), relief tube(28)Pass through water inlet pipe C(10)With internal box(13)Connection.
  6. A kind of 6. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The driving Device is driving stepper motor machine or is servomotor driving machine.
  7. A kind of 7. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The water inlet Pipe, outlet pipe are transparent water pipe made of plastic material.
  8. A kind of 8. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The interior case Body(13), outer case(14)For the cylindrical transparent containers being arranged concentrically.
  9. A kind of 9. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The PLC controls Device processed uses west gate S7-200 SMART CPU ST40, touch-screen HMI to use Siemens SMART 700IE, frequency converter VVVF to adopt With the G120 of Siemens, analog quantity uses Siemens's EM AM06 analog input and output mixing modules with digital quantity modular converter, Ethernet switch uses CSM1277.
CN201720459684.0U 2017-04-28 2017-04-28 A kind of gas cylinder hydraulic pressure test experience actual training device Expired - Fee Related CN206921327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720459684.0U CN206921327U (en) 2017-04-28 2017-04-28 A kind of gas cylinder hydraulic pressure test experience actual training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720459684.0U CN206921327U (en) 2017-04-28 2017-04-28 A kind of gas cylinder hydraulic pressure test experience actual training device

Publications (1)

Publication Number Publication Date
CN206921327U true CN206921327U (en) 2018-01-23

Family

ID=61306082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720459684.0U Expired - Fee Related CN206921327U (en) 2017-04-28 2017-04-28 A kind of gas cylinder hydraulic pressure test experience actual training device

Country Status (1)

Country Link
CN (1) CN206921327U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952525A (en) * 2017-04-28 2017-07-14 淮安信息职业技术学院 A kind of gas cylinder hydraulic pressure test experience actual training device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952525A (en) * 2017-04-28 2017-07-14 淮安信息职业技术学院 A kind of gas cylinder hydraulic pressure test experience actual training device

Similar Documents

Publication Publication Date Title
CN2938055Y (en) Device for detecting leakage of central air-conditioning pipeline system by differential pressure
CN203688419U (en) Atmospheric corrosion simulating test box
CN201207013Y (en) Detecting machine for airtightness of oil tank
CN203269530U (en) Integrated quantitative propellant filling and discharging device
CN104807604A (en) Water purifier detection equipment and detection method utilizing water purifier detection equipment
CN102661859B (en) Performance testing equipment of pressure regulator of bottled liquefied petroleum gas and application method thereof
CN106840547A (en) A kind of batteries of electric automobile bag air-tightness detection device and detection method
CN102562565B (en) Method and device for water pump delivery inspection
CN206921327U (en) A kind of gas cylinder hydraulic pressure test experience actual training device
CN106952525A (en) A kind of gas cylinder hydraulic pressure test experience actual training device
CN103791985A (en) Static state standard cubic meter calibration device and calibration method of static state standard cubic meter calibration device
CN105157781B (en) Clean tank volume self-operated measuring unit and method
CN108051285A (en) A kind of sack method VOC pretreating devices and its application method
CN201281013Y (en) Lubricating oil pump performance test desk
CN205300873U (en) Combined type airtight inspection machine futilely wets
RU2433482C2 (en) Educational training complex "automatic regulation and therotechnical control"
CN204594635U (en) A kind of full-automatic butterfly valve seal performance aircraft
CN101988861B (en) System for detecting air tightness of cavity of mechanical and electrical product
CN209281749U (en) Quantitative filling practical training teaching aid
CN103123311B (en) Device used for detecting pressure resistance of ceramic tube
CN204314029U (en) A kind of device for detecting sealability of water purification machine
CN216621601U (en) Double-circuit batch intelligent calibrating device for barometer and oil pressure meter
CN210834055U (en) Valve leakage water-free detection system
CN2241333Y (en) Bench full-automatic gas relay checker
CN213480663U (en) Automatic supply device for Freon of photoetching machine air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123

Termination date: 20200428

CF01 Termination of patent right due to non-payment of annual fee