CN206921327U - A kind of gas cylinder hydraulic pressure test experience actual training device - Google Patents
A kind of gas cylinder hydraulic pressure test experience actual training device Download PDFInfo
- Publication number
- CN206921327U CN206921327U CN201720459684.0U CN201720459684U CN206921327U CN 206921327 U CN206921327 U CN 206921327U CN 201720459684 U CN201720459684 U CN 201720459684U CN 206921327 U CN206921327 U CN 206921327U
- Authority
- CN
- China
- Prior art keywords
- water
- inlet pipe
- motor
- water inlet
- gas cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model discloses a kind of gas cylinder hydraulic pressure test experience actual training device, including storage tank(1), Experimental Water Tank, valve, motor and water pump A(2), motor and water pump B(29), liquid level sensor(20), cooling-water temperature sensor(19), motor(11)And water temperature heating(18)And control device;The technical problems to be solved in the utility model is to provide a kind of gas cylinder hydraulic pressure test experience actual training device, the utility model solves the specialized courses such as existing electric information, electrical category experimental real-training apparatus and can open up training program and can not meet that correlated curriculum lectures content needs to greatest extent, it is impossible to the infinite approach of fast-developing manufacturing industry and processing industry automation control appliance with China.The device can meet that more subjects carry out the needs of related experiment practical training project, be easy to lift Students ' Comprehensive practical operating abilities, and device is cost-effective, convenient operating maintenance, it may also be used for teacher carries out related scientific research intermediate item.
Description
Technical field
It the utility model is related to vehicle gas cylinder detection technique field, and in particular to a kind of use for laboratory gas cylinder hydraulic pressure detection is real
Test actual training device.
Background technology
Automobile using natural gas as power fuel, worldwide by most people the advantages that because of fuel clean environment firendly
Favor, and automobile with compressed natural gas is most widely used in China.As country is vigorously advocated using gas-fueled vehicles, storage
The gas cylinder usage amount of compressed natural gas is even more growing day by day, and such gas cylinder belongs to the high-pressure bottle for storing inflammable and explosive medium,
With high risk, the compressed natural gas stored will be once irreparable damage will be caused by revealing, in order to reduce gas cylinder leakage
Or blast caused by the possibility of property loss and casualties, national regulation must to dispatch from the factory the gas cylinder before coming into operation and
The gas cylinder of military service carries out periodic detection.Because detection gas cylinder automaticity is not high enough, supervision department can not carry out real-time whole process
Monitoring, causes that part vehicle gas cylinder can not be detected periodically or detection process is not strict enough, causes the non-periodic detection gas in part
Bottle and the unqualified gas cylinder of detection are still using, this invisible probability for adding the security incidents such as gas cylinder leakage or blast and occurring.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of gas cylinder hydraulic pressure test experience actual training device and control system
System, the utility model, which solves the specialized courses such as existing electric information, electrical category experimental real-training apparatus, can open up training program not
It can meet that correlated curriculum lectures content needs to greatest extent, it is impossible to which fast-developing manufacturing industry and processing industry are automatic with China
Change the infinite approach of control device.The device and control system can meet that more subjects carry out the need of related experiment practical training project
Will, it is easy to lift Students ' Comprehensive practical operating abilities, and device is cost-effective, convenient operating maintenance, it may also be used for teacher
Carry out related scientific research intermediate item.
The utility model is achieved through the following technical solutions:
A kind of gas cylinder hydraulic pressure test experience actual training device, it is characterised in that:Including storage tank(1), Experimental Water Tank, valve,
Motor and water pump A(2), motor and water pump B(29), motor(11)And control device, the Experimental Water Tank include interior
Casing(13), outer case(14), internal box(13)With outer case(14)Etc. high setting, and volume is equal, internal box(13)With it is outer
Casing(14)Pass through water inlet pipe, outlet pipe and storage tank respectively(1)Connection, internal box(13)With storage tank(1)The water inlet of connection
Pressure gauge is set on pipe, and water inlet pipe, outlet pipe are provided with valve, and motor and water pump A are provided with water inlet pipe(2), it is electronic
Machine and water pump B(29), internal box(13)Inside it is provided with stirring vane(30), inwall bottom is respectively arranged with liquid level sensor
(20), cooling-water temperature sensor(19)And water temperature heating(18), outer case(14)Side wall passes through outlet pipe and weighing container(16)
Connection, weighing container(16)Bottom sets electronic scale(17), valve, motor and water pump A(2), motor and water pump B(29)、
Pressure gauge, liquid level sensor(20), cooling-water temperature sensor(19)And electronic scale(17), motor(11)Connect with control device signal
Connect, storage tank(1)Bottom is provided with roller more than two(34);
The control device includes PC ends, PLC, analog quantity and digital quantity modular converter, frequency converter VVVF, PC
End is connected by Ethernet through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF;PLC is also
Pass through RS485 buses and touch-screen HMI, frequency converter VVVF, electronic scale(17)It is connected, data volume input/output port is with pressing
Button, switch, motor driver, indicator lamp, auxiliary reclay, frequency converter VVVF are connected;The cooling-water temperature sensor, liquid level pass
Sensor and the converted switch of the analog signalses of pressure gauge output are connected with frequency converter VVVF or matched with PLC
The analog quantity of set is connected with digital quantity modular converter, and analog quantity is controlled with digital quantity modular converter by expansion cable and PLC
Device is connected, while is connected with frequency converter VVVF analog output port, and PLC passes through driver and motor
(11)Connection, is connected with valve by auxiliary reclay, passes through A.C. contactor and motor and water pump A(2)With motor and
Water pump B(29)Connection.
The further Technological improvement plan of the utility model is:
The water inlet pipe includes water inlet pipe A(3), water inlet pipe B(27), water inlet pipe C(10), outlet pipe includes relief tube
(28), drainpipe A(15), drainpipe B(25), drainpipe C(22), drainpipe D(33), storage tank(1)Pass through water inlet pipe B
(27), drainpipe B(25)With outer case(14)Connection, passes through water inlet pipe A(3), water inlet pipe C(10), drainpipe C(22)And let out
Pressure pipe(28)With internal box(13)Connection, drainpipe D(33)It is arranged at storage tank(1)Bottom;
The valve includes hand-operated valve A(5), hand-operated valve B(21), hand-operated valve C(24), hand-operated valve D(32), magnetic valve A
(4), magnetic valve B(6), magnetic valve C(7), magnetic valve D(23), magnetic valve E(26);
Water inlet pipe A(3)On be correspondingly arranged motor and water pump A(2), magnetic valve A(4), water inlet pipe B(27)On be correspondingly arranged
Motor and water pump B(29), magnetic valve C(7), relief tube(28)On be correspondingly arranged on magnetic valve B(6), drainpipe B(25)For simultaneously
Connection formula drainpipe is correspondingly arranged magnetic valve E respectively(26), hand-operated valve C(24), drainpipe C(22)It is right respectively for parallel drainpipe
Magnetic valve D should be set(23), hand-operated valve C(24)Hand-operated valve B(21), water inlet pipe C(10), drainpipe D(33)It is correspondingly arranged respectively
Hand-operated valve A(5), hand-operated valve D(32).
The further Technological improvement plan of the utility model is:
The pressure gauge includes simulated pressure table(8), electro connecting pressure gauge(9), pressure gauge is arranged at water inlet pipe C(10)
On.
The further Technological improvement plan of the utility model is:
The stirring vane(30)Pass through connecting shaft(12)With motor(11)Connection.
The further Technological improvement plan of the utility model is:
The water inlet pipe A(3), relief tube(28)Pass through water inlet pipe C(10)With internal box(13)Connection.
The further Technological improvement plan of the utility model is:
The driver is driving stepper motor machine or is servomotor driving machine.
The further Technological improvement plan of the utility model is:
The water inlet pipe, outlet pipe are transparent water pipe made of plastic material.
The further Technological improvement plan of the utility model is:
The internal box(13), outer case(14)For the cylindrical transparent containers being arranged concentrically.
The further Technological improvement plan of the utility model is:
The PLC uses west gate S7-200 SMART CPU ST40, touch-screen HMI to use Siemens SMART
700IE, frequency converter VVVF use the G120 of Siemens, and analog quantity is simulated with digital quantity modular converter using Siemens EM AM06
Input and output mixing module is measured, Ethernet switch uses CSM1277.
The utility model compared with prior art, has following obvious advantage:
First, the utility model can realize slitless connection with modern enterprise engineer applied, be infinitely close to gas cylinder detection enterprise
Used automation control appliance, cost-effective, small volume, it is easy to school and realizes that one to two student operates an equipment,
It is easy to improve student's independence, independence, the experimental real-training operational capacity of novelty;
2nd, the utility model can realize the experimental real-training project of more subjects, such as programmable controller in set of device
The courses such as PLC, frequency converter, configuration technology, industrial stokehold, industrial networking technology, reduce school's input experimental real-training equipment
Cost, experimental real-training hold facility experimental real-training number of chambers amount is reduced, improve school experiment Practical training equipment utilization rate to greatest extent;
3rd, several operable, Yi Shi can be achieved by the flexible combination of different components on the device in the utility model
Existing experimental real-training project;
4th, all input and output connecting lines of electric information component used in the utility model, which draw, is connected in terminal block, just
Teaching efficiency when experimental real-training is improved.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model experimental real-training apparatus;
Fig. 2 is the schematic diagram of the utility model control system.
Embodiment
As shown in Figure 1 and Figure 2, the utility model includes storage tank 1, test water tank, water inlet pipe, water outlet tube valve, motor
And water pump A 2, motor and water pump B 29, liquid level sensor 20, cooling-water temperature sensor 19, pressure gauge, water temperature heating 18, stirring
Blade 30, electronic scale 17, PC ends, PLC, touch-screen HMI, frequency converter VVVF, analog quantity and digital quantity modular converter, with
Too network switch, button, switch, indicator lamp, change-over switch, auxiliary reclay, A.C. contactor and power supply, the storage tank 1
For plastic, transparent cuboid, there are the running water 31 of hydraulic pressure detection, lower right and drainpipe D 33 and hand-operated valve D 32 in the inside
It is connected;It is that inside and outside double-layer plastic transparent cylinder includes internal box 13, outer case 14 to test plastic cistern, and ectonexine is respectively marked with
Even graduation mark, the only upper bottom surface of ectonexine are connected, and surrounding communicates, and ectonexine volume is equal, outer layer and outer layer water inlet pipe and water outlet pipe
It is connected, internal layer is connected with internal layer water inlet pipe and water outlet pipe, and bottom is provided with liquid level sensor 20, cooling-water temperature sensor 19, water temperature in internal layer
Heater 18 and agitator 30, the gas cylinder when simulated water pressure of internal box 13 detects, the water jacket when simulated water pressure of outer case 14 detects;
Water inlet pipe and water outlet pipe is plastic, transparent water pipe, and so as to the flow direction and water level of operator's energy Real Time Observation water, water inlet pipe and water outlet pipe is included city
Water is incorporated into the water inlet pipe C 10 of internal box 13, the water 31 in storage tank 1 injected to the water inlet pipe A 3 of internal box 13, by water storage
The reclaimed water 31 of case 1 is injected into the water inlet pipe B 27 of outer case 14, the water in internal box 13 is incorporated into the drainpipe C of storage tank 1
22nd, the water in outer case 14 is incorporated into the drainpipe B 25 of storage tank 1, will be used when gas cylinder deformation is determined in hydraulic pressure detection process
In outer case 14 overflow draining drainpipe A 15, by release in hydraulic pressure detection process when be used for by the water under high pressure of internal box 13 discharge
Relief tube 28, one end of water inlet pipe C 10 for introducing city's water is connected with the upper surface of internal box 13, and the other end connects with city's water
Mouth is connected, and for being connected to one end of water inlet pipe A 3 of the water filling of internal box 13 with storage tank 1, the other end introduces city's water with being used for
Water inlet pipe C 10 carries out T fonts and is connected, another for being connected to one end of water inlet pipe B 27 of the water filling of outer case 14 with storage tank 1
End is connected with the upper surface of outer case 14, for one end of drainpipe C 22 that the reclaimed water of internal box 13 is incorporated into storage tank 1 and interior case
The lower surface of body 13 is connected, and the other end is connected with storage tank 1, for the reclaimed water of outer case 14 to be incorporated into the drainpipe B of storage tank 1
25 one end are connected with the lower surface of outer case 14, and the other end is connected with storage tank 1, for determining gas cylinder deformation in hydraulic pressure detection process
When displacement the one end of drainpipe A 15 and the side of outer case 14 above be connected, the other end extends to spilling water weighing container 16
Interior, one end of relief tube 28 for release in hydraulic pressure detection process is connected with introducing the progress of the water inlet pipe C 10 T fonts of city's water,
The other end is connected with storage tank 1;The valve includes hand-operated valve and magnetic valve, and hand-operated valve, which includes moving city sailor, is incorporated into interior case
Hand-operated valve A 5 in body 13, for the water in internal box 13 is incorporated into storage tank 1 hand-operated valve B 21, for by outer container
Hand-operated valve C 24, the hand-operated valve D 32 for the reclaimed water 31 of storage tank 1 to be emptied that water in body 14 is incorporated into storage tank 1, electricity
Magnet valve includes being used for toward the magnetic valve A 4 of water filling in internal box 13, for toward the magnetic valve C 7 of water filling in outer case 14, be used for
The magnetic valve D 23 and hydraulic pressure of the draining of internal box 13 detect the magnetic valve B 6 of ending phase release, for the draining of outer case 14
Magnetic valve E 26, hand-operated valve are separately positioned on the water inlet pipe C 10 that Jiang Shishui is incorporated into internal box 13, by internal box 13
The drainpipe C 22 that is incorporated into storage tank 1 of water on, the water in outer case 14 be incorporated into drainpipe B 25 in storage tank 1
Above, on the drainpipe D 33 emptied the water 31 in storage tank 1, magnetic valve, which is separately positioned on, is injected into the reclaimed water 31 of storage tank 1
It is injected on water inlet pipe A 3 in internal box 13, by the reclaimed water 31 of storage tank 1 on the water inlet pipe B 27 in outer case 14, by interior case
The draining in storage tank 1 is incorporated on the drainpipe C 22 that water in body 13 is incorporated into storage tank 1, by the water in outer case 14
On pipe B 25, by during detection process ending phase in internal box 13 water under high pressure carry out release relief tube 28 on, hand-operated valve
21 by the way that water pipe is in parallel with magnetic valve 23, hand-operated valve 24 is in parallel with magnetic valve E 26 by water pipe, and magnetic valve D 23 is opening degree
Can electricity regulation magnetic valve, be connected with the supporting analog quantity of PLC with digital quantity modular converter;The motor and water
Pump includes the reclaimed water 31 of storage tank 1 being injected into common adjustable frequency motor and water pump A 2 in internal box 13, outer case 14, electronic
Machine and water pump B 29 and the stepping being stirred to the water in internal box 13 or servomotor 11, for by the reclaimed water of storage tank 1
The 31 common adjustable frequency motors and water pump being injected into internal box 13, outer case 14 are separately positioned on corresponding water inlet pipe A 3, entered
On water pipe B 27, internal box 13 is arranged on for the stepping being stirred to the water in internal box 13 or servomotor 11
Side, is connected by connecting shaft 12 with the agitator 30 being arranged in internal box 13;The sensor includes being arranged on internal box 13
Liquid level sensor 20, the cooling-water temperature sensor 19 of bottom, its detecting element are arranged on the bottom of internal box 13, and data signal line is arranged on
It is external to test plastic cistern;The pressure gauge includes simulated water pressure table 8 and electric contact water pressure gauge 9, is both connected to and introduces city's water
Onto the water inlet pipe C 10 of internal box 13, simulated pressure table 8 can be in simulation gas cylinder hydraulic pressure detection in real-time display internal box 13
Pressure size, electro connecting pressure gauge 9 is used for exceeding system settings when actual hydraulic pressure(The inspection applied during simulation gas cylinder detection
Survey the hydraulic pressure upper limit)When, instruction is sent to PLC, makes it stop detection work, plays a protective role;The water temperature heating
Device 18 is arranged on the bottom of internal box 13, for being heated to the water of internal box 13;The agitator 30 is arranged on internal box 13
In, for being stirred to the water of internal box 13;The electronic scale 17 is arranged on the side of outer case 14, is placed on storage tank 1,
For to overflowing water in outer case 14 because internal box 13 expands in gas cylinder hydraulic pressure detection process and it being weighed, electricity
Sub- scale 17 should have peeling function, while answer existing analog output interface circuit, also there is RS485 communication interfaces;The PC ends pass through
Ethernet is connected through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF, for PLC program
Download monitored with operation, the input of the configuration of touch-screen HMI pictures and dynamic data and output, frequency converter VVVF parameters are set
Put;The PLC is also connected by RS485 buses with touch-screen HMI, frequency converter VVVF, electronic scale, data volume input
Output port is connected with button, switch, motor driver, indicator lamp, auxiliary reclay, frequency converter;The water temperature sensing
The converted switch of analog signalses of device, liquid level sensor and the output of simulated pressure table is connected with frequency converter VVVF, or with
The analog quantity that PLC matches is connected with digital quantity modular converter, and analog quantity passes through extension with digital quantity modular converter
Cable is connected with PLC, is also connected with frequency converter VVVF analog output port;If the button is extra dry red wine
Color, green band button, it is easy to reduce component installation dimension, reduces the device and taken up space, including starting button, stopping is pressed
Button, drain button, release button;The PLC, frequency converter VVVF, touch-screen HMI can realize what is opened up on the apparatus
Some experimental real-training projects;The motor, magnetic valve, pressure gauge, sensor, heater 18,17 all electric informations of electronic scale
The input and output connecting line of component draw be connected to installation on the apparatus and have a dominant component mark be easily attached operation
Terminal block on, the connection of electric wiring when being easy to experimental real-training;The experimental real-training project opened up should at least include compiling
Several electric informations, the Mechatronics specialities such as range controller PLC, frequency converter, configuration technology, industrial stokehold, industrial networking technology
Core curriculum.
Utility model works process is sketched with reference to Fig. 1, Fig. 2:
Utility model works process is introduced so that gas cylinder hydraulic pressure detects comprehensive practical training project as an example:Carrying out gas cylinder
Before hydraulic pressure detection, should first be ready work, preparation comprise at least by all motor and water pump A 2 in the present apparatus,
Motor and water pump B 29, valve, pressure gauge, liquid level sensor 20, cooling-water temperature sensor 19, water temperature heating 18, electronic scale 17
Deng component and corresponding controller(Such as controller PLC, frequency converter VVVF and programming monitoring PC ends and touch-screen HMI)
Equipment is connected, and is connected between controller by Ethernet switch or serial communication RS485 bus ports, controller PLC's
121 it is Ethernet interface, 122 is RS485 serial bus interfaces, by PC end by under associated control procedures, parameter, configuration interface
It is downloaded in programmable controller PLC, frequency converter VVVF and touch-screen HMI(Frequency converter VVVF parameter setting can also pass through face
Plate is set);Then open hand-operated valve A 5 and city's water is incorporated into storage tank 1 by hand-operated valve B 21, treat the water 31 in storage tank 1
When adding to 80% or so of storage tank 1, hand-operated valve A 5 and hand-operated valve B 21 is closed(If have during experimental real-training in storage tank 1 for real
This step need not then be operated by testing the water of practical training project needs);All hand-operated valves close in advance under, pass through PC ends or touch-screen
The starting button that water filling is carried out to internal box 13 on HMI or control device, the magnetic valve A controlled by controller PLC program
4 openings and motor and water pump A 2 bring into operation, rapidly to the water filling of internal box 13, when liquid level sensor 20 detects interior case
Water in body 13 is full, then closes magnetic valve A 4 and stop motor and water pump A 2 operation, the water temperature entered as noted is not up to
To gas cylinder testing conditions, then system sends police instruction, while starts stepping or the servo electricity of water temperature heating 18 and stirring
Motivation 11 is started and is stirred, and water temperature heating 18 keeps the water temperature in internal box 13 to meet testing conditions, or the reclaimed water of storage tank 1
Temperature has met testing conditions, then controller PLC opens magnetic valve C 7 by programme-control and makes motor and the works of water pump B 29
Make, the water 31 in storage tank 1 starts to be rapidly injected outer case 14, treats that the water in outer case 14 fills(Water is from drainpipe A 15
Overflow, the reclaimed water of weighing container 16 increased again)When close magnetic valve C 7 and stop motor and water pump B 29, operator is led to
The peeling function button crossed on PC ends or touch-screen HMI or electronic scale 17 makes electronic scale 17 realize peeling function, or passes through program
It is arranged to perform peeling function automatically;The gas cylinder hydraulic pressure detection that operator is pressed on PC ends or touch-screen HMI starts button or control
Starting button on control equipment starts to carry out pressurization detection to internal box 13, now the stepping for stirring or servomotor
11 are stopped, and magnetic valve A 4 opens to be run again with motor and water pump A 2, quickly(Middling speed)Enter into internal box 13
Row water filling, at this moment simulated pressure table 8 show internal box 13 in real time hydraulic pressure value can gradually increase, the finger of electro connecting pressure gauge 9
Pin also can be rotated clockwise gradually, and to show, hydraulic pressure is gradually increasing in internal box 13, when hydraulic pressure gradually rises to examine in internal box 13
90% or so of measuring pressure arranges value, motor and the slower water fillings into internal box 13 of water pump A 2, when hydraulic pressure in internal box 13
When reaching detection pressure arranges value, close magnetic valve A 4 and stop motor and water pump A 2 work, in the process, interior case
The hydraulic pressure of body 13 expands internal box 13 because constantly raising, and so as to extrude outer case 14, the reclaimed water of outer case 14 is overflowed and is passed through
Drainpipe A 15 is flowed into weighing container 16, and then gas cylinder detection process enters packing stage, and after pressurize 2 minutes, gas cylinder detects
Process enters the release stage, and magnetic valve B 6 is opened, and carries out release to the water under high pressure in internal box 13, water under high pressure passes through relief tube
28 flow into storage tank 1, and internal box 13 causes the inside points water suck-back of weighing container 16 to enter in outer case 14 again because release is shunk,
After the completion of release(The display data of simulated pressure table 8 is 0, and the pointer of electro connecting pressure gauge 9 goes back to original position), it is remaining in weighing container 16
Water detect remaining displacement for gas cylinder hydraulic pressure;Electronic scale 17 in real time passes through displacement certainly in gas cylinder hydraulic pressure detection process
The analog signal line or communication data line of body send controller PLC to, and controller PLC is bent by hydraulic pressure-time by data processing
Real-time hydraulic pressure value in line, displacement-time graph, displacement-hydraulic curve, internal box 13, displacement, maximum displacement,
Remaining displacement is shown by touch-screen HMI or PC ends, if simulated pressure table 8 is damaged or controlled in hydraulic pressure detection process
The analog quantity that device PLC processed matches and digital quantity modular converter(For receiving the module of sensor output signal)Damage or number
According to communication failure, the hydraulic pressure of internal box 13 is caused to exceed system detectio arranges value, now the upper limit normally opened contact of electro connecting pressure gauge 9 closes
Close, stopping detection instruction is sent to controller PLC, now detection process stops, when abnormal conditions occurring in detection process, behaviour
Author can by press the gas cylinder hydraulic pressure on PC ends or touch-screen HMI detection stop key or control device on stop button,
Also detection process can be stopped;After release terminates, water temperature heating 18 stops heating, by case in display on touch-screen HMI or PC ends
Body 13(Simulate gas cylinder)The full deformation rate of volume and the information such as whether rate of residual and hydraulic pressure testing result qualified, gas cylinder hydraulic pressure
After detection terminates, operator presses the row on gas cylinder hydraulic pressure detection draining button or control device on PC ends or touch-screen HMI
Water button, magnetic valve D 23(Opening degree is adjusted to maximum), magnetic valve E 26 open, the water in internal box 13, outer case 14
Its internal water is discharged in storage tank 1 by drainpipe C 22, drainpipe B 25, is 0 when liquid level sensor 20 detects data
And after extending a period of time, magnetic valve D 23, magnetic valve E 26 are closed, and now drainage procedure terminates;Hand-operated valve B 21 and manually
The water that valve C 24 is used in manual internal box 13, outer case 14 is discharged in storage tank 1 by drainpipe C 22, drainpipe B 25,
Hand-operated valve 32 and drainpipe D 33 are used for the hand-held evacuation of water 31 in storage tank 1;The opening degrees of magnetic valve D 23, which can adjust, to be used for
In the experimental real-training project such as the constant pressure water supply PID control of internal box 13 or permanent liquid level PID control;Roller below device
34 are used for the movement of the device.
Motor 1 in motor and water pump A 2 is stepping or servomotor, if stepping motor, then driver
For driving stepper motor machine;If servomotor, then driver is servomotor driving machine;Motor and water pump B 29 include
Motor 2.
The present apparatus opens up experimental real-training project and inputs experimental real-training project, control including at least controller PLC digital quantity
Device PLC processed digital output experimental real-training project, controller PLC analog input experimental real-training project, controller PLC
The communication of analog output experimental real-training project, controller PLC pulsed quantity output experimental real-training project, controller PLC(Such as with
Too Network Communication, serial communication, PROFIBUS-DP communications etc.)Experimental real-training project, controller PLC sequence design method experimental real-trainings
Project, frequency converter VVVF On-off signal experimental real-trainings project, frequency converter VVVF output switch parameter experimental real-trainings project, frequency converter
VVVF analog input experimental real-trainings project, frequency converter VVVF analog output experimental real-trainings project, frequency converter VVVF communications are real
Test practical training project, configuration switching value control experimental real-training project, the various domain experimental real-training projects of configuration, Combining soft control process interface
Experimental real-training project, controller PLC and frequency converter VVVF and the comprehensive switching values of touch-screen HMI or analog quantity or communication etc. are tested
Practical training project, by the flexible combination of different components on device, several experimental real-training items that are operable, easily realizing can be achieved
Mesh, specific experiment practical training project title and content and complexity should be awarded in teaching according to the basic and each course of each college student
Appearance is opened up or secondary research and development, meanwhile, this device and control system teachers and students can be additionally used in the related religion scientific research intermediate item of exploitation,
Lift teachers and students and teach scientific research level and ability.
Technological means disclosed in the utility model is not limited only to the technological means disclosed in above-mentioned embodiment, also
Including being combined formed technical scheme by above technical characteristic.It should be pointed out that the ordinary skill for the art
For personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these are improved and profit
Decorations are also considered as the scope of protection of the utility model.
Claims (9)
- A kind of 1. gas cylinder hydraulic pressure test experience actual training device, it is characterised in that:Including storage tank(1), Experimental Water Tank, valve, electricity Motivation and water pump A(2), motor and water pump B(29), motor(11)And control device, the Experimental Water Tank include interior case Body(13), outer case(14), internal box(13)With outer case(14)Etc. high setting, and volume is equal, internal box(13)With outer container Body(14)Pass through water inlet pipe, outlet pipe and storage tank respectively(1)Connection, internal box(13)With storage tank(1)The water inlet pipe of connection Upper setting pressure gauge, water inlet pipe, outlet pipe are provided with valve, and motor and water pump A are provided with water inlet pipe(2), motor And water pump B(29), internal box(13)Inside it is provided with stirring vane(30), inwall bottom is respectively arranged with liquid level sensor(20)、 Cooling-water temperature sensor(19)And water temperature heating(18), outer case(14)Side wall passes through outlet pipe and weighing container(16)Connection, Weighing container(16)Bottom sets electronic scale(17), valve, motor and water pump A(2), motor and water pump B(29), pressure Table, liquid level sensor(20), cooling-water temperature sensor(19)And electronic scale(17), motor(11)It is connected with control device signal, Storage tank(1)Bottom is provided with roller more than two(34);The control device includes PC ends, PLC, analog quantity and digital quantity modular converter, frequency converter VVVF, PC ends lead to Ethernet is crossed through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF to be connected;PLC also passes through RS485 buses and touch-screen HMI, frequency converter VVVF, electronic scale(17)It is connected, data volume input/output port and button, opens Pass, motor driver, indicator lamp, auxiliary reclay, frequency converter VVVF are connected;The cooling-water temperature sensor, liquid level sensor Switch converted with the analog signalses of pressure gauge output is connected with frequency converter VVVF or matched with PLC Analog quantity is connected with digital quantity modular converter, and analog quantity passes through expansion cable and PLC phase with digital quantity modular converter Connection, while be connected with frequency converter VVVF analog output port, PLC passes through driver and motor(11)Even Connect, be connected by auxiliary reclay with valve, pass through A.C. contactor and motor and water pump A(2)With motor and water pump B (29)Connection.
- A kind of 2. gas cylinder hydraulic pressure test experience actual training device according to claim 1, it is characterised in that:The water inlet pipe bag Include water inlet pipe A(3), water inlet pipe B(27), water inlet pipe C(10), outlet pipe includes relief tube(28), drainpipe A(15), drainpipe B (25), drainpipe C(22), drainpipe D(33), storage tank(1)Pass through water inlet pipe B(27), drainpipe B(25)With outer case(14) Connection, passes through water inlet pipe A(3), water inlet pipe C(10), drainpipe C(22)And relief tube(28)With internal box(13)Connection, row Water pipe D(33)It is arranged at storage tank(1)Bottom;The valve includes hand-operated valve A(5), hand-operated valve B(21), hand-operated valve C(24), hand-operated valve D(32), magnetic valve A(4), electricity Magnet valve B(6), magnetic valve C(7), magnetic valve D(23), magnetic valve E(26);Water inlet pipe A(3)On be correspondingly arranged motor and water pump A(2), magnetic valve A(4), water inlet pipe B(27)On be correspondingly arranged it is electronic Machine and water pump B(29), magnetic valve C(7), relief tube(28)On be correspondingly arranged on magnetic valve B(6), drainpipe B(25)To be parallel Drainpipe is correspondingly arranged magnetic valve E respectively(26), hand-operated valve C(24), drainpipe C(22)Correspond to and set respectively for parallel drainpipe Put magnetic valve D(23), hand-operated valve C(24)Hand-operated valve B(21), water inlet pipe C(10), drainpipe D(33)It is correspondingly arranged respectively manually Valve A(5), hand-operated valve D(32).
- A kind of 3. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The pressure Table includes simulated pressure table(8), electro connecting pressure gauge(9), pressure gauge is arranged at water inlet pipe C(10)On.
- A kind of 4. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The stirring Blade(30)Pass through connecting shaft(12)With motor(11)Connection.
- A kind of 5. gas cylinder hydraulic pressure test experience actual training device according to claim 2, it is characterised in that:The water inlet pipe A (3), relief tube(28)Pass through water inlet pipe C(10)With internal box(13)Connection.
- A kind of 6. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The driving Device is driving stepper motor machine or is servomotor driving machine.
- A kind of 7. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The water inlet Pipe, outlet pipe are transparent water pipe made of plastic material.
- A kind of 8. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The interior case Body(13), outer case(14)For the cylindrical transparent containers being arranged concentrically.
- A kind of 9. gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The PLC controls Device processed uses west gate S7-200 SMART CPU ST40, touch-screen HMI to use Siemens SMART 700IE, frequency converter VVVF to adopt With the G120 of Siemens, analog quantity uses Siemens's EM AM06 analog input and output mixing modules with digital quantity modular converter, Ethernet switch uses CSM1277.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720459684.0U CN206921327U (en) | 2017-04-28 | 2017-04-28 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720459684.0U CN206921327U (en) | 2017-04-28 | 2017-04-28 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206921327U true CN206921327U (en) | 2018-01-23 |
Family
ID=61306082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720459684.0U Expired - Fee Related CN206921327U (en) | 2017-04-28 | 2017-04-28 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206921327U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106952525A (en) * | 2017-04-28 | 2017-07-14 | 淮安信息职业技术学院 | A kind of gas cylinder hydraulic pressure test experience actual training device |
-
2017
- 2017-04-28 CN CN201720459684.0U patent/CN206921327U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106952525A (en) * | 2017-04-28 | 2017-07-14 | 淮安信息职业技术学院 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2938055Y (en) | Device for detecting leakage of central air-conditioning pipeline system by differential pressure | |
CN203688419U (en) | Atmospheric corrosion simulating test box | |
CN201207013Y (en) | Detecting machine for airtightness of oil tank | |
CN203269530U (en) | Integrated quantitative propellant filling and discharging device | |
CN104807604A (en) | Water purifier detection equipment and detection method utilizing water purifier detection equipment | |
CN102661859B (en) | Performance testing equipment of pressure regulator of bottled liquefied petroleum gas and application method thereof | |
CN106840547A (en) | A kind of batteries of electric automobile bag air-tightness detection device and detection method | |
CN102562565B (en) | Method and device for water pump delivery inspection | |
CN206921327U (en) | A kind of gas cylinder hydraulic pressure test experience actual training device | |
CN106952525A (en) | A kind of gas cylinder hydraulic pressure test experience actual training device | |
CN103791985A (en) | Static state standard cubic meter calibration device and calibration method of static state standard cubic meter calibration device | |
CN105157781B (en) | Clean tank volume self-operated measuring unit and method | |
CN108051285A (en) | A kind of sack method VOC pretreating devices and its application method | |
CN201281013Y (en) | Lubricating oil pump performance test desk | |
CN205300873U (en) | Combined type airtight inspection machine futilely wets | |
RU2433482C2 (en) | Educational training complex "automatic regulation and therotechnical control" | |
CN204594635U (en) | A kind of full-automatic butterfly valve seal performance aircraft | |
CN101988861B (en) | System for detecting air tightness of cavity of mechanical and electrical product | |
CN209281749U (en) | Quantitative filling practical training teaching aid | |
CN103123311B (en) | Device used for detecting pressure resistance of ceramic tube | |
CN204314029U (en) | A kind of device for detecting sealability of water purification machine | |
CN216621601U (en) | Double-circuit batch intelligent calibrating device for barometer and oil pressure meter | |
CN210834055U (en) | Valve leakage water-free detection system | |
CN2241333Y (en) | Bench full-automatic gas relay checker | |
CN213480663U (en) | Automatic supply device for Freon of photoetching machine air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180123 Termination date: 20200428 |
|
CF01 | Termination of patent right due to non-payment of annual fee |