CN106952525A - A kind of gas cylinder hydraulic pressure test experience actual training device - Google Patents
A kind of gas cylinder hydraulic pressure test experience actual training device Download PDFInfo
- Publication number
- CN106952525A CN106952525A CN201710290638.7A CN201710290638A CN106952525A CN 106952525 A CN106952525 A CN 106952525A CN 201710290638 A CN201710290638 A CN 201710290638A CN 106952525 A CN106952525 A CN 106952525A
- Authority
- CN
- China
- Prior art keywords
- water
- inlet pipe
- motor
- water inlet
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F23/00—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L7/00—Measuring the steady or quasi-steady pressure of a fluid or a fluent solid material by mechanical or fluid pressure-sensitive elements
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L9/00—Measuring steady of quasi-steady pressure of fluid or fluent solid material by electric or magnetic pressure-sensitive elements; Transmitting or indicating the displacement of mechanical pressure-sensitive elements, used to measure the steady or quasi-steady pressure of a fluid or fluent solid material, by electric or magnetic means
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Fluid Mechanics (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The invention discloses a kind of gas cylinder hydraulic pressure test experience actual training device, including storage tank(1), Experimental Water Tank, valve, motor and water pump A(2), motor and water pump B(29), liquid level sensor(20), cooling-water temperature sensor(19), motor(11)And water temperature heating(18)And control device;The technical problem to be solved in the present invention is to provide a kind of gas cylinder hydraulic pressure test experience actual training device, the present invention, which solves the specialized courses such as existing electric information, electrical category experimental real-training apparatus and can open up training program and can not meet correlated curriculum to greatest extent, lectures content needs, it is impossible to the infinite approach of fast-developing manufacturing industry and processing industry automation control appliance with China.The need for the device can meet many subjects development related experiment practical training projects, it is easy to lift Students ' Comprehensive practical operating abilities, and device cost performance is high, convenient operating maintenance, it may also be used for and teacher carries out related scientific research intermediate item.
Description
Technical field
The present invention relates to vehicle gas cylinder detection technique field, and in particular to a kind of use for laboratory gas cylinder hydraulic pressure test experience is real
Training apparatus.
Background technology
Using natural gas as the automobile of power fuel, worldwide by most people the advantages of because of fuel clean environment firendly
Favor, and automobile with compressed natural gas is most widely used in China.Gas-fueled vehicles are used as country vigorously advocates, are stored
The gas cylinder usage amount of compressed natural gas is even more growing day by day, and such gas cylinder belongs to the high-pressure bottle for storing inflammable and explosive medium,
With high risk, the compressed natural gas stored will be once irreparable damage will be caused by revealing, in order to reduce gas cylinder leakage
Or the possibility of property loss and casualties caused by blast, national regulation must be come into operation to dispatching from the factory before gas cylinder and
The gas cylinder of military service carries out periodic detection.Because detection gas cylinder automaticity is not high enough, supervision department can not carry out real-time whole process
Monitoring, causes that part vehicle gas cylinder can not be detected periodically or detection process is not strict enough, causes the non-periodic detection gas in part
Bottle and detect that unqualified gas cylinder is still being used, this is invisible to add probability that the security incidents such as gas cylinder leakage or blast occur.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of gas cylinder hydraulic pressure test experience actual training device and control system, sheet
Invention solve the specialized courses such as existing electric information, electrical category experimental real-training apparatus can open up training program can not be to greatest extent
Ground meets correlated curriculum and lectures content needs, it is impossible to fast-developing manufacturing industry and processing industry automation control appliance with China
Infinite approach.The need for the device and control system can meet many subjects development related experiment practical training projects, it is easy to lifting
Students ' Comprehensive practical operating abilities, and device cost performance is high, convenient operating maintenance, it may also be used for and teacher carries out related scientific research
Intermediate item.
The present invention is achieved through the following technical solutions:
A kind of gas cylinder hydraulic pressure test experience actual training device, it is characterised in that:Including storage tank(1), it is Experimental Water Tank, valve, electronic
Machine and water pump A(2), motor and water pump B(29), motor(11)And control device, the Experimental Water Tank include internal box
(13), outer case(14), internal box(13)With outer case(14)Etc. high setting, and volume is equal, internal box(13)With outer case
(14)Pass through water inlet pipe, outlet pipe and storage tank respectively(1)Connection, internal box(13)With storage tank(14)On the water inlet pipe of connection
Pressure gauge is set, and water inlet pipe, outlet pipe, which are provided with valve, water inlet pipe, is provided with motor and water pump A(2), motor and
Water pump B(29), internal box(13)Inside it is provided with stirring vane(30), inwall bottom is respectively arranged with liquid level sensor(20), water
Temperature sensor(19)And water temperature heating(18), outer case(14)Side wall passes through outlet pipe and weighing container(16)Connection, claims
Weight container(16)Bottom sets electronic scale(17), valve, motor and water pump A(2), motor and water pump B(29), pressure gauge,
Liquid level sensor(20), cooling-water temperature sensor(19)And electronic scale(17), motor(11)It is connected with control device signal;
The control device includes PC ends, PLC, analog quantity and digital quantity modular converter, frequency converter VVVF, PC ends and led to
Ethernet is crossed through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF to be connected;PLC also passes through
RS485 buses and touch-screen HMI, frequency converter VVVF, electronic scale(17)It is connected, data volume input/output port and button, opens
Pass, motor driver, indicator lamp, auxiliary reclay, frequency converter VVVF are connected;The cooling-water temperature sensor, liquid level sensor
The converted switch of analog signalses that is exported with pressure gauge is connected with frequency converter VVVF or matched with PLC
Analog quantity is connected with digital quantity modular converter, and analog quantity passes through expansion cable and PLC phase with digital quantity modular converter
Connection, while being connected with frequency converter VVVF analog output port, PLC passes through driver and motor(11)Even
Connect, be connected by auxiliary reclay with valve, pass through A.C. contactor and motor and water pump A(2)With motor and water pump B
(29)Connection.
Further Technological improvement plan is the present invention:
The water inlet pipe includes water inlet pipe A(3), water inlet pipe B(27), water inlet pipe C(10), outlet pipe include relief tube(28), row
Water pipe A(15), drainpipe B(25), drainpipe C(22), drainpipe D(33), storage tank(1)Pass through water inlet pipe B(27), drainpipe
B(25)With outer case(14)Connection, passes through water inlet pipe A(3), water inlet pipe C(10), drainpipe C(22)And relief tube(28)With
Internal box(13)Connection, drainpipe D(33)It is arranged at storage tank(1)Bottom;
The valve includes hand-operated valve A(5), hand-operated valve B(21), hand-operated valve C(24), hand-operated valve D(32), magnetic valve A(4), electricity
Magnet valve B(6), magnetic valve C(7), magnetic valve D(23), magnetic valve E(26);
Water inlet pipe A(3)On be correspondingly arranged motor and water pump A(2), magnetic valve A(4), water inlet pipe B(27)On be correspondingly arranged it is electronic
Machine and water pump B(29), magnetic valve C(7), relief tube(28)On be correspondingly arranged on magnetic valve B(6), drainpipe B(25)To be parallel
Drainpipe is correspondingly arranged magnetic valve E respectively(26), hand-operated valve C(24), drainpipe C(22)Correspond to and set respectively for parallel drainpipe
Put magnetic valve D(23), hand-operated valve C(24)Hand-operated valve B(21), water inlet pipe C(10), drainpipe D(33)It is correspondingly arranged respectively manually
Valve A(5), hand-operated valve D(32).
Further Technological improvement plan is the present invention:
The pressure gauge includes simulated pressure table(8), electro connecting pressure gauge(9), pressure gauge is arranged at water inlet pipe C(10)On.
Further Technological improvement plan is the present invention:
The stirring vane(30)Pass through connecting shaft(12)With motor(11)Connection.
Further Technological improvement plan is the present invention:
The water inlet pipe A(3), relief tube(28)Pass through water inlet pipe C(10)With internal box(13)Connection.
Further Technological improvement plan is the present invention:
The driver is driving stepper motor machine or is servomotor driving machine.
Further Technological improvement plan is the present invention:
The water inlet pipe, outlet pipe are the transparent water pipe that plastic material is made.
Further Technological improvement plan is the present invention:
The internal box(13), outer case(14)For the cylindrical transparent containers being arranged concentrically.
Further Technological improvement plan is the present invention:
The PLC uses west gate S7-200 SMART CPU ST40, touch-screen HMI to use Siemens SMART
700IE, frequency converter VVVF use the G120 of Siemens, and analog quantity is simulated with digital quantity modular converter using Siemens EM AM06
Input and output mixing module is measured, Ethernet switch uses CSM1277.
The present invention compared with prior art, with following obvious advantage:
First, the present invention can realize slitless connection with modern enterprise engineer applied, be infinitely close to used in gas cylinder detection enterprise
Automation control appliance, cost performance is high, small volume, it is easy to which school realizes that one to two student operates an equipment, is easy to improve
Student's independence, independence, innovative experimental real-training operational capacity;
2nd, the present invention can realize the experimental real-training project of many subjects, such as programmable controller PLC, frequency conversion in set of device
The courses such as device, configuration technology, industrial stokehold, industrial networking technology, reduction school input experimental real-training equipment cost, reduction
Experimental real-training hold facility experimental real-training number of chambers amount, improves school experiment Practical training equipment utilization rate to greatest extent;
3rd, several experiments that are operable, easily realizing can be achieved by the flexible combination of different components on the device in the present invention
Practical training project;
4th, all input and output connecting lines of present invention electric information component used, which draw, is connected in terminal block, is easy to improve real
Test teaching efficiency during real training.
Brief description of the drawings
Fig. 1 is the structural representation of experimental real-training apparatus of the present invention;
Fig. 2 is the schematic diagram of control system of the present invention.
Embodiment
As shown in Figure 1 and Figure 2, the present invention includes storage tank 1, test water tank, water inlet pipe, water outlet tube valve, motor and water
Pump A 2, motor and water pump B 29, liquid level sensor 20, cooling-water temperature sensor 19, pressure gauge, water temperature heating 18, stirring vane
30th, electronic scale 17, PC ends, PLC, touch-screen HMI, frequency converter VVVF, analog quantity and digital quantity modular converter, Ethernet
Interchanger, button, switch, indicator lamp, change-over switch, auxiliary reclay, A.C. contactor and power supply, the storage tank 1 are modeling
Expect transparent pane body, there is the running water 31 of hydraulic pressure detection the inside, and lower right is connected with drainpipe D 33 and hand-operated valve D 32;
It is that inside and outside double-layer plastic transparent cylinder includes internal box 13, outer case 14 to test plastic cistern, and ectonexine is respectively marked with uniform quarter
Line is spent, ectonexine only has upper bottom surface to be connected, and surrounding is communicated, and ectonexine volume is equal, and outer layer is connected with outer layer water inlet pipe and water outlet pipe,
Internal layer is connected with internal layer water inlet pipe and water outlet pipe, and bottom is provided with liquid level sensor 20, cooling-water temperature sensor 19, water temperature heating in internal layer
18 and agitator 30, the gas cylinder when simulated water pressure of internal box 13 is detected, the water jacket when simulated water pressure of outer case 14 is detected;Inlet and outlet water
Pipe is plastic, transparent water pipe, and so as to the flow direction and water level of operator's energy Real Time Observation water, water inlet pipe and water outlet pipe includes introducing in city's water
Water inlet pipe C 10 to internal box 13, the water inlet pipe A 3 that the water 31 in storage tank 1 is injected to internal box 13, by the reclaimed water of storage tank 1
31 it is injected into the water inlet pipe B 27 of outer case 14, the water in internal box 13 is incorporated into the drainpipe C 22 of storage tank 1, by outer container
Water in body 14 is incorporated into the drainpipe B 25 of storage tank 1, will be used for outer case when gas cylinder deformation is determined in hydraulic pressure detection process
14 overflow the drainpipe A 15 of drainings, by the relief tube in hydraulic pressure detection process during release for the water under high pressure of internal box 13 to be discharged
28, one end of water inlet pipe C 10 for introducing city's water is connected with the upper surface of internal box 13, and the other end is connected with city's water interface, uses
It is connected in one end of water inlet pipe A 3 of the water filling of internal box 13 with storage tank 1, the other end and the water inlet pipe C 10 for introducing city's water
T fonts are carried out to be connected, for being connected to one end of water inlet pipe B 27 of the water filling of outer case 14 with storage tank 1, the other end and outer case
14 upper surfaces are connected, the one end of drainpipe C 22 and the lower surface of internal box 13 for the reclaimed water of internal box 13 to be incorporated into storage tank 1
Be connected, the other end is connected with storage tank 1, for the reclaimed water of outer case 14 is incorporated into storage tank 1 the one end of drainpipe B 25 and outside
The lower surface of casing 14 is connected, and the other end is connected with storage tank 1, displacement during for determining gas cylinder deformation in hydraulic pressure detection process
The one end of drainpipe A 15 above the side of outer case 14 with being connected, and the other end is extended in spilling water weighing container 16, for hydraulic pressure
One end of relief tube 28 of release in detection process is connected with introducing the progress of the water inlet pipe C 10 T fonts of city's water, the other end and storage
Water tank 1 is connected;The valve includes hand-operated valve and magnetic valve, and hand-operated valve is included the dynamic hand being incorporated into internal box 13 of city sailor
Dynamic valve A 5, for the water in internal box 13 is incorporated into storage tank 1 hand-operated valve B 21, for by the water in outer case 14
Hand-operated valve C 24, the hand-operated valve D 32 for the reclaimed water 31 of storage tank 1 to be emptied being incorporated into storage tank 1, magnetic valve include using
Magnetic valve A 4 in the water filling into internal box 13, for toward the magnetic valve C 7 of water filling in outer case 14, for the row of internal box 13
The magnetic valve D 23 and hydraulic pressure of water detect magnetic valve B 6, the magnetic valve E 26 for the draining of outer case 14 of ending phase release,
Hand-operated valve is separately positioned on the water inlet pipe C 10 that Jiang Shishui is incorporated into internal box 13, the water in internal box 13 is incorporated into storage
Water on drainpipe C 22 in water tank 1, in outer case 14 is incorporated on the drainpipe B 25 in storage tank 1, by storage tank 1
Water 31 empty drainpipe D 33 on, magnetic valve is separately positioned on is injected into entering in internal box 13 by the reclaimed water 31 of storage tank 1
It is injected on water pipe A 3, by the reclaimed water 31 of storage tank 1 on the water inlet pipe B 27 in outer case 14, introduces the water in internal box 13
It is incorporated on the drainpipe B 25 in storage tank 1, will examines on to the drainpipe C 22 in storage tank 1, by the water in outer case 14
On the relief tube 28 for carrying out release during survey process ending phase to the water under high pressure in internal box 13, hand-operated valve 21 passes through water pipe and electricity
Magnet valve 23 is in parallel, hand-operated valve 24 is in parallel with magnetic valve E 26 by water pipe, and magnetic valve D 23 is that opening degree can the electric electromagnetism adjusted
Valve, is connected with the supporting analog quantity of PLC with digital quantity modular converter;The motor and water pump are included storage tank
1 reclaimed water 31 is injected into common adjustable frequency motor and water pump A 2 in internal box 13, outer case 14, motor and the and of water pump B 29
The stepping being stirred to the water in internal box 13 or servomotor 11, for the reclaimed water 31 of storage tank 1 to be injected into internal box
13rd, the common adjustable frequency motor and water pump in outer case 14 are separately positioned on corresponding water inlet pipe A 3, water inlet pipe B 27, are used
Stepping or servomotor 11 that water in internal box 13 is stirred are arranged on the top of internal box 13, pass through connecting shaft
12 are connected with the agitator 30 being arranged in internal box 13;The sensor includes the level sensing for being arranged on the bottom of internal box 13
Device 20, cooling-water temperature sensor 19, its detecting element are arranged on the bottom of internal box 13, and data signal line is arranged on experiment plastic cistern body
Outside;The pressure gauge includes simulated water pressure table 8 and electric contact water pressure gauge 9, is both connected to Jiang Shishui and is incorporated into entering for internal box 13
On water pipe C 10, the pressure size that simulated pressure table 8 can be in simulation gas cylinder hydraulic pressure detection in real-time display internal box 13, electricity connects
Point pressure table 9 is used for when actual hydraulic pressure exceedes system settings(The detection hydraulic pressure upper limit applied during simulation gas cylinder detection)When,
Instruction is sent to PLC, makes it stop detection work, plays a protective role;The water temperature heating 18 is arranged on interior case
The bottom of body 13, is heated for the water to internal box 13;The agitator 30 is arranged in internal box 13, for internal box
13 water is stirred;The electronic scale 17 is arranged on the side of outer case 14, is placed on storage tank 1, for gas cylinder hydraulic pressure
The water in outer case 14 is set to overflow and be weighed to it because internal box 13 expands in detection process, electronic scale 17, which should have, to be gone
Skin function, while answering existing analog output interface circuit, also there is RS485 communication interfaces;The PC ends are by Ethernet through Ethernet
Interchanger is connected with PLC, touch-screen HMI, frequency converter VVVF, and download and the operation for PLC program are supervised
Input and output, the setting of frequency converter VVVF parameters of control, the configuration of touch-screen HMI pictures and dynamic data;The PLC controls
Device is also connected by RS485 buses with touch-screen HMI, frequency converter VVVF, electronic scale, and data volume input/output port is with pressing
Button, switch, motor driver, indicator lamp, auxiliary reclay, frequency converter are connected;The cooling-water temperature sensor, liquid level sensor
It is connected with the converted switch of the analog signalses of simulated pressure table output or with frequency converter VVVF, or matches with PLC
The analog quantity of set is connected with digital quantity modular converter, and analog quantity is controlled with digital quantity modular converter by expansion cable and PLC
Device is connected, and is also connected with frequency converter VVVF analog output port;The button is pressed for some red, green band lamps
Button, be easy to reduce component installation dimension, reduce the device and taken up space, including starting button, stop button, drain button,
Release button;The PLC, frequency converter VVVF, touch-screen HMI can realize some experimental real-trainings opened up on the apparatus
Project;The input of all electric information components of the motor, magnetic valve, pressure gauge, sensor, heater 18, electronic scale 17
Output connecting line, which draws to be connected to, to be installed on the apparatus and has being easily attached in the terminal block of operation of dominant component mark, just
The connection of electric wiring when experimental real-training;The experimental real-training project opened up should at least include programmable controller PLC, become
Several electric informations, the core curriculum of Mechatronics specialities such as frequency device, configuration technology, industrial stokehold, industrial networking technology.
The course of work of the present invention is sketched with reference to Fig. 1, Fig. 2:
The course of work of the present invention is introduced so that gas cylinder hydraulic pressure detects comprehensive practical training project as an example:Carrying out gas cylinder hydraulic pressure detection
Before, should first be ready work, preparation at least include by all motor and water pump A 2 in the present apparatus, motor and
The components such as water pump B 29, valve, pressure gauge, liquid level sensor 20, cooling-water temperature sensor 19, water temperature heating 18, electronic scale 17
With corresponding controller(Such as controller PLC, frequency converter VVVF and programming monitoring PC ends and touch-screen HMI)Equipment is connected
Connect, be connected between controller by Ethernet switch or serial communication RS485 bus ports, the 121 of controller PLC is ether
Network interface, 122 are RS485 serial bus interfaces, by PC ends by associated control procedures, parameter, configuration interface is downloaded to compile
In range controller PLC, frequency converter VVVF and touch-screen HMI(Frequency converter VVVF parameter setting can also be set by panel);
Then open hand-operated valve A 5 and city's water is incorporated into storage tank 1 by hand-operated valve B 21, treat that the water 31 in storage tank 1 adds to water storage
Case 1 80% or so when, close hand-operated valve A 5 and hand-operated valve B 21(If having during experimental real-training in storage tank 1 for experimental real-training
The water that mesh needs need not then operate this step);All hand-operated valves close in advance under, pass through PC ends or touch-screen HMI or control
The starting button that water filling is carried out to internal box 13 on control equipment, the magnetic valve A 4 controlled by controller PLC program open and
Motor and water pump A 2 bring into operation, rapidly to the water filling of internal box 13, when liquid level sensor 20 is detected in internal box 13
Water is full, then closes magnetic valve A 4 and stop motor and water pump A 2 operation, the water temperature entered as noted does not reach gas cylinder inspection
Survey condition, then system sends police instruction, while starting water temperature heating 18 and stepping or the servomotor 11 of stirring
Dynamic to be stirred, the water temperature in the holding internal box 13 of water temperature heating 18 meets water temperature in testing conditions, or storage tank 1 and met
Testing conditions, then controller PLC is by programme-control opening magnetic valve C 7 and motor and water pump B 29 is worked, storage tank 1
In water 31 start to be rapidly injected outer case 14, treat that the water in outer case 14 is filled(Water overflows from drainpipe A 15, appearance of weighing
The reclaimed water of device 16 increased again)When close magnetic valve C 7 and stop motor and water pump B 29, operator passes through PC ends or touch
Peeling function button on screen HMI or electronic scale 17 makes electronic scale 17 realize peeling function, or is set to by program to hold automatically
Row peeling function;The gas cylinder hydraulic pressure detection that operator is pressed on PC ends or touch-screen HMI starts on button or control device
Dynamic button starts to carry out pressurization detection to internal box 13, and now the stepping for stirring or servomotor 11 are stopped,
Magnetic valve A 4 is opened to be run again with motor and water pump A 2, quickly(Middling speed)Water filling is carried out into internal box 13, at this moment
Hydraulic pressure value can gradually increase in real time in the internal box 13 that simulated pressure table 8 is shown, the pointer of electro connecting pressure gauge 9 also can be gradually suitable
Hour hands are rotated, to show that hydraulic pressure is gradually increasing in internal box 13, when hydraulic pressure gradually rises to detect pressure arranges value in internal box 13
90% or so, motor and the slower water fillings into internal box 13 of water pump A 2, when hydraulic pressure reaches detection pressure in internal box 13
During arranges value, close magnetic valve A 4 and stop motor and water pump A 2 work, in the process, the hydraulic pressure of internal box 13 is not because
Break and raise and expand internal box 13, so as to extrude outer case 14, the reclaimed water of outer case 14 is overflowed and is flowed by drainpipe A 15
Enter in weighing container 16, then gas cylinder detection process enters packing stage, after pressurize 2 minutes, gas cylinder detection process enters release
Stage, magnetic valve B 6 is opened, and release is carried out to the water under high pressure in internal box 13, and water under high pressure flows into storage tank 1 by relief tube 28
In, internal box 13 shrinks because of release, causes that part water suck-back enters in outer case 14 in weighing container 16 again, after the completion of release(Mould
The display data of pseudopressure table 8 is 0, and the pointer of electro connecting pressure gauge 9 goes back to original position), the remaining water in weighing container 16 is gas cylinder
The remaining displacement of hydraulic pressure detection;The analog signal that displacement is passed through itself by electronic scale 17 in real time in gas cylinder hydraulic pressure detection process
Line or communication data line send controller PLC to, controller PLC by data processing by hydraulic pressure-time graph, displacement-
Real-time hydraulic pressure value, displacement, maximum displacement, remaining displacement lead in time graph, displacement-hydraulic curve, internal box 13
Cross touch-screen HMI or PC ends to show, if simulated pressure table 8 is damaged in hydraulic pressure detection process or controller PLC matches
Analog quantity and digital quantity modular converter(Module for receiving sensor output signal)Damage or data communication failure, cause
The hydraulic pressure of internal box 13 is set to exceed system detectio arranges value, now the upper limit normally opened contact of electro connecting pressure gauge 9 is closed, to controller
PLC sends stopping detection instruction, and now detection process stops, and when occurring abnormal conditions in detection process, operator can pass through
Press on PC ends or touch-screen HMI gas cylinder hydraulic pressure detection stop key or control device on stop button, can also stop inspection
Survey process;After release terminates, water temperature heating 18 stops that internal box 13 will be shown on heating, touch-screen HMI or PC ends(Simulation
Gas cylinder)The full deformation rate of volume and rate of residual and the information such as whether hydraulic pressure testing result qualified, the detection of gas cylinder hydraulic pressure terminates
Afterwards, operator presses the drain button on gas cylinder hydraulic pressure detection draining button or the control device on PC ends or touch-screen HMI, electricity
Magnet valve D 23(Opening degree is adjusted to maximum), magnetic valve E 26 open, the water in internal box 13, outer case 14 passes through drainpipe
Its internal water is discharged in storage tank 1 by C 22, drainpipe B 25, when the detection data of liquid level sensor 20 are 0 and one section of extension
After time, magnetic valve D 23, magnetic valve E 26 are closed, and now drainage procedure terminates;Hand-operated valve B 21 and hand-operated valve C 24 are used for
Water in manual internal box 13, outer case 14 is discharged in storage tank 1 by drainpipe C 22, drainpipe B 25, the He of hand-operated valve 32
Drainpipe D 33 is used for the hand-held evacuation of water 31 in storage tank 1;The opening degrees of magnetic valve D 23 can adjust for internal box 13
In the experimental real-training project such as constant pressure water supply PID control or permanent liquid level PID control;Roller 34 below device is used for the dress
The movement put.
Motor 1 in motor and water pump A 2 is stepping or servomotor, if stepping motor, then driver
For driving stepper motor machine;If servomotor, then driver is servomotor driving machine;Motor and water pump B 29 include
Motor 2.
The present apparatus opens up the experimental real-training project at least digital quantity including controller PLC and inputs experimental real-training project, control
Device PLC processed digital output experimental real-training project, controller PLC analog input experimental real-training project, controller PLC
Analog output experimental real-training project, controller PLC pulsed quantity output experimental real-training project, controller PLC communication(Such as with
Too Network Communication, serial communication, PROFIBUS-DP communications etc.)Experimental real-training project, controller PLC sequence design method experimental real-trainings
Project, frequency converter VVVF On-off signal experimental real-trainings project, frequency converter VVVF output switch parameter experimental real-trainings project, frequency converter
VVVF analog input experimental real-trainings project, frequency converter VVVF analog output experimental real-trainings project, frequency converter VVVF communications are real
Test practical training project, configuration switching value control experimental real-training project, the various domain experimental real-training projects of configuration, Combining soft control process interface
Experimental real-training project, controller PLC and frequency converter VVVF and the comprehensive switching values of touch-screen HMI or analog quantity or communication etc. are tested
Practical training project, by the flexible combination of different components on device, can be achieved several experimental real-trainings that are operable, easily realizing
Mesh, specific experiment practical training project title and content and complexity should be awarded according to the basic and each course of each college student in teaching
Appearance is opened up or secondary research and development, meanwhile, this device and control system teachers and students can be additionally used in the related religion scientific research intermediate item of exploitation,
Lift teachers and students' religion scientific research level and ability.
Technological means disclosed in the present invention program is not limited only to the technological means disclosed in above-mentioned embodiment, also includes
Constituted technical scheme is combined by above technical characteristic.It should be pointed out that for those skilled in the art
For, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as
Protection scope of the present invention.
Claims (9)
1. a kind of gas cylinder hydraulic pressure test experience actual training device, it is characterised in that:Including storage tank(1), Experimental Water Tank, valve, electricity
Motivation and water pump A(2), motor and water pump B(29), motor(11)And control device, the Experimental Water Tank include interior case
Body(13), outer case(14), internal box(13)With outer case(14)Etc. high setting, and volume is equal, internal box(13)With outer container
Body(14)Pass through water inlet pipe, outlet pipe and storage tank respectively(1)Connection, internal box(13)With storage tank(14)The water inlet pipe of connection
Upper setting pressure gauge, water inlet pipe, outlet pipe, which are provided with valve, water inlet pipe, is provided with motor and water pump A(2), motor
And water pump B(29), internal box(13)Inside it is provided with stirring vane(30), inwall bottom is respectively arranged with liquid level sensor(20)、
Cooling-water temperature sensor(19)And water temperature heating(18), outer case(14)Side wall passes through outlet pipe and weighing container(16)Connection,
Weighing container(16)Bottom sets electronic scale(17), valve, motor and water pump A(2), motor and water pump B(29), pressure
Table, liquid level sensor(20), cooling-water temperature sensor(19)And electronic scale(17), motor(11)It is connected with control device signal;
The control device includes PC ends, PLC, analog quantity and digital quantity modular converter, frequency converter VVVF, PC ends and led to
Ethernet is crossed through Ethernet switch with PLC, touch-screen HMI, frequency converter VVVF to be connected;PLC also passes through
RS485 buses and touch-screen HMI, frequency converter VVVF, electronic scale(17)It is connected, data volume input/output port and button, opens
Pass, motor driver, indicator lamp, auxiliary reclay, frequency converter VVVF are connected;The cooling-water temperature sensor, liquid level sensor
The converted switch of analog signalses that is exported with pressure gauge is connected with frequency converter VVVF or matched with PLC
Analog quantity is connected with digital quantity modular converter, and analog quantity passes through expansion cable and PLC phase with digital quantity modular converter
Connection, while being connected with frequency converter VVVF analog output port, PLC passes through driver and motor(11)Even
Connect, be connected by auxiliary reclay with valve, pass through A.C. contactor and motor and water pump A(2)With motor and water pump B
(29)Connection.
2. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 1, it is characterised in that:The water inlet pipe bag
Include water inlet pipe A(3), water inlet pipe B(27), water inlet pipe C(10), outlet pipe include relief tube(28), drainpipe A(15), drainpipe B
(25), drainpipe C(22), drainpipe D(33), storage tank(1)Pass through water inlet pipe B(27), drainpipe B(25)With outer case(14)
Connection, passes through water inlet pipe A(3), water inlet pipe C(10), drainpipe C(22)And relief tube(28)With internal box(13)Connection, row
Water pipe D(33)It is arranged at storage tank(1)Bottom;
The valve includes hand-operated valve A(5), hand-operated valve B(21), hand-operated valve C(24), hand-operated valve D(32), magnetic valve A(4), electricity
Magnet valve B(6), magnetic valve C(7), magnetic valve D(23), magnetic valve E(26);
Water inlet pipe A(3)On be correspondingly arranged motor and water pump A(2), magnetic valve A(4), water inlet pipe B(27)On be correspondingly arranged it is electronic
Machine and water pump B(29), magnetic valve C(7), relief tube(28)On be correspondingly arranged on magnetic valve B(6), drainpipe B(25)To be parallel
Drainpipe is correspondingly arranged magnetic valve E respectively(26), hand-operated valve C(24), drainpipe C(22)Correspond to and set respectively for parallel drainpipe
Put magnetic valve D(23), hand-operated valve C(24)Hand-operated valve B(21), water inlet pipe C(10), drainpipe D(33)It is correspondingly arranged respectively manually
Valve A(5), hand-operated valve D(32).
3. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The pressure
Table includes simulated pressure table(8), electro connecting pressure gauge(9), pressure gauge is arranged at water inlet pipe C(10)On.
4. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The stirring
Blade(30)Pass through connecting shaft(12)With motor(11)Connection.
5. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 2, it is characterised in that:The water inlet pipe A
(3), relief tube(28)Pass through water inlet pipe C(10)With internal box(13)Connection.
6. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The driving
Device is driving stepper motor machine or is servomotor driving machine.
7. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The water inlet
Pipe, outlet pipe are the transparent water pipe that plastic material is made.
8. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The interior case
Body(13), outer case(14)For the cylindrical transparent containers being arranged concentrically.
9. a kind of gas cylinder hydraulic pressure test experience actual training device according to claim 1 or 2, it is characterised in that:The PLC controls
Device processed uses west gate S7-200 SMART CPU ST40, touch-screen HMI to use Siemens SMART 700IE, frequency converter VVVF to adopt
With the G120 of Siemens, analog quantity uses Siemens's EM AM06 analog input and output mixing modules with digital quantity modular converter,
Ethernet switch uses CSM1277.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710290638.7A CN106952525A (en) | 2017-04-28 | 2017-04-28 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710290638.7A CN106952525A (en) | 2017-04-28 | 2017-04-28 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106952525A true CN106952525A (en) | 2017-07-14 |
Family
ID=59477693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710290638.7A Pending CN106952525A (en) | 2017-04-28 | 2017-04-28 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106952525A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108871936A (en) * | 2018-09-06 | 2018-11-23 | 淮安信息职业技术学院 | A kind of vehicle gas cylinder hydraulic pressure detection control apparatus |
CN111174102A (en) * | 2019-12-30 | 2020-05-19 | 清华大学 | Active safety feedback emergency stop system for hydrogen pipeline |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20020340U1 (en) * | 2000-11-30 | 2001-01-25 | Herrneder, Jürgen, 53859 Niederkassel | Pressure test device |
US20100236648A1 (en) * | 2009-03-20 | 2010-09-23 | Energetic Technology Development Limited | Filling machine for highly compressed gas |
CN101881713A (en) * | 2009-05-07 | 2010-11-10 | 刘小成 | Device for testing gas cylinder by using computer control moving burette jacket method |
CN102033019A (en) * | 2010-11-11 | 2011-04-27 | 无锡昌华机电制造有限公司 | Automatic hydrostatic test control system using air-bottle outer measuring method |
CN202729801U (en) * | 2012-08-17 | 2013-02-13 | 江阴同悦机械设备有限公司 | Automatic control system containing variable-frequency nitrogen making machine |
CN105719527A (en) * | 2016-03-14 | 2016-06-29 | 大连市锅炉压力容器检验研究院 | Cylinder hydrostatic test operation training and evaluation simulation system |
CN206921327U (en) * | 2017-04-28 | 2018-01-23 | 淮安信息职业技术学院 | A kind of gas cylinder hydraulic pressure test experience actual training device |
-
2017
- 2017-04-28 CN CN201710290638.7A patent/CN106952525A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20020340U1 (en) * | 2000-11-30 | 2001-01-25 | Herrneder, Jürgen, 53859 Niederkassel | Pressure test device |
US20100236648A1 (en) * | 2009-03-20 | 2010-09-23 | Energetic Technology Development Limited | Filling machine for highly compressed gas |
CN101881713A (en) * | 2009-05-07 | 2010-11-10 | 刘小成 | Device for testing gas cylinder by using computer control moving burette jacket method |
CN102033019A (en) * | 2010-11-11 | 2011-04-27 | 无锡昌华机电制造有限公司 | Automatic hydrostatic test control system using air-bottle outer measuring method |
CN202729801U (en) * | 2012-08-17 | 2013-02-13 | 江阴同悦机械设备有限公司 | Automatic control system containing variable-frequency nitrogen making machine |
CN105719527A (en) * | 2016-03-14 | 2016-06-29 | 大连市锅炉压力容器检验研究院 | Cylinder hydrostatic test operation training and evaluation simulation system |
CN206921327U (en) * | 2017-04-28 | 2018-01-23 | 淮安信息职业技术学院 | A kind of gas cylinder hydraulic pressure test experience actual training device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108871936A (en) * | 2018-09-06 | 2018-11-23 | 淮安信息职业技术学院 | A kind of vehicle gas cylinder hydraulic pressure detection control apparatus |
CN111174102A (en) * | 2019-12-30 | 2020-05-19 | 清华大学 | Active safety feedback emergency stop system for hydrogen pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106952525A (en) | A kind of gas cylinder hydraulic pressure test experience actual training device | |
CN206921327U (en) | A kind of gas cylinder hydraulic pressure test experience actual training device | |
CN103178277A (en) | Full-automatic gas displacement system and method | |
CN108120571B (en) | Waterproof test fixture and test system for electronic product | |
CN105157781B (en) | Clean tank volume self-operated measuring unit and method | |
CN206920297U (en) | A kind of mortar impermeability automatic detection device | |
CN204594635U (en) | A kind of full-automatic butterfly valve seal performance aircraft | |
CN209281749U (en) | Quantitative filling practical training teaching aid | |
CN101988861B (en) | System for detecting air tightness of cavity of mechanical and electrical product | |
CN104677562A (en) | Full-automatic butterfly valve sealing performance testing machine and testing method thereof | |
CN206610533U (en) | A kind of experience system of PLC control temperature and liquid level | |
CN107462371B (en) | Deposit lid gas tightness testboard | |
CN110726547A (en) | Portable comprehensive checking device for pressure protection device | |
CN204314029U (en) | A kind of device for detecting sealability of water purification machine | |
CN216621601U (en) | Double-circuit batch intelligent calibrating device for barometer and oil pressure meter | |
CN2241333Y (en) | Bench full-automatic gas relay checker | |
CN210834055U (en) | Valve leakage water-free detection system | |
CN203754403U (en) | Semi-automatic vacuum oil charging machine | |
CN204463525U (en) | Gas-oil separation analogue simulation system | |
CN211941688U (en) | Automatic control device for wind pressure, wind speed and temperature in vulcanizing tank | |
CN112964433A (en) | Purification column pressure maintaining test device and method thereof | |
CN112542068A (en) | Simple transformer oil sampling simulation device and oil sampling method | |
CN207709002U (en) | A kind of quick air distribution system of mixed gas suitable for tun | |
CN207667597U (en) | A kind of mixed gas air distribution system suitable for tun | |
CN102466550A (en) | Compressor leak hunting apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170714 |
|
WD01 | Invention patent application deemed withdrawn after publication |