CN206920532U - Intelligent substation closed loop test system based on GOOSE network - Google Patents
Intelligent substation closed loop test system based on GOOSE network Download PDFInfo
- Publication number
- CN206920532U CN206920532U CN201720769862.XU CN201720769862U CN206920532U CN 206920532 U CN206920532 U CN 206920532U CN 201720769862 U CN201720769862 U CN 201720769862U CN 206920532 U CN206920532 U CN 206920532U
- Authority
- CN
- China
- Prior art keywords
- test
- intelligent substation
- goose network
- goose
- closed loop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The utility model discloses a kind of intelligent substation closed loop test system based on GOOSE network, the system is the TEST patterns based on IEC61850 standards, and it is included:SCD parsing modules, intelligent substation is connected, the intended response of tested protection system is generated according to the SCD file of intelligent substation;Testing control module, GOOSE network is connected, for sending test instruction;The tested protection system using protection device to be measured as core formed according to the empty terminal annexation description information of intelligent substation SCD file, GOOSE network is connected, test response is produced under the excitation of test instruction;Test evaluation module, SCD parsing modules and GOOSE network are connected, for being compared to intended response and test response.Its advantage is:SCD reflects the signal incidence relation of secondary system of intelligent substation, it would be possible to automatically generate checking electrical secondary system incidence relation based on SCD, closed loop test is realized using IEC61850 detection patterns, is greatly improved integration testing, live commissioning and maintenance repair testing efficiency and correctness.
Description
Technical field
It the utility model is related to secondary system of intelligent substation closed loop test system technical field, and in particular to one kind is based on
The intelligent substation closed loop test system of GOOSE network.
Background technology
The power network of large-scale complex improves constantly to secondary degree of dependence.This just to the united analysis towards bulk power grid,
Control;Strengthening system is integrated and the construction of the digital power grid of information sharing proposes actual demand.Existing electrical secondary system
Technology development is very fast, especially the alteration of monitoring system of 500kV transformer stations, and the problem of due to system architecture, transformation process is complicated,
Cost is higher, and the cycle that has a power failure is longer and because mode limits, and can not often arrange power failure to cause the transformation cycle uncontrollable, unfavorable
In safe and reliable, the economical operation of system.And to solve problems, from current condition, unique approach is to implement power transformation
Communication system of standing IEC61850.
IEC61850 pilots are also just being carried out in different aspects.But due to lacking the body to intelligent substation
System assesses, and verifies the means and mode of evaluation, whole intelligent substation pilots also lack more perfect technical support and
System ensures.Data model is unified simultaneously, and security partitioning, data source are integrated, and information and system application aspect also have substantial amounts of work
Need to promote.
Secondary system of intelligent substation is different from conventional comprehensive is characterized in that electrical secondary system depth relies on from the maximum of electrical secondary system
In substation configuration description file SCD, SCD file describes:(1)Transforming plant primary equipment model and electric topology information;(2)
Function view:Distribution of the automation function in each interval;(3)IED views:IED ability descriptions;(4)Communicate view:Communication is matched somebody with somebody
Confidence ceases;(5)Product view:The mapping of the LN in LN and function view in IED views;(6)Data flow:Water between IED
Flat communication communicates with vertical.Thus, SCD reflects the signal incidence relation of secondary system of intelligent substation, in other words based on SCD
It would be possible to automatically generate the test case of checking electrical secondary system incidence relation, realized using the TEST patterns of IEC61850 standards
Closed loop test, it is greatly improved integration testing, live commissioning and maintenance repair testing efficiency and correctness.
Transformer substation communication system is divided into 3 layers by transformer substation communication system IEC61850:Substation level, wall, process layer.
Network between substation level and wall is mapped to manufacture message specification (MMS), transmission using Abstract Common Service Interface
Control protocol/Internet protocol (TCP/IP) Ethernet or optical networking.Intelligent electronic device in transformer station(IED, measurement and control unit and
Relay protection)Row information exchange is entered using unified agreement.The characteristics of IEC61850 is:1)Object-oriented modeling;2)It is abstract
Communication Service Interface;3)Towards real-time service;4)Configuration language;5)Whole power system unified Modeling.IEC61850 standards
Define most of public physical devices and apparatus assembly model.These model definitions common data form, identifier, behavior
And control, such as transformer station and feeder plant(Breaker, voltage regulator and relay protection etc.).Information self-description energy
Data management expense is significantly reduced, simplifies data maintenance, reduce the system downtime caused by configuration error.
At present, RTDS (REAL TIME DIGITAL SIMULATION real-timedigital simulations systems mainly are used both at home and abroad
System).RTDS main feature includes:1) conventional parallel processing calculates;2) have abundant and easily set with physical analogy amount
The standby input being connected and output quantity interface;3) unit of hardware is referred to as one " Rack ", and each Rack includes:
The card (3PC) of 12 pieces of three digital signal processors composition, 1 piece of internal Rack address card (IRC), 1 piece of work station with
Rack connection card (WIF).Substantial amounts of model is had in RTDS for calling, including:1)Power system component model, it is such as automatic
Field regulator(AVR), power system stabilizer, PSS(PSS), speed regulator, transformer, circuit, generator, asynchronous motor, synchronization
Motor, CT, PT, CVT, TSC, TCSC etc.;2) control system component model, such as DC control system, various logic door, touch
Hair, delay, the input of various types of signal and output control etc..The application of RTDS simulations at present includes:The closed loop of relay protection system
Experiment, the closed test of control system, the analysis and research of power system, education and training.But it there is no solve intelligent power transformation at present
Electrical secondary system of standing test problem.
Utility model content
The purpose of this utility model is to provide a kind of intelligent substation closed loop test system based on GOOSE network, sharp
With the characteristics of intelligent substation SCD file and GOOSE network communication mechanism, constructed under IEC61850 TEST patterns with
Single protection device is the closed loop test system of the protection Quadratic Imaginary circuit system of core, and operation maintenance testing efficiency is greatly improved
With test correctness, reliable basis is provided for intelligent substation safety management, reduces the safety of secondary system of intelligent substation
Risk.
In order to achieve the above object, the utility model is achieved through the following technical solutions:
A kind of intelligent substation closed loop test system based on GOOSE network, it is characterized in that, the closed loop test system is base
In the TEST patterns of IEC61850 standards, described closed loop test system includes:
SCD parsing modules, intelligent substation is connected, tested protection system is generated according to the SCD file of intelligent substation
Intended response;
Testing control module, GOOSE network is connected, for sending test instruction;
According to the formation of the empty terminal annexation description information of intelligent substation SCD file using protection device to be measured as core
The tested protection system of the heart, GOOSE network is connected, test response is produced under the excitation of test instruction;
Test evaluation module, SCD parsing modules and GOOSE network are connected, for being responded to intended response and test
It is compared.
The above-mentioned intelligent substation closed loop test system based on GOOSE network, wherein, also include:
Network communication module, GOOSE network is connected, the input and output for performing closed loop test system are controlled, received
Test response.
The above-mentioned intelligent substation closed loop test system based on GOOSE network, wherein, described tested protection system bag
Contain:
Combining unit, connect GOOSE network;
Protection device to be measured, connect GOOSE network and combining unit;
Adjacent protection device, connect GOOSE network and protection device to be measured;
Intelligent terminal, connect GOOSE network and protection device to be measured.
The above-mentioned intelligent substation closed loop test system based on GOOSE network, wherein:
Combining unit and intelligent terminal are located at process layer, and protection device to be measured is located at wall.
The utility model has advantages below compared with prior art:
1st, SCD reflects the signal incidence relation of secondary system of intelligent substation, would be possible to automatically generate based on SCD and tests
Demonstrate,prove electrical secondary system incidence relation test, realize closed loop test using IEC61850 detection patterns, be greatly improved integration testing,
Live commissioning and maintenance repair testing efficiency and correctness;
2nd, the testing scheme based on IEC61850 standard TEST mechanism, supports online distant place testing mechanism, existing not changing
Field wiring(Such as plug optical cable), under the premise of not changing protection device setting valve, complete to lead to for intelligent substation protection system
Believe the test of connecting mode;
3rd, parsed based on SCD, adapt to " directly adopting straight jump ", " directly adopt net jump ", " net is adopted net and jumped " mode of connection realize non-invade
Enter formula test, a kind of referential Technology Ways are provided to solve the not convenient property of O&M test at this stage.
Brief description of the drawings
Fig. 1 is system block diagram of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, by describing a preferable specific embodiment in detail, the utility model is done and further explained
State.
Intelligent substation passes through optical cable using the digital protection device for meeting IEC61850 standards in intelligent substation
It is connected with combining unit, intelligent terminal and other protection devices, eliminates the analog input of GPF (General Protection False device and open into opening
Outgoing interface, while also eliminate the hard pressing plate of function of screen cabinet and export hard pressing plate, it the substitute is and used using fiber optic communication mouth
In transmitting-receiving input/output information.Intelligent substation using " three layer of two net " electrical secondary system framework, including station level, wall,
Process layer, and station level network and process-level network.Combining unit and intelligent terminal are located at process layer, and protection device is positioned at interval
Layer, combining unit collect after current and voltage signals by SV message up sending to process layer net or are directly inputted to protection device,
Intelligent terminal then receives the breaker tripping and closing signal of protection device by GOOSE message, and gathers and be sent on the signals such as circuit breaker position
Process layer net or protection device.SV messages and GOOSE message can use process layer difference networking or common network transmission two ways.Intelligence
Can transformer station protection it is more using directly adopting the docked mode directly jumped, it is so-called straight to adopt straight jump and refer to sampling SV and the GOOSE that trips
Information is directly sent to protection device and intelligent terminal without process layer switch.
GOOSE Generic Substation Event models, intelligent substation are configured with process layer GOOSE defined in IEC61850 standards
Net, for the signal transmission between IED.GOOSE communication mechanisms are a kind of Real-time Communication Technologies, are mainly used in realizing interval locking
The quick transmission of signal and real-time breaker tripping and closing signal etc., while open for protecting the control of transmission and the soft pressing plate of protection into signal
Deng.The utility model is using the advantage of GOOSE communication mechanisms:a)It is all configured information (as tripping operation, unsuccessful reason,
Circuit breaker position etc.) it can be transmitted on a network;b)GOOSE transmitting-receiving messages between IED instead of traditional hard
Wiring, reduce the cost of transformer station secondary system;c)Simplify the data communication configurations change procedure between IED.
Although directly adopting SV and GOOSE under straight hop pattern without process layer switch directly with protection device to be connected, merge
Unit and intelligent terminal are still linked into process layer SV/GOOSE networks, it means that can build protection based on GOOSE network
The signal interaction relation of system.Therefore, the closed loop test scheme based on GOOSE network just possesses physical basis, and this practicality is new
Type utilizes GOOSE communication mechanisms by applying test and excitation to combining unit, and receives the test of each IED in protected subsystem
Response.
Explanation of nouns:
1)CONFIG.SYS SCD and device CID files
The electrical secondary system framework of intelligent substation " three layer of two net " is included in whole station configuration description (SCD) file, SCD texts
Part describes the communication configuration and transforming plant primary system architecture between all IED exemplary configuration and messaging parameter, IED,
And signal contact information, by the system integration, manufacturer is completed, and transformer station two is completed by engineering configuration tool and IED configuration tools
The configuration of subsystem signal association.The empty terminal of secondary system of intelligent substation, empty loop information are included in SCD file, and
By IED configuration tools configuration according to the CID files for exporting each device in SCD file with specific IED relevant information and under
It is downloaded in device.
Because SCD file contains the information association information in whole secondary system of intelligent substation between all IED,
When being tested for the protection system of core a certain protection device, searched using SCD file has letter with the protection device
Number association IED equipment collection, then build the testing scheme of the protected subsystem for the equipment collection and form protected subsystem
To the intended response of test and excitation, and protection device to the real response of test and excitation is carried out according to CID files.Thus originally
The testing scheme of text except checking protection device in itself to the response function of test and excitation it is whether correct in addition to, can also verify guarantor simultaneously
Protect whether the information association in subsystem Quadratic Imaginary loop is correct, i.e. whether CID is consistent with SCD.
2)IEC61850 TEST patterns
IEC61850 standards support TEST patterns to be used to carry out O&M test to the IED in intelligent substation, comprising as follows
Model information:a)IED LLN0 Mod/Beh parameters.Wherein Mod is used for the Test/ON states of switching device, i.e. test/fortune
Row state;Beh is used for the Test/ON states of reading device;b)Test positions and SMV data qualities in IED GOOSE message
(Quality) the test positions in field are used to define whether IED is in test mode;c)IED service support Test parameters.
The IED such as device, combining unit, intelligent terminal, which are claimed, in IEC61850 TEST patterns must support TEST moulds
The TEST patterns of formula, wherein IED equipment itself are and the TEST moulds of MMS/GOOSE/SV messages by the Determines of maintenance pressing plate
Formula is determined by the TEST flag bits in message, only in the case where the message of IED equipment and its reception is in TEST patterns, ability
Send the message with TEST flag bits.
The utility model proposes a kind of intelligent substation closed loop test method based on GOOSE network, it is included:
The expected response signal of tested protection system is generated and according to intelligent power transformation according to the SCD file of intelligent substation
The empty terminal annexation description information for the SCD file stood builds the tested protection system using protection device to be measured as core;
Sending test instruction to tested protection system by GOOSE network makes excitation of the tested protection system in test instruction
It is lower to produce test response;
The empty loop annexation generated according to the SCD file of intelligent substation obtains the expected of tested protection system and rung
Should;
Contrast intended response and test response obtain comparative result.
As shown in figure 1, in the present embodiment, the above method is surveyed by an intelligent substation closed loop based on GOOSE network
Test system is completed, and the closed loop test system is TEST patterns based on IEC61850 standards, described closed loop test system
Comprising:
SCD parsing modules 1, intelligent substation is connected, tested protection system is generated according to the SCD file of intelligent substation
Intended response;SCD parsing modules 1 are additionally operable to the inspection for pushing the wrong each IED in ticket, including the tested protection system of input to be formed before test
Pressing plate is repaiied, the GOOSE at interval out of service sends soft pressing plate of soft pressing plate and the soft pressing plate of GOOSE shunt trippings and outlet etc., and builds
Test oracle response template.
Testing control module 3, GOOSE network is connected, for sending test instruction;
According to the formation of the empty terminal annexation description information of intelligent substation SCD file using protection device to be measured as core
The tested protection system of the heart, GOOSE network is connected, test response is produced under the excitation of test instruction;
Test evaluation module 4, connection SCD parsing modules 1 and GOOSE network, for being rung to intended response and test
It should be compared, that is, verify the uniformity in SCD Quadratic Imaginaries loop and IED Quadratic Imaginaries loop, finally provide test result;
Network communication module 2, GOOSE network is connected, the input and output for performing closed loop test system are controlled, received
Test response, main to include applying test and excitation to combining unit 7, maintenance pressing plate and the soft pressing plates of GOOSE and soft pressure of returning to school are moved back in throwing
Board status, receive GOOSE information structures test response for being tested that each IED is sent in protection system in test process etc..
Described tested protection system includes:Combining unit 7, connect GOOSE network;Protection device 6 to be measured, connection
GOOSE network and combining unit 7;Adjacent protection device 5, connect GOOSE network and protection device to be measured 6;Intelligent terminal
8, connect GOOSE network and protection device to be measured 6.
Wherein, described tested protection system includes combining unit 7, the protection device to be measured for connecting GOOSE network respectively
6th, adjacent protection device 5 and intelligent terminal 8;Response of the tested protection system to test instruction is carried out according to CID files, described
The method that test response is produced under the excitation of tested protection systems test instruction specifically includes:From process layer GOOSE network pairing
And unit 7 applies failure excitation;After protection device 6 to be measured receives the simulated failure SV messages that combining unit 7 is sent, jump is sent
Lock GOOSE signals are simultaneously emitted by unsuccessful reason GOOSE signals to adjacent protection device 5 to intelligent terminal 8;Intelligent terminal 8 receives
To after tripping operation GOOSE signals, corresponding circuit breaker position GOOSE signals are sent;Adjacent protection device 5 receives unsuccessful reason
After GOOSE signals, failure shunt tripping GOOSE signals are sent to the interval where protection device to be measured;Unsuccessful reason GOOSE signals,
Failure shunt tripping GOOSE signals and circuit breaker position GOOSE signals form described test response.
The above-mentioned intelligent substation closed loop test method based on GOOSE network, wherein:Test instruction is a fault test
Excitation, the pattern of fault test excitation is the three phase short circuit fault pattern of instantaneity or the three phase short circuit fault pattern of long delay.
The above-mentioned intelligent substation closed loop test method based on GOOSE network, wherein, the structure of the tested protection system
Construction method specifically includes:The SCD file of intelligent substation is obtained, the void for selected protection device to be measured according to SCD file
Loop annexation finds the IED equipment collection using protection device to be measured as core, and is built and tested according to each actual IED model
Intended response.
The actual sound of intended response template and test that the test evaluation module 4 is generated by comparing by SCD parsing modules
Answer information, can provide whether consistent test result, in the case where not changing protection device internal operation definite value, the test
Conclusion has actually reacted transformer station's SCD file and the uniformity of CID files inside each IED, i.e., for empty loop between each IED
The uniformity of annexation description, including combining unit are returned to the empty loop of protection device, the void of protection device to intelligent terminal
The mistake of road, the unsuccessful reason void loop of protection device to be measured to adjacent protection device and adjacent protection device to this maintenance interval
Clever shunt tripping void loop etc..
Embodiment
To be exemplified by 220 kV intelligent substations Ludings of District of Shanghai become, employ electronic mutual inductor and " directly adopt straight
Jump " pattern, main electrical scheme is line transformer group pattern, and main transformer voltage class is the kV of 220 kV/110 kV/ 35,110 kV sides
Using double-bus main wiring mode.
Specifically, above-mentioned closed loop test system is disposed in GOOSE network, after test system reads in SCD file, by SCD
Parsing module is obtained using newly-increased protection equipment for transformer as the IED equipment collection in the tested protection system of core, including:Main transformer is protected
Protection unit, 110 kV busbar protective devices, high side voltage combining unit, high voltage side current combining unit, medium voltage side electric current close
And unit, low-pressure side electric current combining unit, high-pressure side intelligent terminal, medium voltage side intelligent terminal, low-pressure side intelligent terminal;Then structure
Build before test and pushed the wrong ticket:a)Put into above-mentioned each IED maintenance pressing plate;b)Exit main transformer protection device and arrive interval
GOOSE sends soft pressing plate and GOOSE and exports soft pressing plate;c)110 kV busbar protective devices are exited to send out to the GOOSE of interval
Soft pressing plate and GOOSE is sent to export soft pressing plate;d)Exit the soft pressing plate of differential protection of main transformer protection.Then test oracle sound is constructed
Template is answered, including:a)Main transformer protection device sends three-phase trip signal to each side intelligent terminal;b)Main transformer protection device sends three
Phase unsuccessful reason signal is to 110 kV busbar protective devices;c)110 kV busbar protective devices send failure shunt tripping signal to middle pressure
Side intelligent terminal, and medium voltage side failure shunt tripping signal is sent to main transformer protection device;d)Each side intelligent terminal sends three-phase combined floodgate
Position becomes 0 GOOSE signals by 1.After above-mentioned preparation is carried out, the three-phase for applying long delay by test and excitation module is short
Road failure is activated to medium voltage side electric current combining unit and high side voltage combining unit, and breaker loses after occurring for simulated failure
The situation of spirit.Finally by network communication module receive in test process all GOOSE responses and with intended response template
Make comparisons, final conclusion is provided by test evaluation module.
Test result:
During above-mentioned test, download to medium voltage side electric current with two kinds of different CID configuration files respectively and close
And in unit:A kind of is the CID configuration files that Luding becomes original main transformer medium voltage side electric current combining unit before extension project, another
It is the CID configuration files that Luding side becomes newly-increased main transformer medium voltage side electric current combining unit after extension project.Under the previous case, test
Real response and intended response template are completely the same;GOOSE responses are not produced under latter event, in whole test process.By
This is visible, and the testing scheme proposed can verify hidden danger existing for protection secondary system void loop, at the same demonstrate SCD with
CID consistency problem, possesses the application value in actual intelligent substation.
To sum up, closed loop test scheme of the utility model based on GOOSE network, which has, adapts to intelligent substation secondary empty time
The advantages of road annexation, test process is automatically quick, and test result is clear and definite, and protection system two can be easily found by test
Hidden danger existing for secondary empty loop, the efficiency of intelligent substation O&M test is greatly improved, is based on for secondary system of intelligent substation
The repair based on condition of component mechanism of fail-safe analysis provides technical identification means.
Although content of the present utility model is discussed in detail by above preferred embodiment, but it should be appreciated that on
The description stated is not considered as to limitation of the present utility model.After those skilled in the art have read the above, for
A variety of modifications and substitutions of the present utility model all will be apparent.Therefore, the scope of protection of the utility model should be by appended
Claim limit.
Claims (4)
1. a kind of intelligent substation closed loop test system based on GOOSE network, it is characterised in that the closed loop test system is base
In the TEST patterns of IEC61850 standards, described closed loop test system includes:
SCD parsing modules, intelligent substation is connected, the expection of tested protection system is generated according to the SCD file of intelligent substation
Response;
Testing control module, GOOSE network is connected, for sending test instruction;
According to the formation of the empty terminal annexation description information of intelligent substation SCD file using protection device to be measured as core
Tested protection system, connects GOOSE network, and test response is produced under the excitation of test instruction;
Test evaluation module, SCD parsing modules and GOOSE network are connected, for being carried out to intended response and test response
Compare.
2. the intelligent substation closed loop test system based on GOOSE network as claimed in claim 1, it is characterised in that also wrap
Contain:
Network communication module, GOOSE network is connected, the input and output for performing closed loop test system control, receive test sound
Should.
3. the intelligent substation closed loop test system based on GOOSE network as claimed in claim 1, it is characterised in that described
Tested protection system include:
Combining unit, connect GOOSE network;
Protection device to be measured, connect GOOSE network and combining unit;
Adjacent protection device, connect GOOSE network and protection device to be measured;
Intelligent terminal, connect GOOSE network and protection device to be measured.
4. the intelligent substation closed loop test system based on GOOSE network as claimed in claim 3, it is characterised in that:
Combining unit and intelligent terminal are located at process layer, and protection device to be measured is located at wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720769862.XU CN206920532U (en) | 2017-06-29 | 2017-06-29 | Intelligent substation closed loop test system based on GOOSE network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720769862.XU CN206920532U (en) | 2017-06-29 | 2017-06-29 | Intelligent substation closed loop test system based on GOOSE network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206920532U true CN206920532U (en) | 2018-01-23 |
Family
ID=61322983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720769862.XU Active CN206920532U (en) | 2017-06-29 | 2017-06-29 | Intelligent substation closed loop test system based on GOOSE network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206920532U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107255761A (en) * | 2017-06-29 | 2017-10-17 | 国网上海市电力公司 | Intelligent substation closed loop test system based on GOOSE network |
CN110676802A (en) * | 2019-09-05 | 2020-01-10 | 深圳供电局有限公司 | Optical fiber current differential protection setting value field calibration system and method |
CN111896828A (en) * | 2020-07-31 | 2020-11-06 | 许昌开普检测研究院股份有限公司 | Automatic testing method and system for intelligent terminal opening action voltage of intelligent substation |
-
2017
- 2017-06-29 CN CN201720769862.XU patent/CN206920532U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107255761A (en) * | 2017-06-29 | 2017-10-17 | 国网上海市电力公司 | Intelligent substation closed loop test system based on GOOSE network |
CN110676802A (en) * | 2019-09-05 | 2020-01-10 | 深圳供电局有限公司 | Optical fiber current differential protection setting value field calibration system and method |
CN110676802B (en) * | 2019-09-05 | 2021-09-24 | 深圳供电局有限公司 | Optical fiber current differential protection setting value field calibration system and method |
CN111896828A (en) * | 2020-07-31 | 2020-11-06 | 许昌开普检测研究院股份有限公司 | Automatic testing method and system for intelligent terminal opening action voltage of intelligent substation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107255761A (en) | Intelligent substation closed loop test system based on GOOSE network | |
CN101272051B (en) | Information system integration method of electric network production control region and management information region | |
CN104122474B (en) | A kind of intelligent distribution type feeder automation logic testing system | |
CN103414251B (en) | A kind of substation network communication analogue system based on IEC61850 | |
WO2015143846A1 (en) | Online real-time loop closing method based on integration of main network and distribution network | |
CN105914890B (en) | A kind of automation of transformation substations control system | |
CN109190305B (en) | Panoramic real-time simulation method for power system | |
CN104505941B (en) | The monitoring system and the simulative running system of intelligent substation network | |
CN206920532U (en) | Intelligent substation closed loop test system based on GOOSE network | |
CN103323691A (en) | Novel, intelligent and multifunctional comprehensive tester and testing method | |
CN103713214A (en) | Intelligent transformer station relay protection closed loop test system | |
CN113364120B (en) | Method, device and equipment for checking control process of intelligent substation and storage medium | |
CN106329720A (en) | Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation | |
CN106549495A (en) | A kind of power system method of real-time | |
CN105680441B (en) | Simulation based on stimulated replacement technology is to a device | |
CN104730397B (en) | Interoperability test system and method between a kind of distribution power automation terminal | |
Donovan et al. | An Evaluation of Extending an Existing Substation Automation System using IEC 61850 | |
Chen et al. | Virtual site acceptance test platform for IEC 61850 based substations with multi‐vendor bay solutions | |
CN103036316A (en) | IEC61850-based IED equipment intelligent detecting method | |
CN107478922A (en) | Intelligent substation closed loop test method based on GOOSE network | |
CN111030301B (en) | Method for checking correlation of scheduling automation information points | |
Daboul et al. | Testing protection relays based on IEC 61850 in substation automation systems | |
Aftab et al. | ICT Technologies, Standards and Protocols for Active Distribution Network Automation and Management | |
CN116992620A (en) | Transformer substation simulation experiment system based on hybrid architecture | |
CN106841842A (en) | The method of testing and device in the empty loop of secondary device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |