CN206917104U - Protect system in a kind of Ventilating for roof hole - Google Patents
Protect system in a kind of Ventilating for roof hole Download PDFInfo
- Publication number
- CN206917104U CN206917104U CN201720487943.0U CN201720487943U CN206917104U CN 206917104 U CN206917104 U CN 206917104U CN 201720487943 U CN201720487943 U CN 201720487943U CN 206917104 U CN206917104 U CN 206917104U
- Authority
- CN
- China
- Prior art keywords
- cover
- ventilating
- permeability cell
- roof
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
System, including roof structure, the passage being opened at roof structure partitioning slot point of interface and the permeability cell being enclosed on air-vent are protected in a kind of Ventilating for roof hole, and the protective cover being connected with roof structure is covered with the permeability cell;The protective cover includes up-small and down-big cone barrel cover body, is connected to cover body tubular cover mouth suitable for reading and the circular cap being connected by pole with cover mouth, and the diameter of the cap is more than the diameter of cover mouth;The base of the cover body is horizontally outward bent to form lower hem, top margin level bends inwards to form upper hem, and the width of lower hem is wider than the width of upper hem;The pole is connected between the upper end edge of cover mouth and cap and circumferentially shape uniform intervals are set.The utility model solves and is not provided with protective cover, flimsy problem outside existing permeability cell.
Description
Technical field
Ventilating for roof field is the utility model is related to, particularly a kind of Ventilating for roof hole protection system.
Background technology
Existing Ventilating for roof pipe is mostly pvc pipe, due on roofing, the throughout the year exposed nature such as exposed to wind and rain
Power and external force effect, easily damage and lose it and use function.But because PVC material flexibility is other roof structure materials
Not available, so so far also without more preferable alternative materials.Stainless steel is a kind of material that present building uses, and is had resistance to
The high-quality special steel and green material that lose, be heat-resisting, attractive in appearance, can absolutely reclaim.Begin to be applied at the beginning of last century
Building field.A large amount of practical applications prove that stainless steel can still keep beautiful table after long term outdoor applications
Face is without corroding.Have just because of stainless steel durable and with little need for this characteristic of surface maintenance, just promote to design
Its application of teacher's pay attention to day by day.Stainless steel production technology is continued to develop, and corresponding technology is also improved, with stainless
The performance of steel is cut to stainless steel, rolled over, be curved, weldering, finally gives the stainless steel products needed for industrial production.Therefore in order to both protect
Stay the dominance of PVC permeability cells reduces destruction of the natural environment to permeability cell again, is badly in need of a kind of cover body of stainless steel to saturating
Tracheae is protected.
Utility model content
The purpose of this utility model is to provide a kind of Ventilating for roof hole protection system, to solve to be not provided with outside existing permeability cell
Protective cover, flimsy problem.
To achieve the above object, the utility model adopts the following technical scheme that:System is protected in a kind of Ventilating for roof hole, including
Roof structure, the passage being opened at roof structure partitioning slot point of interface and the permeability cell being enclosed on air-vent are described ventilative
The protective cover being connected with roof structure is covered with pipe;The protective cover includes up-small and down-big cone barrel cover body, is connected to cover body
Tubular cover mouth suitable for reading and the circular cap being connected by pole with cover mouth, and the diameter of the cap is more than the straight of cover mouth
Footpath;The base of the cover body is horizontally outward bent to form lower hem, top margin level bends inwards to form upper hem, and lower hem
Width is wider than the width of upper hem;The pole is connected between the upper end edge of cover mouth and cap and circumferentially shape uniform intervals
Set.
Preferably, the roof structure include lay successively from the bottom to top concrete, heat-insulation layer, screed-coat,
Waterproof layer, cement sand bed and ceramic tile layer.
Preferably, the air-vent insertion is opened on the heat-insulation layer, screed-coat and waterproof layer of roof structure.
Preferably, it is attached that the bottom of the permeability cell is socketed in air-vent, middle part is enclosed with the waterproof being connected with waterproof layer
Layer, top is added to extend roofing;The upper end of the additional waterproof course is fastenedly connected by fastener with permeability cell and waterproof is added
Seam crossing between layer and permeability cell is sealed by the first encapsulant.
Preferably, the waterproof layer and additional waterproof course are waterproof roll.
Preferably, the lower hem of the protective cover is clipped between waterproof layer and cement sand bed, and the bottom of cover body and water
Gap between silt particle pulp layer and ceramic tile layer is sealed by the second encapsulant.
Preferably, the protective cover is stainless steel protection cover.
The utility model has the characteristics that and beneficial effect compared with prior art:
1st, put and be welding as one up and down by pole between cap and cover mouth, the exhaust outlet of protective cover is formed, for permeability cell
The discharge of interior steam;Cover mouth lower end is connected with cover body upper hem full weld, it is ensured that the fastness that cover mouth is connected with cover body, is supported enough
External force resistance acts on;Lower hem and cover body are integral, without section, are installed on the corruption that can be reduced in roof structure to bending place
Erosion.
2nd, protective cover is stainless steel protection cover, and characteristic anti-corrosion, heat-resisting, attractive in appearance and environmentally friendly makes it work as in use in the future
Middle gain is much;Stainless steel protection cover unharmful substance discharges, and surface is smooth, is not easy to pollute, and is a hundred per cent after the completion of use
Recyclable green material.
3rd, separated, sealed using silicone sealant between cover body and Roofing brick, indwelling between protective cover and cement sand bed
There is gap, avoid pushing caused by mortar is flexible to stainless steel protection cover and destroy, gap is sealed using silicone sealant, is prevented
Rainwater, which enters in space, causes Corrosion of Stainless Steel.
4th, when to protective cover global design, cap, cover mouth and cover body use circular design, can reduce material wave
Take, accomplish elegant in appearance, cap size is more than cover mouth size, can effectively avoid junk from blocking cover mouth.
5th, Ventilating for roof hole protective cover provides possibility to realize that batch production is processed, meanwhile, the production of batch production avoids people
The defects of processing brought for difference is uneven, preferably ensure the quality of stainless steel protection cover.
The utility model can be widely applied in Ventilating for roof structure.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is cross-sectional view of the present utility model.
Fig. 2 is planar structure schematic diagram of the present utility model.
Fig. 3 is the planar structure schematic diagram that cap connects with pole.
Fig. 4 is the facade structures schematic diagram that cap connects with pole.
Fig. 5 is the cross-sectional view of protective cover.
Reference:1- concretes, 2- heat-insulation layers, 3- screed-coats, 4- waterproof layer 5- cement sand beds,
6- ceramic tile layers, 7- fasteners, the encapsulants of 8- first, 9- permeability cells, 10- protective covers, 10-1- cover bodies, 10-2- covers
Mouth, 10-3- caps, 10-4- poles, 10-5- lower hems, 10-6- upper hems, 11- additional waterproof courses, 12- second are close
Closure material.
Embodiment
Embodiment is shown in Figure 1, and system, including roof structure are protected in a kind of Ventilating for roof hole, shown in Figure 2, open
Passage at roof structure partitioning slot point of interface and the PVC permeability cells 9 being enclosed on air-vent, the upper cover of permeability cell 9
There is the protective cover 10 being connected with roof structure;Shown in Figure 5, the protective cover 10 includes up-small and down-big cone barrel cover body
10-1, the cover body tubular cover mouth 10-2 suitable for reading and circular cap 10-3 being connected by pole 10-4 with cover mouth is connected to,
And the diameter of the cap is more than the diameter of cover mouth;The base of the cover body 10-1 be horizontally outward bent to form lower hem 10-5,
Top margin level bends inwards to form upper hem 10-6, and the width of lower hem is that the width that 30mm is wider than upper hem is 10mm;Institute
The end edge for stating upper hem is connected with the lower end edge full weld of cover mouth;Referring to shown in Fig. 3 and Fig. 4, the pole 10-4 is three, spot welding
It is connected between the upper end edge of cover mouth and cap and circumferentially shape uniform intervals is set, forms the ventilative position of air-vent;Referring to
Shown in Fig. 1, the roof structure include lay successively from the bottom to top concrete 1, heat-insulation layer 2, screed-coat 3, waterproof
Layer 4, cement sand bed 5 and ceramic tile layer 6;Cement sand bed 5 is by by 1:The cement mortar laying of 3 ratios mixing forms, ceramic tile layer 6
Formed by the laying of 200X200 ceramic tiles;The air-vent insertion is opened in the heat-insulation layer 2, screed-coat 3 and waterproof layer 4 of roof structure
On.The bottom of the permeability cell 9 is socketed in air-vent, middle part is enclosed with the additional waterproof course 11 being connected with waterproof layer 4, top
Extend roofing;The upper end of the additional waterproof course 11 be fastenedly connected by fastener 7 and permeability cell 9 and additional waterproof course with
Seam crossing between permeability cell is sealed by the first encapsulant 8;The waterproof layer 4 and additional waterproof course 11 are SBS waterproofs
Coiled material;The lower hem 10-5 of the protective cover 10 is clipped between waterproof layer 4 and cement sand bed 5, the bottom of the cover body 10-1
The Breadth Maximum in the gap between cement sand bed 5 and ceramic tile layer 6 is 10mm and gap is close by the second encapsulant 12
Envelope;First encapsulant and the second encapsulant are silicone sealant;The protective cover 10 be by 304# thick 1mm not
Rust steel is made.
The course of work of the present utility model:
1st, successively construct roof structure concrete 1, heat-insulation layer 2, screed-coat 3 and waterproof layer 4.
2nd, waterproof layer 4, screed-coat 3 and heat-insulation layer 2 are drilled through successively with electric drill, sets out passage.
3rd, permeability cell 9 is enclosed in air-vent.
4th, the upper berth of waterproof layer 4 around breather pipe 9 sets additional waterproof course 11, and is fastened on additional waterproof course with anchor ear
On permeability cell 9.
5th, the seam crossing sealant sealing between permeability cell 9 and additional waterproof course 11.
6th, protective cover 10 is covered on permeability cell 9, lower hem is pressed on additional waterproof course.
7th, construct cement sand bed 5 and ceramic tile layer 6 are continued.
8th, sealant sealing is filled out in gap between cover body and silt particle pulp layer 5 and ceramic tile layer 6, completes construction.
Claims (7)
1. system is protected in a kind of Ventilating for roof hole, including roof structure, the passage that is opened at roof structure partitioning slot point of interface
And it is enclosed on the permeability cell on air-vent(9), it is characterised in that:The permeability cell(9)On be covered with the guarantor being connected with roof structure
Shield(10);The protective cover(10)Including up-small and down-big cone barrel cover body(10-1), be connected to cover body tubular suitable for reading
Cover mouth(10-2)And the circular cap being connected by pole with cover mouth(10-3), and the diameter of the cap is more than the straight of cover mouth
Footpath;The cover body(10-1)Base be horizontally outward bent to form lower hem(10-5), top margin level bends inwards to form folding
Side(10-6), and the width of lower hem is wider than the width of upper hem;The pole(10-4)It is connected to the upper end edge and cover of cover mouth
Between cap and circumferentially shape uniform intervals are set.
2. system is protected in Ventilating for roof hole according to claim 1, it is characterised in that:The roof structure include by it is lower extremely
On the concrete that lays successively(1), heat-insulation layer(2), screed-coat(3), waterproof layer(4), cement sand bed(5)And ceramic tile
Layer(6).
3. system is protected in Ventilating for roof hole according to claim 2, it is characterised in that:The air-vent insertion is opened in room
The heat-insulation layer of face structure(2), screed-coat(3)And waterproof layer(4)On.
4. system is protected in Ventilating for roof hole according to claim 3, it is characterised in that:The permeability cell(9)Bottom set
It is connected in air-vent, middle part is enclosed with and waterproof layer(4)The additional waterproof course of connection(11), top extend roofing;It is described anti-
Water extra play(11)Upper end pass through fastener(7)With permeability cell(9)It is fastenedly connected and between additional waterproof course and permeability cell
Seam crossing passes through the first encapsulant(8)Sealing.
5. system is protected in Ventilating for roof hole according to claim 4, it is characterised in that:The waterproof layer(4)It is attached with waterproof
Add layer(11)It is waterproof roll.
6. the Ventilating for roof hole protection system according to claim any one of 1-5, it is characterised in that:The protective cover(10)
Lower hem(10-5)It is clipped in waterproof layer(4)And cement sand bed(5)Between, and cover body(10-1)Bottom and cement sand bed
(5)And ceramic tile layer(6)Between gap pass through the second encapsulant(12)Sealing.
7. system is protected in Ventilating for roof hole according to claim 1, it is characterised in that:The protective cover(10)It is stainless steel
Protective cover.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720487943.0U CN206917104U (en) | 2017-05-04 | 2017-05-04 | Protect system in a kind of Ventilating for roof hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720487943.0U CN206917104U (en) | 2017-05-04 | 2017-05-04 | Protect system in a kind of Ventilating for roof hole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206917104U true CN206917104U (en) | 2018-01-23 |
Family
ID=61306736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720487943.0U Expired - Fee Related CN206917104U (en) | 2017-05-04 | 2017-05-04 | Protect system in a kind of Ventilating for roof hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206917104U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115653217A (en) * | 2022-03-25 | 2023-01-31 | 江苏省建筑工程集团有限公司 | Integrated building roof ventilating device and mounting method thereof |
-
2017
- 2017-05-04 CN CN201720487943.0U patent/CN206917104U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115653217A (en) * | 2022-03-25 | 2023-01-31 | 江苏省建筑工程集团有限公司 | Integrated building roof ventilating device and mounting method thereof |
CN115653217B (en) * | 2022-03-25 | 2023-10-20 | 江苏省建筑工程集团有限公司 | Integrated building roof ventilation device and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201695580U (en) | Inverted roof structure | |
CN206917104U (en) | Protect system in a kind of Ventilating for roof hole | |
CN212201042U (en) | Hidden natural ventilation and drainage system for heat-preservation and heat-insulation planting roof | |
CN206053156U (en) | A kind of architectural design roof cornice waterproof structure | |
CN206722238U (en) | Antiseepage spills roof pipeline construction | |
CN217537610U (en) | Top anti-leakage structure for settlement joints with different building heights | |
CN217128772U (en) | Inverted roof drainage structure | |
CN206851454U (en) | Plantation layer and domatic roofing applied to slope structure | |
CN206844495U (en) | A kind of roof leak proof rain building structure | |
CN214302610U (en) | Roof exit tube well construction node | |
CN210828085U (en) | Profiled steel sheet composite heat-insulation planting roof structure | |
CN213086880U (en) | Be used for utility tunnel shutter bottom connected node structure | |
CN205399853U (en) | Embedded roofing system structure of solar energy | |
CN211396308U (en) | Waterproof structure of pitched roof eaves gutter | |
CN205224451U (en) | Roofing parapet flashing protective layer structure | |
CN205046589U (en) | Waterproof structure of basement | |
CN207776290U (en) | A kind of horizontal type water for flat roof waterproof system falls mouth structure | |
CN201214861Y (en) | Green roof system | |
CN206328775U (en) | Boiler room venting of dust explosion mouth structure | |
CN213038968U (en) | Dedicated pottery urea bond waterproof coating structure under water | |
CN210164154U (en) | Eave waterproof node structure for villa building house | |
CN212478298U (en) | Roof steam exhaust channel is at eaves mouth department waterproof seal structure | |
CN214246347U (en) | Water leakage-proof roof | |
CN218233833U (en) | Waterproof construction at curtain and roofing handing-over position | |
CN219261479U (en) | Heat preservation structure integrated raw soil module polygonal roof truss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180123 Termination date: 20180504 |
|
CF01 | Termination of patent right due to non-payment of annual fee |