CN206901724U - Kerbstone installation auxiliary device - Google Patents
Kerbstone installation auxiliary device Download PDFInfo
- Publication number
- CN206901724U CN206901724U CN201720864368.1U CN201720864368U CN206901724U CN 206901724 U CN206901724 U CN 206901724U CN 201720864368 U CN201720864368 U CN 201720864368U CN 206901724 U CN206901724 U CN 206901724U
- Authority
- CN
- China
- Prior art keywords
- kerbstone
- clamping jaw
- connecting rod
- balancing pole
- auxiliary device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Road construction equipment technical field, more particularly to a kind of kerbstone installation auxiliary device are the utility model is related to, it includes balancing pole, moving assembly and hanging component;2/7 to 1/2 place is some fulcrum on balancing pole, and balancing pole is divided into lifting portion and grip part by boundary of fulcrum, and the lower section that moving assembly is fixedly connected on the fulcrum of balancing pole is used for shifting balance bar;Hanging component is arranged on the end in lifting portion, hanging component includes suspension hook and hangs over the stone fixture of clamping kerbstone and the stone suspender of lifting kerbstone in suspension hook, the upper end of suspension hook is rotatably connected on the end in lifting portion, stone suspender includes clip and steel wire rope, the top of clip has a retainer ring coordinated with suspension hook, and steel wire rope, which is wound on clip, forms annular to be inserted in kerbstone.The device reduces the unnecessary breakage of material in installation process, so as to lift kerbstone work progress progress and quality.
Description
Technical field
It the utility model is related to road construction equipment technical field, more particularly to a kind of kerbstone installation auxiliary device.
Background technology
At present, country's development at full speed, the premise of development is the coast is clear, but the construction of road will increasingly specification
Change.According to the road in roads at different levels or even garden, work progress must standardize, wherein, runway and pavement or have not
There must be obvious line of demarcation with using function, the line of demarcation generally use kerbstone is divided, and the construction of kerbstone is determined
Determine road construction progress and quality.The material generally use lithotome of kerbstone, by taking standard size kerbstone as an example
(990mm*150mm*150mm)Weight up to 60 kilograms, it is not only time-consuming in installation process, take it is artificial, and in field it is artificial carry it is easy
Damage takes material, and the quality and progress to kerbstone installation process cause strong influence, and not up to preferable economic benefit.
Utility model content
In order to solve the above problems, the purpose of this utility model is to provide a kind of kerbstone installation auxiliary device, the dress
Put it is easy to operate, can one or more people operated kerbstone lifted and unloaded, short distance can be carried out and left the theatre interior transport
Kerbstone, it is finely adjusted after can also being laid to kerbstone, reduces the unnecessary breakage of material in installation process, so as to lift road
Kerb work progress progress and quality.
To achieve the above object, the utility model uses following technical scheme:
Kerbstone installation auxiliary device, including balancing pole, moving assembly and hanging component;2/7 to 1/2 place on balancing pole
It is some fulcrum, balancing pole is divided into lifting portion and grip part by boundary of fulcrum, and moving assembly is fixedly connected on the fulcrum of balancing pole
Lower section be used for shifting balance bar;Hanging component is arranged on the end in lifting portion, and hanging component includes suspension hook and hung in suspension hook
Clamping kerbstone stone fixture and lifting kerbstone stone suspender, the upper end of suspension hook is rotatably connected on the end in lifting portion
Portion, stone suspender include clip and steel wire rope, and the top of clip has a retainer ring coordinated with suspension hook, and steel wire rope is wound on clip
It is upper to form annular to be inserted in kerbstone.
Wherein, the stone fixture includes the first clamping jaw and the second clamping jaw, passes through in the middle part of the first clamping jaw and the second clamping jaw
One hinge is hinged, and the medial surface of the first clamping jaw and the second clamping jaw bottom is provided with clamping plate, the upper end of the first clamping jaw and one first
The lower end of connecting rod is hinged, and the upper end of first connecting rod is hung in suspension hook by chain sling and suspension ring;The upper end of second clamping jaw and one second
The lower end of connecting rod is hinged, and the upper end of second connecting rod is hinged on the middle part of first connecting rod.
Wherein, the locking system of restricted two clamping jaws relative motion is set on first clamping jaw and the second clamping jaw.
Wherein, the locking system includes fixture block and grab, and fixture block is arranged in the outer side edges of the first clamping jaw, grab upper end
It is hinged on the second clamping jaw, lower end has the hook portion coordinated with fixture block.
Wherein, the clamping plate includes the steel plate layer being fixedly connected on clamping jaw and the friction being fixedly connected in steel plate layer
Layer.
Wherein, the moving assembly includes diclinic support, rotating shaft, wheel bearing and wheel, and the upper end of diclinic support is fixedly connected on
At the fulcrum of balancing pole, lower end is fixedly connected in horizontally disposed rotating shaft, and diclinic support is triangular in shape with rotating shaft, and wheel bearing is arranged
At the both ends of rotating shaft, wheel is set in outside wheel bearing.
Wherein, the opening of the suspension hook is provided with the safe bolt that can clasp suspension hook.
Wherein, the end set of the grip part has grip component, and grip component includes flexible connecting rod and two handrails, stretched
Contracting connecting rod sets perpendicular to balancing pole and is fixedly connected on the end of grip part, and two handrails are fixedly connected on flexible connecting rod
Both ends.
Wherein, the flexible connecting rod includes hollow mobile jib and slide bar, and mobile jib is set perpendicular to balancing pole and fixed company
The end of grip part is connected on, the both ends punching of mobile jib has through hole;Two sliding bars are set in inside mobile jib both ends, if there is punching on slide bar
Dry connecting hole, latch fix the relative position of mobile jib and slide bar through through hole with connecting hole, and two handrails are respectively fixedly connected with two
The outer end of slide bar.
The utility model has the advantages that:
The device is easy to operate, can one or more people operated kerbstone lifted and unloaded, can carry out short
Transport kerbstone in distance field, it is finely adjusted after can also being laid to kerbstone, reduces the unnecessary of material in installation process and break
Damage, so as to lift kerbstone work progress progress and quality.
The stone fixture of the device and stone suspender mating reaction, stone fixture clamping kerbstone, stone suspender lifting road
Kerb, after kerbstone reaches appointed place and adjusts good position, the steel wire rope of stone suspender can be first dismantled, then puts down curb
Stone, stone fixture unclamp kerbstone automatically, eliminate after original device kerbstone is installed in place, and could dismantle the fiber crops of steel wire rope
It is tired.In addition, stone suspender can play dual safety effect, in the case of the clamping failure of stone fixture, kerbstone is prevented
Suddenly fall.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is the structural representation of stone fixture of the present utility model;
Fig. 3 is the structural representation of stone suspender of the present utility model;
Fig. 4 is the structural representation of grip component of the present utility model.
Description of reference numerals:
1st, balancing pole;11st, lifting portion;12nd, grip part;2nd, moving assembly;21st, diagonal brace;22nd, rotating shaft;23rd, wheel bearing;24、
Wheel;31st, suspension hook;311st, safe bolt;32nd, stone fixture;321st, the first clamping jaw;322nd, the second clamping jaw;323rd, clamping plate;
3231st, steel plate layer;3232nd, frictional layer;324th, first connecting rod;325th, chain sling;326th, suspension ring;327th, second connecting rod;328th, fixture block;
329th, grab;33rd, stone suspender;331st, clip;332nd, steel wire rope;4th, grip component;41st, flexible connecting rod;411st, mobile jib;
412nd, slide bar;42nd, handrail.
Embodiment
The utility model is described in further details below in conjunction with the drawings and specific embodiments:
Referring to Fig. 1 to Fig. 4, kerbstone installation auxiliary device, including balancing pole 1, moving assembly 2, hanging component and gripping
Component 4.
The moving assembly 2 is fixedly connected on the lower section of balancing pole 1, the moving assembly 2 include diclinic support 21, rotating shaft 22,
Wheel bearing 23 and wheel 24;The upper end of diclinic support 21 is fixedly connected on the lower section at 2/7 to 1/2 place of balancing pole 1, and lower end, which is fixed, to be connected
It is connected in horizontally disposed rotating shaft 22, diclinic support 21 is triangular in shape with rotating shaft 22, and diclinic supports 21 upper ends and is fixedly connected with balancing pole 1
Place forms a fulcrum, and the fulcrum divides balancing pole 1 for lifting portion 11(Length between the end of balancing pole 1 and fulcrum is shorter
Part)With grip part 12(The longer part of length between the end of balancing pole 1 and fulcrum), can be light using lever principle
The lifting kerbstone of pine.Wheel bearing 23 is set in the both ends of rotating shaft 22, and wheel 24 is set in outside wheel bearing 23.In the present embodiment,
The six width formula wheels that the wheel 24 is used using Manual hand-push car, tire is using the hard tire solid wheel for exempting from inflation.
The hanging component is arranged on the end in lifting portion 11;The hanging component includes suspension hook 31, the and of stone fixture 32
Stone suspender 33.
The upper end of the suspension hook 31 is rotatably connected on the end in lifting portion 11, and the opening of suspension hook 31 is provided with to clasp and hung
The safe bolt 311 of hook 31, prevent the device in suspension hook 31 from deviating from.
The stone fixture 32 includes first clamping jaw 321 and the second clamping jaw 322 of " L " type, the first clamping jaw 321 and the second folder
The middle part of pawl 322 is hinged by a hinge, and the medial surface of the first clamping jaw 321 and the bottom of the second clamping jaw 322 is provided with clamping plate
323, clamping plate 323 includes the steel plate layer 3231 being fixedly connected on clamping jaw and the frictional layer being fixedly connected in steel plate layer 3231
3232, in the present embodiment, the frictional layer 3232 is the rough rubber layer in outer surface.The upper end and one of first clamping jaw 321
The lower end of first connecting rod 324 is hinged, and the upper end of first connecting rod 324 is fixedly connected with the lower end of chain sling 325, and the upper end of chain sling 325 is consolidated
Surely the suspension ring 326 hung in suspension hook 31 are connected with;The upper end of second clamping jaw 322 and the lower end of a second connecting rod 327 are hinged, and second
The upper end of connecting rod 327 is hinged on the middle part of first connecting rod 324.Preferably, it is provided with the first clamping jaw 321 and the second clamping jaw 322
Limit the locking system of two clamping jaw relative motions, in the present embodiment, the locking system includes fixture block 328 and grab 329, described
Fixture block 328 is arranged in the outer side edges of the first clamping jaw 321, and the upper end of grab 329 is hinged on the second clamping jaw 322, lower end have with
The hook portion that fixture block 328 coordinates.
The stone suspender 33 includes clip 331 and steel wire rope 332;The clip 331 is hexagon single clip button 331, folder
The top of button 331 has a retainer ring coordinated with suspension hook 31, and steel wire rope 332, which is wound on clip 331, forms annular, steel wire rope
332 are used to be inserted in kerbstone, play a part of lifting in the transportation of kerbstone and prevent kerbstone from falling.
The grip component 4 is arranged on the end of the grip part 12 of balancing pole 1;The grip component 4 includes flexible connecting rod
41 and two handrails 42, the flexible connecting rod 41 include hollow mobile jib 411 and slide bar 412, the mobile jib 411 is perpendicular to balance
Bar 1 sets and is fixedly connected on the end of the grip part 12 of balancing pole 1, and the both ends punching of mobile jib 411 has through hole;Two slide bars 412 slide
It is set in inside the both ends of mobile jib 411, being rushed on slide bar 412 there are some connecting holes, and latch fixes mobile jib 411 through through hole and connecting hole
With the relative position of slide bar 412, two handrails 42 are respectively fixedly connected with the outer end of two slide bars 412.During one man operation, to mobile jib
Latch fixation mobile jib 411 is inserted in 411 after the slide bar 412 of Slideslip two and the position of slide bar 412 can one man operation;Two people operate
When, to the outer slide bar 412 of Slideslip two of mobile jib 411 after insert latch fix the position of mobile jib 411 and slide bar 412 can be same by two people
When operate.
The application method of said apparatus is as follows:
Regulation slide bar 412 is fixed with inserting latch after the relative position of mobile jib 411, is gripped handrail 42 and is lifted balancing pole 1
Grip part 12 so that the lifting portion 11 of balancing pole 1, which is displaced downwardly to stone fixture 32, can get at kerbstone, make the of stone fixture 32
One clamping jaw 321 and the second clamping jaw 322 clamp kerbstone, push grip part 12 and above carry so that chain sling 325 drives the He of first connecting rod 324
Second connecting rod 327 links so that the first clamping jaw 321 and the second clamping jaw 322 tightly clamp the medium position of kerbstone, grab 329
The clamping jaw of 328 locking of fixture block two is blocked, while the both ends of kerbstone are entangled with steel wire rope 332, continues to push grip part 12 and lifts road
Kerb transports kerbstone to after specified location, lifts grip part 12 and tentatively transfers kerbstone, when kerbstone is soon close to installation bottom surface
When, after the angle that kerbstone is adjusted by rotating suspension hook 31, steel wire rope 332 is first dismantled, then transfers kerbstone to ground,
Stone fixture 32 unclamps kerbstone automatically.
Specific embodiment of the present utility model is the foregoing is only, not thereby limits patent model of the present utility model
Enclose, every equivalent structure transformation made using the utility model specification and accompanying drawing content, or be directly or indirectly used in it
The technical field of his correlation, is similarly included in scope of patent protection of the present utility model.
Claims (9)
1. kerbstone installation auxiliary device, it is characterised in that:Including balancing pole(1), moving assembly(2)And hanging component;Balance
Bar(1)Upper 2/7 to 1/2 place is some fulcrum, balancing pole(1)It is divided into lifting portion by boundary of fulcrum(11)And grip part(12),
Moving assembly(2)It is fixedly connected on balancing pole(1)The lower section of fulcrum be used for shifting balance bar(1);Hanging component, which is arranged on, to be hung
Dress portion(11)End, hanging component includes suspension hook(31)With hang over suspension hook(31)The stone fixture of interior clamping kerbstone(32)
With the stone suspender of lifting kerbstone(33), suspension hook(31)Upper end be rotatably connected on lifting portion(11)End, stone suspender
(33)Including clip(331)And steel wire rope(332), clip(331)Top there is one and suspension hook(31)The retainer ring of cooperation, steel
Cord(332)It is wound on clip(331)It is upper to form annular to be inserted in kerbstone.
2. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The stone fixture(32)Including
One clamping jaw(321)With the second clamping jaw(322), the first clamping jaw(321)With the second clamping jaw(322)Middle part be hinged by a hinge,
First clamping jaw(321)With the second clamping jaw(322)The medial surface of bottom is provided with clamping plate(323), the first clamping jaw(321)Upper end
With a first connecting rod(324)Lower end be hinged, first connecting rod(324)Upper end pass through chain sling(325)And suspension ring(326)Hang over and hang
Hook(31)It is interior;Second clamping jaw(322)Upper end and a second connecting rod(327)Lower end be hinged, second connecting rod(327)Upper end hinge
It is connected on first connecting rod(324)Middle part.
3. kerbstone installation auxiliary device according to claim 2, it is characterised in that:First clamping jaw(321)With
Two clamping jaws(322)The upper locking system that restricted two clamping jaws relative motion is set.
4. kerbstone installation auxiliary device according to claim 3, it is characterised in that:The locking system includes fixture block
(328)And grab(329), fixture block(328)It is arranged on the first clamping jaw(321)Outer side edges on, grab(329)Upper end is hinged on
Two clamping jaws(322)On, lower end has and fixture block(328)The hook portion of cooperation.
5. kerbstone installation auxiliary device according to claim 2, it is characterised in that:The clamping plate(323)Including fixation
The steel plate layer being connected on clamping jaw(3231)Be fixedly connected on steel plate layer(3231)On frictional layer(3232).
6. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The moving assembly(2)Including double
Diagonal brace(21), rotating shaft(22), wheel bearing(23)And wheel(24), diclinic support(21)Upper end be fixedly connected on balancing pole(1)'s
At fulcrum, lower end is fixedly connected on horizontally disposed rotating shaft(22)On, diclinic support(21)With rotating shaft(22)It is triangular in shape, wheel bearing
(23)It is set in rotating shaft(22)Both ends, wheel(24)It is set in wheel bearing(23)Outside.
7. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The suspension hook(31)Opening set
Suspension hook can be clasped by being equipped with(31)Safe bolt(311).
8. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The grip part(12)End set
It is equipped with grip component(4), grip component(4)Including connecting rod of stretching(41)With two handrails(42), connecting rod of stretching(41)Vertically
In balancing pole(1)Set and be fixedly connected on grip part(12)End, two handrails(42)It is fixedly connected on flexible connecting rod
(41)Both ends.
9. kerbstone installation auxiliary device according to claim 8, it is characterised in that:The flexible connecting rod(41)Including
Hollow mobile jib(411)And slide bar(412), mobile jib(411)Perpendicular to balancing pole(1)Set and be fixedly connected on grip part(12)
End, mobile jib(411)Both ends punching have through hole;Two slide bars(412)Be slidably located in mobile jib(411)Inside both ends, slide bar
(412)Upper punching has some connecting holes, and latch fixes mobile jib through through hole and connecting hole(411)And slide bar(412)Relative position,
Two handrails(42)It is respectively fixedly connected with two slide bars(412)Outer end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720864368.1U CN206901724U (en) | 2017-07-17 | 2017-07-17 | Kerbstone installation auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720864368.1U CN206901724U (en) | 2017-07-17 | 2017-07-17 | Kerbstone installation auxiliary device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206901724U true CN206901724U (en) | 2018-01-19 |
Family
ID=61313310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720864368.1U Active CN206901724U (en) | 2017-07-17 | 2017-07-17 | Kerbstone installation auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206901724U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024294A (en) * | 2018-08-21 | 2018-12-18 | 新疆北新路桥集团股份有限公司 | Tabular component installs vehicle and tabular component construction |
CN109763410A (en) * | 2019-03-18 | 2019-05-17 | 中交一公局海威工程建设有限公司 | Curve control device |
CN110697639A (en) * | 2019-08-26 | 2020-01-17 | 河北华丰能源科技发展有限公司 | Device for stably moving heavy structure |
CN113336152A (en) * | 2021-05-13 | 2021-09-03 | 中国建筑第二工程局有限公司 | Lever car for carrying and installing stone |
-
2017
- 2017-07-17 CN CN201720864368.1U patent/CN206901724U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024294A (en) * | 2018-08-21 | 2018-12-18 | 新疆北新路桥集团股份有限公司 | Tabular component installs vehicle and tabular component construction |
CN109763410A (en) * | 2019-03-18 | 2019-05-17 | 中交一公局海威工程建设有限公司 | Curve control device |
CN109763410B (en) * | 2019-03-18 | 2023-09-19 | 中交一公局海威工程建设有限公司 | Curve line type control device |
CN110697639A (en) * | 2019-08-26 | 2020-01-17 | 河北华丰能源科技发展有限公司 | Device for stably moving heavy structure |
CN113336152A (en) * | 2021-05-13 | 2021-09-03 | 中国建筑第二工程局有限公司 | Lever car for carrying and installing stone |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206901724U (en) | Kerbstone installation auxiliary device | |
CN206494696U (en) | A kind of portable lever type manhole cover opening device | |
CN106393026A (en) | Tool kit for electrician | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN106823190B (en) | Inverted L-shaped deep well rescue device and method | |
CN206052477U (en) | Dismantling of track device | |
CN111348540A (en) | Curb overhead hoist | |
CN207312948U (en) | A kind of material transportation bucket for building | |
CN206288881U (en) | A kind of tower crane counter-jib dumping device | |
CN206956559U (en) | Quick peace for guardrail template in Bridge guardrail concrete pouring construction tears equipment open | |
CN213676712U (en) | Large-scale prefabricated section handling tool | |
CN214935290U (en) | Hoisting structure for highway construction | |
CN211920618U (en) | Curb overhead hoist | |
CN210012558U (en) | Curb hoist and mount handling tool car | |
CN211139355U (en) | Stone strip transport driving | |
CN208617222U (en) | A kind of digging machine upright bar special hanger | |
CN208071186U (en) | A kind of device for the mapping of administrative division boundary line | |
CN209940317U (en) | Marble mounting hanger | |
CN205901178U (en) | Concrete pole tower overhead earth wire hoisting device | |
CN205662284U (en) | Two poles become platform ground jack | |
CN205954146U (en) | Silicon wafer stick hoisting device | |
CN214456578U (en) | Hydraulic manual multifunctional transfer vehicle for pump station | |
CN215558848U (en) | Simple equipment for hoisting pipe trench cover plate | |
CN203095269U (en) | Cable body pay-off rack | |
CN217578254U (en) | Road flat stone hanging and rotating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |