CN206901724U - Kerbstone installation auxiliary device - Google Patents

Kerbstone installation auxiliary device Download PDF

Info

Publication number
CN206901724U
CN206901724U CN201720864368.1U CN201720864368U CN206901724U CN 206901724 U CN206901724 U CN 206901724U CN 201720864368 U CN201720864368 U CN 201720864368U CN 206901724 U CN206901724 U CN 206901724U
Authority
CN
China
Prior art keywords
kerbstone
clamping jaw
connecting rod
balancing pole
auxiliary device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720864368.1U
Other languages
Chinese (zh)
Inventor
曾元青
修兴洲
许盛淮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN201720864368.1U priority Critical patent/CN206901724U/en
Application granted granted Critical
Publication of CN206901724U publication Critical patent/CN206901724U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

Road construction equipment technical field, more particularly to a kind of kerbstone installation auxiliary device are the utility model is related to, it includes balancing pole, moving assembly and hanging component;2/7 to 1/2 place is some fulcrum on balancing pole, and balancing pole is divided into lifting portion and grip part by boundary of fulcrum, and the lower section that moving assembly is fixedly connected on the fulcrum of balancing pole is used for shifting balance bar;Hanging component is arranged on the end in lifting portion, hanging component includes suspension hook and hangs over the stone fixture of clamping kerbstone and the stone suspender of lifting kerbstone in suspension hook, the upper end of suspension hook is rotatably connected on the end in lifting portion, stone suspender includes clip and steel wire rope, the top of clip has a retainer ring coordinated with suspension hook, and steel wire rope, which is wound on clip, forms annular to be inserted in kerbstone.The device reduces the unnecessary breakage of material in installation process, so as to lift kerbstone work progress progress and quality.

Description

Kerbstone installation auxiliary device
Technical field
It the utility model is related to road construction equipment technical field, more particularly to a kind of kerbstone installation auxiliary device.
Background technology
At present, country's development at full speed, the premise of development is the coast is clear, but the construction of road will increasingly specification Change.According to the road in roads at different levels or even garden, work progress must standardize, wherein, runway and pavement or have not There must be obvious line of demarcation with using function, the line of demarcation generally use kerbstone is divided, and the construction of kerbstone is determined Determine road construction progress and quality.The material generally use lithotome of kerbstone, by taking standard size kerbstone as an example (990mm*150mm*150mm)Weight up to 60 kilograms, it is not only time-consuming in installation process, take it is artificial, and in field it is artificial carry it is easy Damage takes material, and the quality and progress to kerbstone installation process cause strong influence, and not up to preferable economic benefit.
Utility model content
In order to solve the above problems, the purpose of this utility model is to provide a kind of kerbstone installation auxiliary device, the dress Put it is easy to operate, can one or more people operated kerbstone lifted and unloaded, short distance can be carried out and left the theatre interior transport Kerbstone, it is finely adjusted after can also being laid to kerbstone, reduces the unnecessary breakage of material in installation process, so as to lift road Kerb work progress progress and quality.
To achieve the above object, the utility model uses following technical scheme:
Kerbstone installation auxiliary device, including balancing pole, moving assembly and hanging component;2/7 to 1/2 place on balancing pole It is some fulcrum, balancing pole is divided into lifting portion and grip part by boundary of fulcrum, and moving assembly is fixedly connected on the fulcrum of balancing pole Lower section be used for shifting balance bar;Hanging component is arranged on the end in lifting portion, and hanging component includes suspension hook and hung in suspension hook Clamping kerbstone stone fixture and lifting kerbstone stone suspender, the upper end of suspension hook is rotatably connected on the end in lifting portion Portion, stone suspender include clip and steel wire rope, and the top of clip has a retainer ring coordinated with suspension hook, and steel wire rope is wound on clip It is upper to form annular to be inserted in kerbstone.
Wherein, the stone fixture includes the first clamping jaw and the second clamping jaw, passes through in the middle part of the first clamping jaw and the second clamping jaw One hinge is hinged, and the medial surface of the first clamping jaw and the second clamping jaw bottom is provided with clamping plate, the upper end of the first clamping jaw and one first The lower end of connecting rod is hinged, and the upper end of first connecting rod is hung in suspension hook by chain sling and suspension ring;The upper end of second clamping jaw and one second The lower end of connecting rod is hinged, and the upper end of second connecting rod is hinged on the middle part of first connecting rod.
Wherein, the locking system of restricted two clamping jaws relative motion is set on first clamping jaw and the second clamping jaw.
Wherein, the locking system includes fixture block and grab, and fixture block is arranged in the outer side edges of the first clamping jaw, grab upper end It is hinged on the second clamping jaw, lower end has the hook portion coordinated with fixture block.
Wherein, the clamping plate includes the steel plate layer being fixedly connected on clamping jaw and the friction being fixedly connected in steel plate layer Layer.
Wherein, the moving assembly includes diclinic support, rotating shaft, wheel bearing and wheel, and the upper end of diclinic support is fixedly connected on At the fulcrum of balancing pole, lower end is fixedly connected in horizontally disposed rotating shaft, and diclinic support is triangular in shape with rotating shaft, and wheel bearing is arranged At the both ends of rotating shaft, wheel is set in outside wheel bearing.
Wherein, the opening of the suspension hook is provided with the safe bolt that can clasp suspension hook.
Wherein, the end set of the grip part has grip component, and grip component includes flexible connecting rod and two handrails, stretched Contracting connecting rod sets perpendicular to balancing pole and is fixedly connected on the end of grip part, and two handrails are fixedly connected on flexible connecting rod Both ends.
Wherein, the flexible connecting rod includes hollow mobile jib and slide bar, and mobile jib is set perpendicular to balancing pole and fixed company The end of grip part is connected on, the both ends punching of mobile jib has through hole;Two sliding bars are set in inside mobile jib both ends, if there is punching on slide bar Dry connecting hole, latch fix the relative position of mobile jib and slide bar through through hole with connecting hole, and two handrails are respectively fixedly connected with two The outer end of slide bar.
The utility model has the advantages that:
The device is easy to operate, can one or more people operated kerbstone lifted and unloaded, can carry out short Transport kerbstone in distance field, it is finely adjusted after can also being laid to kerbstone, reduces the unnecessary of material in installation process and break Damage, so as to lift kerbstone work progress progress and quality.
The stone fixture of the device and stone suspender mating reaction, stone fixture clamping kerbstone, stone suspender lifting road Kerb, after kerbstone reaches appointed place and adjusts good position, the steel wire rope of stone suspender can be first dismantled, then puts down curb Stone, stone fixture unclamp kerbstone automatically, eliminate after original device kerbstone is installed in place, and could dismantle the fiber crops of steel wire rope It is tired.In addition, stone suspender can play dual safety effect, in the case of the clamping failure of stone fixture, kerbstone is prevented Suddenly fall.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is the structural representation of stone fixture of the present utility model;
Fig. 3 is the structural representation of stone suspender of the present utility model;
Fig. 4 is the structural representation of grip component of the present utility model.
Description of reference numerals:
1st, balancing pole;11st, lifting portion;12nd, grip part;2nd, moving assembly;21st, diagonal brace;22nd, rotating shaft;23rd, wheel bearing;24、 Wheel;31st, suspension hook;311st, safe bolt;32nd, stone fixture;321st, the first clamping jaw;322nd, the second clamping jaw;323rd, clamping plate; 3231st, steel plate layer;3232nd, frictional layer;324th, first connecting rod;325th, chain sling;326th, suspension ring;327th, second connecting rod;328th, fixture block; 329th, grab;33rd, stone suspender;331st, clip;332nd, steel wire rope;4th, grip component;41st, flexible connecting rod;411st, mobile jib; 412nd, slide bar;42nd, handrail.
Embodiment
The utility model is described in further details below in conjunction with the drawings and specific embodiments:
Referring to Fig. 1 to Fig. 4, kerbstone installation auxiliary device, including balancing pole 1, moving assembly 2, hanging component and gripping Component 4.
The moving assembly 2 is fixedly connected on the lower section of balancing pole 1, the moving assembly 2 include diclinic support 21, rotating shaft 22, Wheel bearing 23 and wheel 24;The upper end of diclinic support 21 is fixedly connected on the lower section at 2/7 to 1/2 place of balancing pole 1, and lower end, which is fixed, to be connected It is connected in horizontally disposed rotating shaft 22, diclinic support 21 is triangular in shape with rotating shaft 22, and diclinic supports 21 upper ends and is fixedly connected with balancing pole 1 Place forms a fulcrum, and the fulcrum divides balancing pole 1 for lifting portion 11(Length between the end of balancing pole 1 and fulcrum is shorter Part)With grip part 12(The longer part of length between the end of balancing pole 1 and fulcrum), can be light using lever principle The lifting kerbstone of pine.Wheel bearing 23 is set in the both ends of rotating shaft 22, and wheel 24 is set in outside wheel bearing 23.In the present embodiment, The six width formula wheels that the wheel 24 is used using Manual hand-push car, tire is using the hard tire solid wheel for exempting from inflation.
The hanging component is arranged on the end in lifting portion 11;The hanging component includes suspension hook 31, the and of stone fixture 32 Stone suspender 33.
The upper end of the suspension hook 31 is rotatably connected on the end in lifting portion 11, and the opening of suspension hook 31 is provided with to clasp and hung The safe bolt 311 of hook 31, prevent the device in suspension hook 31 from deviating from.
The stone fixture 32 includes first clamping jaw 321 and the second clamping jaw 322 of " L " type, the first clamping jaw 321 and the second folder The middle part of pawl 322 is hinged by a hinge, and the medial surface of the first clamping jaw 321 and the bottom of the second clamping jaw 322 is provided with clamping plate 323, clamping plate 323 includes the steel plate layer 3231 being fixedly connected on clamping jaw and the frictional layer being fixedly connected in steel plate layer 3231 3232, in the present embodiment, the frictional layer 3232 is the rough rubber layer in outer surface.The upper end and one of first clamping jaw 321 The lower end of first connecting rod 324 is hinged, and the upper end of first connecting rod 324 is fixedly connected with the lower end of chain sling 325, and the upper end of chain sling 325 is consolidated Surely the suspension ring 326 hung in suspension hook 31 are connected with;The upper end of second clamping jaw 322 and the lower end of a second connecting rod 327 are hinged, and second The upper end of connecting rod 327 is hinged on the middle part of first connecting rod 324.Preferably, it is provided with the first clamping jaw 321 and the second clamping jaw 322 Limit the locking system of two clamping jaw relative motions, in the present embodiment, the locking system includes fixture block 328 and grab 329, described Fixture block 328 is arranged in the outer side edges of the first clamping jaw 321, and the upper end of grab 329 is hinged on the second clamping jaw 322, lower end have with The hook portion that fixture block 328 coordinates.
The stone suspender 33 includes clip 331 and steel wire rope 332;The clip 331 is hexagon single clip button 331, folder The top of button 331 has a retainer ring coordinated with suspension hook 31, and steel wire rope 332, which is wound on clip 331, forms annular, steel wire rope 332 are used to be inserted in kerbstone, play a part of lifting in the transportation of kerbstone and prevent kerbstone from falling.
The grip component 4 is arranged on the end of the grip part 12 of balancing pole 1;The grip component 4 includes flexible connecting rod 41 and two handrails 42, the flexible connecting rod 41 include hollow mobile jib 411 and slide bar 412, the mobile jib 411 is perpendicular to balance Bar 1 sets and is fixedly connected on the end of the grip part 12 of balancing pole 1, and the both ends punching of mobile jib 411 has through hole;Two slide bars 412 slide It is set in inside the both ends of mobile jib 411, being rushed on slide bar 412 there are some connecting holes, and latch fixes mobile jib 411 through through hole and connecting hole With the relative position of slide bar 412, two handrails 42 are respectively fixedly connected with the outer end of two slide bars 412.During one man operation, to mobile jib Latch fixation mobile jib 411 is inserted in 411 after the slide bar 412 of Slideslip two and the position of slide bar 412 can one man operation;Two people operate When, to the outer slide bar 412 of Slideslip two of mobile jib 411 after insert latch fix the position of mobile jib 411 and slide bar 412 can be same by two people When operate.
The application method of said apparatus is as follows:
Regulation slide bar 412 is fixed with inserting latch after the relative position of mobile jib 411, is gripped handrail 42 and is lifted balancing pole 1 Grip part 12 so that the lifting portion 11 of balancing pole 1, which is displaced downwardly to stone fixture 32, can get at kerbstone, make the of stone fixture 32 One clamping jaw 321 and the second clamping jaw 322 clamp kerbstone, push grip part 12 and above carry so that chain sling 325 drives the He of first connecting rod 324 Second connecting rod 327 links so that the first clamping jaw 321 and the second clamping jaw 322 tightly clamp the medium position of kerbstone, grab 329 The clamping jaw of 328 locking of fixture block two is blocked, while the both ends of kerbstone are entangled with steel wire rope 332, continues to push grip part 12 and lifts road Kerb transports kerbstone to after specified location, lifts grip part 12 and tentatively transfers kerbstone, when kerbstone is soon close to installation bottom surface When, after the angle that kerbstone is adjusted by rotating suspension hook 31, steel wire rope 332 is first dismantled, then transfers kerbstone to ground, Stone fixture 32 unclamps kerbstone automatically.
Specific embodiment of the present utility model is the foregoing is only, not thereby limits patent model of the present utility model Enclose, every equivalent structure transformation made using the utility model specification and accompanying drawing content, or be directly or indirectly used in it The technical field of his correlation, is similarly included in scope of patent protection of the present utility model.

Claims (9)

1. kerbstone installation auxiliary device, it is characterised in that:Including balancing pole(1), moving assembly(2)And hanging component;Balance Bar(1)Upper 2/7 to 1/2 place is some fulcrum, balancing pole(1)It is divided into lifting portion by boundary of fulcrum(11)And grip part(12), Moving assembly(2)It is fixedly connected on balancing pole(1)The lower section of fulcrum be used for shifting balance bar(1);Hanging component, which is arranged on, to be hung Dress portion(11)End, hanging component includes suspension hook(31)With hang over suspension hook(31)The stone fixture of interior clamping kerbstone(32) With the stone suspender of lifting kerbstone(33), suspension hook(31)Upper end be rotatably connected on lifting portion(11)End, stone suspender (33)Including clip(331)And steel wire rope(332), clip(331)Top there is one and suspension hook(31)The retainer ring of cooperation, steel Cord(332)It is wound on clip(331)It is upper to form annular to be inserted in kerbstone.
2. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The stone fixture(32)Including One clamping jaw(321)With the second clamping jaw(322), the first clamping jaw(321)With the second clamping jaw(322)Middle part be hinged by a hinge, First clamping jaw(321)With the second clamping jaw(322)The medial surface of bottom is provided with clamping plate(323), the first clamping jaw(321)Upper end With a first connecting rod(324)Lower end be hinged, first connecting rod(324)Upper end pass through chain sling(325)And suspension ring(326)Hang over and hang Hook(31)It is interior;Second clamping jaw(322)Upper end and a second connecting rod(327)Lower end be hinged, second connecting rod(327)Upper end hinge It is connected on first connecting rod(324)Middle part.
3. kerbstone installation auxiliary device according to claim 2, it is characterised in that:First clamping jaw(321)With Two clamping jaws(322)The upper locking system that restricted two clamping jaws relative motion is set.
4. kerbstone installation auxiliary device according to claim 3, it is characterised in that:The locking system includes fixture block (328)And grab(329), fixture block(328)It is arranged on the first clamping jaw(321)Outer side edges on, grab(329)Upper end is hinged on Two clamping jaws(322)On, lower end has and fixture block(328)The hook portion of cooperation.
5. kerbstone installation auxiliary device according to claim 2, it is characterised in that:The clamping plate(323)Including fixation The steel plate layer being connected on clamping jaw(3231)Be fixedly connected on steel plate layer(3231)On frictional layer(3232).
6. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The moving assembly(2)Including double Diagonal brace(21), rotating shaft(22), wheel bearing(23)And wheel(24), diclinic support(21)Upper end be fixedly connected on balancing pole(1)'s At fulcrum, lower end is fixedly connected on horizontally disposed rotating shaft(22)On, diclinic support(21)With rotating shaft(22)It is triangular in shape, wheel bearing (23)It is set in rotating shaft(22)Both ends, wheel(24)It is set in wheel bearing(23)Outside.
7. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The suspension hook(31)Opening set Suspension hook can be clasped by being equipped with(31)Safe bolt(311).
8. kerbstone installation auxiliary device according to claim 1, it is characterised in that:The grip part(12)End set It is equipped with grip component(4), grip component(4)Including connecting rod of stretching(41)With two handrails(42), connecting rod of stretching(41)Vertically In balancing pole(1)Set and be fixedly connected on grip part(12)End, two handrails(42)It is fixedly connected on flexible connecting rod (41)Both ends.
9. kerbstone installation auxiliary device according to claim 8, it is characterised in that:The flexible connecting rod(41)Including Hollow mobile jib(411)And slide bar(412), mobile jib(411)Perpendicular to balancing pole(1)Set and be fixedly connected on grip part(12) End, mobile jib(411)Both ends punching have through hole;Two slide bars(412)Be slidably located in mobile jib(411)Inside both ends, slide bar (412)Upper punching has some connecting holes, and latch fixes mobile jib through through hole and connecting hole(411)And slide bar(412)Relative position, Two handrails(42)It is respectively fixedly connected with two slide bars(412)Outer end.
CN201720864368.1U 2017-07-17 2017-07-17 Kerbstone installation auxiliary device Active CN206901724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720864368.1U CN206901724U (en) 2017-07-17 2017-07-17 Kerbstone installation auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720864368.1U CN206901724U (en) 2017-07-17 2017-07-17 Kerbstone installation auxiliary device

Publications (1)

Publication Number Publication Date
CN206901724U true CN206901724U (en) 2018-01-19

Family

ID=61313310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720864368.1U Active CN206901724U (en) 2017-07-17 2017-07-17 Kerbstone installation auxiliary device

Country Status (1)

Country Link
CN (1) CN206901724U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024294A (en) * 2018-08-21 2018-12-18 新疆北新路桥集团股份有限公司 Tabular component installs vehicle and tabular component construction
CN109763410A (en) * 2019-03-18 2019-05-17 中交一公局海威工程建设有限公司 Curve control device
CN110697639A (en) * 2019-08-26 2020-01-17 河北华丰能源科技发展有限公司 Device for stably moving heavy structure
CN113336152A (en) * 2021-05-13 2021-09-03 中国建筑第二工程局有限公司 Lever car for carrying and installing stone

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024294A (en) * 2018-08-21 2018-12-18 新疆北新路桥集团股份有限公司 Tabular component installs vehicle and tabular component construction
CN109763410A (en) * 2019-03-18 2019-05-17 中交一公局海威工程建设有限公司 Curve control device
CN109763410B (en) * 2019-03-18 2023-09-19 中交一公局海威工程建设有限公司 Curve line type control device
CN110697639A (en) * 2019-08-26 2020-01-17 河北华丰能源科技发展有限公司 Device for stably moving heavy structure
CN113336152A (en) * 2021-05-13 2021-09-03 中国建筑第二工程局有限公司 Lever car for carrying and installing stone

Similar Documents

Publication Publication Date Title
CN206901724U (en) Kerbstone installation auxiliary device
CN206494696U (en) A kind of portable lever type manhole cover opening device
CN106393026A (en) Tool kit for electrician
CN203128099U (en) Slipping type pipeline lifting device
CN106823190B (en) Inverted L-shaped deep well rescue device and method
CN206052477U (en) Dismantling of track device
CN111348540A (en) Curb overhead hoist
CN207312948U (en) A kind of material transportation bucket for building
CN206288881U (en) A kind of tower crane counter-jib dumping device
CN206956559U (en) Quick peace for guardrail template in Bridge guardrail concrete pouring construction tears equipment open
CN213676712U (en) Large-scale prefabricated section handling tool
CN214935290U (en) Hoisting structure for highway construction
CN211920618U (en) Curb overhead hoist
CN210012558U (en) Curb hoist and mount handling tool car
CN211139355U (en) Stone strip transport driving
CN208617222U (en) A kind of digging machine upright bar special hanger
CN208071186U (en) A kind of device for the mapping of administrative division boundary line
CN209940317U (en) Marble mounting hanger
CN205901178U (en) Concrete pole tower overhead earth wire hoisting device
CN205662284U (en) Two poles become platform ground jack
CN205954146U (en) Silicon wafer stick hoisting device
CN214456578U (en) Hydraulic manual multifunctional transfer vehicle for pump station
CN215558848U (en) Simple equipment for hoisting pipe trench cover plate
CN203095269U (en) Cable body pay-off rack
CN217578254U (en) Road flat stone hanging and rotating device