CN206889833U - A kind of heating pipe installation platform - Google Patents

A kind of heating pipe installation platform Download PDF

Info

Publication number
CN206889833U
CN206889833U CN201720829721.2U CN201720829721U CN206889833U CN 206889833 U CN206889833 U CN 206889833U CN 201720829721 U CN201720829721 U CN 201720829721U CN 206889833 U CN206889833 U CN 206889833U
Authority
CN
China
Prior art keywords
mounting groove
roller
assemblied
chute
screw mandrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720829721.2U
Other languages
Chinese (zh)
Inventor
李中山
张海斌
宫斯平
王平
张鹏翔
高宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Installation & Construction Co Ltd
Original Assignee
Qingdao Installation & Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Installation & Construction Co Ltd filed Critical Qingdao Installation & Construction Co Ltd
Priority to CN201720829721.2U priority Critical patent/CN206889833U/en
Application granted granted Critical
Publication of CN206889833U publication Critical patent/CN206889833U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model provides a kind of heating pipe installation platform,Including rotating disk,Screw mandrel,Arc groove two,Movable block,Ball nut pair,Mounting groove one,Roller one,Mounting groove two and roller two,The screw mandrel right-hand member is assemblied in right side inside chute,The screw mandrel left end passes through left side inside chute,And it is arranged on rotating disk right side,The ball nut pair is assemblied in screw mandrel annular side,The arc groove two is opened in movable block upper surface,The design achieves the purpose of the convenient regulation pipeline spacing of the utility model,The mounting groove one is opened on rear side of chute,The mounting groove two is opened on front side of chute,The roller one is assemblied in mounting groove one,The roller two is assemblied in mounting groove two,It is larger that the design solves original construction platform for pipe installation frictional force,Cause to adjust the problem of pipeline location is wasted time and energy,The utility model is easy to use,It is simple to operate,Stability is good,Reliability is high.

Description

A kind of heating pipe installation platform
Technical field
The utility model is a kind of heating pipe installation platform, belongs to pipe installation technology field.
Background technology
Pipeline be with pipe, pipe connector and valve etc. be connected into be used for convey gas, liquid or with solid particle Fluid device.At present, in building field, it usually needs installation heating pipe, because the caliber of section of tubing is big, weight Greatly, in work progress there is larger difficulty in workmen, and construction intensity is higher, it is necessary to which multiple staff pull together to complete The installation of pipeline.
In the prior art, still there is many weak points, its structure to fix for construction platform for pipe installation, can not adjust The distance between two pipelines, cause pipeline docking difficulty big, and docking is moved using manpower and easily occurs to squeeze to hinder accident, simultaneously Existing construction platform for pipe installation frictional force is larger, causes regulation pipeline location to waste time and energy, so being badly in need of a kind of heating pipe Pipeline installation construction platform solves above-mentioned produced problem.
The content of the invention
In view of the deficienciess of the prior art, the utility model purpose is to provide a kind of heating pipe installation platform, To solve the problems mentioned in the above background technology, the utility model is easy to use, simple to operate, and stability is good, and reliability is high.
To achieve these goals, the utility model is to realize by the following technical solutions:A kind of heating pipe peace Construction platform is filled, including apparatus main body, pipeline distance regulating mechanism and resistance reducing mechanism, described device main body include circular arc Groove one, fixed block, workbench and chute, the fixed block are arranged on the left of workbench upper surface, and the arc groove one opens up In fixed block upper surface, the chute is opened in workbench upper surface, the pipeline distance regulating mechanism include rotating disk, screw mandrel, Arc groove two, movable block, contiguous block and ball nut pair, the rotating disk are arranged on the left of workbench, the screw mandrel right-hand member dress Right side inside chute is fitted over, the screw mandrel left end is arranged on rotating disk right side, the ball through left side inside chute Pair of nut is assemblied in screw mandrel annular side, and the movable block is assemblied in chute upper surface, and the contiguous block upper end is fixed on work Motion block lower surface centre position, the contiguous block lower end are fixed in ball nut pair annular side, and the arc groove two opens up In movable block upper surface, the resistance reducing mechanism is assemblied in workbench upper surface, and the resistance reducing mechanism includes mounting groove First, roller one, mounting groove two and roller two, the mounting groove one are opened on rear side of chute, and the mounting groove two is opened in cunning On front side of groove, the roller one is assemblied in mounting groove one, and the roller two is assemblied in mounting groove two.
Further, the roller one and roller two are each equipped with more than three groups, and three groups of rollers one described above are equidistantly pacified In mounting groove one, three groups of rollers two described above are equidistantly mounted in mounting groove two.
Further, the roller one is assemblied in mounting groove one by rotating shaft, and the roller two is assemblied in by rotating shaft In mounting groove two.
Further, it is enclosed with foam-rubber cushion on the rotating disk.
Further, it is each equipped with slipmat in the arc groove one and arc groove two.
Further, the fixed block is identical with activity block specifications.
Further, the screw mandrel is arranged in chute by bearing.
The beneficial effects of the utility model:A kind of heating pipe installation platform of the present utility model, because this practicality is new Type with the addition of rotating disk, screw mandrel, arc groove two, movable block, contiguous block and ball nut pair, and the design solves original pipeline peace Dress construction platform structure is fixed, and can not adjust the distance between two pipelines, causes pipeline docking difficulty big, and removed using manpower Dynamic docking easily occurs to squeeze the problem of hindering accident, realizes the purpose of the convenient regulation pipeline spacing of the utility model, improves this The security of utility model.
Because the utility model with the addition of mounting groove one, roller one, mounting groove two and roller two, the design solves original Construction platform for pipe installation frictional force is larger, causes to adjust the problem of pipeline location is wasted time and energy, reduces in the utility model Frictional force between portion's part, reduce labor intensity of the present utility model.
Because the utility model with the addition of rotating shaft, the installation of roller one and roller two is easy in the design, separately with the addition of foam-rubber cushion, The design improves the comfort that the utility model uses, and separately with the addition of slipmat, and the design avoids the feelings that pipeline slides Condition, bearing is separately with the addition of, the installation of screw mandrel is easy in the design, and the utility model is easy to use, simple to operate, and stability is good, can By property height.
Brief description of the drawings
By reading the detailed description made with reference to the following drawings to non-limiting example, other spies of the present utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural representation of heating pipe installation platform of the utility model;
Fig. 2 is the structural representation of pipeline distance regulating mechanism in a kind of heating pipe installation platform of the utility model Figure;
Fig. 3 is the structural representation of resistance reducing mechanism in a kind of heating pipe installation platform of the utility model;
In figure:1- pipelines distance regulating mechanism, 2- resistances reducing mechanism, 3- arc grooves one, 4- fixed blocks, 5- workbench, 6- chutes, 11- rotating disks, 12- screw mandrels, 13- arc grooves two, 14- movable blocks, 15- contiguous blocks, 16- ball nuts are secondary, 21- installations Groove one, 22- rollers one, 23- mounting grooves two, 24- rollers two.
Embodiment
Technological means, creation characteristic, reached purpose and effect to realize the utility model are easy to understand, below With reference to embodiment, the utility model is expanded on further.
Fig. 1-Fig. 3 is referred to, the utility model provides a kind of technical scheme:A kind of heating pipe installation platform, bag Include apparatus main body, pipeline distance regulating mechanism 1 and resistance reducing mechanism 2, apparatus main body include arc groove 1, fixed block 4, Workbench 5 and chute 6, fixed block 4 are arranged on the left of the upper surface of workbench 5, and arc groove 1 is opened in the upper surface of fixed block 4, Chute 6 is opened in the upper surface of workbench 5.
Pipeline distance regulating mechanism 1 includes rotating disk 11, screw mandrel 12, arc groove 2 13, movable block 14, contiguous block 15 and rolling Pearl pair of nut 16, rotating disk 11 are arranged on the left side of workbench 5, and the right-hand member of screw mandrel 12 is assemblied in the inside right side of chute 6, the left end of screw mandrel 12 Through the inside left side of chute 6, and the right side of rotating disk 11 being arranged on, ball nut pair 16 is assemblied in the annular side of screw mandrel 12, Movable block 14 is assemblied in the upper surface of chute 6, and the upper end of contiguous block 15 is fixed on the lower surface centre position of movable block 14, under contiguous block 15 End is fixed in secondary 16 annular sides of ball nut, and arc groove 2 13 is opened in the upper surface of movable block 14, and the design solves original There is construction platform for pipe installation structure to fix, the distance between two pipelines can not be adjusted, cause pipeline docking difficulty big, and adopt Docking is moved with manpower easily to occur to squeeze the problem of hindering accident.
Resistance reducing mechanism 2 is assemblied in the upper surface of workbench 5, and resistance reducing mechanism 2 includes mounting groove 1, roller one 22nd, mounting groove 2 23 and roller 2 24, mounting groove 1 is opened in the rear side of chute 6, before mounting groove 2 23 is opened in chute 6 Side, roller 1 are assemblied in mounting groove 1, and roller 2 24 is assemblied in mounting groove 2 23, and the design solves original pipeline Installation platform frictional force is larger, causes to adjust the problem of pipeline location is wasted time and energy.
Roller 1 and roller 2 24 are each equipped with more than three groups, and three groups are equidistantly mounted on mounting groove one with upper roller 1 In 21, three groups are equidistantly mounted in mounting groove 2 23 with upper roller 2 24, and roller 1 is assemblied in mounting groove 1 by rotating shaft Interior, roller 2 24 is assemblied in mounting groove 2 23 by rotating shaft, and foam-rubber cushion, arc groove 1 and arc groove are enclosed with rotating disk 11 Slipmat is each equipped with 2 13, fixed block 4 is identical with the specification of movable block 14, and screw mandrel 12 is arranged in chute 6 by bearing.
Embodiment:In progress in use, being checked first by personnel the utility model, check whether and deposit In defect, it can not just carry out using if there is defect, now need to notify maintenance personal to be repaired, if do not deposited It can be carried out using if problem, in use, one end of pipeline is placed on the arc groove 1 of fixed block 4 by user of service It is interior, one end of another pipeline is placed in the upper end arc groove 2 13 of movable block 14, then user of service passes through 11 turns of rotating disk Dynamic screw mandrel 12, and then ball nut pair 16 is converted into moving along a straight line in the rotary motion of screw mandrel 12, and driven by contiguous block 15 Movable block 14 moves, and movable block 14 drives pipeline movement, so as to realize two purposes of the pipeline enclosure away from regulation, so as to improve pipe The installation effectiveness of road docking.
When movable block 14 moves in the upper surface of workbench 5, the movement of movable block 14 drives roller 1 in mounting groove 1 Interior rolling and drive roller 2 24 are rolled in mounting groove 2 23, and slip between movable block 14 and workbench 5 is rubbed with this Wiping is converted to rolling friction, so as to reduce the resistance in the moving process of movable block 14.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above, for For those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and without departing substantially from this In the case of the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the utility model is by institute Attached claim rather than described above limit, it is intended that will fall in the implication and scope of the equivalency of claim All changes are included in the utility model.Any reference in claim should not be considered as to the involved right of limitation It is required that.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (7)

1. a kind of heating pipe installation platform, including apparatus main body, pipeline distance regulating mechanism and resistance reducing mechanism, It is characterized in that:Described device main body includes arc groove one, fixed block, workbench and chute, and the fixed block is arranged on work Make on the left of platform upper surface, the arc groove one is opened in fixed block upper surface, and the chute is opened in workbench upper surface;
The pipeline distance regulating mechanism includes rotating disk, screw mandrel, arc groove two, movable block, contiguous block and ball nut pair, institute State rotating disk to be arranged on the left of workbench, the screw mandrel right-hand member is assemblied in right side inside chute, and the screw mandrel left end passes through chute Internal left side, and rotating disk right side is arranged on, the ball nut pair is assemblied in screw mandrel annular side, and the activity is packaged Chute upper surface is fitted over, the contiguous block upper end is fixed on movable block lower surface centre position, and the contiguous block lower end is fixed on In ball nut pair annular side, the arc groove two is opened in movable block upper surface;
The resistance reducing mechanism is assemblied in workbench upper surface, and the resistance reducing mechanism includes mounting groove one, roller one, peace Tankage two and roller two, the mounting groove one are opened on rear side of chute, and the mounting groove two is opened on front side of chute, the rolling Wheel one is assemblied in mounting groove one, and the roller two is assemblied in mounting groove two.
A kind of 2. heating pipe installation platform according to claim 1, it is characterised in that:The roller one and roller Two are each equipped with more than three groups, and three groups of rollers one described above are equidistantly mounted in mounting groove one, three groups of rollers two described above It is equidistantly mounted in mounting groove two.
A kind of 3. heating pipe installation platform according to claim 1, it is characterised in that:The roller one is by turning Axle is assemblied in mounting groove one, and the roller two is assemblied in mounting groove two by rotating shaft.
A kind of 4. heating pipe installation platform according to claim 1, it is characterised in that:It is enclosed with the rotating disk Foam-rubber cushion.
A kind of 5. heating pipe installation platform according to claim 1, it is characterised in that:The arc groove one and circle Slipmat is each equipped with arc groove two.
A kind of 6. heating pipe installation platform according to claim 1, it is characterised in that:The fixed block and activity Block specifications are identical.
A kind of 7. heating pipe installation platform according to claim 1, it is characterised in that:The screw mandrel passes through bearing In chute.
CN201720829721.2U 2017-07-11 2017-07-11 A kind of heating pipe installation platform Expired - Fee Related CN206889833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720829721.2U CN206889833U (en) 2017-07-11 2017-07-11 A kind of heating pipe installation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720829721.2U CN206889833U (en) 2017-07-11 2017-07-11 A kind of heating pipe installation platform

Publications (1)

Publication Number Publication Date
CN206889833U true CN206889833U (en) 2018-01-16

Family

ID=61296514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720829721.2U Expired - Fee Related CN206889833U (en) 2017-07-11 2017-07-11 A kind of heating pipe installation platform

Country Status (1)

Country Link
CN (1) CN206889833U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108995188A (en) * 2018-08-01 2018-12-14 宁国市挚友合金钢材料有限公司 A kind of plastics Bending Processing plastics softening plant
CN109016473A (en) * 2018-08-02 2018-12-18 安徽海蚨祥橡胶有限公司 A kind of plastic products Bending Processing softening plant
CN111981198A (en) * 2020-07-29 2020-11-24 武汉华兴隆新能源科技有限公司 Multi-connected air conditioner energy-saving environment-friendly fresh air system
CN115483636A (en) * 2022-10-08 2022-12-16 国网山东省电力公司淄博供电公司 Special tool for replacing current transformer in switch cabinet

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108995188A (en) * 2018-08-01 2018-12-14 宁国市挚友合金钢材料有限公司 A kind of plastics Bending Processing plastics softening plant
CN109016473A (en) * 2018-08-02 2018-12-18 安徽海蚨祥橡胶有限公司 A kind of plastic products Bending Processing softening plant
CN111981198A (en) * 2020-07-29 2020-11-24 武汉华兴隆新能源科技有限公司 Multi-connected air conditioner energy-saving environment-friendly fresh air system
CN115483636A (en) * 2022-10-08 2022-12-16 国网山东省电力公司淄博供电公司 Special tool for replacing current transformer in switch cabinet

Similar Documents

Publication Publication Date Title
CN206889833U (en) A kind of heating pipe installation platform
CN206347203U (en) Rolling wheel support disc
CN107270027A (en) A kind of support wheel type pipeline detection robot of optimization
CN106903371A (en) A kind of cutting machine
CN210834534U (en) Novel rotary cutting abrasion test device for hob ring
CN202884266U (en) Pipe bracket structure of high-temperature pipeline
CN205949529U (en) Slitter edge coiling machine
Jiang et al. Study on the particle distribution of a horizontal multi-tube circulating fluidized bed
CN112658832A (en) Pipe grinding machanism for machine-building
CN110253133A (en) Mixing yoghurt device and method for tubular structure inner wall
CN206366417U (en) A kind of vertical vibration grinder with good lubrication effect
CN206701983U (en) A kind of coalignment
CN106958596A (en) A kind of bearing for facilitating the oiling long life
CN108031810B (en) The casting method of tubing workpiece
CN201105365Y (en) Special electric universal ball holder for welding drill rod abrasion resistant area
CN206735202U (en) A kind of insulating tube conveying device
CN206435801U (en) A kind of insulating tube cutting rack system
CN106735041A (en) Play positioner during the spun casting of bimetal composite wear resistant tube road
CN204583867U (en) Middle alloy seamless pipe punch pipe disc type propulsion plant
CN211360363U (en) Copper strip cladding device of copper-clad aluminum wire
CN210071553U (en) Inspection shaft lid bearing capacity test equipment
CN206494541U (en) A kind of special handling facilities of bottled water
CN207061182U (en) A kind of agriculture docking facilities for cereal blanking transfer
CN207155163U (en) A kind of pipeline turning rolls
CN207034603U (en) A kind of galvanized wire surface lubricant adds machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20190711

CF01 Termination of patent right due to non-payment of annual fee