CN206878408U - A kind of line box erecting device - Google Patents
A kind of line box erecting device Download PDFInfo
- Publication number
- CN206878408U CN206878408U CN201720860076.0U CN201720860076U CN206878408U CN 206878408 U CN206878408 U CN 206878408U CN 201720860076 U CN201720860076 U CN 201720860076U CN 206878408 U CN206878408 U CN 206878408U
- Authority
- CN
- China
- Prior art keywords
- line box
- fastener
- chute
- erecting device
- keel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Casings For Electric Apparatus (AREA)
Abstract
The utility model provides a kind of line box erecting device, belongs to decorating apparatus field, and the line box for cladding brick wall is installed, and it includes wall surface keel and locating rack;Wall surface keel is fixedly connected with metope, and wall surface keel includes centre keel and transom, and suspension space is formed between centre keel and transom;Locating rack one end is fixedly linked with centre keel, and the other end is fixedly linked with adjacent centre keel;The sliding groove slided for line box is provided with locating rack, sliding groove is directed away from the side of metope.When carrying out line box installation only it needs to be determined that height can carry out the installation of line box, and the position in same level height can be adjusted again after cladding wall brick.
Description
Technical field
Decorating apparatus field is the utility model is related to, in particular to a kind of line box erecting device.
Background technology
At present, increasing public building wall surfacing uses cladding brick, cladding brick wall easy construction, construction effect
It is attractive in appearance, but bring electric wire box installation and cladding crossed construction, set aside pre-embedded can not correctly ensure line box position, wall surface line
The common quality defects such as box absolute altitude deviation, position be crooked, influence Integral decoration effect.
The masonry project construction stage, planning positioning is carried out to line box position, electric operation teams and groups enter according to regulation position
Go and reserved, found that pre-buried position still has error in cladding brick wall model work progress, need electricity in work progress
Gas operation team is adjusted to line box, is caused crossed construction to influence dry hanging construction and is easily caused cladding brick to destroy, increase simultaneously
Add labour cost, the expenditure of Master Cost.
Utility model content
The utility model provides a kind of line box erecting device, it is intended to solves existing for line box erecting device in the prior art
Above mentioned problem.
What the utility model was realized in:
A kind of line box erecting device, the line box for cladding brick wall are installed, and it includes wall surface keel and locating rack;
The wall surface keel is fixedly connected with metope, and the wall surface keel includes centre keel and transom, the centre keel
Suspension space is formed between the transom;
Described locating rack one end is fixedly linked with the centre keel, and the other end is fixedly linked with the adjacent centre keel;
The sliding groove slided for line box is provided with the locating rack, the sliding groove is directed away from the one of the metope
Side.
In the utility model preferred embodiment, the line box erecting device also includes spool, the spool and positioning
Frame is vertical, and the spool is fixedly linked with the locating rack.
In the utility model preferred embodiment, the line box erecting device also includes box set, and the sliding groove includes
The first side and the second side being oppositely arranged, and bottom land, first side are provided with the first chute, and second side is provided with
Two chutes, the box set include the first fastener and the second fastener, and first fastener includes the first end and second being oppositely arranged
End, the first end are contained in first chute, and second end is contained in the second chute, and second fastener includes relative
The 3rd end and the 4th end set, the 3rd end are contained in first chute, and the 4th end is contained in the second chute.
In the utility model preferred embodiment, line gap was provided between first fastener and the bottom land,
Line gap was provided between second fastener and the bottom land.
In the utility model preferred embodiment, first fastener is connected with second fastener by connection sheet.
A kind of line box erecting device, the line box for cladding brick wall are installed, and it includes wall surface keel and locating rack;
The wall surface keel is fixedly connected with metope, and the wall surface keel includes centre keel and transom, the centre keel
Suspension space is formed between the transom;
Described locating rack one end is fixedly linked with the transom, and the other end is fixedly linked with the adjacent centre keel;
The sliding groove slided for line box is provided with the locating rack, the sliding groove is directed away from the one of the metope
Side.
In the utility model preferred embodiment, the line box erecting device also includes spool, the spool and positioning
Frame is vertical, and the spool is fixedly linked with the locating rack.
In the utility model preferred embodiment, the line box erecting device also includes box set, and the sliding groove includes
The first side and the second side being oppositely arranged, and bottom land, first side are provided with the first chute, and second side is provided with
Two chutes, the box set include the first fastener and the second fastener, and first fastener includes the first end and second being oppositely arranged
End, the first end are contained in first chute, and second end is contained in the second chute, and second fastener includes relative
The 3rd end and the 4th end set, the 3rd end are contained in first chute, and the 4th end is contained in the second chute.
In the utility model preferred embodiment, line gap was provided between first fastener and the bottom land,
Line gap was provided between second fastener and the bottom land.
In the utility model preferred embodiment, first fastener is connected with second fastener by connection sheet.
The beneficial effects of the utility model are:By line box erecting device provided by the utility model, efficiently solve because
For the common quality defect such as electric operation group and the metope line box absolute altitude deviation do not brought freely of wall construction group exchange, position be crooked.Together
When locating rack wall surface keel can be utilized to construct remaining lightgage steel joist, realize the recycling of discarded object.
Brief description of the drawings
, below will be to required in embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment
The accompanying drawing used is briefly described, it will be appreciated that and the following drawings illustrate only some embodiments of the present utility model, therefore not
The restriction to scope is should be considered as, for those of ordinary skill in the art, on the premise of not paying creative work,
Other related accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the line box erecting device that the utility model embodiment one provides and wall surface keel;
Fig. 2 is the partial enlarged drawing of a-quadrant in Fig. 1;
Fig. 3 is the structural representation at the first visual angle of the mounting seat that the utility model embodiment provides;
Fig. 4 is the structural representation at the second visual angle of the mounting seat that the utility model embodiment provides;
Fig. 5 is the structural representation for the box set that the utility model embodiment provides;
Fig. 6 is the sectional view for the locating rack that the utility model embodiment provides;
Fig. 7 is the structural representation of the line box erecting device that the utility model embodiment two provides and wall surface keel.
Icon:001- line box erecting devices;010- wall surface keels;100- centre keels;200- transoms;110- mounting seats;
111- metope installation ends;113- keel installations end;021- hangs space;115- corner braces;300- locating racks;310- sliding grooves;
The sides of 311- first;The sides of 315- second;319- bottom lands;The chutes of 313- first;The chutes of 317- second;400- box sets;410- first blocks
Part;The fasteners of 430- second;411- first ends;The ends of 413- second;The ends of 431- the 3rd;The ends of 433- the 4th;450- connection sheets;470- pacifies
Piece installing;490- crosses line gap;500- spools.
Embodiment
To make the purpose, technical scheme and advantage of the utility model embodiment clearer, below in conjunction with this practicality
Accompanying drawing in new embodiment, the technical scheme in the utility model embodiment is clearly and completely described, shown
So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on this practicality
Embodiment in new, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of the utility model protection.Therefore, the implementation of the present utility model to providing in the accompanying drawings below
The detailed description of mode is not intended to limit claimed the scope of the utility model, but is merely representative of of the present utility model
Selected embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative labor
The every other embodiment obtained under the premise of dynamic, belong to the scope of the utility model protection.
In description of the present utility model, it is to be understood that the term of indicating position or position relationship is based on accompanying drawing
Shown orientation or position relationship, it is for only for ease of description the utility model and simplifies description, rather than indicates or imply institute
The equipment or element of finger must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this reality
With new limitation.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be
Mechanically connect or electrically connect;Can be joined directly together, can also be indirectly connected by intermediary, can be two
The connection of element internal or the interaction relationship of two elements.For the ordinary skill in the art, can basis
Concrete condition understands concrete meaning of the above-mentioned term in the utility model.
In the utility model, unless otherwise clearly defined and limited, fisrt feature is on or below second feature
Can directly it be contacted including the first and second features, it is not directly to contact but pass through it that can also include the first and second features
Between other characterisation contact.Moreover, fisrt feature is on second feature, top and above include fisrt feature the
Directly over two features and oblique upper, or be merely representative of fisrt feature level height and be higher than second feature.Fisrt feature is special second
Under sign, lower section and fisrt feature included below are immediately below second feature and obliquely downward, or are merely representative of fisrt feature level
Highly it is less than second feature.
Embodiment one
A kind of line box erecting device 001 is present embodiments provided, referring to Fig. 1, this line box erecting device 001 includes wall
Face keel 010 and locating rack 300.
Fig. 1, Fig. 3 and Fig. 4 are referred to, wall surface keel 010 includes centre keel 100 and transom 200, centre keel 100 and horizontal stroke
Keel 200 are vertically arranged, and centre keel 100 and transom 200 are fixed on metope by mounting seat 110.Mounting seat 110 includes
Metope installation end 111 and keel installation end 113, mounting seat 110 is arranged on by metope by bolt pass through wall surface installation end 111
On, centre keel 100 or transom 200 can be arranged on by way of welding on keel installation end 113.Metope installation end
111 and keel installation end 113 be vertically arranged.
The cross section of transom 200 and centre keel 100 is attached by way of welding, ensure that transom 200
With the quality of connection of centre keel 100.
Transom 200 and the arranged in a crossed manner of centre keel 100 form suspension space 021, and hanging in space 021 to place
Electric wire etc. needs the recessive device set.This ensure that the aesthetics of the normal operation of integral room and entirety after finishing.
Fig. 1 and Fig. 2 are referred to, corner brace 115 is welded in the relevant position of centre keel 100, by corner brace 115 by locating rack
On 300 centre keels 100 being fixedly mounted on, the other end of locating rack 300 is fixedly mounted on adjacent perpendicular dragon also by corner brace 115
On bone 100.Locating rack 300 is vertical with centre keel 100 in the present embodiment.
Locating rack 300 is the straight frame of hard, and sliding groove 310 is provided with locating rack 300, and sliding groove 310 includes relative set
The first side 311 and the second side 315 put, and the bottom land 319 positioned at bottom surface.The inner side of first side 311 is provided with the first chute
313, the inner side of the second side 315 is provided with the second chute 317, can be in sliding groove by the first chute 313 and the second chute 317
Installation box set 400 in 310.
Fig. 5 and Fig. 6 are referred to, box set 400 includes the first fastener 410 and the second fastener 430, and the first fastener 410 includes phase
To the end 413 of first end 411 and second of setting, first end 411 is contained in the first chute 313, and can be in the first chute 313
Slide, the second end 413 is contained in the second chute 317, and can be slided in the second chute 317.Second fastener 430 includes relative
The 3rd end 431 and the 4th end 433 set, the 3rd end 431 is contained in the first chute 313, and can be slided in the first chute 313
Dynamic, the 4th end 433 is contained in the second chute 317, and can be slided in the second chute 317.
First fastener 410 and the second fastener 430 are connected by connection sheet 450, and the first fastener 410 and the second fastener 430 are equal
It is axially vertical with sliding groove 310.Line box can be installed between the first fastener 410 and the second fastener 430, after installation, line box can
Slided with the cooperation by the first fastener 410 and the second fastener 430 and chute in locating rack 300.
There is installed part 470 in the couple positioned opposite of the first fastener 410 and the second fastener 430, can be incited somebody to action by installed part 470
Line box is arranged between the first fastener 410 and the second fastener 430.
Line gap 490 was provided between first fastener 410 and bottom land 319, between the second fastener 430 and bottom land 319
Line gap 490 was provided with, cable can be by crossing the winding displacement in sliding groove 310 of line gap 490.And the slip rail of box set 400
Mark and sliding groove 310 are axially in parallel, therefore cross line gap 490 and will not broaden or narrow because of the slip of box set 400.It ensure that
The security of winding displacement.
Cable tube 500 is fixedly mounted in the outside of the first side 311, cable can be by the guiding of spool 500, into sliding groove
In 310, spool 500 can not only play a part of protecting cable, can also be stored, avoid the confusion of cable.
The first fastener 410 and the second fastener 430 in the utility model can also be separately provided without by connection sheet 450
It is connected.
The application method of line box erecting device 001 provided by the utility model is as follows:Wall surface keel 010 is fixedly mounted
On metope, box set 400 is set in the groove of locating rack 300, estimates the height and position of line box, by corner brace 115 by locating rack
300 are arranged between two centre keels 100 adjacent on predetermined altitude, and locating rack 300 is parallel with transom 200, passes through bolt
Spool 500 is fixedly mounted on the upper end of locating rack 300.Line box is arranged in box set 400, is fixed by installed part 470,
Line box can be slided in the sliding groove 310, first brick is punched in reserved location on wall surface keel 010 by brick is cladding, with
Line box is slided into openings position again afterwards can install switch panel.
By line box erecting device 001 provided by the utility model, efficiently solve because electric operation group is applied with metope
The common quality defects such as the metope line box absolute altitude deviation do not brought freely of work group exchange, position be crooked.Locating rack 300 can utilize wall simultaneously
Face keel 010 are constructed remaining lightgage steel joist, realize the recycling of discarded object.
Embodiment two
A kind of line box erecting device 001 is present embodiments provided, referring to Fig. 7, this line box erecting device 001 includes wall
Face keel 010 and locating rack 300.
Refer to Fig. 7, Fig. 3 and Fig. 4, wall surface keel 010 includes transom 200 and centre keel 100, transom 200 and perpendicular
Keel 100 are vertically arranged, and transom 200 and centre keel 100 are fixed on metope by mounting seat 110.Mounting seat 110 includes
Metope installation end 111 and keel installation end 113, mounting seat 110 is arranged on by metope by bolt pass through wall surface installation end 111
On, transom 200 or centre keel 100 can be arranged on by way of welding on keel installation end 113.Metope installation end
111 and keel installation end 113 be vertically arranged.
Centre keel 100 and the cross section of transom 200 are attached by way of welding, ensure that centre keel 100
With the quality of connection of transom 200.
Centre keel 100 and the arranged in a crossed manner of transom 200 form suspension space 021, and hanging in space 021 to place
Electric wire etc. needs the recessive device set.This ensure that the aesthetics of the normal operation of integral room and entirety after finishing.
Referring to Fig. 7, welding corner brace 115 in the relevant position of transom 200, locating rack 300 is fixed by corner brace 115
In the transom 200 being arranged on, the other end of locating rack 300 is fixedly mounted on adjacent transom 200 also by corner brace 115
On.Locating rack 300 is vertical with transom 200 in the present embodiment.
Locating rack 300 is the straight frame of hard, and sliding groove 310 is provided with locating rack 300, and sliding groove 310 includes relative set
The first side 311 and the second side 315 put, and the bottom land 319 positioned at top surface.The inner side of first side 311 is provided with the first chute
313, the inner side of the second side 315 is provided with the second chute 317, can be in sliding groove by the first chute 313 and the second chute 317
Installation box set 400 in 310.
Box set 400 includes the first fastener 410 and the second fastener 430, and the first fastener 410 includes the first end being oppositely arranged
411 and second end 413, first end 411 be contained in the first chute 313, and can be slided in the first chute 313, the second end 413
It is contained in the second chute 317, and can be slided in the second chute 317.Second fastener 430 includes the 3rd end being oppositely arranged
431 and the 4th end 433, the 3rd end 431 be contained in the first chute 313, and can be slided in the first chute 313, the 4th end 433
It is contained in the second chute 317, and can be slided in the second chute 317.
First fastener 410 and the second fastener 430 are connected by connection sheet 450, and the first fastener 410 and the second fastener 430 are equal
It is axially vertical with sliding groove 310.Line box can be installed between the first fastener 410 and the second fastener 430, after installation, line box can
Slided with the cooperation by the first fastener 410 and the second fastener 430 and chute in locating rack 300.
There is installed part 470 in the couple positioned opposite of the first fastener 410 and the second fastener 430, can be incited somebody to action by installed part 470
Line box is arranged between the first fastener 410 and the second fastener 430.
Line gap 490 was provided between first fastener 410 and bottom land 319, between the second fastener 430 and bottom land 319
Line gap 490 was provided with, cable can be by crossing the winding displacement in sliding groove 310 of line gap 490.And the slip rail of box set 400
Mark and sliding groove 310 are axially in parallel, therefore cross line gap 490 and will not broaden or narrow because of the slip of box set 400.It ensure that
The security of winding displacement.
Cable tube 500 is fixedly mounted in the outside of the first side 311, cable can be by the guiding of spool 500, into sliding groove
In 310, spool 500 can not only play a part of protecting cable, can also be stored, avoid the confusion of cable.
The first fastener 410 and the second fastener 430 in the utility model can also be separately provided without by connection sheet 450
It is connected.
The application method of line box erecting device 001 provided by the utility model is as follows:Wall surface keel 010 is fixedly mounted
On metope, box set 400 is set in the groove of locating rack 300, estimates the height and position of line box, by corner brace 115 by locating rack
300 are arranged between two transoms 200 adjacent on predetermined altitude, and locating rack 300 is parallel with centre keel 100, passes through bolt
Spool 500 is fixedly mounted on the upper end of locating rack 300.Line box is arranged in box set 400, is fixed by installed part 470,
Line box can be slided in the sliding groove 310, first brick is punched in reserved location on wall surface keel 010 by brick is cladding, with
Line box is slided into openings position again afterwards can install switch panel.
By line box erecting device 001 provided by the utility model, efficiently solve because electric operation group is applied with metope
The common quality defects such as the metope line box absolute altitude deviation do not brought freely of work group exchange, position be crooked.Locating rack 300 can utilize wall simultaneously
Face keel 010 are constructed remaining lightgage steel joist, realize the recycling of discarded object.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for
For those skilled in the art, the utility model can have various modifications and variations.It is all in spirit of the present utility model and former
Within then, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.
Claims (10)
1. a kind of line box erecting device, the line box for cladding brick wall is installed, it is characterised in that including wall surface keel and positioning
Frame;
The wall surface keel is fixedly connected with metope, and the wall surface keel includes centre keel and transom, the centre keel and institute
Space is hung in formation between stating transom;
Described locating rack one end is fixedly linked with the centre keel, and the other end is fixedly linked with the adjacent centre keel;
The sliding groove slided for line box is provided with the locating rack, the sliding groove is directed away from the side of the metope.
2. line box erecting device according to claim 1, it is characterised in that the line box erecting device also includes spool,
The spool is vertical with locating rack, and the spool is fixedly linked with the locating rack.
3. line box erecting device according to claim 2, it is characterised in that the line box erecting device also includes box set,
The sliding groove includes the first side and the second side being oppositely arranged, and bottom land, and first side is provided with the first chute, described
Second side is provided with the second chute, and the box set includes the first fastener and the second fastener, and first fastener includes being oppositely arranged
First end and the second end, the first end be contained in first chute, second end is contained in the second chute, described
Two fasteners include the 3rd end and the 4th end being oppositely arranged, and the 3rd end is contained in first chute, and the 4th end holds
Put in the second chute.
4. line box erecting device according to claim 3, it is characterised in that set between first fastener and the bottom land
Line gap was equipped with, line gap was provided between second fastener and the bottom land.
5. line box erecting device according to claim 4, it is characterised in that first fastener leads to second fastener
Cross connection sheet connection.
6. a kind of line box erecting device, the line box for cladding brick wall is installed, it is characterised in that including wall surface keel and positioning
Frame;
The wall surface keel is fixedly connected with metope, and the wall surface keel includes centre keel and transom, the centre keel and institute
Space is hung in formation between stating transom;
Described locating rack one end is fixedly linked with the transom, and the other end is fixedly linked with the adjacent centre keel;
The sliding groove slided for line box is provided with the locating rack, the sliding groove is directed away from the side of the metope.
7. line box erecting device according to claim 6, it is characterised in that the line box erecting device also includes spool,
The spool is vertical with locating rack, and the spool is fixedly linked with the locating rack.
8. line box erecting device according to claim 7, it is characterised in that the line box erecting device also includes box set,
The sliding groove includes the first side and the second side being oppositely arranged, and bottom land, and first side is provided with the first chute, described
Second side is provided with the second chute, and the box set includes the first fastener and the second fastener, and first fastener includes being oppositely arranged
First end and the second end, the first end be contained in first chute, second end is contained in the second chute, described
Two fasteners include the 3rd end and the 4th end being oppositely arranged, and the 3rd end is contained in first chute, and the 4th end holds
Put in the second chute.
9. line box erecting device according to claim 8, it is characterised in that set between first fastener and the bottom land
Line gap was equipped with, line gap was provided between second fastener and the bottom land.
10. line box erecting device according to claim 9, it is characterised in that first fastener and second fastener
Connected by connection sheet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720860076.0U CN206878408U (en) | 2017-07-14 | 2017-07-14 | A kind of line box erecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720860076.0U CN206878408U (en) | 2017-07-14 | 2017-07-14 | A kind of line box erecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206878408U true CN206878408U (en) | 2018-01-12 |
Family
ID=61330321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720860076.0U Withdrawn - After Issue CN206878408U (en) | 2017-07-14 | 2017-07-14 | A kind of line box erecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206878408U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107230958A (en) * | 2017-07-14 | 2017-10-03 | 山西建筑工程有限公司 | A kind of line box erecting device and line box installation method |
CN110469009A (en) * | 2019-07-30 | 2019-11-19 | 北新集团建材股份有限公司 | A kind of keel with power connection mechanism, keel of partition wall component and its assemble method |
CN111101671A (en) * | 2018-10-26 | 2020-05-05 | 北新集团建材股份有限公司 | Line box fossil fragments connection structure |
-
2017
- 2017-07-14 CN CN201720860076.0U patent/CN206878408U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107230958A (en) * | 2017-07-14 | 2017-10-03 | 山西建筑工程有限公司 | A kind of line box erecting device and line box installation method |
CN107230958B (en) * | 2017-07-14 | 2019-02-15 | 山西建筑工程集团有限公司 | A kind of box installation device and box installation method |
CN111101671A (en) * | 2018-10-26 | 2020-05-05 | 北新集团建材股份有限公司 | Line box fossil fragments connection structure |
CN110469009A (en) * | 2019-07-30 | 2019-11-19 | 北新集团建材股份有限公司 | A kind of keel with power connection mechanism, keel of partition wall component and its assemble method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104032925B (en) | CSI house wall ground Stilt layer construction method | |
CN206878408U (en) | A kind of line box erecting device | |
CN103510631B (en) | A kind of indoor sound insulation constructing structure and construction method thereof | |
CN206722266U (en) | Wall panel assembly | |
CN103437475A (en) | Construction method of architectural structure gypsum board with paper surface hung ceiling | |
CN203654692U (en) | Overhanging type mobile scaffold | |
CN203684632U (en) | Telescopic type welding operation platform | |
CN102704712A (en) | Integrated bathroom made of composite material and assembly method of integrated bathroom | |
CN105762728A (en) | Method for pre-burying of strong and weak electricity box and electrical tubing | |
CN104599045A (en) | Project real scene acceptance inspection method | |
CN206667564U (en) | One kind splicing ceiling structure | |
CN107090960A (en) | The cladding supporting and limiting device of wall brick and wall brick assembled dry hanging construction method | |
CN208844782U (en) | A kind of fast-assembling walling system and hangar system | |
CN108505664A (en) | A kind of corner suspended ceiling module | |
CN107230958A (en) | A kind of line box erecting device and line box installation method | |
CN203961041U (en) | Fire prevention booth case | |
CN104912344A (en) | Guide structure and installation method used for installation of light wall boards | |
CN102900233B (en) | Dual face raw slurry clean water concrete construction | |
CN209353608U (en) | A kind of decorative panel convenient for electric wire arrangement | |
CN205063152U (en) | Integrated furred ceiling decorative board mounting structure | |
CN108505669A (en) | A kind of annular ceiling system | |
CN206844552U (en) | The cladding supporting and limiting device of wall brick | |
CN204001289U (en) | There is the light steel keel partition that carries the arm of encorbelmenting | |
CN205502318U (en) | Wall structure with decorate wire casing | |
CN209703936U (en) | A kind of floor ground structure suitable for information system computer floor in building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 030000 9-12, C block 32, South Pingyang Road, Xiaodian District, Taiyuan, Shanxi. Patentee after: Shanxi Construction Engineering Group Co., Ltd. Address before: 030000 9-12, C block 32, South Pingyang Road, Xiaodian District, Taiyuan, Shanxi. Patentee before: Shanxi Construction Engineering Co., Ltd. |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20180112 Effective date of abandoning: 20190215 |