CN110469009A - Keel with electrical connection structure, partition wall keel assembly and assembly method thereof - Google Patents
Keel with electrical connection structure, partition wall keel assembly and assembly method thereof Download PDFInfo
- Publication number
- CN110469009A CN110469009A CN201910696781.5A CN201910696781A CN110469009A CN 110469009 A CN110469009 A CN 110469009A CN 201910696781 A CN201910696781 A CN 201910696781A CN 110469009 A CN110469009 A CN 110469009A
- Authority
- CN
- China
- Prior art keywords
- side plate
- box
- keel
- box side
- side plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/76—Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
- E04B2/766—T-connections
- E04B2/767—Connections between wall studs and upper or lower locating rails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/76—Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
- E04B2/78—Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips
- E04B2/7854—Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of open profile
- E04B2/7872—Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of open profile of substantially H - section with flanges perpendicular to plane of partition
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Casings For Electric Apparatus (AREA)
Abstract
本发明公开了一种具有接电结构的龙骨、隔墙龙骨组件及其组装方法,涉及隔墙龙骨结构技术领域,为解决相关技术中隔墙的接线底盒及穿线管安装不方便以及固定不牢固、接线底盒的购买需要占用一定的成本的问题而发明。上述具有接电结构的龙骨,包括龙骨本体、第一盒侧板以及第二盒侧板,龙骨本体包括底板以及设置在底板相对两侧边缘处的侧板,底板与两个侧板围成安装槽,侧板上开设有通孔;侧板上还设有第一卡接结构,第一盒侧板和第二盒侧板上均设有第二卡接结构,第一盒侧板、第二盒侧板设置于安装槽中,且均通过第二卡接结构与第一卡接结构卡接,以使第一盒侧板、第二盒侧板与安装槽的槽壁围成接线盒腔。本发明可用于接线底盒及穿线管的制作安装。
The invention discloses a keel with an electrical connection structure, a partition wall keel assembly and an assembly method thereof, relates to the technical field of partition wall keel structures, and aims to solve the problem of inconvenient installation and fixation of the junction box and threading pipe of the partition wall in the related art. It is invented because of the problem that it is firm and the purchase of the junction box needs to occupy a certain cost. The above-mentioned keel with electrical connection structure includes the keel body, the first box side plate and the second box side plate. The side plate is provided with a through hole; the side plate is also provided with a first clamping structure, the first box side plate and the second box side plate are provided with a second clamping structure, the first box side plate, the second box side plate The side plates of the two boxes are arranged in the installation groove, and are all engaged with the first clamping structure through the second clamping structure, so that the first box side plate, the second box side plate and the groove wall of the installation groove enclose a junction box cavity. The invention can be used in the manufacture and installation of junction bottom boxes and wire pipes.
Description
技术领域technical field
本发明涉及隔墙龙骨结构技术领域,尤其涉及一种具有接电结构的龙骨、隔墙龙骨组件及其组装方法。The invention relates to the technical field of partition wall keel structures, in particular to a keel with an electrical connection structure, a partition wall keel assembly and an assembly method thereof.
背景技术Background technique
传统的房屋建筑通常采用钢结构和整体浇筑水泥结构,其楼房内部除了结构性承重柱子以外是空的,需要根据房屋的具体用途而设置内隔墙,将整体楼层划分各个功能性房间。内隔墙制作常采用轻钢龙骨、保温材料和薄板(石膏板、硅钙板等)建造的工艺。为了实现房间的用电功能,在墙内设置插座及电器开关盒。其中,如何解决接线底盒及穿线管安装不方便的问题,已成为业内亟待解决的问题。Traditional house construction usually adopts steel structure and integral pouring cement structure. The interior of the building is empty except for the structural load-bearing columns. It is necessary to set up internal partition walls according to the specific use of the house to divide the overall floor into various functional rooms. The inner partition wall is usually made of light steel keel, thermal insulation material and thin board (gypsum board, silicon calcium board, etc.). In order to realize the power consumption function of the room, sockets and electrical switch boxes are installed in the wall. Among them, how to solve the problem of inconvenient installation of the junction box and the threading pipe has become an urgent problem in the industry.
在现有技术中,内隔墙的接线底盒及穿线管在薄板内的龙骨之间安装,可以有效避免墙体二次开槽破坏,在建造过程中,常采用金属片现场折弯后安装于两侧竖龙骨之间的方法,且片材抗弯强度低需要在接线底盒的上侧和下侧安装两条金属片材实现固定。In the existing technology, the junction bottom box and the threading pipe of the inner partition wall are installed between the keels in the thin plate, which can effectively avoid the secondary slotting damage of the wall. During the construction process, the metal sheet is often bent on site and installed The method between the vertical keels on both sides, and the bending strength of the sheet is low, it is necessary to install two metal sheets on the upper side and the lower side of the junction box to achieve fixation.
在现有技术中,购买接线底盒需要占用一定的成本,同时,由于接线底盒是固定在两条金属片上,这样在安装接线底盒时,接线底盒在金属片上的定位不便,固定不牢固,安装需要较长时间;在将穿线管与接线底盒连接时,需要根据接线底盒的安装情况调整穿线管的安装位置,安装不方便,费时费工。In the prior art, the purchase of the junction box needs to occupy a certain cost. At the same time, since the junction box is fixed on the two metal sheets, when the junction box is installed, the location of the junction box on the metal sheets is inconvenient. It is firm, and the installation takes a long time; when connecting the threading pipe to the junction box, the installation position of the threading pipe needs to be adjusted according to the installation situation of the junction box, which is inconvenient and time-consuming.
发明内容Contents of the invention
本发明实施例提供了一种具有接电结构的龙骨、隔墙龙骨组件及其组装方法,用于解决现有技术中购买接线底盒需要占用一定的成本以及接线底盒和穿线管安装不方便、固定不牢固、费时费工的技术问题。The embodiment of the present invention provides a keel with an electrical connection structure, a partition wall keel assembly and an assembly method thereof, which are used to solve the need to occupy a certain cost for the purchase of a junction bottom box in the prior art and the inconvenient installation of the junction bottom box and the threading pipe , Fixing is not firm, time-consuming and labor-intensive technical problems.
为达到上述目的,第一方面,本发明的实施例提供了一种具有接电结构的龙骨,包括龙骨本体、第一盒侧板以及第二盒侧板,所述龙骨本体包括底板以及设置在所述底板相对两侧边缘处的侧板,所述底板与两个所述侧板围成安装槽,所述侧板上开设有用于避让穿线管的通孔;所述侧板上还设有第一卡接结构,所述第一盒侧板和所述第二盒侧板上均设有第二卡接结构,所述第一盒侧板、所述第二盒侧板沿所述安装槽的长度方向相隔设置于所述安装槽中,且均通过所述第二卡接结构与所述第一卡接结构卡接,以使所述第一盒侧板、所述第二盒侧板与所述安装槽的槽壁围成接线盒腔,并且所述接线盒腔与所述通孔相对。In order to achieve the above purpose, in the first aspect, an embodiment of the present invention provides a keel with an electrical connection structure, including a keel body, a first box side plate and a second box side plate, the keel body includes a bottom plate and a The side plates at the edges of the opposite sides of the base plate, the base plate and the two side plates form a mounting groove, and the side plates are provided with through holes for avoiding threading pipes; the side plates are also provided with The first clamping structure, the first box side plate and the second box side plate are provided with a second clamping structure, the first box side plate, the second box side plate are installed along the The longitudinal direction of the grooves is arranged in the installation grooves at intervals, and all of them are engaged with the first engaging structure through the second engaging structure, so that the first box side plate, the second box side plate The board and the groove wall of the installation groove enclose a junction box cavity, and the junction box cavity is opposite to the through hole.
第二方面,本发明实施例提供了一种隔墙龙骨组件,包括穿线管、多个竖龙骨,以及第一方面中所述的具有接电结构的龙骨,所述龙骨本体的两个端部分别与相邻的两个所述竖龙骨固定连接,并且所述龙骨本体的两个侧板均水平设置;所述穿线管插入至所述具有接电结构的龙骨的侧板上的通孔中,并且与所述侧板固定。In the second aspect, the embodiment of the present invention provides a partition wall keel assembly, including a threading pipe, a plurality of vertical keels, and the keel with the electrical connection structure described in the first aspect, the two ends of the keel body The two adjacent vertical keels are respectively fixedly connected, and the two side plates of the keel body are horizontally arranged; the threading pipe is inserted into the through hole on the side plate of the keel with the electrical connection structure , and fixed with the side panels.
第三方面,本发明实施例提供了一种用于第二方面中所述的隔墙龙骨组件的组装方法,包括以下步骤:将龙骨本体的两个端部分别与隔墙龙骨中相邻的两个竖龙骨固定连接,以使所述龙骨本体的两个侧板均水平设置;将第一盒侧板、第二盒侧板的第二卡接结构均与所述龙骨本体的侧板上的第一卡接结构卡接,以使所述第一盒侧板、所述第二盒侧板与所述龙骨本体的安装槽的槽壁围成接线盒腔,并且所述接线盒腔与所述龙骨本体的侧板上的通孔相对;将穿线管插入所述侧板上的通孔,然后将所述穿线管与所述侧板固定。In the third aspect, the embodiment of the present invention provides an assembly method for the partition wall keel assembly described in the second aspect, including the following steps: connecting the two ends of the keel body with the adjacent two ends of the partition wall keel The two vertical keels are fixedly connected so that the two side plates of the keel body are set horizontally; The first clamping structure of the first box is clamped so that the first box side plate, the second box side plate and the groove wall of the installation groove of the keel body enclose a junction box cavity, and the junction box cavity and The through holes on the side plates of the keel body are opposite; the threading pipes are inserted into the through holes on the side plates, and then the threading pipes are fixed to the side plates.
本发明实施例提供的具有接电结构的龙骨、隔墙龙骨组件及其组装方法,由于龙骨本体的底板与侧板围成安装槽,在龙骨本体的侧板上设有第一卡接结构,第一盒侧板和第二盒侧板上均设有第二卡接结构,由此,在进行安装时,可将第一盒侧板和第二盒侧板卡入安装槽中并通过第二卡接结构与第一卡接结构进行卡接,以将第一盒侧板、第二盒侧板与安装槽的槽壁围成接线盒腔,也就是通过将第一盒侧板和第二盒侧板卡入安装槽直接制成接线底盒,这样就无需外购接线底盒,从而省去了接线底盒的购买成本,且通过卡接制作形成的接线底盒固定更加牢固;同时,相较于现有技术中接线底盒的安装方式,采用第一盒侧板和第二盒侧板与龙骨本体卡接制作形成接线底盒并实现其安装的方式,安装更加简便快捷,省工省时;由于龙骨本体的侧板上开设有用于避让穿线管的通孔,这样在安装穿线管时,穿线管可以插入侧板上的通孔,从而可以方便穿线管在具有接电结构的龙骨上的安装定位,进而可以节省穿线管的安装时间。The keel with electrical connection structure, the keel assembly of the partition wall and the assembly method thereof provided by the embodiment of the present invention, since the bottom plate and the side plate of the keel body form an installation groove, the side plate of the keel body is provided with a first clamping structure, Both the side panels of the first box and the side panels of the second box are provided with a second clamping structure, so that when installing, the side panels of the first box and the side panels of the second box can be snapped into the installation grooves and passed through the first box side panel. The second clamping structure is clamped with the first clamping structure to enclose the first box side plate, the second box side plate and the groove wall of the installation groove to form a junction box cavity, that is, by connecting the first box side plate and the second box side plate The side panels of the second box are snapped into the installation groove to directly make a junction bottom box, so that there is no need to purchase a junction bottom box, thereby saving the purchase cost of the junction bottom box, and the junction bottom box formed by snap-fitting is more firmly fixed; at the same time , compared with the installation method of the junction bottom box in the prior art, the junction bottom box is formed by clamping the first box side plate and the second box side plate with the keel body and the installation method is realized. The installation is more convenient and fast, saving Labor saving and time-saving; since the side plate of the keel body is provided with a through hole for avoiding the threading pipe, when the threading pipe is installed, the threading pipe can be inserted into the through hole on the side plate, so that the threading pipe can be conveniently installed in the electric connection structure. The installation and positioning on the keel can save the installation time of the threading pipe.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本发明实施例中具有接电结构的龙骨与竖龙骨连接的结构示意图;Fig. 1 is the schematic structural diagram of the connection between the keel and the vertical keel with the electric connection structure in the embodiment of the present invention;
图2为本发明实施例中第一盒侧板和第二盒侧板的结构示意图;Fig. 2 is a structural schematic diagram of the first box side panel and the second box side panel in the embodiment of the present invention;
图3为本发明实施例中第二盒侧板的结构示意图;Fig. 3 is the structural representation of the second box side plate in the embodiment of the present invention;
图4为本发明实施例中龙骨本体的结构示意图;Fig. 4 is the structural representation of keel body in the embodiment of the present invention;
图5为本发明实施例中龙骨本体与竖龙骨固定连接的结构示意图;Fig. 5 is a structural schematic diagram of the fixed connection between the keel body and the vertical keel in the embodiment of the present invention;
图6为本发明实施例中隔墙龙骨组件的结构示意图;Fig. 6 is a structural schematic diagram of a partition wall keel assembly in an embodiment of the present invention;
图7为本发明实施例中隔墙龙骨组件的组装方法的流程图。Fig. 7 is a flow chart of the method for assembling the partition wall keel assembly in the embodiment of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
在本发明的描述中,需要理解的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于该产品实际安装状态下的描述发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", The orientation or positional relationship indicated by "top", "bottom", "inner" and "outer" are inventions and simplified descriptions based on the actual installation state of the product, rather than indicating or implying that the device or element referred to must have Certain orientations, constructed and operative in certain orientations, therefore are not to be construed as limitations on the invention.
术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。The terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, unless otherwise specified, "plurality" means two or more.
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.
第一方面,本发明实施例提供了一种具有接电结构的龙骨,如图1和图2所示,包括龙骨本体110、第一盒侧板120以及第二盒侧板130,龙骨本体110包括底板1以及设置在底板1相对两侧边缘处的侧板2,底板1与两个侧板2围成安装槽3,侧板2上开设有用于避让穿线管200的通孔21;侧板2上还设有第一卡接结构22,第一盒侧板120和第二盒侧板130上均设有第二卡接结构4,第一盒侧板120、第二盒侧板130沿安装槽3的长度方向相隔设置于安装槽3中,且均通过第二卡接结构4与第一卡接结构22卡接,以使第一盒侧板120、第二盒侧板130与安装槽3的槽壁围成接线盒腔5,并且接线盒腔5与通孔21相对。In the first aspect, the embodiment of the present invention provides a keel with an electrical connection structure, as shown in FIG. 1 and FIG. It includes the base plate 1 and the side plates 2 arranged at the opposite side edges of the base plate 1, the base plate 1 and the two side plates 2 enclose the installation groove 3, and the side plate 2 is provided with a through hole 21 for avoiding the threading pipe 200; the side plate 2 is also provided with a first clamping structure 22, the first box side plate 120 and the second box side plate 130 are provided with a second clamping structure 4, the first box side plate 120, the second box side plate 130 along the The lengthwise direction of the mounting groove 3 is arranged in the mounting groove 3 at intervals, and both are engaged with the first engaging structure 22 through the second engaging structure 4, so that the first box side plate 120, the second box side plate 130 and the installation The groove wall of the groove 3 encloses a junction box cavity 5 , and the junction box cavity 5 is opposite to the through hole 21 .
其中,如图3和图4所示,第一盒侧板120、第二盒侧板130的长度X可以与安装槽3的深度Y相等或相近,第一盒侧板120、第二盒侧板130的高度H可以与龙骨本体110两侧板2间的间距Z相等或相近。龙骨本体110、第一盒侧板120和第二盒侧板130可以均由金属材质制成,还可以由其它材质制成,在此不做具体限定。Wherein, as shown in Figure 3 and Figure 4, the length X of the first box side plate 120 and the second box side plate 130 can be equal to or close to the depth Y of the installation groove 3, the first box side plate 120, the second box side The height H of the board 130 may be equal to or similar to the distance Z between the boards 2 on both sides of the keel body 110 . The keel body 110 , the first box side panel 120 and the second box side panel 130 may all be made of metal, or other materials, which are not specifically limited here.
本发明实施例提供的具有接电结构的龙骨,如图2所示,由于龙骨本体110的底板1与侧板2围成安装槽3,在龙骨本体110的侧板2上设有第一卡接结构22,第一盒侧板120和第二盒侧板130上均设有第二卡接结构4,由此,在进行安装时,可将第一盒侧板120和第二盒侧板130卡入安装槽3中并通过第二卡接结构4与第一卡接结构22进行卡接,以将第一盒侧板120、第二盒侧板130与安装槽3的槽壁围成接线盒腔5,也就是通过将第一盒侧板120和第二盒侧板130卡入安装槽3直接制成接线底盒,这样就无需外购接线底盒,从而省去了接线底盒的购买成本,且通过卡接制作形成的接线底盒固定更加牢固;同时,相较于现有技术中接线底盒的安装方式,采用第一盒侧板120和第二盒侧板130与龙骨本体110卡接制作形成接线底盒并实现其安装的方式,安装更加简便快捷,省工省时;由于龙骨本体110的侧板2上开设有用于避让穿线管200的通孔21,这样在安装穿线管200时,穿线管200可以插入侧板2上的通孔21,从而可以方便穿线管200在具有接电结构的龙骨100上的安装定位,进而可以节省穿线管200的安装时间。The keel with electrical connection structure provided by the embodiment of the present invention, as shown in FIG. The connecting structure 22, the first box side plate 120 and the second box side plate 130 are all provided with the second clamping structure 4, thus, when installing, the first box side plate 120 and the second box side plate can be connected 130 snaps into the installation groove 3 and engages with the first snap-fit structure 22 through the second snap-in structure 4 to enclose the first box side plate 120, the second box side plate 130 and the groove wall of the installation slot 3 Junction box cavity 5, that is, the junction box is made directly by snapping the first box side plate 120 and the second box side plate 130 into the installation groove 3, so that there is no need to purchase a junction box, thereby eliminating the need for a junction box purchase cost, and the junction bottom box formed by clamping is more firmly fixed; at the same time, compared with the installation method of the junction bottom box in the prior art, the first box side plate 120 and the second box side plate 130 are used to connect with the keel The main body 110 is clamped to form a junction bottom box and realize its installation. The installation is more convenient and quick, labor-saving and time-saving; because the side plate 2 of the keel main body 110 is provided with a through hole 21 for avoiding the threading pipe 200. When threading the threading pipe 200, the threading pipe 200 can be inserted into the through hole 21 on the side plate 2, so that the installation and positioning of the threading pipe 200 on the keel 100 with the electrical connection structure can be facilitated, and the installation time of the threading pipe 200 can be saved.
在上述实施例中,第一卡接结构22和第二卡接结构4的结构并不唯一。比如,如图3和图4所示,第一卡接结构22可以为开设于每个侧板2上的第一插孔221和第二插孔222,并且在每个侧板2上,第一插孔221、第二插孔222均沿安装槽3的长度方向相隔设置,第二卡接结构4可以为设置于第一盒侧板120和第二盒侧板130的相对两个端部上的插片41,在安装第一盒侧板120和第二盒侧板130时,将第一盒侧板120的两个端部上的插片41分别插入两个侧板2上的第一插孔221中,使第一盒侧板120上的插片41与对应第一插孔221卡接,将第二盒侧板130的两个端部上的插片41分别插入两个侧板2上的第二插孔222中,使第二盒侧板130上的插片41与对应第二插孔222卡接;另外,第一卡接结构22可以为开设于每个侧板2上的第一卡勾和第二卡勾,并且在每个侧板2上,第一卡勾和第二卡勾均沿安装槽3的长度方向相隔设置,第二卡接结构4可以为设置于第一盒侧板120和第二盒侧板130的相对两个端部上的卡孔,在安装第一盒侧板120和第二盒侧板130时,将第一盒侧板的卡孔与对应第一卡勾配合卡接,将第二盒侧板130的卡孔与第二卡勾配合卡接。相比于将第一卡接结构22设置为卡勾、第二卡接结构4设置为卡孔,将第一卡接结构22设置成插孔、第二卡接结构4设置为插片41,结构简单,加工方便,且在使用过程中不会有卡勾脱落的风险。In the above embodiments, the structures of the first locking structure 22 and the second locking structure 4 are not unique. For example, as shown in FIG. 3 and FIG. 4 , the first engaging structure 22 can be a first insertion hole 221 and a second insertion hole 222 opened on each side plate 2 , and on each side plate 2 , the second insertion hole 222 The first insertion hole 221 and the second insertion hole 222 are arranged at intervals along the length direction of the installation groove 3, and the second clamping structure 4 can be arranged on the opposite ends of the first box side plate 120 and the second box side plate 130 When installing the first box side plate 120 and the second box side plate 130, the inserting pieces 41 on the two ends of the first box side plate 120 are respectively inserted into the second side plate 2 on the two side plates. In a socket 221, the inserting piece 41 on the first box side plate 120 is engaged with the corresponding first jacking hole 221, and the inserting piece 41 on the two ends of the second box side plate 130 is inserted into the two sides respectively. In the second insertion hole 222 on the board 2, the insertion piece 41 on the second box side plate 130 is engaged with the corresponding second insertion hole 222; in addition, the first engagement structure 22 can be provided on each side plate 2 The first hook and the second hook on each side plate 2, the first hook and the second hook are arranged at intervals along the length direction of the installation groove 3, and the second hook structure 4 can be set In the card holes on the opposite two ends of the first box side plate 120 and the second box side plate 130, when the first box side plate 120 and the second box side plate 130 are installed, the card of the first box side plate The hole is matched with the corresponding first hook, and the hole of the second box side plate 130 is matched with the second hook. Compared with setting the first clamping structure 22 as a hook and the second clamping structure 4 as a clamping hole, setting the first clamping structure 22 as an insertion hole and the second clamping structure 4 as an insertion piece 41, The structure is simple, the processing is convenient, and there is no risk of the hook falling off during use.
本发明实施例提供的具有接电结构的龙骨中,如图4所示,龙骨本体110的底板1与两个侧板2相接所呈的形状并不唯一,比如,底板1与侧板2可以相接呈U型;另外,底板1与侧板2也可以相接呈工字型。相比于工字型,U型龙骨的侧板2宽度较小,可以减小具有接电结构的龙骨100在底板1厚度方向上的尺寸,当具有接电结构的龙骨100组装在隔墙上时,可以减少隔墙的厚度,从而减少隔墙对房间的占用。In the keel with electrical connection structure provided by the embodiment of the present invention, as shown in FIG. 4 , the shape of the connection between the bottom plate 1 of the keel body 110 and the two side plates 2 is not unique, for example, the bottom plate 1 and the side plates 2 It can be joined to form a U shape; in addition, the bottom plate 1 and the side plate 2 can also be joined to form an I-shape. Compared with the I-shaped keel, the width of the side plate 2 of the U-shaped keel is smaller, which can reduce the size of the keel 100 with the electrical connection structure in the thickness direction of the bottom plate 1. When the keel 100 with the electrical connection structure is assembled on the partition wall When the thickness of the partition wall can be reduced, the occupancy of the partition wall to the room can be reduced.
本发明实施例提供的具有接电结构的龙骨中,通孔21的开设位置也不唯一,比如,如图4所示,每个侧板2上可以均开设通孔21;另外,也可以在位于底板1的一侧侧板2上开设通孔21。相比在底板1的一侧侧板2上开设通孔21,当每个侧板2上均开设通孔21时,在安装穿线管200时,不但可以从具有接电结构的龙骨100的一侧插入至安装槽3中,另外,还能从具有接电结构的龙骨100的另一侧插入至安装槽3中,这样大大方便了穿线管200的安装。In the keel with the electrical connection structure provided by the embodiment of the present invention, the opening position of the through hole 21 is not unique, for example, as shown in Figure 4, each side plate 2 can be provided with a through hole 21; A through hole 21 is defined in the side plate 2 located on one side of the bottom plate 1 . Compared with opening the through hole 21 on the side plate 2 of one side of the base plate 1, when each side plate 2 is provided with the through hole 21, when the threading pipe 200 is installed, not only can the keel 100 with the electric connection structure In addition, it can also be inserted into the installation groove 3 from the other side of the keel 100 with the electrical connection structure, which greatly facilitates the installation of the threading pipe 200 .
为了方便后续墙体开关、墙体插座等器件与第一盒侧板120、第二盒侧板130和龙骨本体110围成的接线底盒连接,如图2所示,在第一盒侧板120、第二盒侧板130远离底板1的一侧边缘处分别设有连接耳6,连接耳6上开设有螺纹孔,这样,在进行安装时,墙体开关或墙体插座等器件可通过第一盒侧板120、第二盒侧板130边缘处的连接耳6与第一盒侧板120、第二盒侧板130固定连接。In order to facilitate the connection of subsequent wall switches, wall sockets and other devices with the junction bottom box surrounded by the first box side plate 120, the second box side plate 130 and the keel body 110, as shown in Figure 2, on the first box side plate 120. The edge of the side plate 130 of the second box away from the bottom plate 1 is respectively provided with connecting ears 6, and threaded holes are provided on the connecting ears 6, so that during installation, devices such as wall switches or wall sockets can pass through The connecting ears 6 at the edges of the first box side plate 120 and the second box side plate 130 are fixedly connected with the first box side plate 120 and the second box side plate 130 .
第二方面,如图5和图6所示,本发明实施例提供了一种隔墙龙骨组件,包括穿线管200、多个竖龙骨300,以及第一方面中的具有接电结构的龙骨100,龙骨本体110的两个端部分别与相邻的两个竖龙骨300固定连接,并且龙骨本体110的两个侧板2均水平设置;穿线管200插入至具有接电结构的龙骨100的侧板2上的通孔21中,并且与侧板2固定。In the second aspect, as shown in Figure 5 and Figure 6, the embodiment of the present invention provides a partition wall keel assembly, including a threading pipe 200, a plurality of vertical keels 300, and the keel 100 with an electrical connection structure in the first aspect , the two ends of the keel body 110 are respectively fixedly connected with two adjacent vertical keels 300, and the two side plates 2 of the keel body 110 are horizontally arranged; In the through hole 21 on the board 2, and be fixed with the side board 2.
其中,龙骨本体110的两个端部与相邻两竖龙骨300的固定连接方式有多种,比如可以是不可拆卸固定连接,例如焊接;另外,也可以是可拆卸固定连接,比如可以通过螺钉等紧固件与相邻两个竖龙骨300可拆卸固定连接,具体可根据情况而定。Wherein, there are many ways of fixed connection between the two ends of the keel body 110 and the adjacent two vertical keels 300, such as non-detachable fixed connection, such as welding; in addition, detachable fixed connection, such as through screws Fasteners are detachably and fixedly connected with two adjacent vertical keels 300, which can be determined according to the situation.
本发明实施例提供的隔墙龙骨组件所解决的技术问题以及取得的技术效果,与第一方面中的具有接电结构的龙骨100所解决的技术问题以及取得的技术效果相同,在此不再赘述。另外,龙骨本体110与竖龙骨300固定连接,提高了隔墙龙骨组件的整体安装强度,能够辅助性地提高墙体的抗冲击强度。The technical problems solved and the technical effects achieved by the partition wall keel assembly provided by the embodiment of the present invention are the same as those solved by the keel 100 with an electrical connection structure in the first aspect and the technical effects achieved, and will not be repeated here. repeat. In addition, the keel body 110 is fixedly connected to the vertical keel 300, which improves the overall installation strength of the keel assembly of the partition wall, and can supplementarily improve the impact resistance of the wall.
第三方面,本发明实施例提供了一种隔墙龙骨组件的组装方法,包括以下步骤:如图7所示,In a third aspect, an embodiment of the present invention provides a method for assembling a partition wall keel assembly, including the following steps: as shown in FIG. 7 ,
S1、如图5所示,将龙骨本体110的两个端部分别与隔墙龙骨中相邻的两个竖龙骨300固定连接,以使龙骨本体110的两个侧板2均水平设置;S1, as shown in Figure 5, the two ends of the keel body 110 are fixedly connected to the two adjacent vertical keels 300 in the partition wall keel, so that the two side plates 2 of the keel body 110 are horizontally arranged;
S2、如图1所示,将第一盒侧板120、第二盒侧板130的第二卡接结构4均与龙骨本体110的侧板2上的第一卡接结构22卡接,以使第一盒侧板120、第二盒侧板130与龙骨本体110的安装槽3的槽壁围成接线盒腔5,并且接线盒腔5与龙骨本体110的侧板2上的通孔21相对;S2. As shown in FIG. 1 , engage the second clamping structure 4 of the first box side plate 120 and the second box side plate 130 with the first clamping structure 22 on the side plate 2 of the keel body 110, so as to Make the first box side plate 120, the second box side plate 130 and the groove wall of the installation groove 3 of the keel body 110 enclose the junction box cavity 5, and the through hole 21 on the side plate 2 of the junction box cavity 5 and the keel body 110 relatively;
S3、如图6所示,将穿线管200插入侧板2上的通孔21,然后将穿线管200与侧板2固定。S3 , as shown in FIG. 6 , insert the threading pipe 200 into the through hole 21 on the side plate 2 , and then fix the threading pipe 200 and the side plate 2 .
本发明实施例提供的隔墙龙骨组件的组装方法所解决的技术问题、以及产生的技术效果均与第一方面中隔墙龙骨组件所解决的技术问题、以及产生的技术效果相同,在此不再赘述。The technical problems solved by the method for assembling the keel assembly of the partition wall provided by the embodiment of the present invention and the technical effects produced are the same as the technical problems solved by the keel assembly of the partition wall in the first aspect and the technical effects produced are the same. Let me repeat.
在第一卡接结构22包括均设置于每个侧板2上的第一插孔221和第二插孔222,第二卡接结构4包括均设置于第一盒侧板120、第二盒侧板130的相对的两个端部上的插片41时,步骤S2还包括以下步骤:The first clamping structure 22 includes a first insertion hole 221 and a second insertion hole 222 which are all arranged on each side plate 2, and the second clamping structure 4 includes a first insertion hole 221 and a second insertion hole 222 which are all arranged on the first box side panel 120, the second box When inserting sheet 41 on the opposite two end portions of side plate 130, step S2 also includes the following steps:
S21、将第一盒侧板120的两个端部上的插片41分别插入两个侧板2上的第一插孔221中,以使第一盒侧板120上的插片41与对应的第一插孔221卡接;S21. Insert the insertion pieces 41 on the two ends of the first box side plate 120 into the first insertion holes 221 on the two side plates 2 respectively, so that the insertion pieces 41 on the first box side plate 120 correspond to The first jack 221 is clamped;
S22、将第二盒侧板130的两个端部上的插片41分别插入两个侧板2上的第二插孔222中,以使第二盒侧板130上的插片41与对应的第二插孔222卡接。S22. Insert the insertion pieces 41 on the two ends of the second box side plate 130 into the second insertion holes 222 on the two side plates 2 respectively, so that the insertion pieces 41 on the second box side plate 130 correspond to The second jack 222 is engaged.
其中,第一盒侧板120、第二盒侧板130具体可以通过以下方式安装:在安装第一盒侧板120时,应先将第一盒侧板120倾斜插入安装槽3底部,然后将第一盒侧板120斜向旋转使其两侧的插片41分别靠近侧板2上的第一插孔221和第二插孔222并分别插入;在安装第二盒侧板130时,其安装方法同上述第一盒侧板130的安装方法一致,在此不再赘述。Wherein, the first box side plate 120 and the second box side plate 130 can be installed in the following manner: when installing the first box side plate 120, the first box side plate 120 should be inserted into the bottom of the installation groove 3 at an angle, and then The first box side plate 120 is rotated obliquely so that the inserts 41 on both sides are respectively close to the first jack 221 and the second jack 222 on the side plate 2 and inserted respectively; when the second box side plate 130 is installed, its The installation method is the same as the installation method of the first box side panel 130 described above, and will not be repeated here.
在该隔墙龙骨组件的组装方法实施例中所出现的与上述隔墙龙骨组件的产品实施例中相同或相近的特征,具体可参照上述隔墙龙骨组件的产品实施例中的描述,在此不再赘述。For the same or similar features in the embodiment of the method of assembling the partition wall keel assembly as in the product embodiment of the above-mentioned partition wall keel assembly, for details, please refer to the description in the product embodiment of the above-mentioned partition wall keel assembly, here No longer.
以上,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以权利要求的保护范围为准。The above is only a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Anyone familiar with the technical field can easily think of changes or replacements within the technical scope disclosed in the present invention, and should cover all Within the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910696781.5A CN110469009A (en) | 2019-07-30 | 2019-07-30 | Keel with electrical connection structure, partition wall keel assembly and assembly method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910696781.5A CN110469009A (en) | 2019-07-30 | 2019-07-30 | Keel with electrical connection structure, partition wall keel assembly and assembly method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110469009A true CN110469009A (en) | 2019-11-19 |
Family
ID=68509203
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910696781.5A Pending CN110469009A (en) | 2019-07-30 | 2019-07-30 | Keel with electrical connection structure, partition wall keel assembly and assembly method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110469009A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112490979A (en) * | 2020-12-09 | 2021-03-12 | 北新集团建材股份有限公司 | Wiring frame and mounting structure thereof |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101473500A (en) * | 2006-03-04 | 2009-07-01 | 奈杰尔·多贝森 | Bottom box |
| CN203783056U (en) * | 2014-04-06 | 2014-08-20 | 李新发 | Floor being provided with take-up box on keel |
| CN204728519U (en) * | 2015-02-11 | 2015-10-28 | 中建三局机电工程有限公司 | The installation system of embedded and wall-hanging equipment on a kind of body of wall |
| CN105244827A (en) * | 2015-11-18 | 2016-01-13 | 上海市安装工程集团有限公司 | Fixing bracket and installation method of electrical end equipment |
| CN205986018U (en) * | 2016-08-29 | 2017-02-22 | 北京弘高建筑装饰设计工程有限公司 | Light gauge steel line box fixing device |
| CN206712395U (en) * | 2017-04-28 | 2017-12-05 | 漳州优普激光科技有限公司 | Light steel keel bracket for placing junction box |
| CN206878408U (en) * | 2017-07-14 | 2018-01-12 | 山西建筑工程有限公司 | A kind of line box erecting device |
| CN108930357A (en) * | 2017-05-22 | 2018-12-04 | 北新集团建材股份有限公司 | A kind of assembled wallboard and preparation method thereof with switch enclosure and penetration pipe |
| CN208329277U (en) * | 2018-05-11 | 2019-01-04 | 宝胜系统集成科技股份有限公司 | Steel construction curtain wall structure |
| CN305055470S (en) * | 2018-10-26 | 2019-03-01 | 北新集团建材股份有限公司 | multifunctional keel |
| CN109698485A (en) * | 2019-01-23 | 2019-04-30 | 上海聚通装饰集团有限公司 | Fixed bracket of the power supply pipe of a kind of light steel keel partition and preparation method thereof |
-
2019
- 2019-07-30 CN CN201910696781.5A patent/CN110469009A/en active Pending
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101473500A (en) * | 2006-03-04 | 2009-07-01 | 奈杰尔·多贝森 | Bottom box |
| CN203783056U (en) * | 2014-04-06 | 2014-08-20 | 李新发 | Floor being provided with take-up box on keel |
| CN204728519U (en) * | 2015-02-11 | 2015-10-28 | 中建三局机电工程有限公司 | The installation system of embedded and wall-hanging equipment on a kind of body of wall |
| CN105244827A (en) * | 2015-11-18 | 2016-01-13 | 上海市安装工程集团有限公司 | Fixing bracket and installation method of electrical end equipment |
| CN205986018U (en) * | 2016-08-29 | 2017-02-22 | 北京弘高建筑装饰设计工程有限公司 | Light gauge steel line box fixing device |
| CN206712395U (en) * | 2017-04-28 | 2017-12-05 | 漳州优普激光科技有限公司 | Light steel keel bracket for placing junction box |
| CN108930357A (en) * | 2017-05-22 | 2018-12-04 | 北新集团建材股份有限公司 | A kind of assembled wallboard and preparation method thereof with switch enclosure and penetration pipe |
| CN206878408U (en) * | 2017-07-14 | 2018-01-12 | 山西建筑工程有限公司 | A kind of line box erecting device |
| CN208329277U (en) * | 2018-05-11 | 2019-01-04 | 宝胜系统集成科技股份有限公司 | Steel construction curtain wall structure |
| CN305055470S (en) * | 2018-10-26 | 2019-03-01 | 北新集团建材股份有限公司 | multifunctional keel |
| CN109698485A (en) * | 2019-01-23 | 2019-04-30 | 上海聚通装饰集团有限公司 | Fixed bracket of the power supply pipe of a kind of light steel keel partition and preparation method thereof |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112490979A (en) * | 2020-12-09 | 2021-03-12 | 北新集团建材股份有限公司 | Wiring frame and mounting structure thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110469049B (en) | A building wall and its installation method | |
| CN205713146U (en) | A kind of quick location and installation attachment structure of PC prefabricated panel | |
| CN115030366B (en) | Tail end mounting structure and method for partition wall | |
| CN112049310A (en) | Ceiling connecting component and mounting method | |
| CN110469006A (en) | Keel with electrical connection structure, partition wall keel assembly and assembly method thereof | |
| CN110469005A (en) | Fixed keel, partition wall keel assembly and assembly method for installing junction bottom box | |
| CN220814493U (en) | Suspended ceiling plate mounting structure | |
| CN113356455B (en) | Ceiling mounting assembly, ceiling structure and mounting method thereof | |
| CN118547794A (en) | Building energy-saving heat-preserving structure | |
| CN117266437B (en) | Assembled furred ceiling structure suitable for low-rise building | |
| CN110761513B (en) | A kind of keel with snap structure and production method thereof | |
| CN115021178B (en) | An integrated installation structure of wall modules and pipelines | |
| CN216516628U (en) | Keel adapter plate | |
| CN215888794U (en) | Mounting connecting piece and mounting structure for drop-level modeling of assembled suspended ceiling | |
| CN216689940U (en) | Light partition wall and concrete beam integration fitment structure | |
| CN110469007A (en) | Fixed joist, partition wall joist, partition wall joist assembly and assembly method thereof, partition wall | |
| CN111101671A (en) | Line box fossil fragments connection structure | |
| CN213653949U (en) | Protruding furred ceiling board of integral type | |
| CN207419962U (en) | A kind of accurate apex angle cable architecture of assembling | |
| CN113431290B (en) | A plug-in component, a decorative panel component and an installation method thereof | |
| RU222765U1 (en) | PROFILE FOR GYPSOCARDON CEILINGS | |
| CN217871315U (en) | Gypsum suspended ceiling structure | |
| CN220434023U (en) | Electric appliance ceiling mounting assembly | |
| CN113550521B (en) | Assembled wall sound insulation structure and installation method thereof | |
| CN216239188U (en) | A foam board sandwich house insulation wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191119 |