CN206854897U - Regulation steel box-girder lifting block positioning apparatus can quickly be corrected - Google Patents
Regulation steel box-girder lifting block positioning apparatus can quickly be corrected Download PDFInfo
- Publication number
- CN206854897U CN206854897U CN201720386417.5U CN201720386417U CN206854897U CN 206854897 U CN206854897 U CN 206854897U CN 201720386417 U CN201720386417 U CN 201720386417U CN 206854897 U CN206854897 U CN 206854897U
- Authority
- CN
- China
- Prior art keywords
- steel box
- hanger
- girder
- limit card
- card board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
It the utility model is related to a kind of quick correction regulation steel box-girder lifting block device in place, it includes interim hanger, chain block and limit card board, the interim hanger is fixed in the vertical web of steel box-girder in the horizontal direction, the bottom of the limit card board offers neck, top offers hanger hole, the neck is arranged on the stiffener of steel box-girder block, with the position of interim hanger in the same horizontal line, the suspension hook at the chain block both ends is hung on the hanger hole above interim hanger and limit card board for the position in the hanger hole.The utility model both ensure that weld gap between steel box-girder lifting block, and effectively improve installation effectiveness;Device making simultaneously is simple, cost is cheap, easy to operate, and installation positioning welding is laterally blocked suitable for various steel box-girders, can widely be promoted in bridge steel structure field and application.
Description
Technical field
A kind of positioning apparatus is the utility model is related to, it is in place can quickly to correct regulation steel box-girder lifting block for specifically one kind
Device.Belong to steel member processing technique field.
Background technology
Because factor, most highway steel box girder bridges such as traffic condition limitation use Automobile Transportation component, steel box-girder is divided
During section merogenesis, each section can laterally be divided into multiple lifting blocks.Therefore in construction, steel box-girder lifting block installation is in place
Afterwards, it is necessary to be corrected regulation, weld gap meets design requirement between making block.Conventional jack is corrected regulation at present,
Waste time and energy and take a lot of work, and more interim fixation is needed during correction regulation, cause cost to increase.
Utility model content
Technical problem to be solved in the utility model is to provide one kind for above-mentioned prior art can quickly correct regulation
Steel box-girder lifting block device in place, improves efficiency of construction, reduces manufacturing cost.
The technical scheme in the invention for solving the above technical problem is:A kind of quick correction regulation steel box-girder lifting block
Body device in place, it includes interim hanger, chain block and limit card board, and the interim hanger is fixed on steel in the horizontal direction
In the vertical web of box beam, the bottom of the limit card board offers neck, and top offers hanger hole, and the neck is arranged in
On the stiffener of steel box-girder block, the position in the hanger hole and the position of interim hanger are in the same horizontal line, described to pull
The suspension hook at cucurbit both ends is hung on the hanger hole above interim hanger and limit card board.
Preferably, the notch length of the neck is the 2/3 of stiffener height, and width of rebate is more than thickness of slab 2-3mm.
Compared with prior art, the utility model has the advantage of:
The utility model both ensure that weld gap between steel box-girder lifting block, and effectively improve installation effectiveness;Together
When the device make that simple, cost is cheap, easy to operate, laterally block installation positioning welding suitable for various steel box-girders, can
It is extensive in bridge steel structure field to promote and apply.
Brief description of the drawings
Fig. 1 is that a kind of regulation steel box-girder that can quickly correct described in the utility model lifts block device signal in place
Figure.
Wherein:
Interim hanger 1, chain block 2, limit card board 3, web 4, weld gap 5, steel box-girder block 6, stiffener 7.
Embodiment
The utility model is described in further detail with reference to embodiments.
Referring to Fig. 1, it the utility model is related to a kind of quick correct and adjust steel box-girder lifting block device in place, including under
Row component:Interim hanger 1, chain block 2, limit card board 3, web 4, weld gap 5, steel box-girder block 6, stiffener 7;
The interim hanger 1 is fixed in the vertical web 4 of steel box-girder in the horizontal direction, the bottom of the limit card board 3
Neck is offered, top offers hanger hole, and the neck is arranged on the stiffener 7 of steel box-girder block 6, the hanger hole
The position of position and interim hanger 1 in the same horizontal line, the suspension hook at the both ends of chain block 2 hang over interim hanger 1 and
On hanger hole above limit card board 3;
Wherein interim hanger and positioner can use unnecessary waste material to carry out cutting stock, and thickness of slab material is unlimited,
Notch length is about the 2/3 of stiffener height, and width of rebate is more than thickness of slab 2-3mm or so;Interim hanger is equally using unnecessary
Waste material carry out cutting stock, ensure that suspension hook can pass through and hang tight, anti-snap hook;Chain block is a kind of using simple, carrying
Convenient Manual hoisting machinery, pulls guide chain with regard to that can play the function of tightening up.
A kind of application method specific steps that can quickly correct regulation steel box-girder lifting block device in place in this example
It is as follows:
(1)Required according to construction drawing, by the lifting of steel box-girder block in place.
(2)The notch of limit card board 3 is stuck on stiffener.
(3)Hung oneself according to limit card board 3 position of earhole, shackle plate is welded on sustained height web 4.
(4)The suspension hook of the left and right ends of chain block 2 is hung on the hanger hole above web 4 and limit card board 3, ensured
Not Slip Hook.
(5)The guide chain on chain block 2 is pulled, the steel box-girder block on right side is moved to the left, reaches weld gap 5
Design requirement.
(6)Field welding is welded, ensures that welding is qualified.
(7)Limit card board 3, chain block 2 to be removed after the completion of welding, interim hanger 1 is cut off using hand cut,
And it is clean to polish.
In addition to the implementation, the utility model also includes other embodiment, all to use equivalents or equivalent
The technical scheme that substitute mode is formed, all should fall within the protection domain of the utility model claims.
Claims (2)
- A kind of 1. quick correction regulation steel box-girder lifting block device in place, it is characterised in that:It includes interim hanger(1)、 Chain block(2)And limit card board(3), the interim hanger(1)The vertical web of steel box-girder is fixed in the horizontal direction(4) On, the limit card board(3)Bottom offer neck, top offers hanger hole, and the neck is arranged in steel box-girder block (6)Stiffener(7)On, position and the interim hanger in the hanger hole(1)Position in the same horizontal line, it is described to pull calabash Reed(2)The suspension hook at both ends hangs over interim hanger(1)And limit card board(3)On hanger hole above.
- A kind of 2. quick correction regulation steel box-girder lifting block according to claim 1 device in place, it is characterised in that: The notch length of the neck is stiffener(7)The 2/3 of height, width of rebate are more than thickness of slab 2-3mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720386417.5U CN206854897U (en) | 2017-04-13 | 2017-04-13 | Regulation steel box-girder lifting block positioning apparatus can quickly be corrected |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720386417.5U CN206854897U (en) | 2017-04-13 | 2017-04-13 | Regulation steel box-girder lifting block positioning apparatus can quickly be corrected |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206854897U true CN206854897U (en) | 2018-01-09 |
Family
ID=60817513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720386417.5U Active CN206854897U (en) | 2017-04-13 | 2017-04-13 | Regulation steel box-girder lifting block positioning apparatus can quickly be corrected |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206854897U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537466A (en) * | 2018-12-17 | 2019-03-29 | 上海盛鑫建设工程有限公司 | A kind of skyborne localization method of steel structure girder suspention |
-
2017
- 2017-04-13 CN CN201720386417.5U patent/CN206854897U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537466A (en) * | 2018-12-17 | 2019-03-29 | 上海盛鑫建设工程有限公司 | A kind of skyborne localization method of steel structure girder suspention |
CN109537466B (en) * | 2018-12-17 | 2021-01-08 | 上海盛鑫建设工程有限公司 | Positioning method for suspending steel structure beam in air |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203905512U (en) | Adjustable device for installing steel beams in place | |
CN111761182A (en) | Method for splicing thin plates of cruise ship | |
CN103993746A (en) | Adjustable steel beam in-place mounting device | |
CN206854897U (en) | Regulation steel box-girder lifting block positioning apparatus can quickly be corrected | |
CN205152817U (en) | External prestressed reinforcement structure of bent cap | |
CN203667797U (en) | Simple lifting appliance tooling for SK-2 type double-block sleepers | |
CN205294630U (en) | I -steel clamping frock | |
CN110241959A (en) | A kind of superimposed sheet and its construction method | |
CN202416881U (en) | Steel girder mounting auxiliary appliance | |
CN106192607B (en) | Subgrade of metro steel reinforcement cage suspension type binding clamping fixture and its application | |
CN207538502U (en) | A kind of novel reinforced concrete frame beam column reinforcing joint | |
CN215592333U (en) | Multi-adaptability double-guide-beam bridge crane lifting appliance device with adjustable hole pitch | |
CN113481768B (en) | Method for adding railway line to existing wharf trestle | |
CN109629350A (en) | The concrete track beam and its construction method that empty iron stressed seamless connects | |
CN205100550U (en) | Detachable no steel bar truss lifts by crane isolated plant | |
CN205772789U (en) | A kind of transporting and hoisting device of prefabricated pile | |
CN207240473U (en) | A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool | |
CN207619857U (en) | Bailey beam erection crane horizontal sliding device | |
CN202429894U (en) | Holder for mounting and assembling of bridge crane | |
CN208146818U (en) | Bridge prefabrication cored slab hinge seam steel bar straightening device | |
CN206051218U (en) | Machine-roomless lift car universal cord head fixing device | |
CN206014249U (en) | A kind of foam cement block transport hoist | |
CN206405203U (en) | Smoothing roll hoisting structure | |
CN111774803A (en) | Mail steamer sheet metal upset frock | |
CN207293927U (en) | A kind of interim suspender peculiar to vessel |