CN206844144U - A kind of system of quick control building settlement - Google Patents

A kind of system of quick control building settlement Download PDF

Info

Publication number
CN206844144U
CN206844144U CN201720697242.XU CN201720697242U CN206844144U CN 206844144 U CN206844144 U CN 206844144U CN 201720697242 U CN201720697242 U CN 201720697242U CN 206844144 U CN206844144 U CN 206844144U
Authority
CN
China
Prior art keywords
steel
cushion cap
thick pillar
pipe pile
pillar formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720697242.XU
Other languages
Chinese (zh)
Inventor
吴如军
唐颖
赵正兴
唐军
陈曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shengte Building Technology Development Co Ltd
Original Assignee
Guangzhou Shengte Building Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shengte Building Technology Development Co Ltd filed Critical Guangzhou Shengte Building Technology Development Co Ltd
Priority to CN201720697242.XU priority Critical patent/CN206844144U/en
Application granted granted Critical
Publication of CN206844144U publication Critical patent/CN206844144U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

A kind of technical scheme of the system of quick control building settlement of the utility model includes:Former post, original basis cushion cap, thick pillar formula steel tray system, new cushion cap, steel-pipe pile and pile compacting equipment, wherein:The thick pillar formula steel tray system is erected on the former post suspension column of sedimentation larger side, and the thick pillar formula steel tray system is by surrounding and being formed with the Steel section member that the former post is connected;The thick pillar formula steel tray system has piling hole, and the steel-pipe pile is arranged in the piling hole and the steel-pipe pile is located at original basis cushion cap periphery;The pile compacting equipment is located between the top of the steel-pipe pile and the thick pillar formula steel tray system;The new cushion cap is located at the periphery of the original basis cushion cap.

Description

A kind of system of quick control building settlement
Technical field
The utility model belongs to control building settlement technical field, and in particular to a kind of quick control building settlement System.
Background technology
With the high speed development of construction industry in recent years, the situation of building run-off the straight is fairly common, and domestic External building inclines The case history tiltedly corrected is also innumerable.The application of building inclination rectification technology at home and abroad is more and more common, causes building The reason for inclination be it is many, as in terms of geology, design aspect, in terms of construction, use.
The way of control building settlement has two kinds substantially at present:First, the side that first stable settlement is big, then try by Settle small side to promote to sink, building is reached Equalsettlement;Second, the side that first stable settlement is small, then tries sedimentation is big Side jacking, by the correcting inclination of building.
The defects of prior art is:The construction process requirement engineering time is longer, it is impossible to quickly controls building settlement.
Utility model content
In order to solve this fast technical problem of building settlement speed of the prior art, the utility model provides a kind of fast The system of speed control building settlement, i.e., fix former post by thick pillar formula steel tray system, pass through thick pillar formula steel tray system Steel-pipe pile is progressed into building basis, after building settlement quickly controls, newly-built cushion cap permanent stabilization by counter-force.
A kind of technical scheme of the system of quick control building settlement of the utility model includes:
Former post, original basis cushion cap, thick pillar formula steel tray system, new cushion cap, steel-pipe pile and pile compacting equipment, wherein:
The thick pillar formula steel tray system is erected on the former post suspension column of sedimentation larger side, the thick pillar formula steel tray System is by surrounding and being formed with the Steel section member that the former post is connected;
The thick pillar formula steel tray system has piling hole, and the steel-pipe pile is arranged in the piling hole and the steel Pile tube is located at original basis cushion cap periphery;
The pile compacting equipment is located between the top of the steel-pipe pile and the thick pillar formula steel tray system;
The new cushion cap is located at the periphery of the original basis cushion cap.
Preferably, the thick pillar formula steel tray system is made up of the Steel section member of four pieces of encirclement former posts.
Preferably, the Steel section member is connected with the former post by split bolt.
Preferably, the steel-pipe pile seals stake by lock stud with the original basis cushion cap and fixed.
Preferably, the steel-pipe pile is circular cross-section.
Method corresponding with the system of above-mentioned quick control building settlement includes:
Step 1: on the former post suspension column of sedimentation larger side, thick pillar formula steel tray system, the thick pillar formula steel tray are set up System is by surrounding and being formed with the Steel section member that the former post is connected;
Step 2: having piling hole in the thick pillar formula steel tray system, steel-pipe pile is set in the piling hole, institute State steel-pipe pile and be located at original basis cushion cap periphery, piling is set between the top of the steel-pipe pile and the thick pillar formula steel tray system Equipment;
Step 3: pouring new cushion cap in the periphery of the original basis cushion cap, the steel-pipe pile is embedded in the new cushion cap;
Step 4, remove the thick pillar formula steel tray system.
Preferably, the thick pillar formula steel tray system is made up of the Steel section member of four pieces of encirclement former posts.
Preferably, the Steel section member is connected with the former post by split bolt.
Preferably, the steel-pipe pile seals stake by lock stud with the original basis cushion cap and fixed.
Preferably, the steel-pipe pile is circular cross-section.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is embodiment of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to the accompanying drawing of offer.
Fig. 1 is a kind of method flow diagram of quick control building settlement;
Fig. 2 is the schematic diagram of building settlement;
Fig. 3 (a) (b) is a kind of front view of the system of quick control building settlement of the utility model, overlooked
Fig. 4 is the structure chart that thick pillar formula steel tray system is removed in Fig. 3.
Embodiment
In order to solve this fast technical problem of building settlement speed of the prior art, the utility model provides a kind of fast The system of speed control building settlement, i.e., fix former post by thick pillar formula steel tray system, pass through thick pillar formula steel tray system Steel-pipe pile is progressed into building basis, after building settlement quickly controls, newly-built cushion cap permanent stabilization by counter-force.
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, a kind of method of quick control building settlement includes:
101st, sedimentation larger side former post suspension column on, set up thick pillar formula steel tray system, thick pillar formula steel tray system by The Steel section member composition for surrounding and being connected with former post;
In the present embodiment, Steel section member is connected with former post by split bolt.
In addition, former post can be cube structure, the edge of former post sets Steel section member, is specifically as follows thick pillar formula The Steel section member that steel tray system surrounds former post by four pieces forms.
102nd, piling hole is had in thick pillar formula steel tray system, steel-pipe pile is set in piling hole, and steel-pipe pile is positioned at original Foundation platform periphery, pile compacting equipment is set between the top of steel-pipe pile and thick pillar formula steel tray system;
In the present embodiment, steel-pipe pile progresses into building basis, steel by the counter-force of thick pillar formula steel tray support system Pile tube seals stake by lock stud with original basis cushion cap and fixed, and steel-pipe pile is circular cross-section.
103rd, new cushion cap is poured in the periphery of original basis cushion cap, steel-pipe pile is embedded in new cushion cap;
In the present embodiment, the new staking is connected with former cushion cap by lock stud or envelope stake.
104, remove thick pillar formula steel tray system.
In the present embodiment, by removing split bolt, thick pillar formula steel tray system is removed.
Fig. 2 to Fig. 4 is referred to, a kind of technical scheme of the system of quick control building settlement of the utility model includes:
Former post 1, original basis cushion cap 2, thick pillar formula steel tray system 3, new cushion cap 7, steel-pipe pile 4 and pile compacting equipment 5, wherein:
Thick pillar formula steel tray system 3 be erected at sedimentation larger side former post 1 suspension column on, thick pillar formula steel tray system 3 by Surround and formed with the Steel section member 31 that former post 1 is connected, specific thick pillar formula steel tray system 3 is by four pieces of types for surrounding former post 1 Steel member 31 is formed, and Steel section member 31 is connected with former post 1 by split bolt 6.
Thick pillar formula steel tray system 3 has piling hole, and steel-pipe pile 4 is arranged in piling hole and steel-pipe pile 4 is located at former base The periphery of plinth cushion cap 2, steel-pipe pile 4 seal stake by lock stud with original basis cushion cap 2 and fixed, and steel-pipe pile 4 is circular cross-section
Pile compacting equipment 5 is located between the top of steel-pipe pile 4 and thick pillar formula steel tray system 3;
New cushion cap 7 is located at the periphery of original basis cushion cap 2.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to foregoing reality Example is applied the utility model is described in detail, it will be understood by those within the art that:It still can be to preceding State the technical scheme described in each embodiment to modify, or equivalent substitution is carried out to which part technical characteristic;And these Modification is replaced, and the essence of appropriate technical solution is departed from the spirit and model of various embodiments of the utility model technical scheme Enclose.

Claims (5)

  1. A kind of 1. system of quick control building settlement, it is characterised in that including:Former post, original basis cushion cap, thick pillar formula steel support Disk body system, new cushion cap, steel-pipe pile and pile compacting equipment, wherein:
    The thick pillar formula steel tray system is erected on the former post suspension column of sedimentation larger side, the thick pillar formula steel tray system By surrounding and being formed with the Steel section member that the former post is connected;
    The thick pillar formula steel tray system has piling hole, and the steel-pipe pile is arranged in the piling hole and the steel-pipe pile Positioned at original basis cushion cap periphery;
    The pile compacting equipment is located between the top of the steel-pipe pile and the thick pillar formula steel tray system;
    The new cushion cap is located at the periphery of the original basis cushion cap.
  2. 2. the system of quick control building settlement according to claim 1, it is characterised in that the thick pillar formula steel tray The Steel section member that system surrounds the former post by four pieces forms.
  3. 3. the system of quick control building settlement according to claim 2, it is characterised in that the Steel section member and institute Former post is stated to connect by split bolt.
  4. 4. the system of quick control building settlement according to claim 1, it is characterised in that the steel-pipe pile with it is described Original basis cushion cap seals stake by lock stud and fixed.
  5. 5. the system of quick control building settlement according to claim 1, it is characterised in that the steel-pipe pile is circle Section.
CN201720697242.XU 2017-06-15 2017-06-15 A kind of system of quick control building settlement Active CN206844144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720697242.XU CN206844144U (en) 2017-06-15 2017-06-15 A kind of system of quick control building settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720697242.XU CN206844144U (en) 2017-06-15 2017-06-15 A kind of system of quick control building settlement

Publications (1)

Publication Number Publication Date
CN206844144U true CN206844144U (en) 2018-01-05

Family

ID=60799946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720697242.XU Active CN206844144U (en) 2017-06-15 2017-06-15 A kind of system of quick control building settlement

Country Status (1)

Country Link
CN (1) CN206844144U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237345A (en) * 2017-06-15 2017-10-10 广州市胜特建筑科技开发有限公司 A kind of method and system of quick control building settlement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237345A (en) * 2017-06-15 2017-10-10 广州市胜特建筑科技开发有限公司 A kind of method and system of quick control building settlement

Similar Documents

Publication Publication Date Title
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN105350639B (en) A kind of facade intersects grid structure peripheral frame and its installation method
CN206844144U (en) A kind of system of quick control building settlement
CN108412223B (en) Deviation correcting structure and deviation correcting method for horizontal locking broken column
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN106245692B (en) The heavy reinforcement pile construction method of soft soil foundation control
CN205839721U (en) A kind of novel offshore platform
CN104452771A (en) Counterfort type row pile supporting method for foundation pit
CN107237345A (en) A kind of method and system of quick control building settlement
CN212897448U (en) Plug-in card type multifunctional scaffold
CN109707054A (en) A kind of steel sections package concrete column and steel beam joint structure and construction method
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN204551452U (en) A kind of composite pile improving bearing capacity of foundation soil
CN107620314A (en) The construction method and concrete column leg structure of a kind of concrete suspension column
CN211596818U (en) Large-load industrial building foundation structure
CN208121551U (en) A kind of assembled device of prefabricated pier shaft and prefabricated bent cap
CN202990418U (en) Slurry-leaking protection device preventing cast-in-place concrete column root from rotting
CN206495371U (en) A kind of 2 light steel wall attachment structures of non-perpendicular handing-over
CN105002906A (en) Binding type anchor cable composite pile structure serving as main body structure stand column and construction method thereof
CN205676914U (en) A kind of device of Fast Installation cement kiln end pylon pre-embedded bolt
CN103711128B (en) A kind of construction method of shallow foundation structural beam slab
CN204875803U (en) Equipment is strutted in stake of double worker's method of grid formula
CN105525618B (en) Domed foundation pit supporting construction and its construction method
CN204626964U (en) Concreting leak-proof device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant