CN204875803U - Equipment is strutted in stake of double worker's method of grid formula - Google Patents

Equipment is strutted in stake of double worker's method of grid formula Download PDF

Info

Publication number
CN204875803U
CN204875803U CN201520590417.8U CN201520590417U CN204875803U CN 204875803 U CN204875803 U CN 204875803U CN 201520590417 U CN201520590417 U CN 201520590417U CN 204875803 U CN204875803 U CN 204875803U
Authority
CN
China
Prior art keywords
stake
deeply
row
stirred
rigit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520590417.8U
Other languages
Chinese (zh)
Inventor
唐为峰
王春
李春忠
高照祥
尚耀宪
高向阳
吕玉勇
张志超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongying Surveying And Mapping Institute
Original Assignee
Dongying Surveying And Mapping Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongying Surveying And Mapping Institute filed Critical Dongying Surveying And Mapping Institute
Priority to CN201520590417.8U priority Critical patent/CN204875803U/en
Application granted granted Critical
Publication of CN204875803U publication Critical patent/CN204875803U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to an equipment is strutted in stake of double worker's method of grid formula, its technical scheme is: include that the stake is stirred deeply at the front row, stake, shaped steel, front -seat guan liang, back row guanliang, rigit -frame beam and reinforcement stake are stirred deeply to the back row, the stake is stirred deeply at the front row and the back row is stirred through the fixed I -shaped structure of formation of rigit -frame beam connection between the stake deeply, the front row is stirred the stake deeply and is connected to form through multiunit shaped steel, and the back row is stirred the stake deeply and is connected to form through multiunit shaped steel, the front row top of stirring the stake deeply be equipped with front -seat guan liang, the stake was stirred deeply in the back row top is equipped with back row guanliang, the inside of rigit -frame beam be equipped with and consolidate the stake, consolidate the one end fixed connection front row of stake and stir the stake deeply, consolidate the other end fixed connection back row of stake and stir the stake deeply, the beneficial effects of the utility model are that: supporting construction the stiffness is big, and anti deformability is strong, struts effectually.

Description

Grid type double engineering method stake support apparatus
Technical field
The utility model relates to a kind of foundation pit supporting construction be applied in civil construction, particularly a kind of grid type double engineering method stake support apparatus.
Background technology
At present in some Practical Project, double-row pile engineering method because of its construction technology simply, the not advantage such as short with soil excavation cross-operation, duration, substitute cantilever pile, brace type retaining structure, the pull-type retaining structure of anchor, obtain certain application.Campshed before and after it, conventional adopts castinplace pile, but castinplace pile can only keep off soil, can not sealing, still need and separately establish water-stopping structure, and filling pile construction mud contamination is large, cost is high, the reinforced concrete pile formed forever keeps underground, becomes underground obstacle, is unfavorable for that long-term sustainable develops.Relative to castinplace pile, SMW engineering method stake (abbreviation of SoilMixingWall) is a kind of soldier pile of environmental protection sustainable development, can solve castinplace pile can not sealing and the problem such as pollution, underground obstacle, but campshed connects by means of only Guan Liang and rigit-frame beam before and after in the stake of double SMW engineering method, its integral rigidity is less than normal, can not form effective support system.
Summary of the invention
The purpose of this utility model is exactly in view of the foregoing defects the prior art has, provides a kind of grid type double engineering method stake support apparatus.
Its technical scheme is: comprise front row and deeply stir stake, rear row stirs stake deeply, shaped steel, front-seat Guan Liang, rear row Guan Liang, rigit-frame beam and reinforcing pile, described front row is deeply stirred stake and rear row and is deeply stirred between stake and be connected and fixed formation I-shaped structure by rigit-frame beam, described front row is deeply stirred stake and is connected to form by many group shaped steel, rear row is deeply stirred stake and is connected to form by many group shaped steel, the top that stake is stirred at described front row is deeply provided with front-seat Guan Liang, the top that rear row stirs stake is deeply provided with rear row Guan Liang, the inside of described rigit-frame beam is provided with reinforcing pile, one end of reinforcing pile is fixedly connected with front row and deeply stirs stake, the other end of reinforcing pile is fixedly connected with rear row and deeply stirs stake.
Above-mentioned reinforcing pile is interconnection, composition cell structure.
The beneficial effects of the utility model are:
(1) supporting and protection structure integral rigidity is large, and non-deformability is strong, and supporting effect is good;
(2) supporting and sealing are integrated;
(3) shaped steel is factorial praluction, and speed is fast, and can pull out recovery, repeatedly uses, environmental protection and economy;
(4) speed of application is fast, and the duration is short, reliable in quality;
(5) by adjustment reinforcing pile parameter, shaped steel quantity and front and rear row pilespacing, can expand supporting range of application, applicability is stronger.
Accompanying drawing explanation
Accompanying drawing 1 is top view of the present utility model;
In upper figure: stake 1 is stirred at front row deeply, rear row stirs stake 2 deeply, shaped steel 3, front-seat hat beam 4, rear row are preced with beam 5, rigit-frame beam 6, reinforcing pile 7.
Detailed description of the invention
By reference to the accompanying drawings 1, the utility model will be further described:
The utility model comprises front row and deeply stirs stake 1, rear row stirs stake 2 deeply, shaped steel 3, front-seat hat beam 4, rear row's hat beam 5, rigit-frame beam 6 and reinforcing pile 7, described front row is deeply stirred stake 1 and rear row and is deeply stirred between stake 2 and be connected and fixed formation I-shaped structure by rigit-frame beam 6, described front row is deeply stirred stake 1 and is connected to form by many group shaped steel 3, rear row is deeply stirred stake 2 and is connected to form by many group shaped steel 3, the top that stake 1 is stirred at described front row is deeply provided with front-seat hat beam 4, the top that rear row stirs stake 2 is deeply provided with rear row hat beam 5, the inside of described rigit-frame beam 6 is provided with reinforcing pile 7, one end of reinforcing pile 7 is fixedly connected with front row and deeply stirs stake 1, the other end of reinforcing pile 7 is fixedly connected with rear row and deeply stirs stake 2.
Above-mentioned reinforcing pile 7 is in interconnection, and composition cell structure, improves the fixed support stability that stake 1 is stirred at front row deeply, rear row stirs stake 2 deeply.
During making, first construct and deeply stir stake, then before cement-soil initial set, insert shaped steel, form the stake of SMW engineering method, then construction reinforcement stake, is linked to be entirety by front and back campshed.Complete also maintenance after 7 days Deng pile body, construction Guan Liang and rigit-frame beam form composite supporting construction.
The above is only preferred embodiment of the present utility model, and any those of ordinary skill in the art all may utilize the technical scheme of above-mentioned elaboration to the utility model correct or are revised as equivalent technical scheme.Therefore, any simple modification of carrying out according to the technical solution of the utility model or substitute equivalents, belong to the greatest extent the scope that the utility model is claimed.

Claims (2)

1. a grid type double engineering method stake support apparatus, it is characterized in that: comprise front row and deeply stir stake (1), rear row stirs stake (2) deeply, shaped steel (3), front-seat Guan Liang (4), rear row Guan Liang (5), rigit-frame beam (6) and reinforcing pile (7), described front row is deeply stirred stake (1) and rear row and is deeply stirred between stake (2) and be connected and fixed formation I-shaped structure by rigit-frame beam (6), described front row is deeply stirred stake (1) and is connected to form by organizing shaped steel (3) more, rear row deeply stirs stake (2) and connects to form by organizing shaped steel (3) more, the top that stake (1) is stirred at described front row is deeply provided with front-seat Guan Liang (4), the top that rear row stirs stake (2) is deeply provided with rear row Guan Liang (5), the inside of described rigit-frame beam (6) is provided with reinforcing pile (7), one end of reinforcing pile (7) is fixedly connected with front row and deeply stirs stake (1), the other end of reinforcing pile (7) is fixedly connected with rear row and deeply stirs stake (2).
2. grid type according to claim 1 double engineering method stake support apparatus, is characterized in that: described reinforcing pile (7), in interconnection, forms cell structure.
CN201520590417.8U 2015-08-07 2015-08-07 Equipment is strutted in stake of double worker's method of grid formula Expired - Fee Related CN204875803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520590417.8U CN204875803U (en) 2015-08-07 2015-08-07 Equipment is strutted in stake of double worker's method of grid formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520590417.8U CN204875803U (en) 2015-08-07 2015-08-07 Equipment is strutted in stake of double worker's method of grid formula

Publications (1)

Publication Number Publication Date
CN204875803U true CN204875803U (en) 2015-12-16

Family

ID=54820195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520590417.8U Expired - Fee Related CN204875803U (en) 2015-08-07 2015-08-07 Equipment is strutted in stake of double worker's method of grid formula

Country Status (1)

Country Link
CN (1) CN204875803U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118701A (en) * 2017-12-21 2018-06-05 上海市政工程设计研究总院(集团)有限公司 A kind of double Larsen steel sheet pile rigit-frame beam and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118701A (en) * 2017-12-21 2018-06-05 上海市政工程设计研究总院(集团)有限公司 A kind of double Larsen steel sheet pile rigit-frame beam and its installation method
CN108118701B (en) * 2017-12-21 2024-01-12 上海市政工程设计研究总院(集团)有限公司 Double-row Larson steel sheet pile rigid frame beam and mounting method thereof

Similar Documents

Publication Publication Date Title
CN103074898B (en) Multi-row pile foundation pit support structure and construction method thereof
CN107060840B (en) A kind of construction method of large cross-section tunnel V grades of country rock excavation supportings
CN206768834U (en) A kind of deep basal pit combined support structure
CN205134331U (en) Foundation ditch excavation bearing structure
CN101509261B (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN106284296A (en) The supporting construction of a kind of double steel sheet pile and construction method thereof
CN103669369B (en) The supporting and protection structure of foundation ditch and supporting method
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN102758458B (en) Underground continuous wall repairing method
CN103074899B (en) Subdepot pier-type foundation pit support structure and construction method
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN106088102A (en) Lattice combined steel plate pile cement-soil composite pile and construction method thereof
CN210562157U (en) Post-grouting composite pile
CN205171528U (en) Recoverable underground structure
CN105089670A (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN205205833U (en) Soil nail and stock combined type double row pile underground structure
CN105862906A (en) Offshore wind power plant draught fan single pile foundation and construction method
CN104805828B (en) W-shaped steel sheet pile structure
CN204875803U (en) Equipment is strutted in stake of double worker's method of grid formula
CN103321234A (en) Load-bearing structure built on high slope or geological complex area and constructing method thereof
CN204626377U (en) W shaped steel plate pile structure
CN104278671B (en) Insert stiffness Soil-cement soldier pile and the construction method thereof of inverted cup shaped steel bucket
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN106245692B (en) The heavy reinforcement pile construction method of soft soil foundation control

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20160807

CF01 Termination of patent right due to non-payment of annual fee