CN206843884U - A kind of temporary road plate - Google Patents
A kind of temporary road plate Download PDFInfo
- Publication number
- CN206843884U CN206843884U CN201720694110.1U CN201720694110U CN206843884U CN 206843884 U CN206843884 U CN 206843884U CN 201720694110 U CN201720694110 U CN 201720694110U CN 206843884 U CN206843884 U CN 206843884U
- Authority
- CN
- China
- Prior art keywords
- template
- reinforcement
- temporary road
- model
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a kind of temporary road plate, including arrangement of reinforcement, angle steel cornerite, template and sand bedding course, the template is rectangle, respectively there is a suspension centre at four angles of the template, angle steel cornerite is cased with the outside of four angles of the template, there is sand bedding course in the template, the arrangement of reinforcement for having laterally longitudinally staggered setting in the template, the end bending of the arrangement of reinforcement, the bending direction of the end of all arrangements of reinforcement of side are identical.The utility model provides a kind of temporary road plate, it is assembled that temporary road is carried out using this roads plate, solving live temporary road laying, time-consuming, later stage also needs to abolish, the problem of wasting buildings and resources, can not only meet the requirement of job site hard surface, and can have enough to meet the need multiple engineerings, economize on resources, reduce cost.
Description
Technical field
Job site road hardening field is the utility model is related to, more particularly to a kind of temporary road plate.
Background technology
Job site temporary road typically uses concrete road surface at present, first carries out compacting leveling to road foundation, repaves
Provided with soil padding, finally carried out with road roller compacting using the concrete of some strength cast-in-place.Indivedual road surfaces can also use and pad
Laying solid concrete brick in layer top is subject to the mode of the coarse sand cementation of fissures.Using conventional method carry out temporary road laying process compared with
More, curing time is longer, and needs progress road to abolish after Practical Completion, extends the duration, adds construction site cleaning
Expense.
Utility model content
In order to solve above-mentioned problem, the utility model provides a kind of temporary road plate, is carried out using this roads plate
Temporary road is assembled, and solving live temporary road laying, time-consuming, and the later stage also needs to abolish, the problem of wasting buildings and resources, no
The requirement for meeting job site hard surface is only capable of, and multiple engineerings can be had enough to meet the need, economizes on resources, reduces cost, for up to this mesh
, the utility model provides a kind of temporary road plate, including arrangement of reinforcement, angle steel cornerite, template and sand bedding course, the template are square
Respectively there is a suspension centre at shape, four angles of the template, is cased with angle steel cornerite on the outside of four angles of the template, has in the template
Sand bedding course, there is the arrangement of reinforcement of laterally longitudinally staggered setting in the template, the end bending of the arrangement of reinforcement, all arrangements of reinforcement of side
The bending direction of end is identical.
Further improvement of the utility model, the template specification be 3m × 1.5m × 0.2m or 0.8m × 0.6m ×
0.2m, the utility model have used in practice, more than main use 2 kinds of specifications during use.
Further improvement of the utility model, the sand bedding course thickness 3cm~5cm, general sand bedding course 3cm~5cm.
Further improvement of the utility model, the diameter of the arrangement of reinforcement are that 10mm spacing is 300mm, the utility model arrangement of reinforcement
The conventional arrangement of reinforcement more than.
Further improvement of the utility model, the angle steel cornerite specification are 50mm × 50mm × 3mm, the utility model angle
Ladle angle mainly uses above specification.
There is neck further improvement of the utility model, bottom cabinet middle part top, and the main supporting plate lower end is inserted
In neck, inserting mode can be dismantled in order to supporting plate.
A kind of temporary road plate of the utility model, has the beneficial effect that:
1st, the utility model roads plate can use two kinds of forms of prefabrication and field fabrication, flexibly be controlled according to field condition
System;
2nd, the utility model working procedure is simple to operation, and plant equipment is not required too much, reduces cost;
3rd, the utility model has carrying heavy vehicle and carries the road deck of two kinds of specifications of light vehicle, can meet that difference is applied
The requirement of work condition;
4th, the utility model can substitute damage road deck at any time, time-consuming short, not interfere with site operation.
5th, the utility model can have enough to meet the need multiple building sites and reuse, and reduce buildings and resources and waste, reduce cost.
Brief description of the drawings
Fig. 1 is the utility model 3m × 1.5m × 0.2m specification roads plate schematic diagrames;
Fig. 2 is the utility model 0.8m × 0.6m × 0.2m specification roads plate schematic diagrames;
Illustrate:
1st, arrangement of reinforcement;2nd, suspension centre;3rd, angle steel cornerite;4th, template;5th, sand bedding course.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
The utility model provides a kind of temporary road plate, carries out temporary road assembly using this roads plate, solves scene
Temporary road laying time-consuming, the later stage also needs to abolish, waste buildings and resources the problem of, job site hard surface can not only be met
Requirement, and multiple engineerings can be had enough to meet the need, economized on resources.
As a kind of specific embodiment of the utility model, the utility model provides a kind of temporary road plate as shown in Figure 1,
Including arrangement of reinforcement 1, angle steel cornerite 3, template 4 and sand bedding course 5, the template 4 is rectangle, the specification of template 4 be 3m × 1.5m ×
0.2m, the utility model have used in practice, more than main use 2 kinds of specifications during use, four of the template 4
Respectively there is a suspension centre 2 at angle, is cased with angle steel cornerite 3 on the outside of four angles of the template 4, the specification of angle steel cornerite 3 be 50mm ×
50mm × 3mm, the utility model angle steel cornerite mainly use above specification, there is sand bedding course 5, the sand bedding course 5 in the template 4
Thick 3cm~5cm, general sand bedding course 3cm~5cm, there is the arrangement of reinforcement 1 of laterally longitudinally staggered setting in the template 4, it is described to match somebody with somebody
The end bending of muscle 1, the bending direction of the end of all arrangements of reinforcement 1 of side is identical, and the diameter of the arrangement of reinforcement 1 is that 10mm spacing is
300mm, the utility model arrangement of reinforcement use conventional arrangement of reinforcement above.
As a kind of specific embodiment of the utility model, the utility model provides a kind of temporary road plate as shown in Figure 2,
Including arrangement of reinforcement 1, angle steel cornerite 3, template 4 and sand bedding course 5, the template 4 is rectangle, and the specification of template 4 is 0.8m × 0.6m
× 0.2m, the utility model have used in practice, more than main use 2 kinds of specifications during use, and the four of the template 4
Respectively there is a suspension centre 2 at individual angle, is cased with angle steel cornerite 3 on the outside of four angles of the template 4, the specification of angle steel cornerite 3 is 50mm
× 50mm × 3mm, the utility model angle steel cornerite mainly use above specification, there is sand bedding course 5, the sand pad in the template 4
Layer 5 thick 3cm~5cm, general sand bedding course 3cm~5cm, there are the arrangement of reinforcement 1 of laterally longitudinally staggered setting, institute in the template 4
The end bending of arrangement of reinforcement 1 is stated, the bending direction of the end of all arrangements of reinforcement 1 of side is identical, and the diameter of the arrangement of reinforcement 1 is between 10mm
Away from being 300mm, the utility model arrangement of reinforcement uses commonly uses arrangement of reinforcement above.
The utility model temporary road plate using engineering it is prefabricated or field fabrication by the way of, mainly including suspension centre, arrangement of reinforcement, angle
Steel sets three parts.It is divided into carrying heavy vehicle, two kinds of carrying light vehicle road deck.Roads plate is designed and sized to 3m × 1.5m
Two kinds of models of × 0.2m and 0.8m × 0.6m × 0.2m.
Specific construction mode is as follows:
The first step, carry out reinforcing bar colligation, arrangement of reinforcement A10@300.Second step carries out model sheetinstallat, is stayed in hoisting point position and sets suspension centre
After-pouring concrete.3rd step surrounding after the completion of prefabricated section maintenance sets 50mm × 50mm × 3mm angle steel.4th step is to road
The medium coarse sand bed course of pavement compaction, smooth rear laying 3cm~5cm.5th step carries out lifting splicing to roads plate.
The utility model uses in practice, and in Wu Kuang Kowloon, Nanjing lake G55, project, the project is positioned at south
To the east of the Hu Shuanlong main roads of Jing Shi Jiangning Districts Kowloon, on the south Xue Lin East Roads.The total floor space of project is about 95295.00 ㎡, fine fitment
Put on Records.This bid section project overall floorage 84499.38 ㎡, the ㎡ of superstructure area 55142.04, hypogee area
29357.34㎡.Property type includes 20F high levels, 6F superpositions, kindergarten, Di Ku.This engineering is assembled project, and the duration is tight
, after carrying out live temporary road assembly using the utility model roads plate, construction period can be greatly shortened by test, also may be used
To meet the theory of assembled project.
It is described above, only it is preferred embodiment of the present utility model, is not that any other is made to the utility model
The limitation of form, and any modification made according to the technical essence of the utility model or equivalent variations, it is new to still fall within this practicality
Type scope claimed.
Claims (5)
1. a kind of temporary road plate, including arrangement of reinforcement(1), angle steel cornerite(3), template(4)And sand bedding course(5), it is characterised in that:Institute
State template(4)For rectangle, the template(4)Four angles respectively have a suspension centre(2), the template(4)Four angle outer sheaths
There is angle steel cornerite(3), the template(4)On have sand bedding course(5), the template(4)Inside there is the arrangement of reinforcement of laterally longitudinally staggered setting
(1), the arrangement of reinforcement(1)End bending, all arrangements of reinforcement of side(1)End bending direction it is identical.
A kind of 2. temporary road plate according to claim 1, it is characterised in that:The template(4)Specification is 3m × 1.5m
× 0.2m or 0.8m × 0.6m × 0.2m.
A kind of 3. temporary road plate according to claim 1, it is characterised in that:The sand bedding course(5)Thick 3cm~5cm.
A kind of 4. temporary road plate according to claim 1, it is characterised in that:The arrangement of reinforcement(1)Diameter be between 10mm
Away from being 300mm.
A kind of 5. temporary road plate according to claim 1, it is characterised in that:The angle steel cornerite(3)Specification is 50mm
×50mm×3mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720694110.1U CN206843884U (en) | 2017-06-15 | 2017-06-15 | A kind of temporary road plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720694110.1U CN206843884U (en) | 2017-06-15 | 2017-06-15 | A kind of temporary road plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206843884U true CN206843884U (en) | 2018-01-05 |
Family
ID=60800397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720694110.1U Active CN206843884U (en) | 2017-06-15 | 2017-06-15 | A kind of temporary road plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206843884U (en) |
-
2017
- 2017-06-15 CN CN201720694110.1U patent/CN206843884U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350559B (en) | A kind of construction method of diamond dust structural floor suitable for large-sized workshop | |
CN108035376B (en) | Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof | |
CN105386454B (en) | A kind of joint assembling type base for power transmission tower | |
CN105507170A (en) | Reinforced concrete slab culvert reinforcement method | |
CN204060020U (en) | A kind of Reinforced Concrete Reinforcement structure | |
CN110863498A (en) | Deep foundation pit combined supporting construction method next to subway station | |
CN101368447B (en) | Old wall renovation and construction method | |
CN111395300A (en) | Method for reinforcing soft soil foundation structure by using original bamboo grouting piles | |
CN110965415A (en) | Method for widening and transforming old concrete pavement | |
CN205954638U (en) | Half semi -rigid flexible supporting construction of deep basal pit lateral wall | |
CN114032724A (en) | Assembled recycled concrete rural pavement | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN206843884U (en) | A kind of temporary road plate | |
CN104890434A (en) | Plastic-stone landscape making method | |
CN101929245A (en) | Thin webbed girder vertical construction method | |
CN110777854A (en) | High-rise building basement roof structure, waterproof coiled material and construction method for protecting layer to survive in one step | |
CN109083442B (en) | Construction method of dynamic load bearing structure during butt joint of existing building and newly-built foundation | |
CN104675138B (en) | A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation | |
CN103276645A (en) | Precast pile, beam and slab renovation technology for diseases of existing line tunnel base | |
CN113774972B (en) | Reinforcing method for overload punching damage of independent foundation under column | |
CN113846714B (en) | Method for repairing and reinforcing raft foundation | |
CN211285121U (en) | Road surface board and road surface structure suitable for interim road weak soil foundation | |
CN113481771A (en) | Permanent-temporary combined construction structure for municipal road and construction method thereof | |
CN104947665A (en) | Construction method of granular material ram-expanded pile composite foundation | |
CN105672681B (en) | One kind realizes load bearing wall support and change method using combining structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |