CN206841489U - A kind of construction site conveying arrangement - Google Patents

A kind of construction site conveying arrangement Download PDF

Info

Publication number
CN206841489U
CN206841489U CN201720631698.6U CN201720631698U CN206841489U CN 206841489 U CN206841489 U CN 206841489U CN 201720631698 U CN201720631698 U CN 201720631698U CN 206841489 U CN206841489 U CN 206841489U
Authority
CN
China
Prior art keywords
fixedly connected
feed tank
body feed
inner chamber
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720631698.6U
Other languages
Chinese (zh)
Inventor
许华硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'anshan Huaxin Construction Co Ltd
Original Assignee
Ma'anshan Huaxin Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'anshan Huaxin Construction Co Ltd filed Critical Ma'anshan Huaxin Construction Co Ltd
Priority to CN201720631698.6U priority Critical patent/CN206841489U/en
Application granted granted Critical
Publication of CN206841489U publication Critical patent/CN206841489U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses a kind of construction site conveying arrangement, including base, body feed tank is fixedly connected with the top of the base, motor housing is fixedly connected with the right side of the base top, the bottom of the motor box cavity is fixedly connected with motor, the output shaft of the motor is fixedly connected with threaded rod by shaft coupling, the left end of the threaded rod is turned left from the right side to be sequentially passed through the left side of motor housing and the right side of body feed tank and is connected with the left pivot movement of material box cavity, the bottom of the inner chamber of the body feed tank is fixedly connected with lowering or hoisting gear, supporting plate is fixedly connected with the top of the lowering or hoisting gear, and both sides of the both sides of supporting plate respectively with material box cavity are slidably connected, lowering or hoisting gear includes the first fixed block, it the utility model is related to technical field of buildings.The construction site conveying arrangement, solve the problems, such as to cause excessive waste of manpower resource and to reduce work task efficiency because the material of body feed tank intracavity bottom is not easy to take out.

Description

A kind of construction site conveying arrangement
Technical field
Technical field of buildings is the utility model is related to, specially a kind of construction site conveying arrangement.
Background technology
From broadly, architecture is the subject of research building and its environment, and architecture is one across engineering technology With the subject of humanities and art, the art of architecture and Building technology involved by architecture and the art of architecture as utility art, Including it is aesthstic and it is practical while, though they have clearly different but maintained close ties with, and its component is with specific The difference of situation and building and differ widely.
Traditional construction site conveying arrangement is when transporting to fixed position, it may occur that in the material of body feed tank intracavity bottom It is not easy situation about taking out, cumbersome, the excessive manpower that wastes particularly is taken out in the case where material is heavier and is provided Source, work task efficiency is indirectly reduced, the using effect of user can not be met.
Utility model content
(One)The technical problem of solution
In view of the shortcomings of the prior art, the utility model provides a kind of construction site conveying arrangement, solve due to The material of body feed tank intracavity bottom, which is not easy to take out, to be caused excessive waste of manpower resource and reduces asking for work task efficiency Topic.
(Two)Technical scheme
To realize object above, the utility model is achieved by the following technical programs:A kind of construction site transport Device, including base, body feed tank is fixedly connected with the top of the base, motor is fixedly connected with the right side of the base top Case, the bottom of the motor box cavity are fixedly connected with motor, and the output shaft of the motor is fixedly connected with spiral shell by shaft coupling Rasp bar, the left end of the threaded rod turned left from the right side sequentially pass through the left side of motor housing and the right side of body feed tank and with material box cavity Left pivot movement connection, the bottom of the inner chamber of the body feed tank is fixedly connected with lowering or hoisting gear, and the top of the lowering or hoisting gear is consolidated Surely supporting plate is connected with, and both sides of the both sides of supporting plate respectively with material box cavity are slidably connected.
The lowering or hoisting gear includes the first fixed block, and first fixed block is sheathed on the surface of threaded rod, and described first First connecting rod is rotatably connected on fixed block, the top of the first connecting rod is rotatably connected to sliding shoe, the top of the sliding shoe Portion slidably connects the first slide rail, and the top of the first slide rail is fixedly connected with the bottom of supporting plate, the supporting plate bottom Both sides be fixedly connected with the second fixed block, be rotatably connected to second connecting rod, and second connecting rod on second fixed block It is rotatablely connected with the middle part of first connecting rod by bolt, the bottom of the second connecting rod is rotatably connected to axle sleeve, and axle sleeve set Located at the surface of threaded rod, the bottom of the axle sleeve is fixedly connected with sliding bar, and the bottom of the sliding bar slidably connects Two tracks, and the bottom of the second track is fixedly connected with the bottom of material box cavity.
Preferably, one-way wheel is fixedly connected with the left of the base bottom, is fixedly connected on the right side of the base bottom There is universal wheel.
Preferably, it is fixedly connected with push and pull bar on the right side of the base top.
Preferably, the both sides of the supporting plate are inlaid with ball, and the surface of ball and the both sides of material box cavity Contact.
Preferably, the side of first fixed block is fixedly connected with gag lever post, and one end of gag lever post and body feed tank The side of inner chamber is fixedly connected.
(Three)Beneficial effect
The utility model provides a kind of construction site conveying arrangement.Possesses following beneficial effect:Use in the construction site Conveying arrangement, pass through motor, threaded rod, the first fixed block, first connecting rod, sliding shoe, the first slide rail, the second fixed block, second Connecting rod, axle sleeve, the second track are used cooperatively, and solve the thing of body feed tank intracavity bottom in traditional construction site conveying arrangement The problem of material is not easy to take out, human resources are saved, add work task efficiency, meet the use effect of user Fruit.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the structural representation of the utility model lowering or hoisting gear.
In figure:1- bases, 2- body feed tanks, 3- motor housings, 4- motors, 5- threaded rods, 6- update devices, 601- first are fixed Block, 602- first connecting rods, 603- sliding shoes, the slide rails of 604- first, the fixed blocks of 605- second, 606- second connecting rods, 607- axle sleeves, 608- sliding bars, the tracks of 609- second, 610- gag lever posts, 7- supporting plates, 8- one-way wheels, 9- universal wheels, 10- push and pull bars, 11- Ball.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of construction site conveying arrangement, including bottom Seat 1, one-way wheel 8 is fixedly connected with the left of the bottom of base 1, universal wheel 9, universal wheel 9 are fixedly connected with the right side of the bottom of base 1 For turning to, the right side at the top of base 1 is fixedly connected with push and pull bar 10, and the top of base 1 is fixedly connected with body feed tank 2, thing Hopper 2 is used to place material, and the right side at the top of base 1 is fixedly connected with motor housing 3, and motor housing 3 is used to protect motor 4, motor The bottom of the inner chamber of case 3 is fixedly connected with motor 4, and motor 4 is threephase asynchronous machine, and the output shaft of motor 4 is fixed by shaft coupling Be connected with threaded rod 5, the left side on the surface of threaded rod 5 and the screw thread that the screw thread on right side is opposite direction, the left end of threaded rod 5 from The right side, which is turned left, to be sequentially passed through the left side of motor housing 3 and the right side of body feed tank 2 and is connected with the left pivot movement of the inner chamber of body feed tank 2, material The bottom of the inner chamber of case 2 is fixedly connected with lowering or hoisting gear 6, and the top of lowering or hoisting gear 6 is fixedly connected with supporting plate 7, and supporting plate 7 is used In support material, and both sides of the both sides of supporting plate 7 respectively with the inner chamber of body feed tank 2 are slidably connected, and the both sides of supporting plate 7 are inlayed Embedded with ball 11, and two side contacts on the surface of ball 11 and the inner chamber of body feed tank 2, ball 11 are used to reduce supporting plate 7 and thing Frictional force between the inwall of hopper 2.
Lowering or hoisting gear 6 includes the first fixed block 601, and the side of the first fixed block 601 is fixedly connected with gag lever post 610, and And one end of gag lever post 610 is fixedly connected with the side of the inner chamber of body feed tank 2, gag lever post 610 is used to limit the first fixed block 601 Position, the first fixed block 601 are sheathed on the surface of threaded rod 5, and first connecting rod 602 is rotatably connected on the first fixed block 601, the The top of one connecting rod 602 is rotatably connected to sliding shoe 603, and the top slide of sliding shoe 603 is connected with the first slide rail 604, and The top of first slide rail 604 is fixedly connected with the bottom of supporting plate 7, and the both sides of the bottom of supporting plate 7 have been fixedly connected with second and consolidated Determine block 605, second connecting rod 606 is rotatably connected on the second fixed block 605, and in second connecting rod 606 and first connecting rod 602 Portion is rotatablely connected by bolt, and the bottom of second connecting rod 606 is rotatably connected to axle sleeve 607, and axle sleeve 607 is sheathed on threaded rod 5 surface, the bottom of axle sleeve 607 are fixedly connected with sliding bar 608, and the bottom of sliding bar 608 slidably connects the second track 609, and the bottom of the second track 609 is fixedly connected with the bottom of the inner chamber of body feed tank 2, the track 609 of sliding bar 608 and second With the use of the movement locus for limiting axle sleeve 607.
Placed in use, the material for needing to transport is positioned on plate 7, promote push-and-pull 10 solid whole device is moved to When positioning is put, the material of the inner chamber of body feed tank 2 is drawn off, when material is too low causes worker to be not easy to take out, opens motor 4, The operation of motor 4 drives the rotation of threaded rod 5, and the motion of threaded rod 5 drives two axle sleeves 607 to be moved horizontally to both sides, and second The bottom of connecting rod 606 follows axle sleeve 607 to move, while the top of second connecting rod 606 is moved upwards, the motion of second connecting rod 606 The top of first connecting rod 602 is driven to follow sliding shoe 603 to be moved inside the first track 604 to the direction of motion of axle sleeve 607, the The interaction of one connecting rod and 602 second connecting rods 606 drives supporting plate 7 to move upwards, and the material for being not easy to lay down is moved into appearance The position easily laid down, has saved human resources.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that Other identical element in the process including the key element, method, article or equipment also be present ".
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction site conveying arrangement, including base(1), it is characterised in that:The base(1)Top be fixedly connected There is body feed tank(2), the base(1)Motor housing is fixedly connected with the right side of top(3), the motor housing(3)The bottom of inner chamber It is fixedly connected with motor(4), the motor(4)Output shaft threaded rod is fixedly connected with by shaft coupling(5), the threaded rod (5)Left end turned left from the right side and sequentially pass through motor housing(3)Left side and body feed tank(2)Right side and and body feed tank(2)Inner chamber Left pivot movement connects, the body feed tank(2)The bottom of inner chamber be fixedly connected with lowering or hoisting gear(6), the lowering or hoisting gear(6)'s Top is fixedly connected with supporting plate(7), and supporting plate(7)Both sides respectively with body feed tank(2)The both sides of inner chamber are slidably connected;
The lowering or hoisting gear(6)Including the first fixed block(601), first fixed block(601)It is sheathed on threaded rod(5)Table Face, first fixed block(601)On be rotatably connected to first connecting rod(602), the first connecting rod(602)Top rotate connect It is connected to sliding shoe(603), the sliding shoe(603)Top slide be connected with the first slide rail(604), and the first slide rail (604)Top and supporting plate(7)Bottom be fixedly connected, the supporting plate(7)The both sides of bottom have been fixedly connected with second Fixed block(605), second fixed block(605)On be rotatably connected to second connecting rod(606), and second connecting rod(606)With First connecting rod(602)Middle part be rotatablely connected by bolt, the second connecting rod(606)Bottom be rotatably connected to axle sleeve (607), and axle sleeve(607)It is sheathed on threaded rod(5)Surface, the axle sleeve(607)Bottom be fixedly connected with sliding bar (608), the sliding bar(608)Bottom slidably connect the second track(609), and the second track(609)Bottom with Body feed tank(2)The bottom of inner chamber is fixedly connected.
A kind of 2. construction site conveying arrangement according to claim 1, it is characterised in that:The base(1)Bottom Left side is fixedly connected with one-way wheel(8), the base(1)Universal wheel is fixedly connected with the right side of bottom(9).
A kind of 3. construction site conveying arrangement according to claim 1, it is characterised in that:The base(1)Top Right side is fixedly connected with push and pull bar(10).
A kind of 4. construction site conveying arrangement according to claim 1, it is characterised in that:The supporting plate(7)Two Side is inlaid with ball(11), and ball(11)Surface and body feed tank(2)Two side contacts of inner chamber.
A kind of 5. construction site conveying arrangement according to claim 1, it is characterised in that:First fixed block (601)Side be fixedly connected with gag lever post(610), and gag lever post(610)One end and body feed tank(2)The side of inner chamber is consolidated Fixed connection.
CN201720631698.6U 2017-06-02 2017-06-02 A kind of construction site conveying arrangement Expired - Fee Related CN206841489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720631698.6U CN206841489U (en) 2017-06-02 2017-06-02 A kind of construction site conveying arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720631698.6U CN206841489U (en) 2017-06-02 2017-06-02 A kind of construction site conveying arrangement

Publications (1)

Publication Number Publication Date
CN206841489U true CN206841489U (en) 2018-01-05

Family

ID=60798625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720631698.6U Expired - Fee Related CN206841489U (en) 2017-06-02 2017-06-02 A kind of construction site conveying arrangement

Country Status (1)

Country Link
CN (1) CN206841489U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109050606A (en) * 2018-08-13 2018-12-21 何港港 A kind of construction handling device
CN109664929A (en) * 2019-01-22 2019-04-23 四川信息职业技术学院(广元无线电技工学校) A kind of anti-dust fall transhipment auxiliary device based on electronic component processing
CN112109779A (en) * 2020-09-22 2020-12-22 郭卫 Building material conveyer based on construction of building major structure
CN112158761A (en) * 2020-10-15 2021-01-01 武汉德创天成科技发展有限公司 Multi-functional material transporting device of building engineering

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109050606A (en) * 2018-08-13 2018-12-21 何港港 A kind of construction handling device
CN109664929A (en) * 2019-01-22 2019-04-23 四川信息职业技术学院(广元无线电技工学校) A kind of anti-dust fall transhipment auxiliary device based on electronic component processing
CN109664929B (en) * 2019-01-22 2023-09-22 四川信息职业技术学院(广元无线电技工学校) Anti-dust transfer auxiliary device based on electronic component processing usefulness
CN112109779A (en) * 2020-09-22 2020-12-22 郭卫 Building material conveyer based on construction of building major structure
CN112109779B (en) * 2020-09-22 2022-06-24 中冶南方工程技术有限公司 Building material conveyer based on construction of building major structure
CN112158761A (en) * 2020-10-15 2021-01-01 武汉德创天成科技发展有限公司 Multi-functional material transporting device of building engineering

Similar Documents

Publication Publication Date Title
CN206841489U (en) A kind of construction site conveying arrangement
CN206784131U (en) A kind of floating instrument of construction
CN107030657A (en) A kind of industrial computer maintenance platform
CN212074170U (en) Special conveyer of municipal administration water supply and drainage pipeline
CN206692276U (en) A kind of higher construction hoistable platform of security
CN206288912U (en) A kind of electronic mobile device for file cabinet movement
CN206871803U (en) A kind of building pipe storage rack
CN108284247A (en) One kind being convenient for fixed steel pipe cutting device
CN206282926U (en) A kind of efficient battery acid adding machine
CN207339555U (en) A kind of building brick handling device
CN206829195U (en) A kind of city supply and discharge well cover opening device
CN206780829U (en) A kind of plastic grain transport trolley component
CN210971215U (en) Water conservancy construction material handling device who facilitates use
CN215972813U (en) Chemical barrel blowing frame for chemical industry
CN214325192U (en) Material conveyor for building engineering construction
CN107187704A (en) A kind of Technological Problems In Computer Manufacturing sheet material stacking adapter
CN104370250A (en) Construction site conveying mechanism
CN210582734U (en) Animal treatment fixing auxiliary device
CN211075946U (en) Precast concrete board's reinforcing apparatus
CN208745879U (en) One kind is for municipal water supply and sewerage pipeline assistant conveyance device
CN208845979U (en) The express delivery cabinet being easily installed
CN209975988U (en) Building engineering is with safe type scaffold frame
CN110587804A (en) Fiber cement board processing dust removal integrated device
CN206437539U (en) Material transport system
CN206328092U (en) A kind of full automatic lifting for conveniently picking and placeing material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180105

Termination date: 20180602