CN104370250A - Construction site conveying mechanism - Google Patents

Construction site conveying mechanism Download PDF

Info

Publication number
CN104370250A
CN104370250A CN201410591328.5A CN201410591328A CN104370250A CN 104370250 A CN104370250 A CN 104370250A CN 201410591328 A CN201410591328 A CN 201410591328A CN 104370250 A CN104370250 A CN 104370250A
Authority
CN
China
Prior art keywords
fixed
conveying
conveying mechanism
positive stop
delivery track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410591328.5A
Other languages
Chinese (zh)
Other versions
CN104370250B (en
Inventor
钱海平
吴明强
吴小芳
陈伟
杨云章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MESKA GROUP CONSTRUCTION CO Ltd
Original Assignee
MESKA GROUP CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MESKA GROUP CONSTRUCTION CO Ltd filed Critical MESKA GROUP CONSTRUCTION CO Ltd
Priority to CN201410591328.5A priority Critical patent/CN104370250B/en
Publication of CN104370250A publication Critical patent/CN104370250A/en
Application granted granted Critical
Publication of CN104370250B publication Critical patent/CN104370250B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for

Abstract

The invention discloses a construction site conveying mechanism which comprises conveying rails. The two sides of the upper end and the two sides of the lower end of each conveying rail are each fixedly provided with connecting supporting legs, and the connecting supporting legs are fixed on walls. Conveying racks are fixedly connected to the rear portions of the conveying rails, and sliding bars are fixedly connected to the front portions of the conveying rails. Every two conveying rails are grouped and are fixed on the walls on the two sides respectively. The outer side walls of two side plates of a feeding box are each fixedly provided with a sliding block, and the sliding blocks are inserted in the sliding bars in a sleeved mode. Reinforcement connecting blocks are fixedly connected to the outer side walls of the side plates, and double-shaft motors are fixedly connected to the reinforcement connecting blocks. Conveying gears are fixedly connected to two output shafts of each double-shaft motor, and the conveying gears are meshed with the conveying racks corresponding to the conveying gears. The construction site conveying mechanism can be mounted after one part of a multi-story building is constructed, building materials such as concrete can be carried conveniently, the labor amount is reduced, and the construction site conveying mechanism is very convenient to use.

Description

A kind of building ground conveying mechanism
Technical field:
The present invention relates to technical field of tools for building, relate to a kind of building ground conveying mechanism in particular.
Background technology:
On building sites, general multi-storey building, when building, need the building materialss such as cement concrete to be transported to top and carry out casting building, it is due to multi-storey building limited height, generally without the need to adopting hoisting crane, general employing a dead lift, its carrying expends bodily strength very much, and labour intensity is large, very inconvenient.
Summary of the invention:
The building materialss such as the object of the invention is to overcome the deficiencies in the prior art, provide a kind of building ground conveying mechanism, it can install after multi-storey building builds a part, convenient carrying cement concrete, reduce labor content, very convenient.
The scheme that the present invention solve the technical problem is:
A kind of building ground conveying mechanism, comprise delivery track, the both sides of the top and bottom of described delivery track are all fixed with connection leg, and connection leg is fixed on metope, and the rear portion of delivery track is fixed with conveying tooth bar, and the front portion of delivery track is fixed with draw runner;
Four delivery tracks are one group with two and are separately fixed on the metope of both sides, the lateral wall of the biside plate of feeding frame is fixed with sliding shoe respectively, sliding shoe sleeve is on draw runner, the lateral wall of side plate is fixed with reinforcement contiguous block, strengthen contiguous block is fixed with dual-axle motor, two output shafts of dual-axle motor are fixed with conveyance gear, and the conveyance gear conveying tooth bar corresponding with it is meshed;
The outer side surface of delivery track is fixed with positive stop strip, the lateral wall of side plate is fixed with limiting stopper, limiting stopper is fixed with position-limited lever, position-limited lever is fixed with briquetting, briquetting is pressed against on the front face of positive stop strip;
Positive stop strip has multiple spacing fixed via, bolt passes side plate and stretches into spacing fixed via, and the top of bolt is bolted with captive nut.
Described side plate is fixed with two and strengthens contiguous block, the two ends of limiting stopper are fixed on two and strengthen on contiguous block.
Described position-limited lever comprises main connecting portion and is connected pole, and main connecting portion is fixed on limiting stopper, connects pole and is molded on main connecting portion, connects on pole and is fixed with briquetting.
The front face of described positive stop strip and sidewall are fixed with graphite slider layer, and briquetting is pressed against on the graphite slider layer on the front face of positive stop strip.
Described spacing fixed via is arranged in a linear.
Outstanding effect of the present invention is:
The building materialss such as compared with prior art, it can install after multi-storey building builds a part, convenient carrying cement concrete, reduce labor content, very convenient.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present invention;
Fig. 2 is part sectional view of the present invention;
Fig. 3 is the local structure schematic diagram between limiting stopper of the present invention and delivery track;
Fig. 4 is the local structure schematic diagram of delivery track;
Fig. 5 is the local structure schematic diagram of side plate and the parts on it.
Detailed description of the invention:
Below in conjunction with accompanying drawing and concrete preferred embodiment, the present invention will be described in detail, can be easier to make advantages and features of the invention be readily appreciated by one skilled in the art, these embodiments are only illustrative objects, are not intended to limit scope of the present invention.
Embodiment, see as shown in Fig. 1 to 5, a kind of building ground conveying mechanism, comprise delivery track 1, the both sides of the top and bottom of described delivery track 1 are all fixed with connection leg 2, connection leg 2 is fixed on metope, and the rear portion of delivery track 1 is fixed with conveying tooth bar 11, and the front portion of delivery track 1 is fixed with draw runner 12;
Four delivery tracks 1 are one group with two and are separately fixed on the metope of both sides, the lateral wall of the biside plate 20 of feeding frame 10 is fixed with sliding shoe 3 respectively, sliding shoe 3 sleeve is on draw runner 12, the lateral wall of side plate 20 is fixed with and strengthens contiguous block 21, strengthen contiguous block 21 is fixed with dual-axle motor 4, two output shafts of dual-axle motor 4 are fixed with conveyance gear 41, and the conveyance gear 41 conveying tooth bar 11 corresponding with it is meshed;
The outer side surface of delivery track 1 is fixed with positive stop strip 13, the lateral wall of side plate 20 is fixed with limiting stopper 5, limiting stopper 5 is fixed with position-limited lever 51, position-limited lever 51 is fixed with briquetting 52, briquetting 52 is pressed against on the front face of positive stop strip 13; Can ensure that feeding frame 10 is stable by briquetting 52.
Positive stop strip 13 has multiple spacing fixed via 131, bolt 14 passes side plate 20 and stretches into spacing fixed via 131, and the top of bolt 14 is bolted with captive nut 15.
Described side plate 20 is fixed with two and strengthens contiguous block 21, the two ends of limiting stopper 5 are fixed on two and strengthen on contiguous block 21.
Described position-limited lever 51 comprises main connecting portion 511 and is connected pole 512, and main connecting portion 511 is fixed on limiting stopper 5, connects pole 512 and is molded on main connecting portion 511, connects on pole 512 and is fixed with briquetting 52.
The front face of described positive stop strip 13 and sidewall are fixed with graphite slider layer 132, and briquetting 52 is pressed against on the graphite slider layer 132 on the front face of positive stop strip 13.Can reduce friction force by graphite slider layer 132, reduce wear, meanwhile, graphite slider layer 132 has self-lubricating effect, improves service life.
Described spacing fixed via 131 is arranged in a linear.
Principle of work: construction timber can be placed on feeding frame 10, then run by dual-axle motor 4, feeding frame 10 is moved up and down, after moving to fixed position, by bolt 14 is passed side plate 20 and stretches into spacing fixed via 131, the top of bolt 14 is spirally connected captive nut 15, is formed fixing, then just can by the building materials blanking use in feeding frame 10.
Above embodiment is only for illustration of the present invention; and be not limitation of the present invention; the those of ordinary skill of relevant technical field; without departing from the spirit and scope of the present invention; can also make a variety of changes and modification; therefore all equivalent technical schemes also belong to category of the present invention, and scope of patent protection of the present invention should be defined by the claims.

Claims (5)

1. a building ground conveying mechanism, comprise delivery track (1), it is characterized in that: the both sides of the top and bottom of described delivery track (1) are all fixed with connection leg (2), connection leg (2) is fixed on metope, the rear portion of delivery track (1) is fixed with conveying tooth bar (11), and the front portion of delivery track (1) is fixed with draw runner (12);
Four delivery tracks (1) are one group with two and are separately fixed on the metope of both sides, the lateral wall of the biside plate (20) of feeding frame (10) is fixed with sliding shoe (3) respectively, sliding shoe (3) sleeve is on draw runner (12), the lateral wall of side plate (20) is fixed with and strengthens contiguous block (21), strengthen contiguous block (21) is fixed with dual-axle motor (4), two output shafts of dual-axle motor (4) are fixed with conveyance gear (41), and conveyance gear (41) the conveying tooth bar (11) corresponding with it is meshed;
The outer side surface of delivery track (1) is fixed with positive stop strip (13), the lateral wall of side plate (20) is fixed with limiting stopper (5), limiting stopper (5) is fixed with position-limited lever (51), position-limited lever (51) is fixed with briquetting (52), briquetting (52) is pressed against on the front face of positive stop strip (13);
Positive stop strip (13) has multiple spacing fixed via (131), bolt (14) is through side plate (20) and stretch into spacing fixed via (131), and the top of bolt (14) is bolted with captive nut (15).
2. a kind of building ground according to claim 1 conveying mechanism, it is characterized in that: described side plate (20) is fixed with two and strengthens contiguous block (21), the two ends of limiting stopper (5) are fixed on two and strengthen on contiguous block (21).
3. a kind of building ground according to claim 1 conveying mechanism, it is characterized in that: described position-limited lever (51) comprises main connecting portion (511) and is connected pole (512), main connecting portion (511) is fixed on limiting stopper (5), connecting pole (512) is molded on main connecting portion (511), connects on pole (512) and is fixed with briquetting (52).
4. a kind of building ground according to claim 1 conveying mechanism, it is characterized in that: the front face of described positive stop strip (13) and sidewall are fixed with graphite slider layer (132), briquetting (52) is pressed against on the graphite slider layer (132) on the front face of positive stop strip (13).
5. a kind of building ground according to claim 1 conveying mechanism, is characterized in that: described spacing fixed via (131) is arranged in a linear.
CN201410591328.5A 2014-10-29 2014-10-29 Construction site conveying mechanism Expired - Fee Related CN104370250B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410591328.5A CN104370250B (en) 2014-10-29 2014-10-29 Construction site conveying mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410591328.5A CN104370250B (en) 2014-10-29 2014-10-29 Construction site conveying mechanism

Publications (2)

Publication Number Publication Date
CN104370250A true CN104370250A (en) 2015-02-25
CN104370250B CN104370250B (en) 2017-02-15

Family

ID=52549498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410591328.5A Expired - Fee Related CN104370250B (en) 2014-10-29 2014-10-29 Construction site conveying mechanism

Country Status (1)

Country Link
CN (1) CN104370250B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106865140A (en) * 2017-04-18 2017-06-20 东莞市鹏翼自动化科技有限公司 A kind of automation conveying equipment
CN106988534A (en) * 2017-04-18 2017-07-28 东莞市鹏翼自动化科技有限公司 One kind automation feeder equipment
CN113735032A (en) * 2021-08-27 2021-12-03 成都兰腾科技有限公司 Wall body hoisting device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2194347Y (en) * 1994-05-22 1995-04-12 陈智安 Vertical lefting conveyer
CN2213150Y (en) * 1994-10-23 1995-11-22 林柏青 Safety elevating table
CN2266582Y (en) * 1995-04-14 1997-11-05 闵在镐 Gear rack type elevator
CN2778772Y (en) * 2005-03-11 2006-05-10 谢滨 Rack-and-pinion lifter
CN202766018U (en) * 2012-09-11 2013-03-06 广州市京龙工程机械有限公司 Double rack standard section
CN203877701U (en) * 2014-06-16 2014-10-15 中联重科股份有限公司 Construction hoist
CN204185194U (en) * 2014-10-29 2015-03-04 美信佳集团建设有限公司 A kind of building ground conveying mechanism

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2194347Y (en) * 1994-05-22 1995-04-12 陈智安 Vertical lefting conveyer
CN2213150Y (en) * 1994-10-23 1995-11-22 林柏青 Safety elevating table
CN2266582Y (en) * 1995-04-14 1997-11-05 闵在镐 Gear rack type elevator
CN2778772Y (en) * 2005-03-11 2006-05-10 谢滨 Rack-and-pinion lifter
CN202766018U (en) * 2012-09-11 2013-03-06 广州市京龙工程机械有限公司 Double rack standard section
CN203877701U (en) * 2014-06-16 2014-10-15 中联重科股份有限公司 Construction hoist
CN204185194U (en) * 2014-10-29 2015-03-04 美信佳集团建设有限公司 A kind of building ground conveying mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106865140A (en) * 2017-04-18 2017-06-20 东莞市鹏翼自动化科技有限公司 A kind of automation conveying equipment
CN106988534A (en) * 2017-04-18 2017-07-28 东莞市鹏翼自动化科技有限公司 One kind automation feeder equipment
CN106988534B (en) * 2017-04-18 2019-05-28 江山市艺康化学有限公司 A kind of automation feeder equipment
CN113735032A (en) * 2021-08-27 2021-12-03 成都兰腾科技有限公司 Wall body hoisting device

Also Published As

Publication number Publication date
CN104370250B (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN202953738U (en) Gantry crane
CN104370250A (en) Construction site conveying mechanism
CN204184858U (en) A kind of lifting material feeder for building
CN204185194U (en) A kind of building ground conveying mechanism
CN102296762B (en) Free transformation type track
CN203282546U (en) Panel butting saw
CN204040479U (en) Building waste clears device
CN201574068U (en) Integrative construction device for transporting and placing stone in position
CN204001416U (en) For the assemble type truss of the factory building of constructing
CN204171083U (en) A kind of roll change buggy
CN204237524U (en) A kind of building ground conveying mechanism lifting truck
CN204585194U (en) A kind of floor discharge rack
CN203471456U (en) Material conveyor for multi-wire saw
CN206940278U (en) A kind of O shapes gantry handling apparatus
CN203402423U (en) Device for pushing end portions of steel pipes to be in same vertical plane
CN203359442U (en) Three-layer drive type transverse carrying skip car device
CN104340620A (en) Building lifting feeding device
CN104370249B (en) A kind of construction site conveying mechanism lifting truck
CN205273537U (en) Electronic multi -purpose work flatbed of hand push
CN204676395U (en) A kind of paver screw feeder hydraulicefficiency elevation structure
CN203767654U (en) Automatic material lifting tipping bucket device for rare earth waste roasting
CN207932968U (en) A kind of architectural engineering brick lifting device
CN202179052U (en) Manually slid silkworm feeding cart
CN214360029U (en) Lifting device for building engineering
CN205471568U (en) A brick pillar driving and reversing mechanism for choosing brick machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: No. 358, Zijing Road, Huzhou Economic and Technological Development Zone, Huzhou City, Zhejiang Province, 313000

Patentee after: MESKA GROUP CONSTRUCTION Co.,Ltd.

Address before: No. 589, Waihuan East Road, Huzhou City, Zhejiang Province, 313000

Patentee before: MESKA GROUP CONSTRUCTION Co.,Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215

Termination date: 20211029

CF01 Termination of patent right due to non-payment of annual fee