CN206832059U - The scrap steel basket increased operation rate - Google Patents
The scrap steel basket increased operation rate Download PDFInfo
- Publication number
- CN206832059U CN206832059U CN201720738470.7U CN201720738470U CN206832059U CN 206832059 U CN206832059 U CN 206832059U CN 201720738470 U CN201720738470 U CN 201720738470U CN 206832059 U CN206832059 U CN 206832059U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- chain
- flashboard
- plate
- operation rate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
This application discloses a kind of scrap steel basket increased operation rate, including expecting basket body, first bottom plate, second bottom plate and upending frame, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with the first flashboard, first bottom plate is pinned at the material basket body by first flashboard, the second bottom plate both sides are respectively equipped with the second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, the upending frame is pinned at the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc sector structure, the installing plate internal diameter is more than the external diameter of the material basket body, two lifting boom is arranged in parallel in the installing plate, the lifting boom has been provided with hanging part away from one end of the installing plate.The scrap steel basket that this is new to increase operation rate is simple in construction, can all launch waste material in basket, improves energy resource utilization ratio.
Description
Technical field
The application is related to feedstock circulation and utilizes field, more particularly to a kind of scrap steel basket increased operation rate.
Background technology
In steelmaking equipment, the scrap steel basket increased operation rate is a kind of device for loading steel scrap, for into converter
Put into steel scrap.The scrap steel basket increased operation rate mainly has bottom to open charging type and oral area to topple over two kinds of charging type, both material
Basket respectively has weak point.Oral area, which topples over the shortcomings that charging type material basket, is:It is due to being difficult to position and being difficult to that steel scrap is whole exactly
It is poured into stove, therefore the material basket of large-tonnage does not use typically oral area to topple over the scrap steel basket that charging type is increased operation rate.Bottom, which is opened, to be added
The shortcomings that material formula material basket is:When material full load in material basket, material is had the trend of fallen downward so as to extrude by Gravitative Loads
Lower half shell bottom plate, it is special because it does not have locking device, lower half shell bottom plate to be opened and the phenomenon for material leakage of appearing to both sides after being pressurized
It is not that the leakage of waste material can give production and environment to be negatively affected when expect to contain in basket is waste material.So need to propose
Improve.
Utility model content
The purpose of this utility model is to provide a kind of scrap steel basket increased operation rate, with overcome it is of the prior art not
Foot.
To achieve the above object, the utility model provides following technical scheme:
The embodiment of the present application discloses a kind of scrap steel basket increased operation rate, including material basket body, the first bottom plate, second
Bottom plate and upending frame, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with first
Flashboard, first bottom plate are pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with
The second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, described
Upending frame is pinned at the material basket body, and the upending frame includes an installing plate and two lifting booms, the installing plate for it is inside and outside all
For the sector structure of circular arc, the installing plate internal diameter is more than the external diameter of the material basket body, and two lifting boom, which is parallel to each other, to be set
The installing plate is placed in, the lifting boom has been provided with hanging part away from one end of the installing plate.
Preferably, in the above-mentioned scrap steel basket increased operation rate, the first bottom plate outer wall is connected with the first chain, described
The center that the tie point of first chain is between two first flashboard, the second bottom plate outer wall are connected with the second chain,
The center that the tie point of second chain is between two second flashboard, the connection of first chain and the first bottom plate
Point and the tie point of the second chain and the second bottom plate are in sustained height.
Preferably, in the above-mentioned scrap steel basket increased operation rate, first chain is away from first bottom plate
One end and the second chain are connected to keying frame away from one end of second bottom plate, and the keying frame center is provided with connection
Hole.
Preferably, in the above-mentioned scrap steel basket increased operation rate, the length phase of first chain and the second chain
Together.
Preferably, in the above-mentioned scrap steel basket increased operation rate, material basket body upper end outer wall is provided with two sliding sleeves,
Two sliding sleeve is respectively at the tie point and the tie point of the second chain and the second bottom plate of first chain and the first bottom plate
Surface, first chain and the second chain are each passed through two sliding sleeves.
Preferably, in the above-mentioned scrap steel basket increased operation rate, first flashboard is away from first bottom plate
One end and the second flashboard are pinned at the both ends of same connecting plate away from one end of second bottom plate respectively.
Preferably, in the above-mentioned scrap steel basket increased operation rate, two group of first flashboard, the second flashboard and the connection
Baffle plate is respectively equipped with the outside of plate, the baffle plate is fixed on the material basket body.
Preferably, in the above-mentioned scrap steel basket increased operation rate, the bottom of first bottom plate and the second bottom plate is
Flat-bottom structure.
Compared with prior art, the utility model has the advantage of:This new scrap steel basket structure letter increased operation rate
It is single, waste material in basket can all be launched, raising energy resource utilization ratio, the bottom of the first bottom plate and the second bottom plate is flat knot
Structure, reduce the probability that taper work contacts to the first bottom plate and the second bottom plate joint, so as to reduce back taper waste material with
The contact gap of first bottom plate and the second bottom plate, reduce the probability that the first bottom plate and the second bottom plate are opened accidentally, while first
Bottom plate and the second bottom plate are linked together by connecting plate, are not in the situation of material leakage.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show the structural representation for the scrap steel basket increased operation rate in the utility model specific embodiment.
Fig. 2 show the top view for the scrap steel basket increased operation rate in the utility model specific embodiment.
Fig. 3 show the side view for the scrap steel basket increased operation rate in the utility model specific embodiment.
Fig. 4 show the first bottom plate and the structural representation of the second bottom plate closure in the utility model specific embodiment.
Fig. 5 show the structural representation that the first bottom plate and the second bottom plate are opened in the utility model specific embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Detailed description, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole implementation
Example.Based on the embodiment in the utility model, those of ordinary skill in the art institute on the premise of creative work is not made
The every other embodiment obtained, belong to the scope of the utility model protection.
Join shown in Fig. 1 to Fig. 5, the scrap steel basket increased operation rate in the present embodiment, including material basket body 10, the first bottom
Plate 20, the second bottom plate 30 and upending frame 40, can be opened and closed between the first bottom plate 20 and the second bottom plate 30, the both sides of the first bottom plate 20 point
Not She You the first flashboard 21, the first bottom plate 20 is pinned at material basket body 10, the both sides of the second bottom plate 30 difference by the first flashboard 21
Provided with being pinned at material basket body 10 with 21 corresponding second flashboard 31 of the first flashboard, the second bottom plate 30 by the second flashboard 31, rise
Suspension bracket 40 is pinned at material basket body 10, and upending frame 40 includes an installing plate 41 and two lifting booms 42, and installing plate 41 is all to be inside and outside
The sector structure of circular arc, the internal diameter of installing plate 41 are more than the external diameter of material basket body 10, and two lifting booms 42 are arranged in parallel in installation
Plate 41, lifting boom 42 have been provided with hanging part away from one end of installing plate 41.
In the technical scheme, the scrap steel basket that this is new to increase operation rate is simple in construction, can all appear waste material in basket,
The bottom of raising energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to first
Bottom plate and the probability of the second bottom plate joint contact, so as to reduce contact of the back taper waste material with the first bottom plate and the second bottom plate
Gap, the probability that the first bottom plate and the second bottom plate are opened accidentally is reduced, while the first bottom plate and the second bottom plate pass through connecting plate
Link together, be not in the situation of material leakage.
Further, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two first
Center between flashboard 21, the outer wall of the second bottom plate 30 are connected with the second chain 32, and the tie point of the second chain 32 is in two second
The connection of the tie point and the second chain 32 and the second bottom plate 30 of center between flashboard 31, the first chain 22 and the first bottom plate 20
Point is in sustained height.
In the technical scheme, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two
Center between first flashboard 21, the outer wall of the second bottom plate 30 are connected with the second chain 32, and the tie point of the second chain 32 is in two
The tie point and the second chain 32 of center between second flashboard 31, the first chain 22 and the first bottom plate 20 and the second bottom plate 30
Tie point is in sustained height, is fed intake for pulling open the first bottom plate 20 and the second bottom plate 30.
Further, the first chain 22 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32
End, which is connected to, opens and closes frame 50, opens and closes the center of frame 50 and is provided with connecting hole.
In the technical scheme, the first chain 22 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32
One end be connected to and open and close frame 50, open and close frame 50 center and be provided with connecting hole, for connecting external impetus equipment, such as drive a vehicle
Deng ensure that the first bottom plate 20 and the second bottom plate 30 are pulled open by same dynamics of same time.
Further, the first chain 22 is identical with the length of the second chain 32.
In the technical scheme, the first chain 22 is identical with the length of the second chain 32, ensures the first bottom plate and the second bottom plate
Open simultaneously, and the angle opened is identical, so as to ensure that the direction to feed intake is straight down.
Further, expect that the upper end outer wall of basket body 10 is provided with two sliding sleeves 11, two sliding sleeves 11 be respectively at the first chain 22 and
The surface of the tie point of first bottom plate 20 and the tie point of the second chain 32 and the second bottom plate 30, the first chain 22 and the second chain
Bar 32 is each passed through two sliding sleeves 11.
In the technical scheme, the upper end outer wall of material basket body 10 is provided with two sliding sleeves 11, and two sliding sleeves 11 are respectively at the first chain
22 and first bottom plate 20 tie point and the tie point of the second chain 32 and the second bottom plate 30 surface, the first chain 22 and
Two chains 32 are each passed through two sliding sleeves 11, and the power suffered by the first bottom plate of guarantee and the second bottom plate is power straight up.
Further, the first flashboard 21 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31
End is pinned at the both ends of same connecting plate 60 respectively.
In the technical scheme, the first flashboard 21 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31
One end be pinned at the both ends of same connecting plate 60 respectively, guarantee is not in the situation of material leakage.
Further, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70, baffle plate
70 are fixed on material basket body 10.
In the technical scheme, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70,
Baffle plate 70 is fixed on material basket body 10, and avoiding waste material from entering influences the between the first flashboard 21, the second flashboard 31 and connecting plate 60
The opening and closing of one bottom plate and the second bottom plate.
Further, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure.
In the technical scheme, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure, reduces taper work pair
First bottom plate and the probability of the second bottom plate joint contact, so as to reduce back taper waste material and the first bottom plate and the second bottom plate
Gap is contacted, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally.
In summary, this new scrap steel basket for increasing operation rate is simple in construction, can all appear waste material in basket, improves
The bottom of energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to the first bottom plate
With the probability of the second bottom plate joint contact, stitched so as to reduce the contact with the first bottom plate and the second bottom plate of back taper waste material
Gap, the probability that the first bottom plate and the second bottom plate are opened accidentally is reduced, while the first bottom plate and the second bottom plate are connected by connecting plate
It is connected together, is not in the situation of material leakage.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those
Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include
Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that
Other identical element also be present in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art
For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as the protection domain of the application.
Claims (8)
1. a kind of scrap steel basket increased operation rate, it is characterised in that including material basket body, the first bottom plate, the second bottom plate and rise
Suspension bracket, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with the first flashboard, described
First bottom plate is pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with and the first flashboard
Corresponding second flashboard, second bottom plate are pinned at the material basket body, the upending frame pin joint by second flashboard
In the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc fan
Shape structure, the installing plate internal diameter are more than the external diameter of the material basket body, and two lifting boom is arranged in parallel in the peace
Loading board, the lifting boom have been provided with hanging part away from one end of the installing plate.
2. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:The first bottom plate outer wall connection
There is the first chain, the center that the tie point of first chain is between two first flashboard, the second bottom plate outer wall
It is connected with the second chain, the center that the tie point of second chain is between two second flashboard, first chain
Sustained height is in the tie point and the tie point of the second chain and the second bottom plate of the first bottom plate.
3. the scrap steel basket according to claim 2 increased operation rate, it is characterised in that:First chain is away from described
One end of first bottom plate and the second chain are connected to keying frame, the keying frame center away from one end of second bottom plate
Provided with connecting hole.
4. the scrap steel basket according to claim 2 increased operation rate, it is characterised in that:First chain and the second chain
The length of bar is identical.
5. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:Material basket body upper end outer wall
Provided with two sliding sleeves, two sliding sleeve is respectively at tie point and the second chain and the second bottom of first chain and the first bottom plate
The surface of the tie point of plate, first chain and the second chain are each passed through two sliding sleeves.
6. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:First flashboard is away from described
One end of first bottom plate and the second flashboard are pinned at the both ends of same connecting plate away from one end of second bottom plate respectively.
7. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:Two group of first flashboard,
Baffle plate is respectively equipped with the outside of two flashboards and connecting plate, the baffle plate is fixed on the material basket body.
8. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:First bottom plate and the second bottom
The bottom of plate is flat-bottom structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720738470.7U CN206832059U (en) | 2017-06-23 | 2017-06-23 | The scrap steel basket increased operation rate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720738470.7U CN206832059U (en) | 2017-06-23 | 2017-06-23 | The scrap steel basket increased operation rate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206832059U true CN206832059U (en) | 2018-01-02 |
Family
ID=60776834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720738470.7U Active CN206832059U (en) | 2017-06-23 | 2017-06-23 | The scrap steel basket increased operation rate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206832059U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107314680A (en) * | 2017-06-23 | 2017-11-03 | 江苏沙钢集团有限公司 | The steel scrap basket increased operation rate |
CN110002339A (en) * | 2019-05-06 | 2019-07-12 | 无锡巨力重工股份有限公司 | The material basket quickly opened |
-
2017
- 2017-06-23 CN CN201720738470.7U patent/CN206832059U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107314680A (en) * | 2017-06-23 | 2017-11-03 | 江苏沙钢集团有限公司 | The steel scrap basket increased operation rate |
CN110002339A (en) * | 2019-05-06 | 2019-07-12 | 无锡巨力重工股份有限公司 | The material basket quickly opened |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206832059U (en) | The scrap steel basket increased operation rate | |
CN205151516U (en) | Simple and easy hoist and mount of prefabricated wallboard | |
CN107314680A (en) | The steel scrap basket increased operation rate | |
CN207877121U (en) | A kind of equipment for supporting patient with burn of steel box-girder | |
CN206940216U (en) | A kind of dregs loads and unloads suspension bucket | |
CN206590757U (en) | A kind of pile tube vertical lifting device | |
CN205294623U (en) | Be used for steel pipe hoist and mount cable spare | |
CN203451057U (en) | Bidirectional plate hook | |
CN203008391U (en) | Reversed T-shaped hoisting connecting piece for prefabricated part hoisting | |
CN203392716U (en) | Hanger | |
CN203738011U (en) | Steel ladle cover of thinned structure | |
CN205152260U (en) | Steel scrap basket | |
CN203754232U (en) | Simple steel rail lifting tool | |
CN208792792U (en) | Prefabricated components hoisting structure and prefabricated components | |
CN205575387U (en) | Internal expanding type lifts by crane instrument | |
CN209505884U (en) | A kind of top plate lifting compartment and vehicle | |
CN205076674U (en) | Gantry crane's assembly auxiliary device | |
CN206798957U (en) | A kind of electric motor end cap lifting device | |
CN205932935U (en) | I -steel is with upset hoist | |
CN209384124U (en) | A kind of steel truss girder purlin piece turnover hoisting structure | |
CN208471394U (en) | Large-scale member bar turning device | |
CN206903058U (en) | One kind is multi-functional to use H profile steel | |
CN207226834U (en) | A kind of crane is used from opening and closing slag bucket device | |
CN205709453U (en) | A kind of line bar handling folder | |
CN206014237U (en) | A kind of 8-shaped lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |