CN206832059U - The scrap steel basket increased operation rate - Google Patents

The scrap steel basket increased operation rate Download PDF

Info

Publication number
CN206832059U
CN206832059U CN201720738470.7U CN201720738470U CN206832059U CN 206832059 U CN206832059 U CN 206832059U CN 201720738470 U CN201720738470 U CN 201720738470U CN 206832059 U CN206832059 U CN 206832059U
Authority
CN
China
Prior art keywords
bottom plate
chain
flashboard
plate
operation rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720738470.7U
Other languages
Chinese (zh)
Inventor
陈涛
张新科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Rongsheng Steel Making Co Ltd
Jiangsu Shagang Group Co Ltd
Original Assignee
Zhangjiagang Rongsheng Steel Making Co Ltd
Jiangsu Shagang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Rongsheng Steel Making Co Ltd, Jiangsu Shagang Group Co Ltd filed Critical Zhangjiagang Rongsheng Steel Making Co Ltd
Priority to CN201720738470.7U priority Critical patent/CN206832059U/en
Application granted granted Critical
Publication of CN206832059U publication Critical patent/CN206832059U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This application discloses a kind of scrap steel basket increased operation rate, including expecting basket body, first bottom plate, second bottom plate and upending frame, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with the first flashboard, first bottom plate is pinned at the material basket body by first flashboard, the second bottom plate both sides are respectively equipped with the second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, the upending frame is pinned at the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc sector structure, the installing plate internal diameter is more than the external diameter of the material basket body, two lifting boom is arranged in parallel in the installing plate, the lifting boom has been provided with hanging part away from one end of the installing plate.The scrap steel basket that this is new to increase operation rate is simple in construction, can all launch waste material in basket, improves energy resource utilization ratio.

Description

The scrap steel basket increased operation rate
Technical field
The application is related to feedstock circulation and utilizes field, more particularly to a kind of scrap steel basket increased operation rate.
Background technology
In steelmaking equipment, the scrap steel basket increased operation rate is a kind of device for loading steel scrap, for into converter Put into steel scrap.The scrap steel basket increased operation rate mainly has bottom to open charging type and oral area to topple over two kinds of charging type, both material Basket respectively has weak point.Oral area, which topples over the shortcomings that charging type material basket, is:It is due to being difficult to position and being difficult to that steel scrap is whole exactly It is poured into stove, therefore the material basket of large-tonnage does not use typically oral area to topple over the scrap steel basket that charging type is increased operation rate.Bottom, which is opened, to be added The shortcomings that material formula material basket is:When material full load in material basket, material is had the trend of fallen downward so as to extrude by Gravitative Loads Lower half shell bottom plate, it is special because it does not have locking device, lower half shell bottom plate to be opened and the phenomenon for material leakage of appearing to both sides after being pressurized It is not that the leakage of waste material can give production and environment to be negatively affected when expect to contain in basket is waste material.So need to propose Improve.
Utility model content
The purpose of this utility model is to provide a kind of scrap steel basket increased operation rate, with overcome it is of the prior art not Foot.
To achieve the above object, the utility model provides following technical scheme:
The embodiment of the present application discloses a kind of scrap steel basket increased operation rate, including material basket body, the first bottom plate, second Bottom plate and upending frame, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with first Flashboard, first bottom plate are pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with The second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, described Upending frame is pinned at the material basket body, and the upending frame includes an installing plate and two lifting booms, the installing plate for it is inside and outside all For the sector structure of circular arc, the installing plate internal diameter is more than the external diameter of the material basket body, and two lifting boom, which is parallel to each other, to be set The installing plate is placed in, the lifting boom has been provided with hanging part away from one end of the installing plate.
Preferably, in the above-mentioned scrap steel basket increased operation rate, the first bottom plate outer wall is connected with the first chain, described The center that the tie point of first chain is between two first flashboard, the second bottom plate outer wall are connected with the second chain, The center that the tie point of second chain is between two second flashboard, the connection of first chain and the first bottom plate Point and the tie point of the second chain and the second bottom plate are in sustained height.
Preferably, in the above-mentioned scrap steel basket increased operation rate, first chain is away from first bottom plate One end and the second chain are connected to keying frame away from one end of second bottom plate, and the keying frame center is provided with connection Hole.
Preferably, in the above-mentioned scrap steel basket increased operation rate, the length phase of first chain and the second chain Together.
Preferably, in the above-mentioned scrap steel basket increased operation rate, material basket body upper end outer wall is provided with two sliding sleeves, Two sliding sleeve is respectively at the tie point and the tie point of the second chain and the second bottom plate of first chain and the first bottom plate Surface, first chain and the second chain are each passed through two sliding sleeves.
Preferably, in the above-mentioned scrap steel basket increased operation rate, first flashboard is away from first bottom plate One end and the second flashboard are pinned at the both ends of same connecting plate away from one end of second bottom plate respectively.
Preferably, in the above-mentioned scrap steel basket increased operation rate, two group of first flashboard, the second flashboard and the connection Baffle plate is respectively equipped with the outside of plate, the baffle plate is fixed on the material basket body.
Preferably, in the above-mentioned scrap steel basket increased operation rate, the bottom of first bottom plate and the second bottom plate is Flat-bottom structure.
Compared with prior art, the utility model has the advantage of:This new scrap steel basket structure letter increased operation rate It is single, waste material in basket can all be launched, raising energy resource utilization ratio, the bottom of the first bottom plate and the second bottom plate is flat knot Structure, reduce the probability that taper work contacts to the first bottom plate and the second bottom plate joint, so as to reduce back taper waste material with The contact gap of first bottom plate and the second bottom plate, reduce the probability that the first bottom plate and the second bottom plate are opened accidentally, while first Bottom plate and the second bottom plate are linked together by connecting plate, are not in the situation of material leakage.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show the structural representation for the scrap steel basket increased operation rate in the utility model specific embodiment.
Fig. 2 show the top view for the scrap steel basket increased operation rate in the utility model specific embodiment.
Fig. 3 show the side view for the scrap steel basket increased operation rate in the utility model specific embodiment.
Fig. 4 show the first bottom plate and the structural representation of the second bottom plate closure in the utility model specific embodiment.
Fig. 5 show the structural representation that the first bottom plate and the second bottom plate are opened in the utility model specific embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Detailed description, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole implementation Example.Based on the embodiment in the utility model, those of ordinary skill in the art institute on the premise of creative work is not made The every other embodiment obtained, belong to the scope of the utility model protection.
Join shown in Fig. 1 to Fig. 5, the scrap steel basket increased operation rate in the present embodiment, including material basket body 10, the first bottom Plate 20, the second bottom plate 30 and upending frame 40, can be opened and closed between the first bottom plate 20 and the second bottom plate 30, the both sides of the first bottom plate 20 point Not She You the first flashboard 21, the first bottom plate 20 is pinned at material basket body 10, the both sides of the second bottom plate 30 difference by the first flashboard 21 Provided with being pinned at material basket body 10 with 21 corresponding second flashboard 31 of the first flashboard, the second bottom plate 30 by the second flashboard 31, rise Suspension bracket 40 is pinned at material basket body 10, and upending frame 40 includes an installing plate 41 and two lifting booms 42, and installing plate 41 is all to be inside and outside The sector structure of circular arc, the internal diameter of installing plate 41 are more than the external diameter of material basket body 10, and two lifting booms 42 are arranged in parallel in installation Plate 41, lifting boom 42 have been provided with hanging part away from one end of installing plate 41.
In the technical scheme, the scrap steel basket that this is new to increase operation rate is simple in construction, can all appear waste material in basket, The bottom of raising energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to first Bottom plate and the probability of the second bottom plate joint contact, so as to reduce contact of the back taper waste material with the first bottom plate and the second bottom plate Gap, the probability that the first bottom plate and the second bottom plate are opened accidentally is reduced, while the first bottom plate and the second bottom plate pass through connecting plate Link together, be not in the situation of material leakage.
Further, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two first Center between flashboard 21, the outer wall of the second bottom plate 30 are connected with the second chain 32, and the tie point of the second chain 32 is in two second The connection of the tie point and the second chain 32 and the second bottom plate 30 of center between flashboard 31, the first chain 22 and the first bottom plate 20 Point is in sustained height.
In the technical scheme, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two Center between first flashboard 21, the outer wall of the second bottom plate 30 are connected with the second chain 32, and the tie point of the second chain 32 is in two The tie point and the second chain 32 of center between second flashboard 31, the first chain 22 and the first bottom plate 20 and the second bottom plate 30 Tie point is in sustained height, is fed intake for pulling open the first bottom plate 20 and the second bottom plate 30.
Further, the first chain 22 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32 End, which is connected to, opens and closes frame 50, opens and closes the center of frame 50 and is provided with connecting hole.
In the technical scheme, the first chain 22 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32 One end be connected to and open and close frame 50, open and close frame 50 center and be provided with connecting hole, for connecting external impetus equipment, such as drive a vehicle Deng ensure that the first bottom plate 20 and the second bottom plate 30 are pulled open by same dynamics of same time.
Further, the first chain 22 is identical with the length of the second chain 32.
In the technical scheme, the first chain 22 is identical with the length of the second chain 32, ensures the first bottom plate and the second bottom plate Open simultaneously, and the angle opened is identical, so as to ensure that the direction to feed intake is straight down.
Further, expect that the upper end outer wall of basket body 10 is provided with two sliding sleeves 11, two sliding sleeves 11 be respectively at the first chain 22 and The surface of the tie point of first bottom plate 20 and the tie point of the second chain 32 and the second bottom plate 30, the first chain 22 and the second chain Bar 32 is each passed through two sliding sleeves 11.
In the technical scheme, the upper end outer wall of material basket body 10 is provided with two sliding sleeves 11, and two sliding sleeves 11 are respectively at the first chain 22 and first bottom plate 20 tie point and the tie point of the second chain 32 and the second bottom plate 30 surface, the first chain 22 and Two chains 32 are each passed through two sliding sleeves 11, and the power suffered by the first bottom plate of guarantee and the second bottom plate is power straight up.
Further, the first flashboard 21 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31 End is pinned at the both ends of same connecting plate 60 respectively.
In the technical scheme, the first flashboard 21 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31 One end be pinned at the both ends of same connecting plate 60 respectively, guarantee is not in the situation of material leakage.
Further, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70, baffle plate 70 are fixed on material basket body 10.
In the technical scheme, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70, Baffle plate 70 is fixed on material basket body 10, and avoiding waste material from entering influences the between the first flashboard 21, the second flashboard 31 and connecting plate 60 The opening and closing of one bottom plate and the second bottom plate.
Further, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure.
In the technical scheme, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure, reduces taper work pair First bottom plate and the probability of the second bottom plate joint contact, so as to reduce back taper waste material and the first bottom plate and the second bottom plate Gap is contacted, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally.
In summary, this new scrap steel basket for increasing operation rate is simple in construction, can all appear waste material in basket, improves The bottom of energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to the first bottom plate With the probability of the second bottom plate joint contact, stitched so as to reduce the contact with the first bottom plate and the second bottom plate of back taper waste material Gap, the probability that the first bottom plate and the second bottom plate are opened accidentally is reduced, while the first bottom plate and the second bottom plate are connected by connecting plate It is connected together, is not in the situation of material leakage.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should It is considered as the protection domain of the application.

Claims (8)

1. a kind of scrap steel basket increased operation rate, it is characterised in that including material basket body, the first bottom plate, the second bottom plate and rise Suspension bracket, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with the first flashboard, described First bottom plate is pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with and the first flashboard Corresponding second flashboard, second bottom plate are pinned at the material basket body, the upending frame pin joint by second flashboard In the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc fan Shape structure, the installing plate internal diameter are more than the external diameter of the material basket body, and two lifting boom is arranged in parallel in the peace Loading board, the lifting boom have been provided with hanging part away from one end of the installing plate.
2. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:The first bottom plate outer wall connection There is the first chain, the center that the tie point of first chain is between two first flashboard, the second bottom plate outer wall It is connected with the second chain, the center that the tie point of second chain is between two second flashboard, first chain Sustained height is in the tie point and the tie point of the second chain and the second bottom plate of the first bottom plate.
3. the scrap steel basket according to claim 2 increased operation rate, it is characterised in that:First chain is away from described One end of first bottom plate and the second chain are connected to keying frame, the keying frame center away from one end of second bottom plate Provided with connecting hole.
4. the scrap steel basket according to claim 2 increased operation rate, it is characterised in that:First chain and the second chain The length of bar is identical.
5. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:Material basket body upper end outer wall Provided with two sliding sleeves, two sliding sleeve is respectively at tie point and the second chain and the second bottom of first chain and the first bottom plate The surface of the tie point of plate, first chain and the second chain are each passed through two sliding sleeves.
6. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:First flashboard is away from described One end of first bottom plate and the second flashboard are pinned at the both ends of same connecting plate away from one end of second bottom plate respectively.
7. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:Two group of first flashboard, Baffle plate is respectively equipped with the outside of two flashboards and connecting plate, the baffle plate is fixed on the material basket body.
8. the scrap steel basket according to claim 1 increased operation rate, it is characterised in that:First bottom plate and the second bottom The bottom of plate is flat-bottom structure.
CN201720738470.7U 2017-06-23 2017-06-23 The scrap steel basket increased operation rate Active CN206832059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720738470.7U CN206832059U (en) 2017-06-23 2017-06-23 The scrap steel basket increased operation rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720738470.7U CN206832059U (en) 2017-06-23 2017-06-23 The scrap steel basket increased operation rate

Publications (1)

Publication Number Publication Date
CN206832059U true CN206832059U (en) 2018-01-02

Family

ID=60776834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720738470.7U Active CN206832059U (en) 2017-06-23 2017-06-23 The scrap steel basket increased operation rate

Country Status (1)

Country Link
CN (1) CN206832059U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107314680A (en) * 2017-06-23 2017-11-03 江苏沙钢集团有限公司 The steel scrap basket increased operation rate
CN110002339A (en) * 2019-05-06 2019-07-12 无锡巨力重工股份有限公司 The material basket quickly opened

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107314680A (en) * 2017-06-23 2017-11-03 江苏沙钢集团有限公司 The steel scrap basket increased operation rate
CN110002339A (en) * 2019-05-06 2019-07-12 无锡巨力重工股份有限公司 The material basket quickly opened

Similar Documents

Publication Publication Date Title
CN206832059U (en) The scrap steel basket increased operation rate
CN205151516U (en) Simple and easy hoist and mount of prefabricated wallboard
CN107314680A (en) The steel scrap basket increased operation rate
CN207877121U (en) A kind of equipment for supporting patient with burn of steel box-girder
CN206940216U (en) A kind of dregs loads and unloads suspension bucket
CN206590757U (en) A kind of pile tube vertical lifting device
CN205294623U (en) Be used for steel pipe hoist and mount cable spare
CN203451057U (en) Bidirectional plate hook
CN203008391U (en) Reversed T-shaped hoisting connecting piece for prefabricated part hoisting
CN203392716U (en) Hanger
CN203738011U (en) Steel ladle cover of thinned structure
CN205152260U (en) Steel scrap basket
CN203754232U (en) Simple steel rail lifting tool
CN208792792U (en) Prefabricated components hoisting structure and prefabricated components
CN205575387U (en) Internal expanding type lifts by crane instrument
CN209505884U (en) A kind of top plate lifting compartment and vehicle
CN205076674U (en) Gantry crane's assembly auxiliary device
CN206798957U (en) A kind of electric motor end cap lifting device
CN205932935U (en) I -steel is with upset hoist
CN209384124U (en) A kind of steel truss girder purlin piece turnover hoisting structure
CN208471394U (en) Large-scale member bar turning device
CN206903058U (en) One kind is multi-functional to use H profile steel
CN207226834U (en) A kind of crane is used from opening and closing slag bucket device
CN205709453U (en) A kind of line bar handling folder
CN206014237U (en) A kind of 8-shaped lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant