CN107314680A - The steel scrap basket increased operation rate - Google Patents

The steel scrap basket increased operation rate Download PDF

Info

Publication number
CN107314680A
CN107314680A CN201710486427.0A CN201710486427A CN107314680A CN 107314680 A CN107314680 A CN 107314680A CN 201710486427 A CN201710486427 A CN 201710486427A CN 107314680 A CN107314680 A CN 107314680A
Authority
CN
China
Prior art keywords
bottom plate
chain
flashboard
plate
steel scrap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710486427.0A
Other languages
Chinese (zh)
Inventor
陈涛
张新科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Rongsheng Steel Making Co Ltd
Jiangsu Shagang Group Co Ltd
Original Assignee
Zhangjiagang Rongsheng Steel Making Co Ltd
Jiangsu Shagang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Rongsheng Steel Making Co Ltd, Jiangsu Shagang Group Co Ltd filed Critical Zhangjiagang Rongsheng Steel Making Co Ltd
Priority to CN201710486427.0A priority Critical patent/CN107314680A/en
Publication of CN107314680A publication Critical patent/CN107314680A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/0025Charging or loading melting furnaces with material in the solid state
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2001/00Composition, conformation or state of the charge
    • F27M2001/02Charges containing ferrous elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Refuse Receptacles (AREA)

Abstract

This application discloses a kind of steel scrap basket increased operation rate, including material basket body, first bottom plate, second bottom plate and upending frame, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with the first flashboard, first bottom plate is pinned at the material basket body by first flashboard, the second bottom plate both sides are respectively equipped with the second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, the upending frame is pinned at the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc sector structure, the installing plate internal diameter is more than the external diameter of the material basket body, two lifting boom is arranged in parallel in the installing plate, the lifting boom has been provided with hanging part away from one end of the installing plate.This new steel scrap basket increased operation rate is simple in construction, can all launch waste material in basket, improves energy resource utilization ratio.

Description

The steel scrap basket increased operation rate
Technical field
The application is related to feedstock circulation and utilizes field, more particularly to a kind of steel scrap basket increased operation rate.
Background technology
In steelmaking equipment, the steel scrap basket increased operation rate is a kind of device for loading steel scrap, for into converter Put into steel scrap.The steel scrap basket increased operation rate mainly has bottom to open charging type and oral area to topple over two kinds of charging type, both material Basket respectively has weak point.The shortcoming that oral area topples over charging type material basket is:It is due to being difficult to position and being difficult to that steel scrap is whole exactly It is poured into stove, therefore the material basket of large-tonnage does not use typically oral area to topple over the steel scrap basket that charging type is increased operation rate.Bottom, which is opened, to be added The shortcoming of material formula material basket is:When material full load in material basket, material is had the trend of fallen downward to extrude by Gravitative Loads Lower half shell bottom plate, it is special because it does not have locking device, lower half shell bottom plate to be opened and the phenomenon for material leakage of appearing to both sides after being pressurized Be not when expect to contain in basket be waste material when, the leakage of waste material can be negatively affected to production and environment.So needing to propose Improve.
The content of the invention
It is an object of the invention to provide a kind of steel scrap basket increased operation rate, to overcome deficiency of the prior art.
To achieve the above object, the present invention provides following technical scheme:
The embodiment of the present application discloses a kind of steel scrap basket increased operation rate, including material basket body, the first bottom plate, second Bottom plate and upending frame, can be opened and closed, the first bottom plate both sides are respectively equipped with first between first bottom plate and the second bottom plate Flashboard, first bottom plate is pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with The second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, described Upending frame is pinned at the material basket body, and the upending frame includes an installing plate and two lifting booms, the installing plate for it is inside and outside all For the sector structure of circular arc, the installing plate internal diameter is more than the external diameter of the material basket body, and two lifting boom, which is parallel to each other, to be set The installing plate is placed in, the lifting boom has been provided with hanging part away from one end of the installing plate.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, the first bottom plate outer wall is connected with the first chain, described The tie point of first chain is in the center between two first flashboard, and the second bottom plate outer wall is connected with the second chain, The tie point of second chain is in the center between two second flashboard, the connection of first chain and the first bottom plate The tie point of point and the second chain and the second bottom plate is in sustained height.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, first chain is away from first bottom plate One end and the second chain are connected to keying frame away from one end of second bottom plate, and the keying frame center is provided with connection Hole.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, the length phase of first chain and the second chain Together.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, material basket body upper end outer wall is provided with two sliding sleeves, Two sliding sleeve is respectively at the tie point and the tie point of the second chain and the second bottom plate of first chain and the first bottom plate Surface, first chain and the second chain are each passed through sliding sleeve described in two.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, first flashboard is away from first bottom plate One end and the second flashboard are pinned at the two ends of same connecting plate away from one end of second bottom plate respectively.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, two group of first flashboard, the second flashboard and connection Baffle plate is respectively equipped with the outside of plate, the baffle plate is fixed on the material basket body.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, the bottom of first bottom plate and the second bottom plate is Flat-bottom structure.
Compared with prior art, the advantage of the invention is that:This new steel scrap basket increased operation rate is simple in construction, energy Waste material in basket is all launched, raising energy resource utilization ratio, the bottom of the first bottom plate and the second bottom plate is flat-bottom structure, is subtracted The probability that taper work is contacted to the first bottom plate and the second bottom plate joint is lacked, so as to reduce back taper waste material and the first bottom The contact gap of plate and the second bottom plate, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally, at the same the first bottom plate and Second bottom plate is linked together by connecting plate, is not in the situation of material leakage.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show the structural representation for the steel scrap basket increased operation rate in the specific embodiment of the invention.
Fig. 2 show the top view for the steel scrap basket increased operation rate in the specific embodiment of the invention.
Fig. 3 show the side view for the steel scrap basket increased operation rate in the specific embodiment of the invention.
Fig. 4 show the first bottom plate and the structural representation of the second bottom plate closure in the specific embodiment of the invention.
Fig. 5 show the structural representation that the first bottom plate and the second bottom plate are opened in the specific embodiment of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, detailed retouch is carried out to the technical scheme in the embodiment of the present invention State, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on the present invention In embodiment, the every other implementation that those of ordinary skill in the art are obtained on the premise of creative work is not made Example, belongs to the scope of protection of the invention.
Join shown in Fig. 1 to Fig. 5, the steel scrap basket increased operation rate in the present embodiment, including material basket body 10, the first bottom Plate 20, the second bottom plate 30 and upending frame 40, can be opened and closed between the first bottom plate 20 and the second bottom plate 30, the both sides of the first bottom plate 20 point Not She You the first flashboard 21, the first bottom plate 20 is pinned at material basket body 10, the both sides of the second bottom plate 30 difference by the first flashboard 21 Provided with corresponding second flashboard 31 of the first flashboard 21, the second bottom plate 30 is pinned at material basket body 10 by the second flashboard 31, rises Suspension bracket 40 is pinned at material basket body 10, and upending frame 40 includes an installing plate 41 and two lifting booms 42, and installing plate 41 is inside and outside to be all The sector structure of circular arc, the internal diameter of installing plate 41 is more than the external diameter of material basket body 10, and two lifting booms 42 are arranged in parallel in installation Plate 41, lifting boom 42 has been provided with hanging part away from one end of installing plate 41.
In the technical scheme, this new steel scrap basket increased operation rate is simple in construction, can all appear waste material in basket, The bottom of raising energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to first Bottom plate and the probability of the second bottom plate joint contact, so as to reduce the contact of back taper waste material and the first bottom plate and the second bottom plate Gap, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally, while the first bottom plate and the second bottom plate pass through connecting plate Link together, be not in the situation of material leakage.
Further, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two first Center between flashboard 21, the outer wall of the second bottom plate 30 is connected with the second chain 32, and the tie point of the second chain 32 is in two second The connection of the tie point and the second chain 32 and the second bottom plate 30 of center between flashboard 31, the first chain 22 and the first bottom plate 20 Point is in sustained height.
In the technical scheme, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two Center between first flashboard 21, the outer wall of the second bottom plate 30 is connected with the second chain 32, and the tie point of the second chain 32 is in two The tie point and the second chain 32 of center between second flashboard 31, the first chain 22 and the first bottom plate 20 and the second bottom plate 30 Tie point is in sustained height, is fed intake for pulling open the first bottom plate 20 and the second bottom plate 30.
Further, the first chain 22 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32 End is connected to keying frame 50, opens and closes the center of frame 50 and is provided with connecting hole.
In the technical scheme, the first chain 22 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32 One end be connected to keying frame 50, open and close frame 50 center and be provided with connecting hole, for connecting external impetus equipment, for example, drive a vehicle Deng, it is ensured that the first bottom plate 20 and the second bottom plate 30 are pulled open by same dynamics of same time.
Further, the first chain 22 is identical with the length of the second chain 32.
In the technical scheme, the first chain 22 is identical with the length of the second chain 32, it is ensured that the first bottom plate and the second bottom plate Open simultaneously, and the angle opened is identical, so as to ensure the direction fed intake for straight down.
Further, the upper end outer wall of material basket body 10 is provided with two sliding sleeves 11, two sliding sleeves 11 be respectively at the first chain 22 with The surface of the tie point of the tie point of first bottom plate 20 and the second chain 32 and the second bottom plate 30, the first chain 22 and the second chain Bar 32 is each passed through two sliding sleeves 11.
In the technical scheme, the upper end outer wall of material basket body 10 is provided with two sliding sleeves 11, and two sliding sleeves 11 are respectively at the first chain 22 and first bottom plate 20 tie point and the second chain 32 and the second bottom plate 30 tie point surface, the first chain 22 and Two chains 32 are each passed through two sliding sleeves 11, it is ensured that the power suffered by the first bottom plate and the second bottom plate is power straight up.
Further, the first flashboard 21 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31 End is pinned at the two ends of same connecting plate 60 respectively.
In the technical scheme, the first flashboard 21 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31 One end be pinned at the two ends of same connecting plate 60 respectively, it is ensured that be not in the situation of material leakage.
Further, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70, baffle plate 70 are fixed on material basket body 10.
In the technical scheme, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70, Baffle plate 70 is fixed on material basket body 10, it is to avoid waste material, which enters, influences the between the first flashboard 21, the second flashboard 31 and connecting plate 60 The opening and closing of one bottom plate and the second bottom plate.
Further, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure.
In the technical scheme, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure, reduces taper work pair First bottom plate and the probability of the second bottom plate joint contact, so as to reduce back taper waste material and the first bottom plate and the second bottom plate Gap is contacted, the probability that the first bottom plate and the second bottom plate are opened accidentally is reduced.
In summary, this new steel scrap basket increased operation rate is simple in construction, can all appear waste material in basket, improves The bottom of energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to the first bottom plate The probability contacted with the second bottom plate joint, so as to reduce back taper waste material contact with the first bottom plate and the second bottom plate seam Gap, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally, while the first bottom plate and the second bottom plate are connected by connecting plate It is connected together, is not in the situation of material leakage.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should It is considered as the protection domain of the application.

Claims (8)

1. a kind of steel scrap basket increased operation rate, it is characterised in that including expecting basket body, the first bottom plate, the second bottom plate and rising Suspension bracket, can be opened and closed, the first bottom plate both sides are respectively equipped with the first flashboard, described between first bottom plate and the second bottom plate First bottom plate is pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with and the first flashboard Corresponding second flashboard, second bottom plate is pinned at the material basket body, the upending frame pin joint by second flashboard In the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc fan Shape structure, the installing plate internal diameter is more than the external diameter of the material basket body, and two lifting boom is arranged in parallel in the peace Plate is filled, the lifting boom has been provided with hanging part away from one end of the installing plate.
2. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:The first bottom plate outer wall connection There is the first chain, the tie point of first chain is in the center between two first flashboard, the second bottom plate outer wall The second chain is connected with, the tie point of second chain is in the center between two second flashboard, first chain Sustained height is in the tie point of the first bottom plate and the tie point of the second chain and the second bottom plate.
3. the steel scrap basket according to claim 2 increased operation rate, it is characterised in that:First chain is away from described One end of first bottom plate and the second chain are connected to keying frame, the keying frame center away from one end of second bottom plate Provided with connecting hole.
4. the steel scrap basket according to claim 2 increased operation rate, it is characterised in that:First chain and the second chain The length of bar is identical.
5. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:Material basket body upper end outer wall Provided with two sliding sleeves, two sliding sleeve is respectively at first chain and the tie point and the second chain of the first bottom plate and the second bottom The surface of the tie point of plate, first chain and the second chain are each passed through sliding sleeve described in two.
6. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:First flashboard is away from described One end of first bottom plate and the second flashboard are pinned at the two ends of same connecting plate away from one end of second bottom plate respectively.
7. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:Two group of first flashboard, Baffle plate is respectively equipped with the outside of two flashboards and connecting plate, the baffle plate is fixed on the material basket body.
8. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:First bottom plate and the second bottom The bottom of plate is flat-bottom structure.
CN201710486427.0A 2017-06-23 2017-06-23 The steel scrap basket increased operation rate Pending CN107314680A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710486427.0A CN107314680A (en) 2017-06-23 2017-06-23 The steel scrap basket increased operation rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710486427.0A CN107314680A (en) 2017-06-23 2017-06-23 The steel scrap basket increased operation rate

Publications (1)

Publication Number Publication Date
CN107314680A true CN107314680A (en) 2017-11-03

Family

ID=60179867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710486427.0A Pending CN107314680A (en) 2017-06-23 2017-06-23 The steel scrap basket increased operation rate

Country Status (1)

Country Link
CN (1) CN107314680A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112320577A (en) * 2020-11-04 2021-02-05 新疆八一钢铁股份有限公司 Operation method for improving counterweight tonnage of scrap steel hopper
CN114572712A (en) * 2022-04-01 2022-06-03 中冶赛迪工程技术股份有限公司 Dead weight type discharging device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204080009U (en) * 2014-09-25 2015-01-07 山东钢铁股份有限公司 A kind of steel scrap basket
CN104315854A (en) * 2014-10-31 2015-01-28 天津市中重金属结构有限公司 Novel steel scrap basket
CN205152260U (en) * 2015-12-01 2016-04-13 通裕重工股份有限公司 Steel scrap basket
CN106365038A (en) * 2016-10-11 2017-02-01 马鞍山钢铁股份有限公司 Waste basket structure
CN206832059U (en) * 2017-06-23 2018-01-02 江苏沙钢集团有限公司 The scrap steel basket increased operation rate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204080009U (en) * 2014-09-25 2015-01-07 山东钢铁股份有限公司 A kind of steel scrap basket
CN104315854A (en) * 2014-10-31 2015-01-28 天津市中重金属结构有限公司 Novel steel scrap basket
CN205152260U (en) * 2015-12-01 2016-04-13 通裕重工股份有限公司 Steel scrap basket
CN106365038A (en) * 2016-10-11 2017-02-01 马鞍山钢铁股份有限公司 Waste basket structure
CN206832059U (en) * 2017-06-23 2018-01-02 江苏沙钢集团有限公司 The scrap steel basket increased operation rate

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112320577A (en) * 2020-11-04 2021-02-05 新疆八一钢铁股份有限公司 Operation method for improving counterweight tonnage of scrap steel hopper
CN112320577B (en) * 2020-11-04 2022-10-14 新疆八一钢铁股份有限公司 Operation method for improving counterweight tonnage of scrap steel hopper
CN114572712A (en) * 2022-04-01 2022-06-03 中冶赛迪工程技术股份有限公司 Dead weight type discharging device and method

Similar Documents

Publication Publication Date Title
CN206832059U (en) The scrap steel basket increased operation rate
CN107314680A (en) The steel scrap basket increased operation rate
CN207877121U (en) A kind of equipment for supporting patient with burn of steel box-girder
CN205906930U (en) From locking -type lifting hook
CN203451057U (en) Bidirectional plate hook
CN106829757A (en) The tower body structure and its welding method of a kind of extra large work crane
CN203392716U (en) Hanger
CN206662256U (en) A kind of splice type ladle working lining with refractory precast block
CN213679474U (en) Full-automatic soil lifting bucket for transferring muck in deep foundation pit excavation construction
CN107839982A (en) A kind of load garbage device
CN210663924U (en) Mechanical connecting rod type automatic side sealing mechanism
CN205294623U (en) Be used for steel pipe hoist and mount cable spare
CN205152260U (en) Steel scrap basket
CN209384124U (en) A kind of steel truss girder purlin piece turnover hoisting structure
CN203638496U (en) Mechanical hanging dual-box drop-bottom garbage station equipment
CN203738011U (en) Steel ladle cover of thinned structure
CN209505884U (en) A kind of top plate lifting compartment and vehicle
CN208704441U (en) It is a kind of for smelting furnace can automatic discharging feeding device
CN207861744U (en) The overhead explosion-proof crane of explosion-proof tank is installed
CN205472276U (en) Simple and easy automatic hopper that opens and shuts
CN106365038A (en) Waste basket structure
CN208022573U (en) A kind of travelling gantry steel-reinforcement cage hanger
CN205076674U (en) Gantry crane's assembly auxiliary device
CN206615921U (en) A kind of construction site with exempt from dismantle cage
CN207226834U (en) A kind of crane is used from opening and closing slag bucket device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171103