CN107314680A - The steel scrap basket increased operation rate - Google Patents
The steel scrap basket increased operation rate Download PDFInfo
- Publication number
- CN107314680A CN107314680A CN201710486427.0A CN201710486427A CN107314680A CN 107314680 A CN107314680 A CN 107314680A CN 201710486427 A CN201710486427 A CN 201710486427A CN 107314680 A CN107314680 A CN 107314680A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- chain
- flashboard
- plate
- steel scrap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 35
- 239000010959 steel Substances 0.000 title claims abstract description 35
- 239000000463 material Substances 0.000 claims abstract description 40
- 230000002459 sustained effect Effects 0.000 claims description 4
- 239000000725 suspension Substances 0.000 claims description 2
- 230000000630 rising effect Effects 0.000 claims 1
- 239000002699 waste material Substances 0.000 abstract description 11
- 238000010276 construction Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000009628 steelmaking Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D3/00—Charging; Discharging; Manipulation of charge
- F27D3/0025—Charging or loading melting furnaces with material in the solid state
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27M—INDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
- F27M2001/00—Composition, conformation or state of the charge
- F27M2001/02—Charges containing ferrous elements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Refuse Receptacles (AREA)
Abstract
This application discloses a kind of steel scrap basket increased operation rate, including material basket body, first bottom plate, second bottom plate and upending frame, it can be opened and closed between first bottom plate and the second bottom plate, the first bottom plate both sides are respectively equipped with the first flashboard, first bottom plate is pinned at the material basket body by first flashboard, the second bottom plate both sides are respectively equipped with the second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, the upending frame is pinned at the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc sector structure, the installing plate internal diameter is more than the external diameter of the material basket body, two lifting boom is arranged in parallel in the installing plate, the lifting boom has been provided with hanging part away from one end of the installing plate.This new steel scrap basket increased operation rate is simple in construction, can all launch waste material in basket, improves energy resource utilization ratio.
Description
Technical field
The application is related to feedstock circulation and utilizes field, more particularly to a kind of steel scrap basket increased operation rate.
Background technology
In steelmaking equipment, the steel scrap basket increased operation rate is a kind of device for loading steel scrap, for into converter
Put into steel scrap.The steel scrap basket increased operation rate mainly has bottom to open charging type and oral area to topple over two kinds of charging type, both material
Basket respectively has weak point.The shortcoming that oral area topples over charging type material basket is:It is due to being difficult to position and being difficult to that steel scrap is whole exactly
It is poured into stove, therefore the material basket of large-tonnage does not use typically oral area to topple over the steel scrap basket that charging type is increased operation rate.Bottom, which is opened, to be added
The shortcoming of material formula material basket is:When material full load in material basket, material is had the trend of fallen downward to extrude by Gravitative Loads
Lower half shell bottom plate, it is special because it does not have locking device, lower half shell bottom plate to be opened and the phenomenon for material leakage of appearing to both sides after being pressurized
Be not when expect to contain in basket be waste material when, the leakage of waste material can be negatively affected to production and environment.So needing to propose
Improve.
The content of the invention
It is an object of the invention to provide a kind of steel scrap basket increased operation rate, to overcome deficiency of the prior art.
To achieve the above object, the present invention provides following technical scheme:
The embodiment of the present application discloses a kind of steel scrap basket increased operation rate, including material basket body, the first bottom plate, second
Bottom plate and upending frame, can be opened and closed, the first bottom plate both sides are respectively equipped with first between first bottom plate and the second bottom plate
Flashboard, first bottom plate is pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with
The second flashboard corresponding with the first flashboard, second bottom plate is pinned at the material basket body by second flashboard, described
Upending frame is pinned at the material basket body, and the upending frame includes an installing plate and two lifting booms, the installing plate for it is inside and outside all
For the sector structure of circular arc, the installing plate internal diameter is more than the external diameter of the material basket body, and two lifting boom, which is parallel to each other, to be set
The installing plate is placed in, the lifting boom has been provided with hanging part away from one end of the installing plate.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, the first bottom plate outer wall is connected with the first chain, described
The tie point of first chain is in the center between two first flashboard, and the second bottom plate outer wall is connected with the second chain,
The tie point of second chain is in the center between two second flashboard, the connection of first chain and the first bottom plate
The tie point of point and the second chain and the second bottom plate is in sustained height.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, first chain is away from first bottom plate
One end and the second chain are connected to keying frame away from one end of second bottom plate, and the keying frame center is provided with connection
Hole.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, the length phase of first chain and the second chain
Together.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, material basket body upper end outer wall is provided with two sliding sleeves,
Two sliding sleeve is respectively at the tie point and the tie point of the second chain and the second bottom plate of first chain and the first bottom plate
Surface, first chain and the second chain are each passed through sliding sleeve described in two.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, first flashboard is away from first bottom plate
One end and the second flashboard are pinned at the two ends of same connecting plate away from one end of second bottom plate respectively.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, two group of first flashboard, the second flashboard and connection
Baffle plate is respectively equipped with the outside of plate, the baffle plate is fixed on the material basket body.
It is preferred that, in the above-mentioned steel scrap basket increased operation rate, the bottom of first bottom plate and the second bottom plate is
Flat-bottom structure.
Compared with prior art, the advantage of the invention is that:This new steel scrap basket increased operation rate is simple in construction, energy
Waste material in basket is all launched, raising energy resource utilization ratio, the bottom of the first bottom plate and the second bottom plate is flat-bottom structure, is subtracted
The probability that taper work is contacted to the first bottom plate and the second bottom plate joint is lacked, so as to reduce back taper waste material and the first bottom
The contact gap of plate and the second bottom plate, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally, at the same the first bottom plate and
Second bottom plate is linked together by connecting plate, is not in the situation of material leakage.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show the structural representation for the steel scrap basket increased operation rate in the specific embodiment of the invention.
Fig. 2 show the top view for the steel scrap basket increased operation rate in the specific embodiment of the invention.
Fig. 3 show the side view for the steel scrap basket increased operation rate in the specific embodiment of the invention.
Fig. 4 show the first bottom plate and the structural representation of the second bottom plate closure in the specific embodiment of the invention.
Fig. 5 show the structural representation that the first bottom plate and the second bottom plate are opened in the specific embodiment of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, detailed retouch is carried out to the technical scheme in the embodiment of the present invention
State, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on the present invention
In embodiment, the every other implementation that those of ordinary skill in the art are obtained on the premise of creative work is not made
Example, belongs to the scope of protection of the invention.
Join shown in Fig. 1 to Fig. 5, the steel scrap basket increased operation rate in the present embodiment, including material basket body 10, the first bottom
Plate 20, the second bottom plate 30 and upending frame 40, can be opened and closed between the first bottom plate 20 and the second bottom plate 30, the both sides of the first bottom plate 20 point
Not She You the first flashboard 21, the first bottom plate 20 is pinned at material basket body 10, the both sides of the second bottom plate 30 difference by the first flashboard 21
Provided with corresponding second flashboard 31 of the first flashboard 21, the second bottom plate 30 is pinned at material basket body 10 by the second flashboard 31, rises
Suspension bracket 40 is pinned at material basket body 10, and upending frame 40 includes an installing plate 41 and two lifting booms 42, and installing plate 41 is inside and outside to be all
The sector structure of circular arc, the internal diameter of installing plate 41 is more than the external diameter of material basket body 10, and two lifting booms 42 are arranged in parallel in installation
Plate 41, lifting boom 42 has been provided with hanging part away from one end of installing plate 41.
In the technical scheme, this new steel scrap basket increased operation rate is simple in construction, can all appear waste material in basket,
The bottom of raising energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to first
Bottom plate and the probability of the second bottom plate joint contact, so as to reduce the contact of back taper waste material and the first bottom plate and the second bottom plate
Gap, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally, while the first bottom plate and the second bottom plate pass through connecting plate
Link together, be not in the situation of material leakage.
Further, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two first
Center between flashboard 21, the outer wall of the second bottom plate 30 is connected with the second chain 32, and the tie point of the second chain 32 is in two second
The connection of the tie point and the second chain 32 and the second bottom plate 30 of center between flashboard 31, the first chain 22 and the first bottom plate 20
Point is in sustained height.
In the technical scheme, the outer wall of the first bottom plate 20 is connected with the first chain 22, and the tie point of the first chain 22 is in two
Center between first flashboard 21, the outer wall of the second bottom plate 30 is connected with the second chain 32, and the tie point of the second chain 32 is in two
The tie point and the second chain 32 of center between second flashboard 31, the first chain 22 and the first bottom plate 20 and the second bottom plate 30
Tie point is in sustained height, is fed intake for pulling open the first bottom plate 20 and the second bottom plate 30.
Further, the first chain 22 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32
End is connected to keying frame 50, opens and closes the center of frame 50 and is provided with connecting hole.
In the technical scheme, the first chain 22 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second chain 32
One end be connected to keying frame 50, open and close frame 50 center and be provided with connecting hole, for connecting external impetus equipment, for example, drive a vehicle
Deng, it is ensured that the first bottom plate 20 and the second bottom plate 30 are pulled open by same dynamics of same time.
Further, the first chain 22 is identical with the length of the second chain 32.
In the technical scheme, the first chain 22 is identical with the length of the second chain 32, it is ensured that the first bottom plate and the second bottom plate
Open simultaneously, and the angle opened is identical, so as to ensure the direction fed intake for straight down.
Further, the upper end outer wall of material basket body 10 is provided with two sliding sleeves 11, two sliding sleeves 11 be respectively at the first chain 22 with
The surface of the tie point of the tie point of first bottom plate 20 and the second chain 32 and the second bottom plate 30, the first chain 22 and the second chain
Bar 32 is each passed through two sliding sleeves 11.
In the technical scheme, the upper end outer wall of material basket body 10 is provided with two sliding sleeves 11, and two sliding sleeves 11 are respectively at the first chain
22 and first bottom plate 20 tie point and the second chain 32 and the second bottom plate 30 tie point surface, the first chain 22 and
Two chains 32 are each passed through two sliding sleeves 11, it is ensured that the power suffered by the first bottom plate and the second bottom plate is power straight up.
Further, the first flashboard 21 deviates from the one of the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31
End is pinned at the two ends of same connecting plate 60 respectively.
In the technical scheme, the first flashboard 21 deviates from the second bottom plate 30 away from one end of the first bottom plate 20 and the second flashboard 31
One end be pinned at the two ends of same connecting plate 60 respectively, it is ensured that be not in the situation of material leakage.
Further, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70, baffle plate
70 are fixed on material basket body 10.
In the technical scheme, the outside of two group of first flashboard 21, the second flashboard 31 and connecting plate 60 is respectively equipped with baffle plate 70,
Baffle plate 70 is fixed on material basket body 10, it is to avoid waste material, which enters, influences the between the first flashboard 21, the second flashboard 31 and connecting plate 60
The opening and closing of one bottom plate and the second bottom plate.
Further, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure.
In the technical scheme, the bottom of the first bottom plate 20 and the second bottom plate 30 is flat-bottom structure, reduces taper work pair
First bottom plate and the probability of the second bottom plate joint contact, so as to reduce back taper waste material and the first bottom plate and the second bottom plate
Gap is contacted, the probability that the first bottom plate and the second bottom plate are opened accidentally is reduced.
In summary, this new steel scrap basket increased operation rate is simple in construction, can all appear waste material in basket, improves
The bottom of energy resource utilization ratio, the first bottom plate and the second bottom plate is flat-bottom structure, reduces taper work to the first bottom plate
The probability contacted with the second bottom plate joint, so as to reduce back taper waste material contact with the first bottom plate and the second bottom plate seam
Gap, reduces the probability that the first bottom plate and the second bottom plate are opened accidentally, while the first bottom plate and the second bottom plate are connected by connecting plate
It is connected together, is not in the situation of material leakage.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those
Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment
Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that
Also there is other identical element in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art
For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as the protection domain of the application.
Claims (8)
1. a kind of steel scrap basket increased operation rate, it is characterised in that including expecting basket body, the first bottom plate, the second bottom plate and rising
Suspension bracket, can be opened and closed, the first bottom plate both sides are respectively equipped with the first flashboard, described between first bottom plate and the second bottom plate
First bottom plate is pinned at the material basket body by first flashboard, and the second bottom plate both sides are respectively equipped with and the first flashboard
Corresponding second flashboard, second bottom plate is pinned at the material basket body, the upending frame pin joint by second flashboard
In the material basket body, the upending frame includes an installing plate and two lifting booms, the installing plate be it is inside and outside be all circular arc fan
Shape structure, the installing plate internal diameter is more than the external diameter of the material basket body, and two lifting boom is arranged in parallel in the peace
Plate is filled, the lifting boom has been provided with hanging part away from one end of the installing plate.
2. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:The first bottom plate outer wall connection
There is the first chain, the tie point of first chain is in the center between two first flashboard, the second bottom plate outer wall
The second chain is connected with, the tie point of second chain is in the center between two second flashboard, first chain
Sustained height is in the tie point of the first bottom plate and the tie point of the second chain and the second bottom plate.
3. the steel scrap basket according to claim 2 increased operation rate, it is characterised in that:First chain is away from described
One end of first bottom plate and the second chain are connected to keying frame, the keying frame center away from one end of second bottom plate
Provided with connecting hole.
4. the steel scrap basket according to claim 2 increased operation rate, it is characterised in that:First chain and the second chain
The length of bar is identical.
5. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:Material basket body upper end outer wall
Provided with two sliding sleeves, two sliding sleeve is respectively at first chain and the tie point and the second chain of the first bottom plate and the second bottom
The surface of the tie point of plate, first chain and the second chain are each passed through sliding sleeve described in two.
6. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:First flashboard is away from described
One end of first bottom plate and the second flashboard are pinned at the two ends of same connecting plate away from one end of second bottom plate respectively.
7. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:Two group of first flashboard,
Baffle plate is respectively equipped with the outside of two flashboards and connecting plate, the baffle plate is fixed on the material basket body.
8. the steel scrap basket according to claim 1 increased operation rate, it is characterised in that:First bottom plate and the second bottom
The bottom of plate is flat-bottom structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486427.0A CN107314680A (en) | 2017-06-23 | 2017-06-23 | The steel scrap basket increased operation rate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486427.0A CN107314680A (en) | 2017-06-23 | 2017-06-23 | The steel scrap basket increased operation rate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107314680A true CN107314680A (en) | 2017-11-03 |
Family
ID=60179867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710486427.0A Pending CN107314680A (en) | 2017-06-23 | 2017-06-23 | The steel scrap basket increased operation rate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107314680A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112320577A (en) * | 2020-11-04 | 2021-02-05 | 新疆八一钢铁股份有限公司 | Operation method for improving counterweight tonnage of scrap steel hopper |
CN114572712A (en) * | 2022-04-01 | 2022-06-03 | 中冶赛迪工程技术股份有限公司 | Dead weight type discharging device and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204080009U (en) * | 2014-09-25 | 2015-01-07 | 山东钢铁股份有限公司 | A kind of steel scrap basket |
CN104315854A (en) * | 2014-10-31 | 2015-01-28 | 天津市中重金属结构有限公司 | Novel steel scrap basket |
CN205152260U (en) * | 2015-12-01 | 2016-04-13 | 通裕重工股份有限公司 | Steel scrap basket |
CN106365038A (en) * | 2016-10-11 | 2017-02-01 | 马鞍山钢铁股份有限公司 | Waste basket structure |
CN206832059U (en) * | 2017-06-23 | 2018-01-02 | 江苏沙钢集团有限公司 | The scrap steel basket increased operation rate |
-
2017
- 2017-06-23 CN CN201710486427.0A patent/CN107314680A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204080009U (en) * | 2014-09-25 | 2015-01-07 | 山东钢铁股份有限公司 | A kind of steel scrap basket |
CN104315854A (en) * | 2014-10-31 | 2015-01-28 | 天津市中重金属结构有限公司 | Novel steel scrap basket |
CN205152260U (en) * | 2015-12-01 | 2016-04-13 | 通裕重工股份有限公司 | Steel scrap basket |
CN106365038A (en) * | 2016-10-11 | 2017-02-01 | 马鞍山钢铁股份有限公司 | Waste basket structure |
CN206832059U (en) * | 2017-06-23 | 2018-01-02 | 江苏沙钢集团有限公司 | The scrap steel basket increased operation rate |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112320577A (en) * | 2020-11-04 | 2021-02-05 | 新疆八一钢铁股份有限公司 | Operation method for improving counterweight tonnage of scrap steel hopper |
CN112320577B (en) * | 2020-11-04 | 2022-10-14 | 新疆八一钢铁股份有限公司 | Operation method for improving counterweight tonnage of scrap steel hopper |
CN114572712A (en) * | 2022-04-01 | 2022-06-03 | 中冶赛迪工程技术股份有限公司 | Dead weight type discharging device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206832059U (en) | The scrap steel basket increased operation rate | |
CN107314680A (en) | The steel scrap basket increased operation rate | |
CN207877121U (en) | A kind of equipment for supporting patient with burn of steel box-girder | |
CN205906930U (en) | From locking -type lifting hook | |
CN203451057U (en) | Bidirectional plate hook | |
CN106829757A (en) | The tower body structure and its welding method of a kind of extra large work crane | |
CN203392716U (en) | Hanger | |
CN206662256U (en) | A kind of splice type ladle working lining with refractory precast block | |
CN213679474U (en) | Full-automatic soil lifting bucket for transferring muck in deep foundation pit excavation construction | |
CN107839982A (en) | A kind of load garbage device | |
CN210663924U (en) | Mechanical connecting rod type automatic side sealing mechanism | |
CN205294623U (en) | Be used for steel pipe hoist and mount cable spare | |
CN205152260U (en) | Steel scrap basket | |
CN209384124U (en) | A kind of steel truss girder purlin piece turnover hoisting structure | |
CN203638496U (en) | Mechanical hanging dual-box drop-bottom garbage station equipment | |
CN203738011U (en) | Steel ladle cover of thinned structure | |
CN209505884U (en) | A kind of top plate lifting compartment and vehicle | |
CN208704441U (en) | It is a kind of for smelting furnace can automatic discharging feeding device | |
CN207861744U (en) | The overhead explosion-proof crane of explosion-proof tank is installed | |
CN205472276U (en) | Simple and easy automatic hopper that opens and shuts | |
CN106365038A (en) | Waste basket structure | |
CN208022573U (en) | A kind of travelling gantry steel-reinforcement cage hanger | |
CN205076674U (en) | Gantry crane's assembly auxiliary device | |
CN206615921U (en) | A kind of construction site with exempt from dismantle cage | |
CN207226834U (en) | A kind of crane is used from opening and closing slag bucket device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171103 |