CN206829165U - Caved in the composite foundation with sapping area for arid biogeographic zone earthen ruins - Google Patents
Caved in the composite foundation with sapping area for arid biogeographic zone earthen ruins Download PDFInfo
- Publication number
- CN206829165U CN206829165U CN201720651536.9U CN201720651536U CN206829165U CN 206829165 U CN206829165 U CN 206829165U CN 201720651536 U CN201720651536 U CN 201720651536U CN 206829165 U CN206829165 U CN 206829165U
- Authority
- CN
- China
- Prior art keywords
- area
- sapping
- composite foundation
- ruins
- stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
For arid area earthen ruins caving zone and the composite foundation in sapping area, the composite foundation includes top and is modified sticky rice syrup ash soil layer from top to bottom(1), bottom stone block building bed course(2), wherein bottom stone block building bed course(2)Including block stone(21)And between stone filling space modification glutinous rice mortar(22).The utility model blocks capillary water to enter sapping and the Disease Processing area root soil body that caves in, the bearing capacity for improving ground and the sedimentation and deformation and the weather resistance of ground that reduce ground by following many aspects.Institute obtained using material it is cheap, environment friendly and pollution-free and strong using material and ruins body compatible deformation performance, it is compatible good, preferably responded the theory of historical relic's protection.Construction technology is easy, solves the unstability that moisture and salt regime causes the earthen ruins wall caused by earthen ruins wall base shortcake alkali.
Description
Technical field
It the utility model is related to earthen ruins caving zone and the foundation consolidating technology in sapping area.
Background technology
The numerous earthen ruins of NW China arid area remnants, arid, short of rain, windy and high evaporation capacity it is severe
Weather make these earthen ruins gradually experience by disease development to disappearance amount-qualitative change process totally, wherein sapping, crack, cave in
It is earthen ruins safe preservation the most universal and typical disease, serious threat to ruins.These diseases development directly or
What is connect is equal relevant with the sapping disease of earthen ruins wall bottom.Under conditions of rainfall and rapid evaporation, because capillary water rises
Effect, directly result in wall base soil structures and intensity wreck, or cause wall base soil water salt under the conditions of drying and watering cycle indirectly
The salt occurred of migrating is swollen and caused frost heave under freeze-thaw cycles, can cause wall root soil structures and intensity by broken
It is bad --- root salt marsh is deteriorated, and is then lost under the abrasion of common sand-carrying wind and deflation, and quality is lost rapidly, from
And wind erosion loss occurs and forms bottom cavity --- sapping area, the further expanding of cavity will induce ruins occur it is local broken
It is bad --- caving zone, or even entirety are toppled.Therefore, composite foundation is the technical measures of earthen ruins body foundation stabilization.
On the basis of meeting traditional handicraft, the historical relic's protection theory of raw material, composite foundation has blocked ground capillary water to rise, and avoids
The development of basal sapping disease caused by the inducement that capillary water rises, and foundation bearing capacity is greatly improved, have
Foundation settlement deformation under complement load action is built on effect control top, and weather resistance is remarkably reinforced.
The content of the invention
The purpose of this utility model blocks ground capillary moisture and salt regime, prevents the generous amount of caving zone from building complement sedimentation and deformation.
The utility model is the composite foundation to be caved in for arid biogeographic zone earthen ruins with sapping area, and the composite foundation is from top to bottom
Be modified sticky rice syrup ash soil layer 1 including top, bottom stone block building bed course 2, wherein bottom stone block building bed course 2 include block stone 21 with
And between stone filling space modification glutinous rice mortar 22.
The beneficial effects of the utility model are:The utility model by following many aspects block capillary water enter sapping and
Disease Processing of the caving in area root soil body, the bearing capacity for improving ground and the sedimentation and deformation that reduces ground and ground it is weather-proof
Performance.Institute obtains cheap, environment friendly and pollution-free and strong using material and ruins body compatible deformation performance, compatibility using material
Property is good, has preferably responded the theory of historical relic's protection.Construction technology is easy, solves moisture and salt regime and causes earthen ruins wall base shortcake alkali
The unstability of caused earthen ruins wall.Major advantage is:1. by using 10 ~ 20cm of particle diameter stone block building, and use
Modified glutinous rice mortar effectively coheres block stone, and using compacted thickness 20cm modification glutinous rice that dirt, these measures are equal
Beneficial has blocked capillary water in composite foundation to rise, and improves foundation bearing capacity;The levelling compacting of foundation trench bottom makes bottom land
It is smooth, increase bottom land area soil body compactness and intensity;Ruins body pre-reinforcement area square staff level is extended into 20cm to outside wall
For the design in sideline on the outside of composite foundation, beneficial increases foundation bearing area.2. composite foundation material therefor is by natural epidemic disaster in booth
The influence such as degree, humidity, Frozen-thawed cycled is little, significantly improves the weather resistance of ground.By the modification of the sticky rice syrup mixing cured
The infiltration coefficient of glutinous rice mortar and modified sticky rice syrup dirt is decreased obviously, and is enhanced its resistance to water-destructible property, cohesive force, is resisted without lateral spacing
Compressive Strength.3. modified sticky rice syrup dirt, block stone and modified glutinous rice mortar raw material sources are extensive, sticky rice syrup making more economy is just
It is prompt.The soil body that foundation trench excavates is but also as ruins caving zone and the raw material of sapping area building soil, whole work progress, without slag
The outer of soil abandons link, while turn avoid environmental pollution, has extremely strong economy and the feature of environmental protection.4. stone block building layer is more easy to simultaneous
It is dissolved in the ruins wall base position soil body;The modification sticky rice syrup ash soil layer of compacting is more compatible with the caving zone or sapping area being overlying on thereon
Building soil layer.It is strong using material and ruins body compatible deformation, compatibility, preferably respond the theory of historical relic's protection.5. make
It is the traditional handicrafts such as foundation trench excavation, stone block building, slurries mix, grey rammed earth with construction technology, it is simple and quick.This practicality
The demand of physics, mechanics and water reason needed for the new wall base reinforcing for fully meeting ruins caving zone and sapping area etc., it is simultaneous
Appearance works well, and meets the basic demand that traditional handicraft is repaired in historical relic's protection, is that the scientific of traditional handicraft is able to soil in ancient times
The reproduction of architectural engineering practice, it provides technical support to save the ancient times earth construction site that large area is caved in.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model composite foundation, Fig. 2 be the utility model be used for earthen ruins caving zone and
The structural representation of the composite foundation in sapping area, Fig. 3 are that modified sticky rice syrup ash soil layer horizontal direction one rams nest position view,
Fig. 4 is that modified sticky rice syrup ash soil layer horizontal direction two rams nest position view, and reference and correspondence are entitled:Modified glutinous rice
Starch grey soil layer 1, modified sticky rice syrup dirt 11, stone block building layer 2, block stone 21, ruins body 3, original basis layer ground 4, ruins sheet
Body pre-reinforcement area metope 5, ruins body pre-reinforcement area square staff 6, sideline 7 on the outside of composite foundation, ruins body pre-reinforcement area faces
Empty face 8, composite foundation inner side sideline 9, caving zone 10, sapping area 11.
Embodiment
The utility model is the composite foundation for arid area earthen ruins caving zone and sapping area, as shown in Figure 1 and Figure 2,
It is of the present utility model to be modified sticky rice syrup dirt for arid area earthen ruins caving zone and the composite foundation in sapping area, including top
Layer 1, wherein bottom stone block building bed course 2, bottom stone block building bed course 2 include the modification in space between block stone 21 and stone filling
Glutinous rice mortar 22.
As shown in Figure 1 and Figure 2, on the outside of composite foundation sideline 7 be located at it is horizontal to wall along ruins body pre-reinforcement area square staff 6
At outer extension 20cm.
As shown in Figure 1 and Figure 2, the compacted thickness that top is modified sticky rice syrup ash soil layer 1 is 20cm.
As shown in Figure 1 and Figure 2, the thickness of bottom stone block building bed course 2 is 400 ~ 600mm and the particle diameter of block stone 21 used is 100
~200mm。
Work progress of the present utility model, its step are:
(1)Prepare sticky rice syrup:By glutinous rice flour and water in mass ratio 3:97 ratio is mixed, stirs evenly, boiled, and is continued after boiling
Heating more than 4 hours, makes sticky rice syrup fully cure, during which uninterruptedly adds water, keep the concentration of sticky rice syrup constant, last slurries temperature
Degree is down to room temperature, adds a little preservative, lays in;
(2)Prepare modified sticky rice syrup dirt 11:
A. grey earth material is selected:Lime selects more than III grade of calcareous quick lime, is fully cleared up before use;From with
Earth material similar in former ruins soil, earth material salt content are less than 0.5%;And lime and earth material are crossed to diameter 5mm sieve, by volume 3:7
Mix is uniform, is prepared into dirt;
B. grey earth material and the uniform mix of sticky rice syrup will be prepared in a, does live compaction test, obtains optimum moisture content and maximum
Dry density;
C. optimum moisture content is obtained according to the modified compaction test of sticky rice syrup dirt 11, makes the modification sticky rice syrup ash used in construction
The moisture content control errors of soil 11 load within ± 2% scope of optimum moisture content, and by the modification sticky rice syrup dirt 11 of preparation
Plastics water-keeping bag, direct sunlight is avoided, conserved 24 hours;
(3)Prepare modified glutinous rice mortar 22:From more than III grade (contain III grade) quick lime and flyash, and by lime and powder
Coal ash crosses diameter 5mm sieve, in mass ratio 1:1 mix is uniform, is then that 0.35 ~ 0.45 addition sticky rice syrup mix is equal by the ratio of mud
It is even;
(4)Gib:The method being combined using hard and soft, effective support top ruins body caving zone 10 or sapping area 11
The soil body, prevent the 3 unstable deformation of ruins body caused by vibration in work progress;
(5)Foundation trench excavates:The position of sideline 7 on the outside of composite foundation is determined with measuring instrument according to engineering design;Clear up ruins
The void product soil of the root of body 3 or the soil that caves in, until cleaning out original basis layer ground 4, cleaning area is sideline 7 on the outside of composite foundation
The horizontal scope for extending 40cm to wall outer side;Sideline 7 cuts out foundation trench contour line on the outside of along composite foundation, and hand excavation is to reserved
Projected depth;Cell wall is repaired neatly, pats into smooth surface.If cell wall soil property is more dry, after appropriate to cell wall can spraying spray water wetting
Pat into smooth surface;By bottom land levelling, selected to be adapted to utensil to tamp substrate according to field condition;
(6)Formwork:Using ruins body pre-reinforcement area free face 8 as template, other three faces formworks.Transplanted inside foundation trench
Pin, pin buried depth 300mm, it is ensured that building hammer ram can vertically exert a force, and will at top modification sticky rice syrup ash soil layer 1 ramming in advance
Template placement is firm;
(7)Stone block building:One layer of block stone 21 is built by laying bricks or stones by substrate, then filled modified glutinous rice mortar 22 empty with block stone 21
Gap;Repeat masonry block stone 21 and fill modified glutinous rice mortar 22 in block 21 space of stone the step of, and sequentially into designed elevation;
(8)Building is modified sticky rice syrup dirt:According to compacted thickness 200mm, modified sticky rice syrup dirt 11 is spread by default pine
Thickness, is paved on block stone, and non-firm offer of first receiving is stepped on, then using the modified sticky rice syrup dirt 11 of the empty paving of sharp bottom hammer ram compacting, it is ensured that change
The global density and quality of property sticky rice syrup ash soil layer 22, during building, in a row tamped in order with sharp bottom hammer ram, be typically head
Rammer rushes extra large nest, two building silver ingots and remaining rammer punching and the combination building such as chops ditch, makes even(As shown in Figure 4), meet compactness K >=0.95;
(9)Form removal:The modified building of sticky rice syrup ash soil layer 1 is completed, and mould therefor is removed, the turbinate eye that pin is extracted is filled out
Enter modified sticky rice syrup dirt 11, and tamp;
(10)Maintenance:After the completion of Composite foundation construction, sticky rice syrup ash soil layer 11 is modified using covered rearing with plastic film upper strata, supported
Shield is not less than 7 days;
(11)Repeat above step, next section of composite foundation for constructing adjacent.
Claims (4)
1. the composite foundation for arid area earthen ruins caving zone and sapping area, it is characterised in that the composite foundation from upper and
Include top down and be modified sticky rice syrup ash soil layer(1), bottom stone block building bed course(2), wherein bottom stone block building bed course(2)Including
Block stone(21)And between stone filling space modification glutinous rice mortar(22).
2. according to claim 1 exist for arid area earthen ruins caving zone and the composite foundation in sapping area, its feature
In sideline on the outside of composite foundation(7)Positioned at along ruins body pre-reinforcement area square staff(6)Level extends at 20cm to outside wall.
3. according to claim 1 exist for arid area earthen ruins caving zone and the composite foundation in sapping area, its feature
In the top is modified sticky rice syrup ash soil layer(1)Compacted thickness be 20cm.
4. according to claim 1 exist for arid area earthen ruins caving zone and the composite foundation in sapping area, its feature
In bottom stone block building bed course(2)Thickness is 400 ~ 600mm and block stone used(21)Particle diameter is 100 ~ 200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720651536.9U CN206829165U (en) | 2017-06-07 | 2017-06-07 | Caved in the composite foundation with sapping area for arid biogeographic zone earthen ruins |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720651536.9U CN206829165U (en) | 2017-06-07 | 2017-06-07 | Caved in the composite foundation with sapping area for arid biogeographic zone earthen ruins |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206829165U true CN206829165U (en) | 2018-01-02 |
Family
ID=60773213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720651536.9U Active CN206829165U (en) | 2017-06-07 | 2017-06-07 | Caved in the composite foundation with sapping area for arid biogeographic zone earthen ruins |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206829165U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107100184A (en) * | 2017-06-07 | 2017-08-29 | 兰州理工大学 | Caved in the composite foundation and construction method with sapping area for arid biogeographic zone earthen ruins |
-
2017
- 2017-06-07 CN CN201720651536.9U patent/CN206829165U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107100184A (en) * | 2017-06-07 | 2017-08-29 | 兰州理工大学 | Caved in the composite foundation and construction method with sapping area for arid biogeographic zone earthen ruins |
CN107100184B (en) * | 2017-06-07 | 2023-06-06 | 兰州理工大学 | Composite foundation for soil site collapse and undercut area in arid area and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107100184A (en) | Caved in the composite foundation and construction method with sapping area for arid biogeographic zone earthen ruins | |
CN110512892B (en) | Construction method for repairing existing ancient city wall | |
CN101451355B (en) | Water retention method of back fill course | |
US7850402B1 (en) | Cement-treated soil blocks with vegetative faces | |
CN106193066B (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
CN111005393B (en) | Slope protection structure for repairing landslide body by using live tree piles and construction method | |
CN205116214U (en) | Composite foundation check guest retaining wall structure | |
CN105569071B (en) | A kind of slip casting under water of cement-based material or mud jacking block ground mass foundation construction | |
CN108442724B (en) | Earthen site crack repairing method | |
CN104404838A (en) | Collapsed loess subgrade base treatment method for railway with speed more than 200km | |
US8596928B1 (en) | Cement-treated soil blocks with vegetative faces | |
CN107032719A (en) | A kind of method that use imitation frosted glass small stone stone Modified soil building reinforces earthen ruins support top | |
CN104674842B (en) | Solidified earth barricade and constructional method thereof | |
CN106087880B (en) | A kind of dam that 300 meter level is high and its construction technology | |
CN107152012A (en) | Sluice construction technique | |
CN108625243A (en) | Suitable for mountain area hills red clay area high-fill roadbed filling construction method | |
CN206829165U (en) | Caved in the composite foundation with sapping area for arid biogeographic zone earthen ruins | |
CN106868969B (en) | A kind of landscape is mated formation floor tile and preparation method thereof | |
CN203334301U (en) | Cave slope strengthening protection structure | |
CN110409413A (en) | The construction method of self-expansion type compaction pile | |
CN207211176U (en) | A kind of big open caisson of superelevation | |
CN107165170A (en) | A kind of foundation ditch construction method | |
CN106703013A (en) | Water-proof curtain for treating built loess roadbed subsidence damages | |
CN103711144B (en) | Alkali-resistant greening variable-inclination-angle type mutually-embedded retaining wall block and construction method for mutually-embedded retaining wall | |
CN106812151A (en) | A kind of construction method on wind tower basis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |