CN206818204U - A kind of special plotting board of construction engineering cost - Google Patents

A kind of special plotting board of construction engineering cost Download PDF

Info

Publication number
CN206818204U
CN206818204U CN201720636650.4U CN201720636650U CN206818204U CN 206818204 U CN206818204 U CN 206818204U CN 201720636650 U CN201720636650 U CN 201720636650U CN 206818204 U CN206818204 U CN 206818204U
Authority
CN
China
Prior art keywords
mapping operations
lower section
operations panel
expansion link
engineering cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720636650.4U
Other languages
Chinese (zh)
Inventor
杜灵销
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720636650.4U priority Critical patent/CN206818204U/en
Application granted granted Critical
Publication of CN206818204U publication Critical patent/CN206818204U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of special plotting board of construction engineering cost, including mapping operations panel, lower section is provided with infrared camera on the left of the mapping operations panel surface, surveying instrument is provided with the right side of the infrared camera, electronic notebook is provided with the right side of the surveying instrument, loudspeaker is provided with above the infrared camera, touch display screen is provided with the right side of the loudspeaker, flexural pivot is connected with below the mapping operations panel, the first expansion link is connected with below the flexural pivot, motor is connected with below first expansion link, fixed plate is connected with below the motor, the left and right sides is provided with supporting leg below the fixed plate, anti-skid base is connected with below the supporting leg, the second expansion link is provided between two supporting leg below fixed plate, roller is connected with below second expansion link.The special plotting board of the construction engineering cost, simple in construction, vdiverse in function, stability is high.

Description

A kind of special plotting board of construction engineering cost
Technical field
The utility model belongs to plotting board technical field, and in particular to a kind of special plotting board of construction engineering cost.
Background technology
The straight meaning of construction costs is exactly the construction price of engineering.The three elements of engineering valuation:Amount, valency, take.Broadly engineering Cost covers construction engineering cost (Civil Specialities and installation specialty), highway engineering cost, marine traffic engineering cost, railway engineering are made Valency, total construction cost of water project, Cost for Electric Power Engineering, communication engineering cost, Aerospace Engineering cost etc..Construction costs refers to carry out The full payment that a certain engineering construction is spent, its core content are that investment estimate, estimation per design, amendment budgetary estimate, construction drawing are pre- Calculation, Engineering Settlement, budget needed for the completion of projects etc..
, it is necessary to be surveyed and drawn to scene when carrying out construction engineering cost, landform is measured, so as to more accurately to building Construction costs is built to be estimated, it is first-class to setting surveying instrument, display screen, infrared photography on the special plotting board of construction engineering cost It can be used in many places, for example, Chinese Patent Application No. CN201520830066.3, applying date 2015.10.23, title For a kind of utility model patent of construction engineering cost field surveys device, infrared camera is provided with one end of fixed mount, it is red The side of outer camera is provided with surveying instrument, and still, the plotting board is inconvenient to carry out position movement, and flexibility is low, while also not Be easy to record ephemeral data outside the venue, on the other hand, the device can not prevent the entrance of dust and rainwater and caused by Damage, function are single.
Utility model content
The purpose of this utility model is to provide a kind of construction engineering cost special plotting board, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the utility model provides following technical scheme:Including mapping operations panel, the mapping work Make lower section on the left of panel surface and be provided with infrared camera, the infrared camera is electrically connected with by wire and controller, described Surveying instrument is provided with mapping operations panel surface on the right side of infrared camera, the surveying instrument is electrically connected by wire with controller Connect, electronic notebook is provided with mapping operations panel surface on the right side of the surveying instrument, the electronic notebook passes through wire and control Device processed is electrically connected with, and USB interface is provided with mapping operations panel surface on the right side of the electronic notebook, on the infrared camera Side is provided with loudspeaker in mapping operations panel surface, and the loudspeaker is electrically connected with by wire and controller, the loudspeaker Right side is provided with printing equipment in mapping operations panel surface, is provided with and touches in mapping operations panel surface on the right side of the printing equipment Display screen, the touch display screen are electrically connected with by wire and controller, and the mapping operations panel itself is provided with controller, Data storage is provided with mapping operations panel itself on the right side of the controller, ball pivot is connected with below the mapping operations panel Joint, the flexural pivot lower section are connected with the first expansion link, motor, the drive are connected with below first expansion link Dynamic motor is electrically connected with by wire and controller, and fixed plate, the fixed plate external left are connected with below the motor Side surface is provided with the first expansion link button, and the second expansion link button, the fixed plate are provided with the right side of the first expansion link button Be provided with supporting leg at left and right sides of lower section, the supporting leg lower section is connected with anti-skid base, in fixed plate between two supporting leg Lower section is provided with the second expansion link, and roller is connected with below second expansion link.
Preferably, roller is connected with below second expansion link, middle part is connected with vertical curve below the fixed plate, institute State and be fixedly connected with plummet below vertical curve.
Preferably, it is provided with waterproof machine box outside the motor.
Preferably, the supporting leg is provided with 2, and the anti-skid base bottom is provided with anti-skidding groove.
Preferably, protective cover joint is provided with the right side of the mapping operations panel, is connected with above the protective cover joint anti- Protecting cover.
Preferably, second expansion link is provided with 2, and second expansion link is located at vertical curve both sides.
Technique effect of the present utility model and advantage:The special plotting board of the construction engineering cost, passes through the second expansion link With the Combination Design of roller, the plotting board can be moved when needing to move, facilitate the position to the plotting board Adjustment is put, more flexibly, conveniently;By the design of protective cover, can not only prevent from damaging zero because the dust shelved is fallen into Part, it is also prevented from damage parts caused by outdoor burst rainfall;, can timely will be interim by the design of electronic notebook Data are recorded in data storage, convenient to call, and are also prevented from paper waste and paper caused by being recorded on paper Open the problems such as losing;The special plotting board of the construction engineering cost, there are reasonable in design, simple operation and other advantages, can be with Promoted the use of.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is mapping operations panel schematic diagram of the present utility model;
Fig. 3 is circuit theory diagrams of the present utility model.
In figure:1 mapping operations panel, 2 touch display screens, 3 surveying instruments, 4 infrared cameras, 5 controllers, 6 data storages Device, 7 USB interfaces, 8 flexural pivots, 9 first expansion links, 10 motors, 11 fixed plates, 12 supporting legs, 13 anti-skid bases, 14 Second expansion link, 15 rollers, 16 vertical curves, 17 plummets, 18 electronic notebooks, 19 loudspeakers, 20 printing equipments, 21 first are stretched Bar button, 22 second expansion link buttons, 23 protective cover joints, 24 protective covers.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
The utility model provides the special plotting board of a kind of construction engineering cost as Figure 1-3, including mapping work Make panel 1, lower section is provided with infrared camera 4 on the left of the surface of mapping operations panel 1, and the infrared camera 4 passes through wire It is electrically connected with controller 5, the right side of infrared camera 4 is provided with surveying instrument 3, the mapping on the surface of mapping operations panel 1 Instrument 3 is electrically connected with by wire and controller 5, and the right side of surveying instrument 3 is provided with electronic notebook on the surface of mapping operations panel 1 18, the electronic notebook 18 can record the ephemeral data that mapping worker outside the venue needs to record, convenient and swift, the electricity at any time Sub- notepad 18 is electrically connected with by wire and controller 5, and the right side of electronic notebook 18 is set on the surface of mapping operations panel 1 There is USB interface 7, the USB interface 7 can import extraneous assistance data, described red in order to preferably analyze data The outer top of camera 4 is provided with loudspeaker 19 on the surface of mapping operations panel 1, and the loudspeaker 19 can be read testing result voice Go out, the loudspeaker 19 is electrically connected with by wire and controller 5, and the right side of loudspeaker 19 is on the surface of mapping operations panel 1 Provided with printing equipment 20, the right side of printing equipment 20 is provided with touch display screen 2, the touch on the surface of mapping operations panel 1 Display screen 2 is electrically connected with by wire and controller 5, and the inside of mapping operations panel 1 is provided with controller 5, the controller 5 Right side is provided with data storage 6 inside mapping operations panel 1, and the data storage 6 is used to store various data, the survey Paint the lower section of working panel 1 and be connected with flexural pivot 8, the lower section of flexural pivot 8 is connected with the first expansion link 9, and described first stretches The lower section of contracting bar 9 is connected with motor 10, and the outside of motor 10 is provided with waterproof machine box, and the motor 10 passes through Wire is electrically connected with controller 5, and the lower section of motor 10 is connected with fixed plate 11, the outer left side table of fixed plate 11 Face is provided with the first expansion link button 21, and the right side of the first expansion link button 21 is provided with the second expansion link button 22, the fixation The lower section of plate 11 left and right sides is provided with supporting leg 12, and the supporting leg 12 is provided with 2, and the lower section of supporting leg 12 is connected with anti-skidding bottom Seat 13, the bottom of anti-skid base 13 are provided with anti-skidding groove, second are provided with below fixed plate 11 between two supporting leg 12 Expansion link 14, the second expansion link 14 are provided with 2, and second expansion link 14 is located at the both sides of vertical curve 16, second expansion link 14 lower sections are connected with roller 15, and the lower section of fixed plate 11 middle part is connected with vertical curve 16, and the lower section of vertical curve 16 is fixed to be connected Plummet 17 is connected to, the plummet 17 is the degree of stability for determining surveying instrument, and the right side of mapping operations panel 1 is provided with protection Lid joint 23, the top of protective cover joint 23 are connected with protective cover 24, and the protective cover 24 can prevent dust and rainwater pair The damage of surveying instrument.
The controller 5 is AT89S52 single-chip microcomputers, is that a kind of 8 using CMOS technology manufacture of high-performance low-power-consumption are micro- Controller.
Wherein, height regulation is carried out to the first expansion link 9 by adjusting the first expansion link button 21, regulation is surveyed to suitable Amount height, then flexural pivot 8 is adjusted, suitable measurement angle is arrived in regulation, and the infrared camera 4 is adjusted the distance and angle After the data such as degree, height are acquired, surveying instrument 3 is handled data, and data are included in touch display screen 2, meanwhile, Loudspeaker 19 will show that result is read with voice, and manipulation touch display screen 2 can be printed result by printing equipment 20, The electronic notebook 18 can record the ephemeral data that testing staff outside the venue needs to record, when needing to change the plotting board During position, the second expansion link button 22 is pressed, the second expansion link 14 extends, and roller 15 contacts with ground, now, the plotting board Can easily it move.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Progress equivalent substitution, all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., It should be included within the scope of protection of the utility model.

Claims (6)

1. a kind of special plotting board of construction engineering cost, including mapping operations panel(1), it is characterised in that:The mapping work Make panel(1)Lower section is provided with infrared camera on the left of surface(4), the infrared camera(4)Pass through wire and controller(5)Electricity Property connection, the infrared camera(4)Right side is in mapping operations panel(1)Surface is provided with surveying instrument(3), the surveying instrument(3) Pass through wire and controller(5)It is electrically connected with, the surveying instrument(3)Right side is in mapping operations panel(1)Remember provided with electronics on surface Thing sheet(18), the electronic notebook(18)Pass through wire and controller(5)It is electrically connected with, the electronic notebook(18)Right side In mapping operations panel(1)Surface is provided with USB interface(7), the infrared camera(4)Top is in mapping operations panel(1)Table Face is provided with loudspeaker(19), the loudspeaker(19)Pass through wire and controller(5)It is electrically connected with, the loudspeaker(19)Right side In mapping operations panel(1)Surface is provided with printing equipment(20), the printing equipment(20)Right side is in mapping operations panel(1)Table Face is provided with touch display screen(2), the touch display screen(2)Pass through wire and controller(5)It is electrically connected with, the mapping operations Panel(1)Inside is provided with controller(5), the controller(5)Right side is in mapping operations panel(1)Inside is provided with data storage (6), the mapping operations panel(1)Lower section is connected with flexural pivot(8), the flexural pivot(8)Lower section is connected with first and stretched Contracting bar(9), first expansion link(9)Lower section is connected with motor(10), the motor(10)Pass through wire and control Device processed(5)It is electrically connected with, the motor(10)Lower section is connected with fixed plate(11), the fixed plate(11)Outer left side table Face is provided with the first expansion link button(21), the first expansion link button(21)Right side is provided with the second expansion link button(22), institute State fixed plate(11)Supporting leg is provided with left and right sides of lower section(12), the supporting leg(12)Lower section is connected with anti-skid base(13), Two supporting leg(12)Between in fixed plate(11)Lower section is provided with the second expansion link(14).
A kind of 2. special plotting board of construction engineering cost according to claim 1, it is characterised in that:Described second is flexible Bar(14)Lower section is connected with roller(15), the fixed plate(11)Vertical curve is connected with the middle part of lower section(16), the vertical curve (16)Lower section is fixedly connected with plummet(17).
A kind of 3. special plotting board of construction engineering cost according to claim 1, it is characterised in that:The motor (10)Outside is provided with waterproof machine box.
A kind of 4. special plotting board of construction engineering cost according to claim 1, it is characterised in that:The supporting leg (12)Provided with 2, the anti-skid base(13)Bottom is provided with anti-skidding groove.
A kind of 5. special plotting board of construction engineering cost according to claim 1, it is characterised in that:The mapping operations Panel(1)Right side is provided with protective cover joint(23), the protective cover joint(23)Top is connected with protective cover(24).
A kind of 6. special plotting board of construction engineering cost according to claim 2, it is characterised in that:Described second is flexible Bar(14)Provided with 2, second expansion link(14)Positioned at vertical curve(16)Both sides.
CN201720636650.4U 2017-06-04 2017-06-04 A kind of special plotting board of construction engineering cost Expired - Fee Related CN206818204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720636650.4U CN206818204U (en) 2017-06-04 2017-06-04 A kind of special plotting board of construction engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720636650.4U CN206818204U (en) 2017-06-04 2017-06-04 A kind of special plotting board of construction engineering cost

Publications (1)

Publication Number Publication Date
CN206818204U true CN206818204U (en) 2017-12-29

Family

ID=60758326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720636650.4U Expired - Fee Related CN206818204U (en) 2017-06-04 2017-06-04 A kind of special plotting board of construction engineering cost

Country Status (1)

Country Link
CN (1) CN206818204U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413947A (en) * 2018-01-31 2018-08-17 西华大学 A kind of project cost field measurement apparatus
CN109596097A (en) * 2018-11-26 2019-04-09 浙江东方工程管理有限公司 A kind of Project Supervising road grade measuring device
CN110006410A (en) * 2019-04-02 2019-07-12 嘉兴灵群贸易有限公司 A kind of construction engineering cost field surveys device
CN113280792A (en) * 2021-06-30 2021-08-20 钦州文泰建设工程有限公司 Indoor surveying and mapping system and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413947A (en) * 2018-01-31 2018-08-17 西华大学 A kind of project cost field measurement apparatus
CN109596097A (en) * 2018-11-26 2019-04-09 浙江东方工程管理有限公司 A kind of Project Supervising road grade measuring device
CN110006410A (en) * 2019-04-02 2019-07-12 嘉兴灵群贸易有限公司 A kind of construction engineering cost field surveys device
CN110006410B (en) * 2019-04-02 2021-09-07 广东精信工程造价咨询有限公司 On-spot mapping device of building engineering cost
CN113280792A (en) * 2021-06-30 2021-08-20 钦州文泰建设工程有限公司 Indoor surveying and mapping system and method

Similar Documents

Publication Publication Date Title
CN206818204U (en) A kind of special plotting board of construction engineering cost
CN205079767U (en) On --spot mapping device of constructional engineering cost
CN105500382B (en) Mobile phone test refers to robot device with integration is double
CN106772692A (en) A kind of intensive unmanned automatic weather station based on 4G technologies
CN205879186U (en) On --spot mapping device of constructional engineering cost
CN210689449U (en) Multi-functional on-spot measuring device of municipal works
CN208722169U (en) A kind of liquid crystal writing film selective erase Image Location System, board, blackboard, drawing board
CN215111519U (en) Foldable media equipment
CN209767722U (en) Building monitoring devices based on BIM technique
CN210603299U (en) Real estate land surveying and mapping device based on big data
CN211145985U (en) Slide rail interaction display system
CN210821549U (en) Portable drawing device for economic benefit evaluation model verification
CN210526125U (en) Circuit diagram drawing board for electrical design
CN205894839U (en) Ware of just attentioning is surveyed to special multi -functional pole of electric power system rural power
CN206891435U (en) Construction engineering cost field surveys device
CN108413947A (en) A kind of project cost field measurement apparatus
CN206534250U (en) A kind of construction costs budget tool box
CN206891429U (en) A kind of cross arm insulator installs scale
CN206818751U (en) A kind of circuit docking facilities of touch-screen detection
CN214591757U (en) Large-screen visual intercom access control host
CN212541328U (en) Building engineering cost budget rehearsal subassembly
CN210998701U (en) Accurate positioning mechanism for mobile multi-joint robot
CN214947907U (en) Building engineering is with novel quality control device
CN206696224U (en) A kind of bat of table tennis specification detector
CN214096011U (en) Measuring tool for building engineering management

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20180604