CN206801478U - Hydraulic drill rig derrick with floating device - Google Patents

Hydraulic drill rig derrick with floating device Download PDF

Info

Publication number
CN206801478U
CN206801478U CN201720515496.5U CN201720515496U CN206801478U CN 206801478 U CN206801478 U CN 206801478U CN 201720515496 U CN201720515496 U CN 201720515496U CN 206801478 U CN206801478 U CN 206801478U
Authority
CN
China
Prior art keywords
assembly
derrick
steel wire
wire rope
sheave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720515496.5U
Other languages
Chinese (zh)
Inventor
蔡京儒
刘维国
卫虹
张长辉
曹立天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Baoji Oilfield Machinery Co Ltd
CNPC National Oil and Gas Drilling Equipment Engineering Technology Research Center Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN201720515496.5U priority Critical patent/CN206801478U/en
Application granted granted Critical
Publication of CN206801478U publication Critical patent/CN206801478U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of hydraulic drill rig derrick with floating device, including derrick assembly and travelling assembly, travelling assembly is slidably socketed with derrick assembly;Derrick assembly lower end is connected by bearing pin with cylinder block base;The structure of travelling assembly is, including floating frame, and top sheave and lower sheave are separately installed with floating frame upper and lower ends;Steel wire rope is wound between top sheave and lower sheave, the active segment of steel wire rope is fixedly connected with hoisting mechanism, and after steel wire rope is around top sheave and lower sheave, steel wire rope two ends are connected with steel wire rope fixing mechanism, and steel wire rope fixing mechanism is fixed on derrick assembly;Floating frame upper end is hinged by the piston rod lug of bearing pin and oil cylinder, and the piston rod of oil cylinder is upward through the grid beam inside floating frame.Device of the present utility model, simplifies drill configuration, makes rig installation, transport, maintenance more convenient reliable.

Description

Hydraulic drill rig derrick with floating device
Technical field
The utility model belongs to technical field of petroleum machinery, is related to a kind of hydraulic drill rig derrick with floating device.
Background technology
Small-sized workover rig derrick generally uses binodal derrick at present, and such a derrick is equipped with conventional derrick institutes such as overhead traveling crane, winches All parts needed, conventional telescopic function derrick fluid cylinder is long, and corollary equipment is complicated, and is needed two sections of wells after raising Frame is fixed in junction, and operating process is more numerous and diverse, have impact on operating efficiency.
Utility model content
The purpose of this utility model is to provide a kind of hydraulic drill rig derrick with floating device, solves existing telescopic work( Can derrick fluid cylinder it is long, the problem of corollary equipment complexity.
The utility model is the technical scheme adopted is that a kind of hydraulic drill rig derrick with floating device, including derrick are total It is slidably socketed into travelling assembly, travelling assembly with derrick assembly;Derrick assembly lower end is connected by bearing pin and cylinder block base Connect;
The structure of travelling assembly is, including floating frame, and top sheave and lower sheave are separately installed with floating frame upper and lower ends; Steel wire rope is wound between top sheave and lower sheave, the active segment of steel wire rope is fixedly connected with hoisting mechanism, and steel wire rope bypasses upper cunning After wheel and lower sheave, steel wire rope two ends are connected with steel wire rope fixing mechanism, and steel wire rope fixing mechanism is fixed on derrick assembly;
Floating frame upper end is hinged by the piston rod lug of bearing pin and oil cylinder, and the piston rod of oil cylinder is upward through in floating frame The grid beam in portion.
Hydraulic drill rig derrick of the present utility model with floating device, is further characterized in that:
Described derrick assembly is steel-frame structure, and one group of cunning is respectively fixed with four columns of derrick assembly surrounding Rail, sliding assembly is respectively arranged with floating frame upper and lower side both sides, and sliding assembly is arranged to sliding block or pulley form, sliding assembly It is engaged with the slide rail set on four columns of derrick assembly.
The beneficial effects of the utility model are 1) this derrick only has a section, without connecting two section derrick, and by fluid cylinder up and down Hook load is undertaken, eliminates the auxiliary facilities such as overhead traveling crane, winch, and only need a set of steel wire rope just to realize lifting simultaneously in travelling assembly Drilling rod and the function to drilling rod pressurization, simplify drill configuration, make rig installation, transport, maintenance more convenient reliable.2) tie simultaneously The hook for closing conventional steel wires rope pulley group carries transfer mode, coordinates frame-type steel structure derrick, fluid cylinder list is realized by floating device Stroke drives hoisting mechanism two-pass, shortens fluid cylinder length, makes product be easier to produce.3) 3 single module (wells are used Frame, floating frame and oil cylinder) drilling and repairing well function, detachable maintaining convenient transportation are realized jointly.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model (travelling assembly low level);
Fig. 2 is schematic diagram of the present utility model (moving on to top on travelling assembly);
Fig. 3 is the travelling assembly structure schematic diagram in the utility model;
Fig. 4 is Fig. 3 side view;
Fig. 5 is the utility model derrick assembly and the schematic diagram (top view) of travelling assembly socket.
In figure, 1. derrick assemblies, 2. travelling assemblies, 3. slide rails, 4. floating frames, 5. steel wire ropes, 6. steel wire rope fixing mechanisms, 7. oil cylinder, 8. hoisting mechanisms, 9. top sheaves, 10. lower sheaves, 11. sliding assemblies.
Embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
Reference picture 1, Fig. 2, Fig. 5, structure of the present utility model are, including derrick assembly 1 and travelling assembly 2, derrick assembly 1 It is steel-frame structure, one group of slide rail 3 is respectively fixed with four columns of the surrounding of derrick assembly 1, the sliding for 2 four jiaos of the assembly that moves about Component 11 is corresponding to be sleeved in each slide rail 3, travelling assembly 2 is realized in derrick assembly 1 and is slided up and down;In derrick assembly 1 Lower end is connected by bearing pin with the cylinder body base of oil cylinder 7;
Reference picture 3, Fig. 4, the structure of travelling assembly 2 is, including floating frame 4, is separately installed with the upper and lower ends of floating frame 4 Top sheave 9 and lower sheave 10, sliding assembly 11 is respectively arranged with the upper and lower side both sides of floating frame 4, sliding assembly 11 is arranged to sliding Block or pulley form, it is engaged with the slide rail 3 set on 1 four columns of derrick assembly;It is wound between top sheave 9 and lower sheave 10 Steel wire rope 5, the active segment of steel wire rope 5 are fixedly connected with hoisting mechanism 8, after steel wire rope 5 is around top sheave 9 and lower sheave 10, steel The two ends of cord 5 are connected with steel wire rope fixing mechanism 6, and steel wire rope fixing mechanism 6 is fixed on well (by bearing pin or welding manner) On frame assembly 1;
The upper end of floating frame 4 is hinged by the piston rod lug of bearing pin and oil cylinder 7, and the piston rod of oil cylinder 7 is upward through travelling Grid beam inside frame 4, makes the piston rod retractable of oil cylinder 7, at the same when vertical direction moves with travelling assembly 2 into one Straight line.
Operation principle of the present utility model is,
See Fig. 1, the initial position of hoisting mechanism 8 is in the bottom of derrick assembly 1, when the piston rod of oil cylinder 7 extends, in floating frame 4 The dynamic travelling assembly 2 of shipper pole moves up, because steel wire rope 5 is fixed at steel wire rope fixing mechanism 6 with derrick assembly 1, so steel wire rope 5 Hoisting mechanism 8 can only be pulled to move up, play a part of carrying drilling rod, now move on to highest order on hoisting mechanism 8, see Fig. 2.
Drive floating frame 4 to move down the travelling assembly 2 of pulling when the piston rod of oil cylinder 7 shortens to move down, now steel wire rope 5 pulls again Hoisting mechanism 8 moves down, and plays a part of pressurizeing to drilling rod.
Because the top sheave 9 in the assembly 2 that moves about and lower sheave 10 are all movable pulley, when travelling assembly 2 moves up and down single times Apart from when, top sheave 9 and lower sheave 10 are used as movable pulley, and steel wire rope 5 drives lifting system to move double distance, so elevator The stroke of structure will be twice of oil cylinder stroke.
Device of the present utility model, hook are carried and undertaken by the oil cylinder 7 being arranged in derrick, and hook is carried by the pulley in floating frame Oil cylinder 7 is delivered to, the hoisting mechanisms such as top drive can be driven to move up and down when being slid up and down in derrick;Meanwhile the floating frame can be real Existing operational hydraulic cylinder stretch one stroke of unit when, the distance that twice of hoisting mechanism motor unit.

Claims (2)

  1. A kind of 1. hydraulic drill rig derrick with floating device, it is characterised in that:Including derrick assembly (1) and travelling assembly (2), trip Dynamic assembly (2) is slidably socketed with derrick assembly (1);Derrick assembly (1) lower end is connected by bearing pin with oil cylinder (7) cylinder body base;
    The structure of travelling assembly (2) is, including floating frame (4), and in floating frame (4), upper and lower ends are separately installed with top sheave (9) And lower sheave (10);Steel wire rope (5), the active segment and elevator of steel wire rope (5) are wound between top sheave (9) and lower sheave (10) Structure (8) is fixedly connected, and after steel wire rope (5) is around top sheave (9) and lower sheave (10), steel wire rope (5) two ends are consolidated with steel wire rope Determine mechanism (6) connection, steel wire rope fixing mechanism (6) is fixed on derrick assembly (1);
    Floating frame (4) upper end is hinged by the piston rod lug of bearing pin and oil cylinder (7), and the piston rod of oil cylinder (7) is upward through trip The internal grid beam of moving frame (4).
  2. 2. the hydraulic drill rig derrick according to claim 1 with floating device, it is characterised in that:Described derrick assembly (1) it is steel-frame structure, one group of slide rail (3) is respectively fixed with four columns of derrick assembly (1) surrounding, in floating frame (4) Upper and lower side both sides are respectively arranged with sliding assembly (11), and sliding assembly (11) is arranged to sliding block or pulley form, sliding assembly (11) it is engaged with the slide rail (3) set on (1) four column of derrick assembly.
CN201720515496.5U 2017-05-10 2017-05-10 Hydraulic drill rig derrick with floating device Active CN206801478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720515496.5U CN206801478U (en) 2017-05-10 2017-05-10 Hydraulic drill rig derrick with floating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720515496.5U CN206801478U (en) 2017-05-10 2017-05-10 Hydraulic drill rig derrick with floating device

Publications (1)

Publication Number Publication Date
CN206801478U true CN206801478U (en) 2017-12-26

Family

ID=60740219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720515496.5U Active CN206801478U (en) 2017-05-10 2017-05-10 Hydraulic drill rig derrick with floating device

Country Status (1)

Country Link
CN (1) CN206801478U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115285873A (en) * 2022-07-14 2022-11-04 中交公路规划设计院有限公司 Ocean engineering investigation double-speed pressurization long-stroke feeding system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115285873A (en) * 2022-07-14 2022-11-04 中交公路规划设计院有限公司 Ocean engineering investigation double-speed pressurization long-stroke feeding system
CN115285873B (en) * 2022-07-14 2023-11-07 中交公路规划设计院有限公司 Ocean engineering investigation double-speed pressurization long-stroke feeding system

Similar Documents

Publication Publication Date Title
CN101809248B (en) Inland rig
CN103726421B (en) Height and span adjustable track paver for metro construction
CN104632088B (en) Oil-well rig derrick set assembly/installation method
CN102556854B (en) Mine hydraulic hoisting traveling crane
CN205634713U (en) Be suitable for narrow and small space long distance transport hoisting apparatus
CN101666208B (en) Gear rack lifting drilling machine
CN105507827A (en) Lifting oil cylinder type well drilling device
CN201738845U (en) Dynamic rathole device
CN103291210B (en) Gate-type double-tower gear-driven drilling machine
CN206801478U (en) Hydraulic drill rig derrick with floating device
CN202346632U (en) Mine hydraulic type lifting crane
CN202500502U (en) Telescopic type drilling machine derrick
CN205116169U (en) Synthesize pile driver
CN205063835U (en) Novel hydraulic drive derrick mechanism
CN202866646U (en) Drill mast type engineering driller equipped with hydraulic lifting device
CN108221512A (en) Adjustable track laying machine
CN208486842U (en) A kind of tower-type headframe jack up unit
CN203806919U (en) Mine pneumatic pot curtain door
CN107445073B (en) Truck-mounted drilling rig combined type lifting device and application method
CN109236211A (en) A kind of production rig
CN104481417B (en) Linear guide rail type speed apparatus for feeding for vehicle-mounted drilling machine for coal bed gas
CN208347716U (en) A kind of nonpetroleum well site preventer installs board migration device
CN202064842U (en) Gear-rack drilling machine
CN202390155U (en) Rack and pinion lifting device
CN108952589A (en) A kind of tower-type headframe jack up unit and lifting method

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210104

Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee after: Baoji Oilfield Machinery Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co., Ltd

Address before: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee before: Baoji Oilfield Machinery Co.,Ltd.