CN206800856U - Stone material dry suspending metope inner corner trim closing in component - Google Patents

Stone material dry suspending metope inner corner trim closing in component Download PDF

Info

Publication number
CN206800856U
CN206800856U CN201720717995.2U CN201720717995U CN206800856U CN 206800856 U CN206800856 U CN 206800856U CN 201720717995 U CN201720717995 U CN 201720717995U CN 206800856 U CN206800856 U CN 206800856U
Authority
CN
China
Prior art keywords
stone material
inner corner
corner trim
face
end cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720717995.2U
Other languages
Chinese (zh)
Inventor
刘卓立
江山
颜宇
王晓琴
刘增威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhuo Yuan Architectural Design Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Qingdao Jianan Construction Group Co Ltd
Original Assignee
Shandong Zhuo Yuan Architectural Design Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Qingdao Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhuo Yuan Architectural Design Co Ltd, Qingdao Zhongjia Construction Group Co Ltd, Qingdao Jianan Construction Group Co Ltd filed Critical Shandong Zhuo Yuan Architectural Design Co Ltd
Priority to CN201720717995.2U priority Critical patent/CN206800856U/en
Application granted granted Critical
Publication of CN206800856U publication Critical patent/CN206800856U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model proposes a kind of stone material dry suspending metope inner corner trim closing in component, including inner corner trim end cap and two blocks of stone materials;The inner corner trim end cap is that cross section is pentagonal pentagonal prism, and five sides of the inner corner trim end cap include two wall binding faces being bonded respectively with forming two walls of inner corner trim, two stone material binding faces for being used to be bonded the stone material, and a visible face;Wherein, two wall binding faces are adjacent and orthogonal, and each wall binding face connects a stone material binding face, and the visible face is connected between two stone material binding faces;Stone material binding face of the side of two blocks of stone materials respectively with the inner corner trim end cap fits.The stone material dry suspending metope inner corner trim closing in component can avoid the generation in two metope junctions cavity at inner corner trim, and decorative effect is attractive in appearance, and metope cleaning is relatively simple.

Description

Stone material dry suspending metope inner corner trim closing in component
Technical field
The utility model belongs to building decoration technology field, more particularly to a kind of stone material dry suspending metope inner corner trim closing in component.
Background technology
At present, the closing-in structure generally use stone material of stone material dry suspending metope inner corner trim directly touches with intersecting for stone material, such as Fig. 1 institutes Show, two blocks of stone materials 12 are cladding in two walls 11 for forming inner corner trim, the side of one of stone material 12 and another block of stone material 12 respectively Front offset.During using this closing-in structure, after stone material transverse direction chamfering, two metope junctions at inner corner trim can produce sky Hole, the attractive in appearance of metope is influenceed, while dirt is easily accommodated at cavity, cleaning is difficult.Therefore, stone material dry suspending metope the moon how is improved The closing-in structure at angle, it is a current technical problem for being badly in need of solving to avoid the cavity of two metope junctions at inner corner trim.
Utility model content
The utility model is directed to above-mentioned technical problem, proposes a kind of stone material dry suspending metope inner corner trim closing in component, can keep away Exempt from the generation in two metope junctions cavity at inner corner trim.
In order to achieve the above object, the technical solution adopted in the utility model is:
A kind of stone material dry suspending metope inner corner trim closing in component, including inner corner trim end cap and two blocks of stone materials;The inner corner trim end cap It is pentagonal pentagonal prism for cross section, five sides of the inner corner trim end cap include two two walls with forming inner corner trim point The wall binding face not being bonded, two stone material binding faces for being used to be bonded the stone material, and a visible face;Wherein, two The wall binding face is adjacent and orthogonal, and each wall binding face connects a stone material binding face, described visible Face is connected between two stone material binding faces;Pasted respectively with the stone material of the inner corner trim end cap side of two blocks of stone materials Conjunction face fits.
Preferably, the stone material binding face is mutually perpendicular to the wall binding face.
Preferably, the width of the stone material binding face is identical with the thickness of the stone material.
Preferably, the side of the stone material binding face and the stone material is by bonding glue sticking.
Preferably, the width of the visible face is in the range of 20mm-30mm.
Compared with prior art, it is the advantages of the utility model with beneficial effect:
Stone material dry suspending metope inner corner trim closing in component provided by the utility model is closed up by cross section for pentagonal inner corner trim The cooperation of bar and stone material, after stone material transverse direction chamfering, two metope junctions will not produce cavity at inner corner trim, and decorative effect is attractive in appearance, And metope cleaning is relatively simple.
Brief description of the drawings
Fig. 1 is the structural representation of existing stone material dry suspending metope inner corner trim closing in component;
In upper figure:11st, wall;12nd, stone material.
Fig. 2 is the structural representation for the stone material dry suspending metope inner corner trim closing in component that the utility model embodiment provides;
Fig. 3 is the structural representation for the inner corner trim end cap that the utility model embodiment provides;
Fig. 4 is the metope inner corner trim that the stone material dry suspending metope inner corner trim closing in component provided using the utility model embodiment is closed up Stereogram;
Above in each figure:21st, wall;22nd, stone material;23rd, inner corner trim end cap;231st, wall binding face;232nd, stone material is bonded Face;233rd, visible face;24th, adhesive glue.
Embodiment
Below, the utility model is specifically described by exemplary embodiment.It should be appreciated, however, that do not having In the case of being further discussed below, element, structure and features in an embodiment can also be advantageously incorporated into other implementations In mode.
, it is necessary to which explanation, the front of stone material 22 refer to the stone of composition metope after installation in description of the present utility model The surface of material 22;The side of stone material 22 refers to and the front of stone material 22 side surface perpendicular, for splicing.
As shown in Fig. 2 a kind of stone material dry suspending metope inner corner trim closing in component is the utility model is related to, including inner corner trim end cap 23 With two blocks of stone materials 22;Inner corner trim end cap 23 is that cross section is pentagonal pentagonal prism, and five sides of inner corner trim end cap 23 include Two wall binding faces 231 being bonded respectively with forming two walls 21 of inner corner trim, two stone material fittings for being used to be bonded stone material 22 Face 232, and a visible face 233;Wherein, as shown in figure 3, two wall binding faces 231 are adjacent and orthogonal, each wall Body binding face 231 connects a stone material binding face 232, it is seen that face 233 is connected between two stone material binding faces 232;Two blocks of stone materials 22 side fits with the stone material binding face 232 of inner corner trim end cap 23 respectively.
As shown in figure 3, stone material binding face 232 is mutually perpendicular to wall binding face 231.Because stone material 22 is cladding in wall 21 Afterwards, the side of stone material 22 is generally vertical with wall 21, by by the stone material binding face 232 of inner corner trim end cap 23 and wall binding face 231 are arranged to be mutually perpendicular to so that the stone material binding face 232 of inner corner trim end cap 23 can with the side of stone material 22 is more preferable to paste Close, avoid and leave gap between stone material binding face 232 and stone material 22.
Further, as shown in Fig. 2 the width of stone material binding face 232 is identical with the thickness of stone material 22.By the way that stone material is pasted The width in conjunction face 232 is arranged to identical with the thickness of stone material 22, can ensure after closing in component installation, at metope inner corner trim Stone material 22 and inner corner trim end cap 23 between transition it is more smooth, be advantageous to the attractive in appearance of metope.
With continued reference to Fig. 2, stone material binding face 232 is be bonded by adhesive glue 24 with the side of stone material 22, so that stone material binding face 232 are closely connected with the side of stone material 22.So setting can not only avoid causing stone material to paste because of the side out-of-flatness of stone material 22 Gap is left between conjunction face 232 and the side of stone material 22, additionally it is possible to is reinforced the connection of stone material 22 and wall 21, is effectively prevented stone material 22 Come off.It should be noted that the adhesive glue 24 in the present embodiment is specially a kind of AB glue, it is to be understood that this area skill Art personnel can also use other adhesive glues, as long as can be together with the side bonds of stone material 22 by stone material binding face 232 Can.
In addition, as shown in Fig. 2 the width of visible face 233 is in the range of 20mm-30mm.The present embodiment further defines The scope of the width of visible face 233 is 20mm-30mm, and this is mainly in view of:, and can if the width of visible face 233 is less than 20mm Two connected stone material binding faces 232 of meeting 233 are closer to the distance, accordingly, fit in the two of two stone material binding faces 232 respectively The distance between block stone material 22 is also relatively near, and two blocks of stone materials 22 have the possibility mutually collided with;If the width of visible face 233 is more than 30mm, then two stone material binding faces 232 being connected with visible face 233 are distant, accordingly, fit in two stone material patches respectively Also farther out, after closing in component installation, inner corner trim end cap 23 exposes visible the distance between two blocks of stone materials 22 in conjunction face 232 Face 233 is wider, influences the overall appearance of metope.The width range for the visible face 233 that the present embodiment limits, can as optimum range Mutually colliding with for two blocks of stone materials 22 is avoided, maintains the overall appearance of metope again.
Referring to Fig. 4, stone material dry suspending metope inner corner trim closing in component described in the utility model, during installation, inner corner trim is received first Two wall binding faces 231 of pig's tongue 23 fit on two walls 21 for forming inner corner trim respectively, inner corner trim end cap 23 is pacified vertically It is at inner corner trim loaded on wall 21, one block of stone material 22 is cladding on side wall 21, and the side of stone material 22 and inner corner trim is closed up The stone material binding face 232 of bar 23 is fitted, and the side of stone material 22 and stone material binding face 232 are bonded together using adhesive glue 24, Adopt in a like fashion that another block of stone material 22 is cladding on opposite side wall 21, complete the installation of closing in component.
Stone material dry suspending metope inner corner trim closing in component provided by the utility model is closed up by cross section for pentagonal inner corner trim The cooperation of bar 23 and stone material 22, after 22 horizontal chamfering of stone material, two metope junctions will not produce cavity, decorative effect at inner corner trim It is attractive in appearance, and metope cleaning is relatively simple.

Claims (5)

1. stone material dry suspending metope inner corner trim closing in component, it is characterised in that:Including inner corner trim end cap (23) and two pieces of stone materials (22);
The inner corner trim end cap (23) is that cross section is pentagonal pentagonal prism, five sides bag of the inner corner trim end cap (23) Two wall binding faces (231) being bonded respectively with forming two walls (21) of inner corner trim are included, two are used to be bonded the stone material (22) stone material binding face (232), and a visible face (233);
Wherein, two wall binding faces (231) are adjacent and orthogonal, each wall binding face (231) connection one The stone material binding face (232), the visible face (233) are connected between two stone material binding faces (232);
Stone material binding face (232) of the side of two pieces of stone materials (22) respectively with the inner corner trim end cap (23) fits.
2. stone material dry suspending metope inner corner trim closing in component according to claim 1, it is characterised in that:The stone material binding face (232) it is mutually perpendicular to the wall binding face (231).
3. stone material dry suspending metope inner corner trim closing in component according to claim 1 or 2, it is characterised in that:The stone material fitting The width in face (232) is identical with the thickness of the stone material (22).
4. stone material dry suspending metope inner corner trim closing in component according to claim 1, it is characterised in that:The stone material binding face (232) it is Nian Jie by adhesive glue (24) with the side of the stone material (22).
5. stone material dry suspending metope inner corner trim closing in component according to claim 1, it is characterised in that:The visible face (233) Width in the range of 20mm-30mm.
CN201720717995.2U 2017-06-19 2017-06-19 Stone material dry suspending metope inner corner trim closing in component Expired - Fee Related CN206800856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720717995.2U CN206800856U (en) 2017-06-19 2017-06-19 Stone material dry suspending metope inner corner trim closing in component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720717995.2U CN206800856U (en) 2017-06-19 2017-06-19 Stone material dry suspending metope inner corner trim closing in component

Publications (1)

Publication Number Publication Date
CN206800856U true CN206800856U (en) 2017-12-26

Family

ID=60749201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720717995.2U Expired - Fee Related CN206800856U (en) 2017-06-19 2017-06-19 Stone material dry suspending metope inner corner trim closing in component

Country Status (1)

Country Link
CN (1) CN206800856U (en)

Similar Documents

Publication Publication Date Title
CN203066290U (en) Cold bridge breaking structure of outer wall
CN206800856U (en) Stone material dry suspending metope inner corner trim closing in component
CN202466893U (en) Composite corner board
CN204152020U (en) The concrete prefabricated body of wall with cast-in-place position bonding strength can be improved
CN102776975A (en) Building block
CN102817424B (en) Hollow load bearing wall
CN206815762U (en) Stone material dry suspending metope external corner closing in component
CN102121278B (en) Waterproof method for deformation joint on building and adhesive anchorage built-in water stop
CN205531135U (en) Fast -assembling wallboard
CN209780104U (en) Plug-in back bolt type decorative plate
CN203846638U (en) Bonding structure of building bricks
CN206128368U (en) Prefabricated wallboard combination wall body
CN203769102U (en) Sodium-based thermal insulation sections for a building external wall
CN202324530U (en) Stone installation structure at position of ground deformation slot
CN208347198U (en) A kind of assembled face brick
CN207453316U (en) A kind of walltile of back side with support feet
CN102817425B (en) Novel hollow load bearing wall
CN205047091U (en) Novel indoor door
CN204492073U (en) A kind of water-tight exterior wall brick
CN204059828U (en) Stone material corner minor face installs mechanical fastening structures
CN201074385Y (en) Exterior wall ceramic angle brick
CN202493193U (en) Corner connecting strip for indoor decoration
CN204059827U (en) External decorative board
CN212054362U (en) Anti-cracking moulding door
CN210342280U (en) Expansion joint structure of parapet on window side

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20180619

CF01 Termination of patent right due to non-payment of annual fee