CN206800358U - Sudden expansion body top drops and sliding corbels support structure - Google Patents

Sudden expansion body top drops and sliding corbels support structure Download PDF

Info

Publication number
CN206800358U
CN206800358U CN201720690941.1U CN201720690941U CN206800358U CN 206800358 U CN206800358 U CN 206800358U CN 201720690941 U CN201720690941 U CN 201720690941U CN 206800358 U CN206800358 U CN 206800358U
Authority
CN
China
Prior art keywords
plate
expansion body
sudden expansion
support structure
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720690941.1U
Other languages
Chinese (zh)
Inventor
周复明
卫怡蕾
赵祯烨
卫书满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Original Assignee
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Mechanical and Electrical Construction Co Ltd filed Critical China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Priority to CN201720690941.1U priority Critical patent/CN206800358U/en
Application granted granted Critical
Publication of CN206800358U publication Critical patent/CN206800358U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Sudden expansion body top drop and sliding corbels support structure are the utility model is related to, it includes sudden expansion body, and the outer wall of the sudden expansion body is provided with netted reinforcing rib, and the corner location in sudden expansion body bottom is welded with corbels support structure.The corbels support structure is divided into two types, the bottom of two groups of downstream faces for being arranged on sudden expansion body of first kind bracket, the bottom of two groups of upstream faces for being arranged on sudden expansion body of Second Type bracket;The first kind bracket includes the first plate, in the bottom sidewall for the downstream face that first plate is weldingly fixed on sudden expansion body, is welded with the second plate on two outsides of the first plate, the bottom of second plate is welded with the 5th plate;This top drop and sliding corbels support structure can be supported to whole sudden expansion body, ensure that hydraulic cylinder can smoothly jack whole sudden expansion body, and can laterally urge whole sudden expansion body, finally realize the adjustment of its installation site.

Description

Sudden expansion body top drops and sliding corbels support structure
Technical field
It the utility model is related to hydro powered formula ship lift large-sized structural parts auxiliary installing device field, and in particular to a kind of Sudden expansion body top drops and sliding corbels support structure.
Background technology
Hydro powered formula ship lift is a kind of pioneering new vertical ship lift with independent intellectual property right in China, build in Monolith on the right side of the hydroelectric pivotal project of Lancang River in Yunnan Province downstream Xishuangbanna Prefecture, Yunnan Province Jinghong, design year 135.8 × 104t of throughput, most Greater than dam tonnage of ship 300t(500t at a specified future date), maximum lifting height 67.2m, carry water ship railway carriage or compartment gross weight 3200t;Jinghong ship lift Build up, border country and the border trade of Yunnan Puer City will be greatly facilitated;
Waterpower type ship elevator is a kind of hydraulic-floating torque balance weight vertical ship lift, and general principle is to reform balance Into the suitable floating drum of weight and volume, floating drum weight is more than ship reception chamber gross weight, and the underwater penetration by adjusting floating drum changes floating The buoyancy of cylinder, buoyancy change is recycled in the heavy caused difference between floating drum weight of ship reception chamber to drive ship reception chamber lifting operation, The speed of service of ship reception chamber is controlled by the speed filled, sluiced in vertical shaft, and Jinghong Waterpower type ship elevator is mainly by civil engineering structure, water The several majors such as Force system, mechanical system, control system form.
Wherein, sudden expansion body is the important component of ship lift water-carriage system, is that filling valve is behind the door on water-carriage system steel pipe The large-scale damping steel cisten mechanism of arrangement, there is the cavitation phenomenon being obviously reduced in the control of water-carriage system flow;It is One of Waterpower type ship elevator water-carriage system key construction technology.Sudden expansion body is arranged in deep 76m subsurface valves room, closed pore installation, always 208t is measured, apart from installation base surface 0.6m, sudden expansion body damping water tank steel construction(The long wide * height=12740*6140*6520 of *).Sudden expansion body Carried out by the way of piecemeal is assembled inside cavern it is assembled, after assembly is completed, because it has apart from ground 0.6m installation Elevation, therefore, it is necessary to it is carried out into decline operation from original platform for lining, carried out progressively by the way of jacking-decline Decentralization is consistent until with reference for installation;And due to after water tank steel structure assembling gross weight it is heavier, and can not just use Lifting, it is therefore desirable to which design is a kind of to push up drop and sliding supporting construction, and then is conveniently pushed up with cylinder device with the use of its is completed Operation is dropped.
Utility model content
The technical problem of the utility model solution is to provide sudden expansion body top drop and sliding corbels support structure, and this top drops and slided Moving corbels support structure can be supported to whole sudden expansion body, ensure that hydraulic cylinder can smoothly jack whole sudden expansion body, And whole sudden expansion body can be laterally urged, finally realize the adjustment of its installation site.
In order to solve the above-mentioned technical problem, the utility model proposes following technical scheme:Sudden expansion body top drops and sliding bracket Supporting construction, it includes sudden expansion body, and the outer wall of the sudden expansion body is provided with netted reinforcing rib, the corner location in sudden expansion body bottom It is welded with corbels support structure.
The corbels support structure is divided into two types, two groups of downstream faces for being arranged on sudden expansion body of first kind bracket Bottom, the bottom of two groups of upstream faces for being arranged on sudden expansion body of Second Type bracket;
The first kind bracket includes the first plate, and first plate is weldingly fixed on the bottom of the downstream face of sudden expansion body In portion's side wall, the second plate is welded with two outsides of the first plate, the bottom of second plate is welded with the 5th plate;
The Second Type bracket includes the first plate, and first plate is weldingly fixed on the bottom of the upstream face of sudden expansion body In portion's side wall, the 3rd plate is welded with two outsides of the first plate, the bottom of second plate is welded with the 5th plate, The lateral surface of 3rd plate is welded with the 4th plate.
First plate, the second plate, the 3rd plate, the 4th plate and the 5th plate all using steel plate materialses cutting and Into.
It is machined with transition arc and the first outer excessive circular in first on first plate, transition arc in described first Fitted with the outer wall of sudden expansion body, and welding groove is machined with the position of contact.
It is machined with transition arc in second on second plate, the first of transition arc and the first plate in described second Outer excessive circular coordinates welding, and is machined with welding groove at the edge of welding.
It is machined with transition arc in the 3rd on 3rd plate, the first of transition arc and the first plate in the described 3rd Outer excessive circular coordinates welding, and is machined with welding groove at the edge of welding.
4th plate and the 5th plate all use rectangular plate.
The bottom of the sudden expansion body is provided with four the first support piers;The bottom of the corbels support structure is provided with second Support pier;First support pier and the second support pier are all stacked using sandwich plate material and formed.
The utility model has the advantages that:
By installing corbels support structure in the bottom of sudden expansion body, sudden expansion body can be carried out by four hydraulic jacks Effective jacking, and by the Second Type bracket of setting, lateral top can be carried out to sudden expansion body and moves operation.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is overall structure front view of the present utility model.
Fig. 2 is overall structure top view of the present utility model.
Fig. 3 is the first plate plan of the present utility model.
Fig. 4 is the second plate plan of the present utility model.
Fig. 5 is the 3rd plate plan of the present utility model.
Fig. 6 is the 4th plate plan of the present utility model.
Fig. 7 is the 5th plate plan of the present utility model.
Fig. 8 is this practicality sudden expansion body overall structure diagram.
In figure:First plate 1, the second plate 2, the 3rd plate 3, the 4th plate 4, the 5th plate 5, sudden expansion body 6, it is netted plus Strengthening tendons 7, the second support pier 8, the first support pier 9, downstream face 10, upstream face 11.
In figure:P1 is vertical apice;P2 is horizontal sliding summit.
Embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings.
Such as Fig. 1-8, sudden expansion body top drop and sliding corbels support structure, it includes sudden expansion body 6, the outer wall of the sudden expansion body 6 Netted reinforcing rib 7 is provided with, the corner location in the bottom of sudden expansion body 6 is welded with corbels support structure.
Further, the corbels support structure is divided into two types, and two groups of first kind bracket are arranged on sudden expansion body 6 Downstream face 10 bottom, the bottom of two groups of the Second Type bracket upstream faces 11 for being arranged on sudden expansion body 6;Pass through first kind ox Leg structure can ensure to jack sudden expansion body 6 vertically, and sudden expansion body 6 can be displaced sideways by Second Type bracket Jacking.
Further, the first kind bracket includes the first plate 1, and first plate 1 is weldingly fixed on sudden expansion body 6 Downstream face 10 bottom sidewall on, the first plate 1 two outside on be welded with the second plate 2, the bottom of second plate 2 Portion is welded with the 5th plate 5;It is welded by polylith plate, while its structural strength is ensured, simplifies its structure.
Further, the Second Type bracket includes the first plate 1, and first plate 1 is weldingly fixed on sudden expansion body 6 Upstream face 11 bottom sidewall on, the first plate 1 two outside on be welded with the 3rd plate 3, the bottom of second plate 2 Portion is welded with the 5th plate 5, and the lateral surface of the 3rd plate 3 is welded with the 4th plate 4.
Further, first plate 1, the second plate 2, the 3rd plate 3, the 4th plate 4 and the 5th plate 5 all use Steel plate materialses cutting forms.Design process is simplified using multi-sheets.
Further, 101 and first outer excessive circular 102 of transition arc, institute in first are machined with first plate 1 The outer wall for stating transition arc 101 and sudden expansion body 6 in first fits, and is machined with welding groove in the position of contact.Pass through Welding groove is set to ensure that weld strength.
Further, transition arc 201 in second are machined with second plate 2, transition arc 201 in described second Coordinate with the first outer excessive circular 102 of the first plate 1 and weld, and welding groove is machined with the edge of welding.Pass through weldering Connect groove and ensure that its structural strength.
Further, it is machined with transition arc 301 in the 3rd on the 3rd plate 3, transition arc 301 in the described 3rd Coordinate with the first outer excessive circular 102 of the first plate 1 and weld, and welding groove is machined with the edge of welding.
Further, the 4th plate 4 and the 5th plate 5 all use rectangular plate.Top ensure that using rectangular plate What is risen is normally carried out.
Further, the bottom of the sudden expansion body 6 is provided with four the first support piers 9;The bottom of the corbels support structure Portion is provided with the second support pier 8;The support pier 8 of first support pier 9 and second is all stacked using sandwich plate material and formed.
The course of work and operation principle of the present utility model are:
When needing sudden expansion body 6 pushing up drop, corbels support structure is fixed in four welded corner joints of sudden expansion body 6 first, then, It is fixed on the second support pier 8 by jack, the 5th plate 5 of corbels support is in contact simultaneously by four hydraulic jacks It is jacked, jacks the incipient stage, in order to ensure its security, is lined with sandwich plate in the bottom of sudden expansion body 6, forms the One support pier 9, and support, then it is jacked, dismantled after jacking certain altitude on several pieces of the first support piers 9 Backing plate, then transfer sudden expansion body 6, be supported on again on the second support pier 8, and remove the backing plate of several pieces of the second support piers 8, Decline the height of hydraulic jack, jack hydraulic jack again, the height of sudden expansion body 6 is increased, then remove several pieces of backing plates, The height of the first support pier 9 is declined again, then transfer sudden expansion body 6, be supported on again on the second support pier 8, and remove The backing plate of several pieces of the second support piers 8, decline the height of hydraulic jack, jacked and declined with this circulation, most at last Whole sudden expansion body 6 transfers to terrestrial reference.
When needing to be displaced sideways sudden expansion body 6, it is only necessary to the corbels support knot of sudden expansion body 6 will be withstood with hydraulic jack The side of the 5th plate 5 of structure, and then lateral top is carried out to sudden expansion body 6 and is moved.
By above-mentioned description, those skilled in the art completely can be without departing from this item utility model technological thought In the range of, various changes and amendments are carried out all within the scope of protection of the utility model.It is of the present utility model not most Matters, belong to the common knowledge of those skilled in the art.

Claims (7)

1. sudden expansion body top drops and sliding corbels support structure, it is characterised in that:It includes sudden expansion body(6), the sudden expansion body(6)'s Outer wall is provided with netted reinforcing rib(7), in sudden expansion body(6)The corner location of bottom is welded with corbels support structure;
The corbels support structure is divided into two types, and two groups of first kind bracket are arranged on sudden expansion body(6)Downstream face (10)Bottom, two groups of Second Type bracket are arranged on sudden expansion body(6)Upstream face(11)Bottom;
The first kind bracket includes the first plate(1), first plate(1)It is weldingly fixed on sudden expansion body(6)Downstream Face(10)Bottom sidewall on, in the first plate(1)Two outside on be welded with the second plate(2), second plate(2)'s Bottom is welded with the 5th plate(5);
The Second Type bracket includes the first plate(1), first plate(1)It is weldingly fixed on sudden expansion body(6)Upstream Face(11)Bottom sidewall on, in the first plate(1)Two outside on be welded with the 3rd plate(3), second plate(2)'s Bottom is welded with the 5th plate(5), the 3rd plate(3)Lateral surface be welded with the 4th plate(4).
2. sudden expansion body top drop according to claim 1 and sliding corbels support structure, it is characterised in that:First plate (1), the second plate(2), the 3rd plate(3), the 4th plate(4)With the 5th plate(5)All formed using steel plate materialses cutting.
3. sudden expansion body top drop according to claim 1 and sliding corbels support structure, it is characterised in that:First plate (1)On be machined with transition arc in first(101)With the first outer excessive circular(102), transition arc in described first(101)With Sudden expansion body(6)Outer wall fit, and be machined with welding groove in the position of contact.
4. sudden expansion body top drop according to claim 1 and sliding corbels support structure, it is characterised in that:Second plate (2)On be machined with transition arc in second(201), transition arc in described second(201)With the first plate(1)The first outer mistake Spend circular arc(102)Coordinate welding, and welding groove is machined with the edge of welding.
5. sudden expansion body top drop according to claim 1 and sliding corbels support structure, it is characterised in that:3rd plate (3)On be machined with transition arc in the 3rd(301), transition arc in the described 3rd(301)With the first plate(1)The first outer mistake Spend circular arc(102)Coordinate welding, and welding groove is machined with the edge of welding.
6. sudden expansion body top drop according to claim 1 and sliding corbels support structure, it is characterised in that:4th plate (4)With the 5th plate(5)All use rectangular plate.
7. sudden expansion body top drop according to claim 1 and sliding corbels support structure, it is characterised in that:The sudden expansion body (6)Bottom be provided with four the first support piers(9);The bottom of the corbels support structure is provided with the second support pier(8);Institute State the first support pier(9)With the second support pier(8)All stacked and formed using sandwich plate material.
CN201720690941.1U 2017-06-14 2017-06-14 Sudden expansion body top drops and sliding corbels support structure Expired - Fee Related CN206800358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720690941.1U CN206800358U (en) 2017-06-14 2017-06-14 Sudden expansion body top drops and sliding corbels support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720690941.1U CN206800358U (en) 2017-06-14 2017-06-14 Sudden expansion body top drops and sliding corbels support structure

Publications (1)

Publication Number Publication Date
CN206800358U true CN206800358U (en) 2017-12-26

Family

ID=60747252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720690941.1U Expired - Fee Related CN206800358U (en) 2017-06-14 2017-06-14 Sudden expansion body top drops and sliding corbels support structure

Country Status (1)

Country Link
CN (1) CN206800358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119654A (en) * 2017-06-14 2017-09-01 中国葛洲坝集团机电建设有限公司 Sudden expansion body top drops and sliding corbels support structure and top drop gliding method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119654A (en) * 2017-06-14 2017-09-01 中国葛洲坝集团机电建设有限公司 Sudden expansion body top drops and sliding corbels support structure and top drop gliding method
CN107119654B (en) * 2017-06-14 2022-12-02 中国葛洲坝集团股份有限公司 Support structure for top-down and sliding bracket of sudden expansion body and top-down sliding method

Similar Documents

Publication Publication Date Title
CN201224866Y (en) Floating pier steel bridge approach floating type elevating system
CN102080370A (en) Foundation construction platform for intertidal zone or offshore zone
CN110382781A (en) For utilizing gravity to be laid with the basic marine structure of building, equipment and wind turbine in marine environment
CN202220340U (en) Underwater concreting conduit
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
WO2022236677A1 (en) Floating-assisting and auxiliary sinking structure of offshore wind power set having suction bucket foundation
CN209243794U (en) A kind of pile foundation building inclination rectification cuts stake and underpins position limiting structure
CN206800358U (en) Sudden expansion body top drops and sliding corbels support structure
CN101806053B (en) Integral installation method of cantilever beams of self lifting type well drilling platform
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN103806407A (en) Pile-bucket integrated wharf structure and construction method thereof
CN202899083U (en) Pile-bucket combined wharf structure
KR101276121B1 (en) Movable marine power generation plant and management method of it
CN212270660U (en) Novel self-adjusting support structure system suitable for movable bridge
CN203891046U (en) Dado type open caisson sinking device
CN207619963U (en) Sudden expansion body damping water tank steel construction spelling platform
CN110465362B (en) Construction waste crushing and recycling equipment
CN206886550U (en) The large-scale damping water tank steel construction sudden expansion body of sectional type
CN107386247A (en) The large-scale damping water tank steel construction sudden expansion body of sectional type and closing deep hole construction method of installation of hydro powered formula ship lift
CN203296050U (en) Lowering construction system of mass concrete cushion cap permanent steel bushing box at sea
CN201952777U (en) Pile wharf steel hoop support structure
CN107119654A (en) Sudden expansion body top drops and sliding corbels support structure and top drop gliding method
CN101614007B (en) Plate inserting device for silt consolidation
CN107117532B (en) Sectional type large size damping water tank steel construction sudden expansion body
CN102963496A (en) Underwater positioning and installation method of flap gate

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226