CN206800345U - A kind of sluice dissipation and scouring structure - Google Patents

A kind of sluice dissipation and scouring structure Download PDF

Info

Publication number
CN206800345U
CN206800345U CN201720579082.9U CN201720579082U CN206800345U CN 206800345 U CN206800345 U CN 206800345U CN 201720579082 U CN201720579082 U CN 201720579082U CN 206800345 U CN206800345 U CN 206800345U
Authority
CN
China
Prior art keywords
concrete
apron
gate dam
sluice
dissipation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720579082.9U
Other languages
Chinese (zh)
Inventor
薛守宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Dadu River shaping Power Generation Co.,Ltd.
Original Assignee
GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co Ltd filed Critical GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co Ltd
Priority to CN201720579082.9U priority Critical patent/CN206800345U/en
Application granted granted Critical
Publication of CN206800345U publication Critical patent/CN206800345U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a kind of sluice dissipation and scouring structure, and the energy dissipating for solving existing flood discharge brake structure is unstable, landfill loose media is washed away by current the problems such as causing gate dam security to reduce for a long time.The utility model includes the concrete gate dam being built on gate dam foundation;Concrete gate dam downstream has poured concrete apron, concrete apron successively;Anti-scour wall has been poured below concrete apron;Concrete seashore is made up of some diamond lattice beams;The inside of diamond lattice beam is filled with concrete tetrahedron and/or boulder;Support column is provided with below concrete apron.The utility model improves the security and stability of protection-apron structure, and solves the problems, such as boulder resource-constrained in nature well, easy construction, and practicality is high, suitable for promoting the use of.

Description

A kind of sluice dissipation and scouring structure
Technical field
It the utility model is related to water conservancy and hydropower construction engineering technical field, and in particular to a kind of sluice dissipation and scouring knot Structure.
Background technology
In Hydraulic and Hydro-Power Engineering, outlet structure escape works are the keys for ensureing reservoir safety and giving full play to project benefit.Disappear Can structure be outlet structure escape works important component, be responsible for the task for the partially or mostly water flow dynamic energy of dissipating, and can make The current that energy dissipater releases current original with downstream river course, which obtain, to be properly connected;Need to consider during design it is lower sluice stream there may be Cavitation corrosion, pulsation, vibration, the destruction such as wear, wash away.
Instantly when the stream that sluices uses disspation through hydraudic jimp, protection-apron (or one part) often makes stiling basin pattern, promotes high speed water Stream produces hydraulic jump in the range of stiling basin, and because stressing conditions are complicated, protection-apron abuts lock chamber or dam body again, once destroy, directly Gate dam safety is influenceed, therefore it is required that protection-apron has enough weight, intensity and impact-resisting wear-resisting ability, is ensured under external force not Floated or destroyed by rush of water;Protection-apron is often built up with armored concrete, and protection-apron top layer and bottom arrange reinforcing bar in general, small-sized Engineering also can only configure top layer reinforcing bar.In order to which the osmotic pressure under protection-apron is reduced or eliminated, in bottom making draining loaded filter, and In the latter half of setting osculum of horizontal segment.Need to be separated with depression seam between protection-apron and lock chamber or dam body, aileron, it is uneven to adapt to Sedimentation.When protection-apron is wider, also need to set the transverse joint of Parallel to the flow direction, its spacing is relevant with foundation condition;It is general not set vertically The transverse joint of water (flow) direction, to ensure the resistance to overturning of protection-apron.
Stream also maintains certain complementary energy after protection-apron significantly energy dissipating, and the effect of apron seeks to eliminate current Complementary energy, velocity flow profile is adjusted, water stream is uniformly diffused out, is allowed to approach with the streamflow regime of natural river course, is exempted from protecting riverbed Washed away.
Energy dissipation by hydraulic jump is applicable to all kinds of outlet structure escape works of senior middle school's low water head, big-and-middle low discharge, and the Energy Dissipation Modes are over the ground Matter condition requires low, good to tail water luffing adaptability, thus is used widely.But there is following ask in the protection-apron in energy dissipation by hydraulic jump Topic:
(1) inside of protection-apron and apron is typically placed with some different boulders to carry out energy dissipating to current, works as head When higher, apron front portion will bear higher flow velocity, it is prone to cavitation corrosion and abrasion, and the bulk of the inside of protection-apron and apron Stone is also easily washed away by current, causes the overall energy dissipating of sluice unstable;
(2) due to the transverse joint of setting Parallel to the flow direction on protection-apron, the current of protection-apron are caused to easily infiltrate into pine below In granular media, cause the loose media of landfill below gate dam to be washed away for a long time by current, the safety of gate dam can be directly influenced.
Utility model content
In view of the above-mentioned problems of the prior art, the utility model provides a kind of sluice dissipation and scouring structure to reach Increase the stability of sluice energy-dissipating structure and the purpose of security, the energy dissipating for solving existing flood discharge brake structure is unstable, fills out Bury loose media washed away for a long time by current cause gate dam security reduce the problems such as.
A kind of sluice dissipation and scouring structure, including the concrete gate dam being built on gate dam foundation;Described concrete Gate dam downstream casting concrete protection-apron;Described concrete apron has poured lower end along below the end of water (flow) direction and has been located at Anti-scour wall in gate dam foundation;The axis direction of described anti-scour wall is vertical with water (flow) direction;Anti-scour wall by concreting and Into can not penetrating into gate dam foundation by the water that the transverse joint of concrete apron penetrates into, avoid the lower section of gate dam foundation The loose media of landfill is washed away and causes potential safety hazard for a long time.
The downstream of described concrete apron has poured concrete apron;Described concrete apron is by some diamonds Lattice beam is formed, and the inside of diamond lattice beam is filled with concrete tetrahedron and/or boulder;Diamond lattice beam can rise well To the left and right of energy dissipating, and the matching degree of the inner frame of diamond lattice beam and concrete tetrahedron and boulder is more preferable, prevents from mixing Coagulate native tetrahedron and boulder to be washed away by current easily, increase the stability of apron;Wherein, concrete tetrahedron can be well Solves the problems, such as boulder resource-constrained in nature, concrete tetrahedron can be prefabricated with mould in the factory.
Support column is provided with below described concrete apron;The lower end of described support column is located in gate dam foundation; Support column can lift the stretching resistance of concrete apron, so as to lift the stability of whole protection-apron.
Preferably, end of the described concrete apron along water (flow) direction reserve it is fluted;Described concrete apron The end opposite with water (flow) direction forms with groove formed by integrally casting;So that the company between concrete apron and concrete apron Connecing more firmly, prevents because the impact of current causes the connecting portion of concrete apron and concrete apron to loosen or even take off Fall, influence the overall security of sluice.
Preferably, described support column is T-shaped post;So that concrete apron is more firm.
Preferably, landfill has loose media below described gate dam foundation;Loose media is run through in the lower end of described anti-scour wall; So that anti-scour wall can preferably stop that water is penetrated into gate dam foundation.
Preferably, the lower end of described support column and the bottom connection of gate dam foundation;So that concrete apron is more Add firm.
Preferably, described anti-scour wall is more than 1;So that anti-scour wall stops the better of infiltration.
Preferably, described support column is more than 2;Adjacent support column equally arranges.
Compared with prior art, the utility model passes through anti-scour wall and the concrete sea being made up of some diamond lattice beams It is unrestrained, improve the security and stability of flood discharge brake structure;The water that the transverse joint that anti-scour wall avoids passing through concrete apron penetrates into is not It can penetrate into gate dam foundation, avoid the loose media of landfill below gate dam foundation from being washed away for a long time and cause potential safety hazard;Diamond Lattice beam can function well as the left and right of energy dissipating, and of the inner frame of diamond lattice beam and concrete tetrahedron and boulder It is more preferable with degree, prevent concrete tetrahedron and boulder from being washed away easily by current, increase the stability of protection-apron.
Also used in the utility model can prefabricated concrete tetrahedron in the factory, solve nature well The problem of middle boulder resource-constrained.
The utility model easy construction, practicality is high, suitable for promoting the use of.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the enlarged drawing of local A in Fig. 1.
Wherein, 1- gate dam foundations, 2- concrete gate dams, 3- concrete aprons, 4- concrete aprons, 5- anti-scour walls, 6- water chestnuts Shape sash beam, 7- support columns, 8- concrete tetrahedrons, 9- grooves.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples, and embodiment of the present utility model includes But it is not limited to the following example.
Embodiment
As shown in Figure 1, 2, a kind of sluice dissipation and scouring structure, including the concrete gate dam being built on gate dam foundation; Landfill has loose media below gate dam;Concrete gate dam downstream casting concrete protection-apron.
Concrete apron pours the anti-scour wall that lower end is located in gate dam foundation along below the end of water (flow) direction;Erosion control The axis direction of wall is vertical with water (flow) direction;Anti-scour wall is more than 1;Adjacent support column equally arranges;Anti-scour wall by Concreting forms, and the water that the transverse joint by concrete apron penetrates into can be caused not penetrate into gate dam foundation, and avoid The loose media of landfill is washed away and causes potential safety hazard for a long time below gate dam foundation.In the present embodiment, the lower end of anti-scour wall is run through Loose media, its quantity are 2;So that anti-scour wall can preferably stop that water is penetrated into gate dam foundation, anti-scour wall, which stops, to be oozed Water it is better.
The downstream of concrete apron has poured concrete apron;Concrete apron is made up of some diamond lattice beams, water chestnut The inside of shape sash beam is filled with concrete tetrahedron and/or boulder;Diamond lattice beam can function well as a left side for energy dissipating The right side, and the inner frame of diamond lattice beam and the matching degree of concrete tetrahedron are more preferable, prevent concrete tetrahedron easily by water Stream washes away, and increases the stability of apron;Concrete tetrahedron can solve asking for boulder resource-constrained in nature well Topic, concrete tetrahedron can be prefabricated with mould in the factory.
Support column is provided with below concrete apron;The lower end of support column is located in gate dam foundation;Support column be 2 with On;Support column can lift the stretching resistance of concrete apron, so as to lift the stability of whole sluice.In the present embodiment, branch Dagger is T-shaped post, and its quantity is 2, the bottom connection of its lower end and gate dam foundation;So that concrete apron is more steady Gu.
In the present embodiment, end of the concrete apron along water (flow) direction is reserved fluted;Concrete apron and water (flow) direction Opposite end forms with groove formed by integrally casting;So that the connection between concrete apron and concrete apron is more firm Gu prevent from, because the impact of current causes concrete apron and the connecting portion of concrete apron to loosen or even come off, influenceing to protect Smooth security.
When carrying out construction of the present utility model, the excavation of gate dam foundation, and the base of reserved concrete apron are carried out first Plinth excavation face;Then casting concrete gate dam;Then smooth formation stability fundamental is cleared up into the foundation excavation face of concrete apron Face, and anti-scour wall and concrete apron are poured successively, while the pre- groove for remaining for stablizing concrete apron;Then by coagulation Native tetrahedron and/or boulder are filled in diamond lattice beam, and pour support column and concrete apron successively;Finally by coagulation Native apron is connected with water (flow) direction identical end with underwater bed smooth-going;Thus construction of the present utility model can be completed.
Preferred embodiment of the present utility model is the foregoing is only, embodiment is used for structure, the function for understanding utility model And effect, it is not limited to the scope of protection of the utility model.The utility model can have various modifications and variations, all at this Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in Protection domain within.

Claims (7)

1. a kind of sluice dissipation and scouring structure, including the concrete gate dam being built on gate dam foundation, it is characterised in that described Concrete gate dam downstream casting concrete protection-apron;Described concrete apron has poured along below the end of water (flow) direction Lower end is located at the anti-scour wall in gate dam foundation;The axis direction of described anti-scour wall is vertical with water (flow) direction;
The downstream of described concrete apron has poured concrete apron;Described concrete apron is by some diamond lattice beams Form, the inside of diamond lattice beam is filled with concrete tetrahedron and/or boulder;The lower section of described concrete apron is set There is support column;The lower end of described support column is located in gate dam foundation.
2. sluice dissipation and scouring structure according to claim 1, it is characterised in that described concrete apron is along current Reserve fluted in the end in direction;Described.
3. sluice dissipation and scouring structure according to claim 2, it is characterised in that described support column is T-shaped post.
4. sluice dissipation and scouring structure according to claim 3, it is characterised in that filled out below described gate dam foundation It is embedded with loose media;Loose media is run through in the lower end of described anti-scour wall.
5. sluice dissipation and scouring structure according to claim 4, it is characterised in that the lower end of described support column and lock The bottom connection of dam foundation plinth.
6. sluice dissipation and scouring structure according to claim 5, it is characterised in that described anti-scour wall is more than 1.
7. sluice dissipation and scouring structure according to claim 6, it is characterised in that described support column is more than 2; Adjacent support column equally arranges.
CN201720579082.9U 2017-05-23 2017-05-23 A kind of sluice dissipation and scouring structure Active CN206800345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720579082.9U CN206800345U (en) 2017-05-23 2017-05-23 A kind of sluice dissipation and scouring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720579082.9U CN206800345U (en) 2017-05-23 2017-05-23 A kind of sluice dissipation and scouring structure

Publications (1)

Publication Number Publication Date
CN206800345U true CN206800345U (en) 2017-12-26

Family

ID=60742300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720579082.9U Active CN206800345U (en) 2017-05-23 2017-05-23 A kind of sluice dissipation and scouring structure

Country Status (1)

Country Link
CN (1) CN206800345U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576361A (en) * 2020-06-02 2020-08-25 广州地理研究所 Flood discharge gate energy dissipation scour protection equipment
CN113152374A (en) * 2021-04-23 2021-07-23 中国电建集团华东勘测设计研究院有限公司 Anti-elutriation structure of apron covering layer foundation and construction method
CN113356156A (en) * 2021-06-18 2021-09-07 广东省水利电力勘测设计研究院有限公司 Sluice low reaches scour protection structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576361A (en) * 2020-06-02 2020-08-25 广州地理研究所 Flood discharge gate energy dissipation scour protection equipment
CN113152374A (en) * 2021-04-23 2021-07-23 中国电建集团华东勘测设计研究院有限公司 Anti-elutriation structure of apron covering layer foundation and construction method
CN113356156A (en) * 2021-06-18 2021-09-07 广东省水利电力勘测设计研究院有限公司 Sluice low reaches scour protection structure

Similar Documents

Publication Publication Date Title
CN206800345U (en) A kind of sluice dissipation and scouring structure
CN108193606B (en) A kind of means of defence of local scour near pier
CN206157683U (en) High water head, many silt, overburden basis sluice dissipation structure
JP2013231290A (en) Levee structure and reinforcement method
CN109056508A (en) The construction method of the bridge pier of basic protection against erosion, bridge and underwater foundation protection against erosion
CN109610405A (en) Half lunar crater shape water pond and its construction method
CN209323512U (en) Anchor cable structure in flood discharge energy dissipation rivers erode district
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN201952787U (en) Shaft well swirling flow energy dissipating and flood discharging hole for diving swirling flow generation pier
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN110894714B (en) Hydraulic engineering protection river bank and protection method thereof
CN104695381B (en) Rivers bank slope imitates pasture and water energy dissipating safeguard structure
CN203795388U (en) Mixed earth dam and gravity dam arrangement structure
CN204326031U (en) Concrete adds the flexible apron structure of rough pier
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN202055261U (en) Landslide-proofing retaining wall
CN109235385A (en) A kind of apron
CN108517843A (en) A kind of downflow weir and elastic force type stilling pond combined energy dissipation structure and energy dissipating method
CN204510136U (en) Rivers bank slope imitates pasture and water energy dissipating safeguard structure
CN213204004U (en) Repair and reinforcement structure for canal slopes on two banks under downstream bridge of main canal river entering section
CN210636421U (en) Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation
CN202390805U (en) Energy dissipation and scour prevention structure for large block stone apron
CN105239540B (en) A kind of inclined floor formula stiling basin
CN110468837B (en) Underwater hollowing defect repairing method and device for ship lock navigation wall pile foundation on gravel layer basis
CN206956682U (en) Plunge pool structure

Legal Events

Date Code Title Description
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 614000 No.94 Jingyang Road, shaping Town, Ebian County, Leshan City, Sichuan Province

Patentee after: Guoneng Dadu River shaping Power Generation Co.,Ltd.

Address before: 614000 No.94 Jingyang Road, shaping Town, Ebian County, Leshan City, Sichuan Province

Patentee before: GUODIAN DADU RIVER SHAPING HYDROPOWER CONSTRUCTION Co.,Ltd.

CP01 Change in the name or title of a patent holder