CN203795388U - Mixed earth dam and gravity dam arrangement structure - Google Patents

Mixed earth dam and gravity dam arrangement structure Download PDF

Info

Publication number
CN203795388U
CN203795388U CN201420196359.6U CN201420196359U CN203795388U CN 203795388 U CN203795388 U CN 203795388U CN 201420196359 U CN201420196359 U CN 201420196359U CN 203795388 U CN203795388 U CN 203795388U
Authority
CN
China
Prior art keywords
dam
gravity
flood discharge
monolith
desilting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420196359.6U
Other languages
Chinese (zh)
Inventor
包芬芬
卢玲
崔莹
张彩双
姜苏阳
宋修昌
李远程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201420196359.6U priority Critical patent/CN203795388U/en
Application granted granted Critical
Publication of CN203795388U publication Critical patent/CN203795388U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a mixed earth dam and gravity dam arrangement structure which comprises homogeneous earth dams and a gravity dam, wherein the homogeneous earth dams are arranged on soil matrixes on both shores; the gravity dam is arranged between the two homogeneous earth dams and on a riverbed rock foundation; the left side and the right side of the gravity dam are connected with the homogeneous earth dams on the corresponding sides through concrete gravity retaining walls; the gravity dam is composed of an overflow dam section, a five-hole flood discharge dam section with a breast wall gate, and a desilting underport dam section from left to right; the gate holes of the flood discharge dam section are separated by middle piers; the left side and the right side of the flood discharge dam section are connected with the overflow dam section and the desilting underport dam section through abutment piers; a stilling basin is arranged on the downstream side of the gravity dam; a water diversion opening is formed in the upper part of the desilting underport dam section. According to the utility model, the functions of dam overflow, flood discharge, desilting and the like are arranged on the riverbed middle rock foundation, and the homogeneous earth dams capable of retaining water are arranged on soil matrixes on both shores, so that earth dam slopes on both shores are prevented from being eroded on the premise of meeting energy dissipations of overflow, flood discharge, desilting and the like.

Description

Earth dam+gravity dam mixes the arrangement of dam type
Technical field
The utility model relates to the check dam in water conservancy construction, especially relates to the arrangement that earth dam+gravity dam mixes dam type.
Background technology
In dam work hinge arrangement, usually to select dam type in conjunction with local geological conditions.Conventionally, the riverbed of a dam site is all consistent with the basis of two sides, selects gravity dam when both dam foundation is all rock, selects earth dam when dam foundation is all loess.But, the basis, two sides that runs into dam site is loess and basis, riverbed is under the geological conditions of rock, if when dam is all made concrete gravity dam, can cause two sides dam foundation excavation amount huge, and do not meet the excavation requirement of concrete gravity dam specification to the dam foundation, the concrete gravity dam dam foundation must be located on basement rock.
Summary of the invention
The utility model object is to provide a kind of earth dam+gravity dam to mix the arrangement of dam type.
For achieving the above object, the utility model is taked following technical proposals:
Earth dam described in the utility model+gravity dam mixes the arrangement of dam type, comprises the homogeneous earth dam being arranged on the soil matrix of two sides, is arranged on the gravity dam in riverbed rock foundation between described two homogeneous earth dams; The described gravity dam left and right sides is connected with the homogeneous earth dam of respective side by concrete gravity retaining wall respectively; Gravity dam is made up of Overflow Section, the flood discharge monolith of five pore area breastwork gates, bottom hole for sand flushing monolith from left to right; Between the lock hole of described flood discharge monolith, adopt Zhong Dun interval, the left and right sides of flood discharge monolith is connected with Overflow Section and bottom hole for sand flushing monolith by abutment pier respectively; Be provided with absorption basin in gravity dam downstream; Be provided with irrigating gate on bottom hole for sand flushing monolith top.
The utility model advantage is to take the functions such as dam overflow, flood discharge, sand discharge are arranged in the rock foundation of middle part, riverbed, the homogeneous earth dam of water retaining function is arranged in to the arrangement form on the soil matrix of two sides, reaches homogeneous earth dam and concrete gravity dam are effectively combined.Therefore,, meeting under the prerequisite of the energy dissipatings such as overflow, flood discharge, sand discharge, avoided washing away two sides soil property dam slope.
Brief description of the drawings
Fig. 1 is arrangement schematic diagram of the present utility model.
Fig. 2 is the plan structure schematic diagram of Fig. 1.
Detailed description of the invention
As shown in Figure 1, 2, earth dam described in the utility model+gravity dam mixes the arrangement of dam type, comprises the homogeneous earth dam 1,2 being arranged on the soil matrix of two sides, is arranged on the gravity dam in riverbed rock foundation between described two homogeneous earth dams 1,2; The described gravity dam left and right sides is connected with the homogeneous earth dam of respective side by concrete gravity retaining wall 3,4 respectively; Gravity dam is made up of Overflow Section 5, the flood discharge monolith 6 of five pore area breastwork gates, bottom hole for sand flushing monolith 7 from left to right; Between the lock hole of described flood discharge monolith 6, adopt Zhong Dun interval, the left and right sides of flood discharge monolith 6 is connected with Overflow Section 5 and bottom hole for sand flushing monolith 7 by abutment pier respectively; Be provided with absorption basin 8 in gravity dam downstream; Be provided with irrigating gate on bottom hole for sand flushing monolith 7 tops.

Claims (1)

1. earth dam+gravity dam mixes an arrangement for dam type, it is characterized in that: comprise the homogeneous earth dam being arranged on the soil matrix of two sides, be arranged on the gravity dam in riverbed rock foundation between described two homogeneous earth dams; The described gravity dam left and right sides is connected with the homogeneous earth dam of respective side by concrete gravity retaining wall respectively; Gravity dam is made up of Overflow Section, the flood discharge monolith of five pore area breastwork gates, bottom hole for sand flushing monolith from left to right; Between the lock hole of described flood discharge monolith, adopt Zhong Dun interval, the left and right sides of flood discharge monolith is connected with Overflow Section and bottom hole for sand flushing monolith by abutment pier respectively; Be provided with absorption basin in gravity dam downstream; Be provided with irrigating gate on bottom hole for sand flushing monolith top.
CN201420196359.6U 2014-04-22 2014-04-22 Mixed earth dam and gravity dam arrangement structure Expired - Lifetime CN203795388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420196359.6U CN203795388U (en) 2014-04-22 2014-04-22 Mixed earth dam and gravity dam arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420196359.6U CN203795388U (en) 2014-04-22 2014-04-22 Mixed earth dam and gravity dam arrangement structure

Publications (1)

Publication Number Publication Date
CN203795388U true CN203795388U (en) 2014-08-27

Family

ID=51377617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420196359.6U Expired - Lifetime CN203795388U (en) 2014-04-22 2014-04-22 Mixed earth dam and gravity dam arrangement structure

Country Status (1)

Country Link
CN (1) CN203795388U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938585A (en) * 2014-04-22 2014-07-23 黄河勘测规划设计有限公司 Arrangement structure of mixed dam composed of earth dams and gravity dam
CN105064288A (en) * 2015-08-04 2015-11-18 中国电建集团华东勘测设计研究院有限公司 Concrete dam and earth and rockfill dam mixed dam type structure and construction method
CN107313406A (en) * 2017-08-18 2017-11-03 长江勘测规划设计研究有限责任公司 Concrete gravity dam arrangement and its method for arranging before rock

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938585A (en) * 2014-04-22 2014-07-23 黄河勘测规划设计有限公司 Arrangement structure of mixed dam composed of earth dams and gravity dam
CN105064288A (en) * 2015-08-04 2015-11-18 中国电建集团华东勘测设计研究院有限公司 Concrete dam and earth and rockfill dam mixed dam type structure and construction method
CN107313406A (en) * 2017-08-18 2017-11-03 长江勘测规划设计研究有限责任公司 Concrete gravity dam arrangement and its method for arranging before rock
CN107313406B (en) * 2017-08-18 2022-12-20 长江勘测规划设计研究有限责任公司 Rock front concrete gravity dam arrangement structure and arrangement method thereof

Similar Documents

Publication Publication Date Title
CN204023501U (en) A remove dangerous and consolidate prevention of seepage processing structure for earth and rockfill dam
CN102535408B (en) Semi-assembly type ecological debris flow check dam, and construction method thereof
CN203795388U (en) Mixed earth dam and gravity dam arrangement structure
CN203320494U (en) High dam spillway foundation drainage system
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN203530926U (en) Slope protection structure for water conservancy project
CN202450491U (en) Open type flood discharge structure at dam crest
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN103290804B (en) Method and the structure of downstream ecology flow are provided after lock under water conservancy diversion outlet structure escape works
CN203007961U (en) Gabion cofferdam structure
CN202450501U (en) Bricking drainage structure for stilling pool
CN202214710U (en) Overflowing-drainage integrated brake weir
CN104695455B (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN103526732A (en) Dam drainage structure
CN202055261U (en) Landslide-proofing retaining wall
CN203530921U (en) Water-permeable pile foundation spur dike
CN203113359U (en) Earth rock cofferdam structure
CN102383401A (en) Overflow water drainage integral type sluice weir
CN202369883U (en) Road base treatment structure for soft soil region
CN206477308U (en) A kind of compatible ready-package river levee in dike road
CN210216332U (en) Retaining dam structure for overhauling whole tunnel section of hydroelectric engineering diversion tunnel in canyon region
CN210263095U (en) Full-tunnel section maintenance cofferdam structure of diversion tunnel in early and middle period
CN203096696U (en) High and low composite backwater weir
CN103758081A (en) Floating self-adjustment water-stopping dam
CN203559405U (en) Dam sluicing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140827