CN203795388U - Mixed earth dam and gravity dam arrangement structure - Google Patents
Mixed earth dam and gravity dam arrangement structure Download PDFInfo
- Publication number
- CN203795388U CN203795388U CN201420196359.6U CN201420196359U CN203795388U CN 203795388 U CN203795388 U CN 203795388U CN 201420196359 U CN201420196359 U CN 201420196359U CN 203795388 U CN203795388 U CN 203795388U
- Authority
- CN
- China
- Prior art keywords
- dam
- gravity
- flood discharge
- monolith
- desilting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000005484 gravity Effects 0.000 title claims abstract description 34
- 239000011435 rock Substances 0.000 claims abstract description 9
- 239000002689 soil Substances 0.000 claims abstract description 7
- 239000004576 sand Substances 0.000 claims description 11
- 238000011010 flushing procedure Methods 0.000 claims description 9
- 239000011159 matrix material Substances 0.000 claims description 4
- 238000010521 absorption reaction Methods 0.000 claims description 3
- 239000011148 porous material Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 4
- 210000000481 breast Anatomy 0.000 abstract 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 abstract 1
- 238000009412 basement excavation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a mixed earth dam and gravity dam arrangement structure which comprises homogeneous earth dams and a gravity dam, wherein the homogeneous earth dams are arranged on soil matrixes on both shores; the gravity dam is arranged between the two homogeneous earth dams and on a riverbed rock foundation; the left side and the right side of the gravity dam are connected with the homogeneous earth dams on the corresponding sides through concrete gravity retaining walls; the gravity dam is composed of an overflow dam section, a five-hole flood discharge dam section with a breast wall gate, and a desilting underport dam section from left to right; the gate holes of the flood discharge dam section are separated by middle piers; the left side and the right side of the flood discharge dam section are connected with the overflow dam section and the desilting underport dam section through abutment piers; a stilling basin is arranged on the downstream side of the gravity dam; a water diversion opening is formed in the upper part of the desilting underport dam section. According to the utility model, the functions of dam overflow, flood discharge, desilting and the like are arranged on the riverbed middle rock foundation, and the homogeneous earth dams capable of retaining water are arranged on soil matrixes on both shores, so that earth dam slopes on both shores are prevented from being eroded on the premise of meeting energy dissipations of overflow, flood discharge, desilting and the like.
Description
Technical field
The utility model relates to the check dam in water conservancy construction, especially relates to the arrangement that earth dam+gravity dam mixes dam type.
Background technology
In dam work hinge arrangement, usually to select dam type in conjunction with local geological conditions.Conventionally, the riverbed of a dam site is all consistent with the basis of two sides, selects gravity dam when both dam foundation is all rock, selects earth dam when dam foundation is all loess.But, the basis, two sides that runs into dam site is loess and basis, riverbed is under the geological conditions of rock, if when dam is all made concrete gravity dam, can cause two sides dam foundation excavation amount huge, and do not meet the excavation requirement of concrete gravity dam specification to the dam foundation, the concrete gravity dam dam foundation must be located on basement rock.
Summary of the invention
The utility model object is to provide a kind of earth dam+gravity dam to mix the arrangement of dam type.
For achieving the above object, the utility model is taked following technical proposals:
Earth dam described in the utility model+gravity dam mixes the arrangement of dam type, comprises the homogeneous earth dam being arranged on the soil matrix of two sides, is arranged on the gravity dam in riverbed rock foundation between described two homogeneous earth dams; The described gravity dam left and right sides is connected with the homogeneous earth dam of respective side by concrete gravity retaining wall respectively; Gravity dam is made up of Overflow Section, the flood discharge monolith of five pore area breastwork gates, bottom hole for sand flushing monolith from left to right; Between the lock hole of described flood discharge monolith, adopt Zhong Dun interval, the left and right sides of flood discharge monolith is connected with Overflow Section and bottom hole for sand flushing monolith by abutment pier respectively; Be provided with absorption basin in gravity dam downstream; Be provided with irrigating gate on bottom hole for sand flushing monolith top.
The utility model advantage is to take the functions such as dam overflow, flood discharge, sand discharge are arranged in the rock foundation of middle part, riverbed, the homogeneous earth dam of water retaining function is arranged in to the arrangement form on the soil matrix of two sides, reaches homogeneous earth dam and concrete gravity dam are effectively combined.Therefore,, meeting under the prerequisite of the energy dissipatings such as overflow, flood discharge, sand discharge, avoided washing away two sides soil property dam slope.
Brief description of the drawings
Fig. 1 is arrangement schematic diagram of the present utility model.
Fig. 2 is the plan structure schematic diagram of Fig. 1.
Detailed description of the invention
As shown in Figure 1, 2, earth dam described in the utility model+gravity dam mixes the arrangement of dam type, comprises the homogeneous earth dam 1,2 being arranged on the soil matrix of two sides, is arranged on the gravity dam in riverbed rock foundation between described two homogeneous earth dams 1,2; The described gravity dam left and right sides is connected with the homogeneous earth dam of respective side by concrete gravity retaining wall 3,4 respectively; Gravity dam is made up of Overflow Section 5, the flood discharge monolith 6 of five pore area breastwork gates, bottom hole for sand flushing monolith 7 from left to right; Between the lock hole of described flood discharge monolith 6, adopt Zhong Dun interval, the left and right sides of flood discharge monolith 6 is connected with Overflow Section 5 and bottom hole for sand flushing monolith 7 by abutment pier respectively; Be provided with absorption basin 8 in gravity dam downstream; Be provided with irrigating gate on bottom hole for sand flushing monolith 7 tops.
Claims (1)
1. earth dam+gravity dam mixes an arrangement for dam type, it is characterized in that: comprise the homogeneous earth dam being arranged on the soil matrix of two sides, be arranged on the gravity dam in riverbed rock foundation between described two homogeneous earth dams; The described gravity dam left and right sides is connected with the homogeneous earth dam of respective side by concrete gravity retaining wall respectively; Gravity dam is made up of Overflow Section, the flood discharge monolith of five pore area breastwork gates, bottom hole for sand flushing monolith from left to right; Between the lock hole of described flood discharge monolith, adopt Zhong Dun interval, the left and right sides of flood discharge monolith is connected with Overflow Section and bottom hole for sand flushing monolith by abutment pier respectively; Be provided with absorption basin in gravity dam downstream; Be provided with irrigating gate on bottom hole for sand flushing monolith top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420196359.6U CN203795388U (en) | 2014-04-22 | 2014-04-22 | Mixed earth dam and gravity dam arrangement structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420196359.6U CN203795388U (en) | 2014-04-22 | 2014-04-22 | Mixed earth dam and gravity dam arrangement structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203795388U true CN203795388U (en) | 2014-08-27 |
Family
ID=51377617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420196359.6U Expired - Lifetime CN203795388U (en) | 2014-04-22 | 2014-04-22 | Mixed earth dam and gravity dam arrangement structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203795388U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103938585A (en) * | 2014-04-22 | 2014-07-23 | 黄河勘测规划设计有限公司 | Arrangement structure of mixed dam composed of earth dams and gravity dam |
CN105064288A (en) * | 2015-08-04 | 2015-11-18 | 中国电建集团华东勘测设计研究院有限公司 | Concrete dam and earth and rockfill dam mixed dam type structure and construction method |
CN107313406A (en) * | 2017-08-18 | 2017-11-03 | 长江勘测规划设计研究有限责任公司 | Concrete gravity dam arrangement and its method for arranging before rock |
-
2014
- 2014-04-22 CN CN201420196359.6U patent/CN203795388U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103938585A (en) * | 2014-04-22 | 2014-07-23 | 黄河勘测规划设计有限公司 | Arrangement structure of mixed dam composed of earth dams and gravity dam |
CN105064288A (en) * | 2015-08-04 | 2015-11-18 | 中国电建集团华东勘测设计研究院有限公司 | Concrete dam and earth and rockfill dam mixed dam type structure and construction method |
CN107313406A (en) * | 2017-08-18 | 2017-11-03 | 长江勘测规划设计研究有限责任公司 | Concrete gravity dam arrangement and its method for arranging before rock |
CN107313406B (en) * | 2017-08-18 | 2022-12-20 | 长江勘测规划设计研究有限责任公司 | Rock front concrete gravity dam arrangement structure and arrangement method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204023501U (en) | A remove dangerous and consolidate prevention of seepage processing structure for earth and rockfill dam | |
CN102535408B (en) | Semi-assembly type ecological debris flow check dam, and construction method thereof | |
CN203795388U (en) | Mixed earth dam and gravity dam arrangement structure | |
CN203320494U (en) | High dam spillway foundation drainage system | |
CN103938585A (en) | Arrangement structure of mixed dam composed of earth dams and gravity dam | |
CN203530926U (en) | Slope protection structure for water conservancy project | |
CN202450491U (en) | Open type flood discharge structure at dam crest | |
CN107761668B (en) | Coastal shore reservoir land-building type revetment structure and construction method thereof | |
CN103290804B (en) | Method and the structure of downstream ecology flow are provided after lock under water conservancy diversion outlet structure escape works | |
CN203007961U (en) | Gabion cofferdam structure | |
CN202450501U (en) | Bricking drainage structure for stilling pool | |
CN202214710U (en) | Overflowing-drainage integrated brake weir | |
CN104695455B (en) | High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof | |
CN103526732A (en) | Dam drainage structure | |
CN202055261U (en) | Landslide-proofing retaining wall | |
CN203530921U (en) | Water-permeable pile foundation spur dike | |
CN203113359U (en) | Earth rock cofferdam structure | |
CN102383401A (en) | Overflow water drainage integral type sluice weir | |
CN202369883U (en) | Road base treatment structure for soft soil region | |
CN206477308U (en) | A kind of compatible ready-package river levee in dike road | |
CN210216332U (en) | Retaining dam structure for overhauling whole tunnel section of hydroelectric engineering diversion tunnel in canyon region | |
CN210263095U (en) | Full-tunnel section maintenance cofferdam structure of diversion tunnel in early and middle period | |
CN203096696U (en) | High and low composite backwater weir | |
CN103758081A (en) | Floating self-adjustment water-stopping dam | |
CN203559405U (en) | Dam sluicing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd. Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140827 |