CN206799032U - A kind of fast hoisting transporter of vertical paint roller - Google Patents
A kind of fast hoisting transporter of vertical paint roller Download PDFInfo
- Publication number
- CN206799032U CN206799032U CN201720699780.2U CN201720699780U CN206799032U CN 206799032 U CN206799032 U CN 206799032U CN 201720699780 U CN201720699780 U CN 201720699780U CN 206799032 U CN206799032 U CN 206799032U
- Authority
- CN
- China
- Prior art keywords
- paint roller
- lifting
- track
- transporter
- lifted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The utility model discloses a kind of lifting transporter of vertical paint roller, including the track being arranged on plant area's crossbeam and the slide trolley being slidably matched with the track, the track extends to safe rest area from production installing zone, and the slide trolley is connected with lowering or hoisting gear.The lifting transporter of above-mentioned vertical paint roller, in actual use, vertical paint roller to be lifted is connected with lowering or hoisting gear, vertical paint roller to be lifted is lifted by lowering or hoisting gear, due to track from production installing zone extend to safe rest area, moved in orbit by dolly, paint roller is transported to corresponding plant area or station, the time is generally required as 30 minutes or so, substantially reduce the duration of lifting transhipment, only need lifting once to complete to produce the mutual transhipment between installing zone and the station of safe rest area two simultaneously, operate simpler convenience.
Description
Technical field
It the utility model is related to hoisting technology field, more particularly to a kind of lifting transporter of vertical paint roller.
Background technology
The vertical paint roller unit of cold rolling mill galvanized wire generally comprises left vertical painting roller group, right vertical painting roller group, and being installed in can
On hoistway, the lifting of left and right paint roller can be realized, when the vertical paint roller in hoistway rise left and right so that the vertical painting in left and right
Roller contacts with steel band, when needing roll change or maintenance down, liftable slideway, reduces left and right slideway, paint roller and strip is had conjunction
The safety inspection gap of reason.In order to facilitate description below by left vertical painting roller group, right vertical painting roller group abbreviation paint roller, work as cold rolling
When the paint roller of factory's galvanizing unit need to be changed, traditional method is that hoisting beam is set on upper brace, is hung out by several times with chain block
Paint roller, paint roller is hung out by several times and refers to be transferred from installation site first with hoisting beam, places to transport carriage, is turned using transport carriage
After being transported to corresponding plant area or station, placed using hoisting beam lifting to placement location;Also can be from placement using same method
Position is hung to installation site, but this method typically need loading and unloading that could complete paint roller in 2 hours or so, short time consumption are longer not
It is easy to operation.
In summary, how to solve the problems, such as that time-consuming is inconvenient for paint roller lifting transhipment, it has also become those skilled in the art
Technical barrier urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of lifting transporter of vertical paint roller, to reduce paint roller lifting transhipment
Duration, while make it that lifting transhipment is more convenient.
To achieve these goals, the utility model provides a kind of lifting transporter of vertical paint roller, including sets
Track on plant area's crossbeam and the dolly being slidably matched with the track, the track extend to safety from production installing zone and put
Area is put, the dolly is connected with lowering or hoisting gear.
Preferably, the lowering or hoisting gear is chain block.
Preferably, the chain block is the chain block of 3-5 tons.
Preferably, in addition to the equalizer bar corresponding with the length of paint roller to be lifted, close to the balance type lifting device
Both ends are provided with connection position, are provided with what is be connected for the Heave Here with lowering or hoisting gear in the middle part of the balance type lifting device
Hanger, the connection position are connected by steel wire rope end corresponding with the roll body to be lifted.
Preferably, reinforcing plate is provided with the top of the balance type lifting device, the hanger is arranged on the reinforcing plate
Middle part.
Preferably, the arc corresponding with the arc surface of the paint roller to be lifted is provided with below the balance type lifting device
Shape plate.
Preferably, the Heave Here of the lowering or hoisting gear is connected by shackle with the hanger.
Preferably, the track is the single rail that I-steel is made, and the slide trolley is monorail trolley.
Content, the lifting transporter of above-mentioned paint roller are introduced compared to background technology, including is arranged on plant area's crossbeam
Track and the dolly being slidably matched with track, track extend to safe rest area from production installing zone, and dolly is connected with lifting dress
Put.In actual use, paint roller to be lifted is connected with lowering or hoisting gear, paint roller to be lifted is lifted by lowering or hoisting gear,
Due to track from production installing zone extend to safe rest area, moved in orbit by dolly, paint roller be transported to accordingly
Plant area or station, the time is generally required as 30 minutes or so, substantially reduces the duration of lifting transhipment, while only need lifting one
It is secondary to complete to produce the mutual transhipment between installing zone and the station of safe rest area two, operate simpler convenience.
Brief description of the drawings
Fig. 1 is the structural representation of the lifting transporter for the vertical paint roller that the utility model embodiment provides;
Fig. 2 is the structural representation of plant area's arrangement of the lifting transporter for the vertical paint roller that the utility model embodiment provides
Figure;
Fig. 3 is Fig. 2 A to structural representation;
Fig. 4 is the structural representation of the balance type lifting device of the lifting transporter for the paint roller that the utility model embodiment provides
Figure.
In figure 1 above -4,
Crossbeam 1, track 2, dolly 3, production installing zone 4, safe rest area 5, lowering or hoisting gear 6, paint roller to be lifted 7, balance
Boom hoisting 8, connection position 9, Heave Here 10, hanger 11, steel wire rope 12, reinforcing plate 13, arc 14, strip 15.
Embodiment
Core of the present utility model is to provide a kind of lifting transporter of vertical paint roller, to reduce paint roller lifting transhipment
Duration, while make it that lifting transhipment is more convenient.
In order that those skilled in the art more fully understands technical scheme provided by the utility model, below in conjunction with attached
The utility model is described in further detail with specific embodiment for figure.
As Figure 1-4, the lifting transporter for a kind of paint roller that the utility model embodiment provides, including it is arranged on factory
Track 2 on area's crossbeam 1 and the dolly 3 being slidably matched with track 2, track 2 extend to safe rest area 5 from production installing zone 4,
Dolly is connected with lowering or hoisting gear 6.Explanation is needed exist for, dolly can be located at the surface or underface of track, and small
Car and track are slidably matched, and only allow dolly to have the free degree along the bearing of trend of track;In addition, dolly slides in orbit
Can be manually pull or dolly installation drive device be driven, such as dolly driven by motor it is in-orbit
Moved on road.
Content is introduced compared to background technology, the lifting transporter of above-mentioned vertical paint roller in actual use, will
Paint roller to be lifted is connected with lowering or hoisting gear, by lowering or hoisting gear and lifting paint roller to be lifted, because track is installed from production
Area extends to safe rest area, is moved in orbit by dolly, and paint roller is transported into corresponding plant area or station, generally required
Time is 30 minutes or so, substantially reduces the duration of lifting transhipment, while only needs lifting once to complete production installation
Mutual transhipment between area and the station of safe rest area two, operates simpler convenience.
In some specific embodiments, above-mentioned lowering or hoisting gear 6 can be for chain block, naturally it is also possible to be ability
Other lowering or hoisting gears that field technique personnel commonly use, such as motor drive hook lifting or pass through hydraulic means and realize lifting.Only not
The utility model embodiment is crossed preferably by the way of above-mentioned chain block.Also, chain block is preferably using 3-5 tons
Chain block, it is of course possible to which understanding, the tonnage of above-mentioned chain block is only the citing of the utility model embodiment, may be used also
To be the tonnage corresponding to the weight range selection of paint roller according to practical condition.
In some more particular embodiments, the lifting transporter of above-mentioned vertical paint roller can also include with waiting to lift
The corresponding balance type lifting device 8 of the length of vertical paint roller 7, connection position is provided with close to the both ends of balance type lifting device 8
9, the middle part of balance type lifting device 8 is provided with the hanger 11 being connected for the Heave Here 10 with lowering or hoisting gear 6, and connection position 9 passes through
Steel wire rope 12 connects with 7 corresponding end of paint roller to be lifted.Need exist for explanation, balance type lifting device and paint roller to be lifted
Length it is corresponding refer to balance beam length it is more slightly longer than the band glue-line barrel length of vertical paint roller or liquid-dipping roller, generally both sides are each
Long 50~100mm, primarily to realizing steel wire rope with connection position and when the end for lifting roll body is connected, steel wire rope can be big
Body vertically, so as to avoid the roll surface with paint roller to be lifted from being in contact.The lifting transporter of above-mentioned vertical paint roller, lead to
To cross and connection position is set close to the both ends of balance type lifting device, end corresponding with paint roller to be lifted connects connection position respectively, and
The length of balance type lifting device is corresponding with the length with lifting paint roller, therefore connection position is by steel wire rope and with lifting paint roller
It is substantially vertical after the stretching of steel wire rope stress during lifting after the connection of end, so as to avoid the surface glue to the roll surface of paint roller
The problem of layer or metal level ankle injury.
In addition, the top of balance type lifting device 8 is provided with reinforcing plate 13, hanger 11 is arranged on the middle part of reinforcing plate 13.When
What right those skilled in the art will readily appreciate that is in order that obtaining the overall gravitational equilibrium of balance type lifting device, reinforcing plate is most
Excellent design method should be symmetrical structure, and the symmetrical center line weight of the symmetrical center line of reinforcing plate and balance type lifting device
Close.More convenient by the processing for designing reinforcing plate hanger, 12mm can be used thick for the reinforcing plate or the cutting of 14mm steel plates
Form, in general, the distance of connection position corresponding to the back gauge of reinforcing plate two is designed in 50~100mm, and the height of reinforcing plate is 150
~200mm, the relative dimensions of certain above-mentioned reinforcing plate are only the citing of the utility model embodiment, can also be according to actual need
Summation strength demand selects other corresponding sizes.In order to reduce stress concentration, and also to when avoiding loading and unloading hanging apparatus
Workmen is stabbed, arc-shaped is processed on the top of reinforcing plate, hanger is directly process in reinforcing plate, for example hanger is hung
Dress hole position is set at top 30~40mm of circular arc away from reinforcing plate the system of cutting placed in the middle, and diameter is generally 50~80mm of φ.Certainly
It is understood that the mode of directly processing hanger is only the citing of the utility model embodiment in above-mentioned reinforcing plate, may be used also
In a manner of being reinforcing plate top welding hanger.
In addition, the lower section of equalizer bar 8 is provided with the arc 14 corresponding with the arc surface of paint roller 7 to be lifted.Here need
Treated it is noted that the arc surface of the arc arcwall face for referring to arc corresponding with the arcwall face of paint roller to be lifted is slightly larger than
Lift the arc surface of paint roller.In general, the arc radius of arc is bigger 20mm-30mm than the arc radius of paint roller 4 to be lifted.
By setting arc, the more conveniently lifting of paint roller to be lifted, first balance type lifting device can be lifted to paint roller to be lifted
Surface, arc and the roll surface of paint roller to be lifted is in contact, installation steel wire rope.
In further embodiment, the Heave Here 10 of above-mentioned lowering or hoisting gear 6 is connected by shackle with hanger 11.Certainly
It is appreciated that suspension hook can also be arranged at Heave Here, the connection with hanger, or those skilled in the art are realized by suspension hook
Other conventional dismountable connected modes.
In some more particular embodiments, above-mentioned track 2 is the single rail that is made of I-steel, and dolly 3
For monorail trolley.Of course, it should be understood that the mode that above-mentioned I-steel makes single rail is only the embodiment of the present invention
The single rail that citing or other section bars make.In addition, the quantity of single rail and monorail trolley can be multigroup
Can be one group, and the utility model embodiment is preferably by the way of arrangement is multigroup.It is multigroup by being arranged to, can be simultaneously right
Multiple paint rollers carry out lifting transhipment.In addition it should be noted that above-mentioned single rail and monorail trolley are slidably matched only
The citing of the utility model embodiment, it can also be the mode that double joint track is slidably matched with dolly.
The lifting transporter of vertical paint roller provided by the utility model is described in detail above.Need to illustrate
, each embodiment in this specification described by the way of progressive, what each embodiment stressed be and its
The difference of his embodiment, between each embodiment identical similar part mutually referring to.
It should also be noted that, herein, such as first and second or the like relational terms are used merely to one
Entity or operation make a distinction with another entity or operation, and not necessarily require or imply between these entities or operation
Any this actual relation or order be present.Moreover, term " comprising ", "comprising" or its any other variant are intended to contain
Lid nonexcludability includes, so that article or equipment including a series of elements not only include those key elements, but also
Including the other element being not expressly set out, or also include for this article or the intrinsic key element of equipment.Do not having
In the case of more limitations, the key element that is limited by sentence "including a ...", it is not excluded that including the article of above-mentioned key element
Or other identical element in equipment also be present.
Specific case used herein is set forth to principle of the present utility model and embodiment, above example
Explanation be only intended to help and understand core concept of the present utility model.It should be pointed out that the ordinary skill for the art
For personnel, on the premise of the utility model principle is not departed from, some improvement and modification can also be carried out to the utility model,
These are improved and modification is also fallen into the protection domain of the utility model claims.
Claims (8)
1. a kind of lifting transporter of vertical paint roller, it is characterised in that including the track (2) being arranged on plant area's crossbeam (1)
With the slide trolley (3) being slidably matched with the track (2), the track (2) extends to safe placement from production installing zone (4)
Area (5), the dolly are connected with lowering or hoisting gear (6).
2. the lifting transporter of paint roller as claimed in claim 1, it is characterised in that the lowering or hoisting gear (6) is to pull calabash
Reed.
3. the lifting transporter of paint roller as claimed in claim 2, it is characterised in that the chain block is the hand of 3-5 tons
Draw cucurbit.
4. the lifting transporter of paint roller as claimed in claim 1, it is characterised in that also include and paint roller to be lifted (7)
The corresponding balance type lifting device of length (8), connection position (9) is provided with close to the both ends of the balance type lifting device (8),
The hanger (11) for being connected with the Heave Here (10) of lowering or hoisting gear (6), institute are provided with the middle part of the balance type lifting device (8)
Connection position (9) is stated to connect by steel wire rope (12) end corresponding with the paint roller (7) to be lifted.
5. the lifting transporter of paint roller as claimed in claim 4, it is characterised in that the top of the balance type lifting device (8)
Portion is provided with reinforcing plate (13), and the hanger (11) is arranged on the middle part of the reinforcing plate (13).
6. the lifting transporter of paint roller as claimed in claim 4, it is characterised in that under the balance type lifting device (8)
Side is provided with the arc (14) corresponding with the arc surface of the paint roller (7) to be lifted.
7. the lifting transporter of paint roller as claimed in claim 4, it is characterised in that the Heave Here of the lowering or hoisting gear (6)
(10) it is connected by shackle with the hanger (11).
8. the lifting transporter of paint roller as claimed in claim 1, it is characterised in that the track (2) makes for I-steel
The single rail formed, and the slide trolley (3) is monorail trolley.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720699780.2U CN206799032U (en) | 2017-06-15 | 2017-06-15 | A kind of fast hoisting transporter of vertical paint roller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720699780.2U CN206799032U (en) | 2017-06-15 | 2017-06-15 | A kind of fast hoisting transporter of vertical paint roller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206799032U true CN206799032U (en) | 2017-12-26 |
Family
ID=60747229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720699780.2U Active CN206799032U (en) | 2017-06-15 | 2017-06-15 | A kind of fast hoisting transporter of vertical paint roller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206799032U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108639966A (en) * | 2018-06-29 | 2018-10-12 | 中国能源建设集团山西电力建设有限公司 | Heat power plant boiler economizer hand installs mechanism in place and installation method |
-
2017
- 2017-06-15 CN CN201720699780.2U patent/CN206799032U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108639966A (en) * | 2018-06-29 | 2018-10-12 | 中国能源建设集团山西电力建设有限公司 | Heat power plant boiler economizer hand installs mechanism in place and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205907556U (en) | Portable rail shifter | |
CN110240048A (en) | A kind of external attached type skyscraper goods jack system | |
CN106564767A (en) | Railway carriage coal flattening and rolling device | |
CN102190249B (en) | Method for hoisting equipment positioned at bottom of multilayer frame platform | |
CN104973517B (en) | A kind of electronic gantry platform that installs for sintering machine head device and its using method | |
CN206799032U (en) | A kind of fast hoisting transporter of vertical paint roller | |
CN201793312U (en) | Auxiliary device for overturning large articles with end flanges | |
CN202879487U (en) | Transfer carriage in steel box | |
CN105907916A (en) | Method for converter steam drum emplacement after workshop closing | |
CN104120702B (en) | The efficient installation system of vertical ship lift large-sized concrete counterweight block and mounting method thereof | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN109779234A (en) | A kind of scaffold big door frame and its production method | |
CN210418998U (en) | Conveying device for large-diameter pipeline of circulating water system | |
CN207774676U (en) | A kind of storage tank installation lifting means | |
CN210236845U (en) | Adjustable hanger for component steel reinforcement cage | |
CN101767753A (en) | Method for hoisting by lifting belt vertically | |
CN207418152U (en) | Rolling type conveying device for solving inter-span hoisting dead angle in factory building | |
CN206384757U (en) | A kind of sandstone lifts conveying device | |
CN208181104U (en) | A kind of trolley for building | |
CN106121254A (en) | Heavy component transportation system after disassembly by reverse construction method and construction method | |
CN206844676U (en) | Steel reinforcement cage rolling device | |
CN206798956U (en) | A kind of hanging apparatus of paint roller and liquid-dipping roller | |
CN206318505U (en) | A kind of bar transporter | |
CN206051276U (en) | A kind of universal shaft moving device of vertical roll of rolling main transmission | |
CN207774675U (en) | A kind of storage tank installation hoisting mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |