CN206799032U - A kind of fast hoisting transporter of vertical paint roller - Google Patents

A kind of fast hoisting transporter of vertical paint roller Download PDF

Info

Publication number
CN206799032U
CN206799032U CN201720699780.2U CN201720699780U CN206799032U CN 206799032 U CN206799032 U CN 206799032U CN 201720699780 U CN201720699780 U CN 201720699780U CN 206799032 U CN206799032 U CN 206799032U
Authority
CN
China
Prior art keywords
paint roller
lifting
track
transporter
lifted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720699780.2U
Other languages
Chinese (zh)
Inventor
祝彪
吴荣善
涂修利
谭克忠
王跃峰
张合荣
鲁晓欣
李定华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Engineering Technology Co Ltd
Original Assignee
Pangang Group Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Engineering Technology Co Ltd filed Critical Pangang Group Engineering Technology Co Ltd
Priority to CN201720699780.2U priority Critical patent/CN206799032U/en
Application granted granted Critical
Publication of CN206799032U publication Critical patent/CN206799032U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model discloses a kind of lifting transporter of vertical paint roller, including the track being arranged on plant area's crossbeam and the slide trolley being slidably matched with the track, the track extends to safe rest area from production installing zone, and the slide trolley is connected with lowering or hoisting gear.The lifting transporter of above-mentioned vertical paint roller, in actual use, vertical paint roller to be lifted is connected with lowering or hoisting gear, vertical paint roller to be lifted is lifted by lowering or hoisting gear, due to track from production installing zone extend to safe rest area, moved in orbit by dolly, paint roller is transported to corresponding plant area or station, the time is generally required as 30 minutes or so, substantially reduce the duration of lifting transhipment, only need lifting once to complete to produce the mutual transhipment between installing zone and the station of safe rest area two simultaneously, operate simpler convenience.

Description

A kind of fast hoisting transporter of vertical paint roller
Technical field
It the utility model is related to hoisting technology field, more particularly to a kind of lifting transporter of vertical paint roller.
Background technology
The vertical paint roller unit of cold rolling mill galvanized wire generally comprises left vertical painting roller group, right vertical painting roller group, and being installed in can On hoistway, the lifting of left and right paint roller can be realized, when the vertical paint roller in hoistway rise left and right so that the vertical painting in left and right Roller contacts with steel band, when needing roll change or maintenance down, liftable slideway, reduces left and right slideway, paint roller and strip is had conjunction The safety inspection gap of reason.In order to facilitate description below by left vertical painting roller group, right vertical painting roller group abbreviation paint roller, work as cold rolling When the paint roller of factory's galvanizing unit need to be changed, traditional method is that hoisting beam is set on upper brace, is hung out by several times with chain block Paint roller, paint roller is hung out by several times and refers to be transferred from installation site first with hoisting beam, places to transport carriage, is turned using transport carriage After being transported to corresponding plant area or station, placed using hoisting beam lifting to placement location;Also can be from placement using same method Position is hung to installation site, but this method typically need loading and unloading that could complete paint roller in 2 hours or so, short time consumption are longer not It is easy to operation.
In summary, how to solve the problems, such as that time-consuming is inconvenient for paint roller lifting transhipment, it has also become those skilled in the art Technical barrier urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of lifting transporter of vertical paint roller, to reduce paint roller lifting transhipment Duration, while make it that lifting transhipment is more convenient.
To achieve these goals, the utility model provides a kind of lifting transporter of vertical paint roller, including sets Track on plant area's crossbeam and the dolly being slidably matched with the track, the track extend to safety from production installing zone and put Area is put, the dolly is connected with lowering or hoisting gear.
Preferably, the lowering or hoisting gear is chain block.
Preferably, the chain block is the chain block of 3-5 tons.
Preferably, in addition to the equalizer bar corresponding with the length of paint roller to be lifted, close to the balance type lifting device Both ends are provided with connection position, are provided with what is be connected for the Heave Here with lowering or hoisting gear in the middle part of the balance type lifting device Hanger, the connection position are connected by steel wire rope end corresponding with the roll body to be lifted.
Preferably, reinforcing plate is provided with the top of the balance type lifting device, the hanger is arranged on the reinforcing plate Middle part.
Preferably, the arc corresponding with the arc surface of the paint roller to be lifted is provided with below the balance type lifting device Shape plate.
Preferably, the Heave Here of the lowering or hoisting gear is connected by shackle with the hanger.
Preferably, the track is the single rail that I-steel is made, and the slide trolley is monorail trolley.
Content, the lifting transporter of above-mentioned paint roller are introduced compared to background technology, including is arranged on plant area's crossbeam Track and the dolly being slidably matched with track, track extend to safe rest area from production installing zone, and dolly is connected with lifting dress Put.In actual use, paint roller to be lifted is connected with lowering or hoisting gear, paint roller to be lifted is lifted by lowering or hoisting gear, Due to track from production installing zone extend to safe rest area, moved in orbit by dolly, paint roller be transported to accordingly Plant area or station, the time is generally required as 30 minutes or so, substantially reduces the duration of lifting transhipment, while only need lifting one It is secondary to complete to produce the mutual transhipment between installing zone and the station of safe rest area two, operate simpler convenience.
Brief description of the drawings
Fig. 1 is the structural representation of the lifting transporter for the vertical paint roller that the utility model embodiment provides;
Fig. 2 is the structural representation of plant area's arrangement of the lifting transporter for the vertical paint roller that the utility model embodiment provides Figure;
Fig. 3 is Fig. 2 A to structural representation;
Fig. 4 is the structural representation of the balance type lifting device of the lifting transporter for the paint roller that the utility model embodiment provides Figure.
In figure 1 above -4,
Crossbeam 1, track 2, dolly 3, production installing zone 4, safe rest area 5, lowering or hoisting gear 6, paint roller to be lifted 7, balance Boom hoisting 8, connection position 9, Heave Here 10, hanger 11, steel wire rope 12, reinforcing plate 13, arc 14, strip 15.
Embodiment
Core of the present utility model is to provide a kind of lifting transporter of vertical paint roller, to reduce paint roller lifting transhipment Duration, while make it that lifting transhipment is more convenient.
In order that those skilled in the art more fully understands technical scheme provided by the utility model, below in conjunction with attached The utility model is described in further detail with specific embodiment for figure.
As Figure 1-4, the lifting transporter for a kind of paint roller that the utility model embodiment provides, including it is arranged on factory Track 2 on area's crossbeam 1 and the dolly 3 being slidably matched with track 2, track 2 extend to safe rest area 5 from production installing zone 4, Dolly is connected with lowering or hoisting gear 6.Explanation is needed exist for, dolly can be located at the surface or underface of track, and small Car and track are slidably matched, and only allow dolly to have the free degree along the bearing of trend of track;In addition, dolly slides in orbit Can be manually pull or dolly installation drive device be driven, such as dolly driven by motor it is in-orbit Moved on road.
Content is introduced compared to background technology, the lifting transporter of above-mentioned vertical paint roller in actual use, will Paint roller to be lifted is connected with lowering or hoisting gear, by lowering or hoisting gear and lifting paint roller to be lifted, because track is installed from production Area extends to safe rest area, is moved in orbit by dolly, and paint roller is transported into corresponding plant area or station, generally required Time is 30 minutes or so, substantially reduces the duration of lifting transhipment, while only needs lifting once to complete production installation Mutual transhipment between area and the station of safe rest area two, operates simpler convenience.
In some specific embodiments, above-mentioned lowering or hoisting gear 6 can be for chain block, naturally it is also possible to be ability Other lowering or hoisting gears that field technique personnel commonly use, such as motor drive hook lifting or pass through hydraulic means and realize lifting.Only not The utility model embodiment is crossed preferably by the way of above-mentioned chain block.Also, chain block is preferably using 3-5 tons Chain block, it is of course possible to which understanding, the tonnage of above-mentioned chain block is only the citing of the utility model embodiment, may be used also To be the tonnage corresponding to the weight range selection of paint roller according to practical condition.
In some more particular embodiments, the lifting transporter of above-mentioned vertical paint roller can also include with waiting to lift The corresponding balance type lifting device 8 of the length of vertical paint roller 7, connection position is provided with close to the both ends of balance type lifting device 8 9, the middle part of balance type lifting device 8 is provided with the hanger 11 being connected for the Heave Here 10 with lowering or hoisting gear 6, and connection position 9 passes through Steel wire rope 12 connects with 7 corresponding end of paint roller to be lifted.Need exist for explanation, balance type lifting device and paint roller to be lifted Length it is corresponding refer to balance beam length it is more slightly longer than the band glue-line barrel length of vertical paint roller or liquid-dipping roller, generally both sides are each Long 50~100mm, primarily to realizing steel wire rope with connection position and when the end for lifting roll body is connected, steel wire rope can be big Body vertically, so as to avoid the roll surface with paint roller to be lifted from being in contact.The lifting transporter of above-mentioned vertical paint roller, lead to To cross and connection position is set close to the both ends of balance type lifting device, end corresponding with paint roller to be lifted connects connection position respectively, and The length of balance type lifting device is corresponding with the length with lifting paint roller, therefore connection position is by steel wire rope and with lifting paint roller It is substantially vertical after the stretching of steel wire rope stress during lifting after the connection of end, so as to avoid the surface glue to the roll surface of paint roller The problem of layer or metal level ankle injury.
In addition, the top of balance type lifting device 8 is provided with reinforcing plate 13, hanger 11 is arranged on the middle part of reinforcing plate 13.When What right those skilled in the art will readily appreciate that is in order that obtaining the overall gravitational equilibrium of balance type lifting device, reinforcing plate is most Excellent design method should be symmetrical structure, and the symmetrical center line weight of the symmetrical center line of reinforcing plate and balance type lifting device Close.More convenient by the processing for designing reinforcing plate hanger, 12mm can be used thick for the reinforcing plate or the cutting of 14mm steel plates Form, in general, the distance of connection position corresponding to the back gauge of reinforcing plate two is designed in 50~100mm, and the height of reinforcing plate is 150 ~200mm, the relative dimensions of certain above-mentioned reinforcing plate are only the citing of the utility model embodiment, can also be according to actual need Summation strength demand selects other corresponding sizes.In order to reduce stress concentration, and also to when avoiding loading and unloading hanging apparatus Workmen is stabbed, arc-shaped is processed on the top of reinforcing plate, hanger is directly process in reinforcing plate, for example hanger is hung Dress hole position is set at top 30~40mm of circular arc away from reinforcing plate the system of cutting placed in the middle, and diameter is generally 50~80mm of φ.Certainly It is understood that the mode of directly processing hanger is only the citing of the utility model embodiment in above-mentioned reinforcing plate, may be used also In a manner of being reinforcing plate top welding hanger.
In addition, the lower section of equalizer bar 8 is provided with the arc 14 corresponding with the arc surface of paint roller 7 to be lifted.Here need Treated it is noted that the arc surface of the arc arcwall face for referring to arc corresponding with the arcwall face of paint roller to be lifted is slightly larger than Lift the arc surface of paint roller.In general, the arc radius of arc is bigger 20mm-30mm than the arc radius of paint roller 4 to be lifted. By setting arc, the more conveniently lifting of paint roller to be lifted, first balance type lifting device can be lifted to paint roller to be lifted Surface, arc and the roll surface of paint roller to be lifted is in contact, installation steel wire rope.
In further embodiment, the Heave Here 10 of above-mentioned lowering or hoisting gear 6 is connected by shackle with hanger 11.Certainly It is appreciated that suspension hook can also be arranged at Heave Here, the connection with hanger, or those skilled in the art are realized by suspension hook Other conventional dismountable connected modes.
In some more particular embodiments, above-mentioned track 2 is the single rail that is made of I-steel, and dolly 3 For monorail trolley.Of course, it should be understood that the mode that above-mentioned I-steel makes single rail is only the embodiment of the present invention The single rail that citing or other section bars make.In addition, the quantity of single rail and monorail trolley can be multigroup Can be one group, and the utility model embodiment is preferably by the way of arrangement is multigroup.It is multigroup by being arranged to, can be simultaneously right Multiple paint rollers carry out lifting transhipment.In addition it should be noted that above-mentioned single rail and monorail trolley are slidably matched only The citing of the utility model embodiment, it can also be the mode that double joint track is slidably matched with dolly.
The lifting transporter of vertical paint roller provided by the utility model is described in detail above.Need to illustrate , each embodiment in this specification described by the way of progressive, what each embodiment stressed be and its The difference of his embodiment, between each embodiment identical similar part mutually referring to.
It should also be noted that, herein, such as first and second or the like relational terms are used merely to one Entity or operation make a distinction with another entity or operation, and not necessarily require or imply between these entities or operation Any this actual relation or order be present.Moreover, term " comprising ", "comprising" or its any other variant are intended to contain Lid nonexcludability includes, so that article or equipment including a series of elements not only include those key elements, but also Including the other element being not expressly set out, or also include for this article or the intrinsic key element of equipment.Do not having In the case of more limitations, the key element that is limited by sentence "including a ...", it is not excluded that including the article of above-mentioned key element Or other identical element in equipment also be present.
Specific case used herein is set forth to principle of the present utility model and embodiment, above example Explanation be only intended to help and understand core concept of the present utility model.It should be pointed out that the ordinary skill for the art For personnel, on the premise of the utility model principle is not departed from, some improvement and modification can also be carried out to the utility model, These are improved and modification is also fallen into the protection domain of the utility model claims.

Claims (8)

1. a kind of lifting transporter of vertical paint roller, it is characterised in that including the track (2) being arranged on plant area's crossbeam (1) With the slide trolley (3) being slidably matched with the track (2), the track (2) extends to safe placement from production installing zone (4) Area (5), the dolly are connected with lowering or hoisting gear (6).
2. the lifting transporter of paint roller as claimed in claim 1, it is characterised in that the lowering or hoisting gear (6) is to pull calabash Reed.
3. the lifting transporter of paint roller as claimed in claim 2, it is characterised in that the chain block is the hand of 3-5 tons Draw cucurbit.
4. the lifting transporter of paint roller as claimed in claim 1, it is characterised in that also include and paint roller to be lifted (7) The corresponding balance type lifting device of length (8), connection position (9) is provided with close to the both ends of the balance type lifting device (8), The hanger (11) for being connected with the Heave Here (10) of lowering or hoisting gear (6), institute are provided with the middle part of the balance type lifting device (8) Connection position (9) is stated to connect by steel wire rope (12) end corresponding with the paint roller (7) to be lifted.
5. the lifting transporter of paint roller as claimed in claim 4, it is characterised in that the top of the balance type lifting device (8) Portion is provided with reinforcing plate (13), and the hanger (11) is arranged on the middle part of the reinforcing plate (13).
6. the lifting transporter of paint roller as claimed in claim 4, it is characterised in that under the balance type lifting device (8) Side is provided with the arc (14) corresponding with the arc surface of the paint roller (7) to be lifted.
7. the lifting transporter of paint roller as claimed in claim 4, it is characterised in that the Heave Here of the lowering or hoisting gear (6) (10) it is connected by shackle with the hanger (11).
8. the lifting transporter of paint roller as claimed in claim 1, it is characterised in that the track (2) makes for I-steel The single rail formed, and the slide trolley (3) is monorail trolley.
CN201720699780.2U 2017-06-15 2017-06-15 A kind of fast hoisting transporter of vertical paint roller Active CN206799032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720699780.2U CN206799032U (en) 2017-06-15 2017-06-15 A kind of fast hoisting transporter of vertical paint roller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720699780.2U CN206799032U (en) 2017-06-15 2017-06-15 A kind of fast hoisting transporter of vertical paint roller

Publications (1)

Publication Number Publication Date
CN206799032U true CN206799032U (en) 2017-12-26

Family

ID=60747229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720699780.2U Active CN206799032U (en) 2017-06-15 2017-06-15 A kind of fast hoisting transporter of vertical paint roller

Country Status (1)

Country Link
CN (1) CN206799032U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108639966A (en) * 2018-06-29 2018-10-12 中国能源建设集团山西电力建设有限公司 Heat power plant boiler economizer hand installs mechanism in place and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108639966A (en) * 2018-06-29 2018-10-12 中国能源建设集团山西电力建设有限公司 Heat power plant boiler economizer hand installs mechanism in place and installation method

Similar Documents

Publication Publication Date Title
CN205907556U (en) Portable rail shifter
CN110240048A (en) A kind of external attached type skyscraper goods jack system
CN106564767A (en) Railway carriage coal flattening and rolling device
CN102190249B (en) Method for hoisting equipment positioned at bottom of multilayer frame platform
CN104973517B (en) A kind of electronic gantry platform that installs for sintering machine head device and its using method
CN206799032U (en) A kind of fast hoisting transporter of vertical paint roller
CN201793312U (en) Auxiliary device for overturning large articles with end flanges
CN202879487U (en) Transfer carriage in steel box
CN105907916A (en) Method for converter steam drum emplacement after workshop closing
CN104120702B (en) The efficient installation system of vertical ship lift large-sized concrete counterweight block and mounting method thereof
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN109779234A (en) A kind of scaffold big door frame and its production method
CN210418998U (en) Conveying device for large-diameter pipeline of circulating water system
CN207774676U (en) A kind of storage tank installation lifting means
CN210236845U (en) Adjustable hanger for component steel reinforcement cage
CN101767753A (en) Method for hoisting by lifting belt vertically
CN207418152U (en) Rolling type conveying device for solving inter-span hoisting dead angle in factory building
CN206384757U (en) A kind of sandstone lifts conveying device
CN208181104U (en) A kind of trolley for building
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN206844676U (en) Steel reinforcement cage rolling device
CN206798956U (en) A kind of hanging apparatus of paint roller and liquid-dipping roller
CN206318505U (en) A kind of bar transporter
CN206051276U (en) A kind of universal shaft moving device of vertical roll of rolling main transmission