CN206789240U - A kind of buried pipeline warning pile - Google Patents
A kind of buried pipeline warning pile Download PDFInfo
- Publication number
- CN206789240U CN206789240U CN201720703196.XU CN201720703196U CN206789240U CN 206789240 U CN206789240 U CN 206789240U CN 201720703196 U CN201720703196 U CN 201720703196U CN 206789240 U CN206789240 U CN 206789240U
- Authority
- CN
- China
- Prior art keywords
- warning
- pile
- section
- embedded
- buried pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Signs Or Road Markings (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of buried pipeline warning pile, include the pile of hollow structure made from fiberglass, above pile the warning section indicated is warned to be provided with, lower end is for embedded embedded section, it is characterized in that, pile upper end end face is provided with warning lid, and warning cap surface is provided with the warning material of red.The utility model have it is convenient improve embedded stability, be not easy to topple over, setting height(from bottom) can be adjusted as needed, there is preferably alarming effect, the advantages that more facilitating patrol officer's inspection to observe.
Description
Technical field
It the utility model is related to energy conduit transportation art, more particularly to a kind of buried pipeline warning pile.
Background technology
Warning pile is also known as marking pile or identification pile, is usually used in electric power, communication, combustion gas, running water, railway underground pipe circuit
Footpath Warning Mark.For open air, greenbelt, bushes, push pipe both sides pipeline path instruction, play warning function.
Warning pilework includes vertical pile, to be provided with the warning part of warning sign above pile, lower end for for
Embedded embedded portion.Earliest warning pile is generally pile structure made from cement concrete, and a marker peg weighs 80 kilograms,
Weight is big, and installation and transportation are very inconvenient, and this identification pile is particularly established in mountain area, it is necessary to multiple person cooperational could be completed, peace
Dress is wasted time and energy, and installation cost is high;Cause to transport and construct it is extremely inconvenient.Now with social development, use
It the warning pile of glass steel material, can greatly mitigate weight, reduce transport and construction cost.Such as ZL201521064073.3
A kind of disclosed marker peg, discloses the pile using glass fibre reinforced plastic structure.
But this existing warning pile, however it remains problems with:1st, to be buried by the way of direct-burried, steadiness is poor,
Under the influence of the influence of high wind and wild animal, easily topple over, particularly now with rural urbanization and conceding the land to forestry etc.
The progress of policy, causes the increase of wild animal, easily causes warning pile and topples over.2nd, warning pile traditional at present, warning part are
Simple warning word, alarming effect is relatively low, while traditional warning pile is highly relatively low, and multi-line regression model is usually made after performing
Overgrowed into weeds, create a further reduction warning pile alarming effect, be difficult to observe police in time when also resulting in patrol officer's inspection
Show stake.
Utility model content
The technical problems to be solved in the utility model is:How a kind of convenient improve is provided and buries stability, is not easy to incline
, its alarming effect while is further improved, the buried pipeline warning pile for more facilitating patrol officer's inspection to observe.
In order to solve the above-mentioned technical problem, the utility model employs following technical scheme.
A kind of buried pipeline warning pile, include the pile of hollow structure made from fiberglass, be to be provided with police above pile
The warning section that indicating is shown, lower end are for embedded embedded section, it is characterised in that pile upper end end face is provided with warning lid, alert
Show that cap surface is provided with the warning material of red.
So, the warning lid of red is additionally arranged in pile upper end end face, can preferably improve its alarming effect, especially just
Just the inspection observation of patrol officer.
As optimization, it is red Noctilucent material to warn the warning material covered.So patrol officer's inspection to the colour of sky compared with
When late, the presence of warning pile also can be conveniently observed.
As optimization, the warning lid is sophisticated structure for the upper end that multiple inclined-planes surround.
So, inclined-plane can preferably avoid dust stratification and beneficial to rainy day rain drop erosion to keep cleaning, and be provided with noctilucence
It can also facilitate during material and sunlight is preferably absorbed on daytime to extend the noctilucence time;Upper end is that tip can avoid flying bird from landing
Stop and covering of shitting reduces alarming effect.
As optimization, extended transversely through in embedded section and be provided with embedded bar cross-perforating.
So, when burying, buried after embedded bar cross-perforating being horizontally through by reinforcing bar, reach bar planting effect
Fruit, improve the stability after warning pile is buried.
As optimization, embedded bar slanted apertures are additionally provided with above embedded bar cross-perforating in embedded section.
When so warning pile is embedded, it can further lean on reinforcing bar oblique and arrive embedded bar slanted apertures through setting, and to
Under pass in oblique embedment stratum, and transverse steel is together, forms more three-dimensional embedded bar net effect, is greatly enhanced police
Show stake it is embedded after stability.Further, the embedded bar cross-perforating and embedded bar slanted apertures it is each it is comfortable before and after
With have setting in the both direction of left and right, so can preferably improve the three-dimensional consolidation effect of embedded bar, greatly carry
High warning pile buries steadiness.
As optimization, embedded section upper end is arranged at intervals with maximum buried depth line and the minimum depth line.
So, it is convenient to be buried according to different soil property situations according to different buried depth line positions, leaned on when soil property is softer
Nearly maximum buried depth line is buried, and close to lower section, the minimum depth line is buried when soil property is harder, ensures that various soil property situations are equal
With preferable embedded stability.
As optimization, the maximum buried depth line and the minimum depth line be in the groove of indent brushing colored pigment obtain.
Guarantee is so facilitated not fade.
As optimization, the regulation section available for regulation height is also set up between embedded section and warning section.
So, during convenient installation, warning pile height is according to circumstances adjusted, such as to be increased by its high in weeds higher field
Degree, to facilitate warning and inspection, the occasion of the more public is waited to reduce setting height(from bottom) to increase stability by the road.
As optimization, the regulation section includes an inner cylinder, can slide vertically the outer barrel for coordinating and being socketed in outside inner cylinder, inner cylinder
Lower end is connected with embedded section, and outer barrel upper end is connected with warning section, between inner cylinder and outer barrel on each comfortable at least two relative face
A vertical setting of types screw is respectively vertically provided with, and coordinates the fixation after realizing regulation by bolt and screw.
So, there is the characteristics of simple in construction, regulation is fixed conveniently fast, and stability is high.
As optimization, the outer barrel cross sectional dimensions is consistent with the cross sectional dimensions of embedded section and warning section.
So, it is more convenient to improve globality, it is more attractive in appearance and beneficial to transport.
As optimization, warning is denoted as being recessed and applies coloured caution slogan.So it is not easy to fade and improve police
Show effect.
In summary, there is the utility model convenient improve to bury stability, is not easy to topple over, can adjust peace as needed
Dress height, has preferably alarming effect, the advantages that more facilitating patrol officer's inspection to observe.
Brief description of the drawings
Fig. 1 is the structure schematic diagram that the utility model implements 1.
Fig. 2 is the structural representation of second of embodiment of the warning lid used in the utility model.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment:
As shown in figure 1, a kind of buried pipeline warning pile, include the pile 1 of hollow structure made from fiberglass, on pile 1
Side is is provided with the warning section of warning sign 2, and lower end is for embedded embedded section, and the upper end end face of pile 1 is provided with warning lid
3, warning lid 3 surface is provided with the warning material of red.
So, the warning lid of red is additionally arranged in pile upper end end face, can preferably improve its alarming effect, especially just
Just the inspection observation of patrol officer.In the present embodiment, pile is that whole height is 3 meters, and width is 8cm square pile.
In the present embodiment, it is red Noctilucent material to warn the warning material on lid 3.So patrol officer's inspection is to the colour of sky
When later, the presence of warning pile also can be conveniently observed.
In the present embodiment, the trapezoidal structure of the vertical cross-section of lid 3 is warned.As other embodiment, as shown in Fig. 2 institute
It is that the upper end that multiple inclined-planes surround is the structure at tip to state warning lid 3.So, under inclined-plane can preferably avoid dust stratification and be beneficial to
Rainy day rain drop erosion can also facilitate to keep cleaning, when being provided with Noctilucent material preferably absorbs sunlight to extend night on daytime
Between light time;Upper end can avoid flying bird landing from stopping covering of shitting for tip reduces alarming effect.
In the present embodiment, extended transversely through in embedded section and be provided with embedded bar cross-perforating 4.
So, when burying, buried after embedded bar cross-perforating being horizontally through by reinforcing bar, reach bar planting effect
Fruit, improve the stability after warning pile is buried.
In the present embodiment, the top of embedded bar cross-perforating 4 is additionally provided with embedded bar slanted apertures 5 in embedded section.
When so warning pile is embedded, it can further lean on reinforcing bar oblique and arrive embedded bar slanted apertures through setting, and to
Under pass in oblique embedment stratum, and transverse steel is together, forms more three-dimensional embedded bar net effect, is greatly enhanced police
Show stake it is embedded after stability.Further, the embedded bar cross-perforating and embedded bar slanted apertures it is each it is comfortable before and after
With have setting in the both direction of left and right, so can preferably improve the three-dimensional consolidation effect of embedded bar, greatly carry
High warning pile buries steadiness.
In the present embodiment, embedded section upper end is arranged at intervals with maximum buried depth line 6 and the minimum depth line 7.
So, it is convenient to be buried according to different soil property situations according to different buried depth line positions, leaned on when soil property is softer
Nearly maximum buried depth line is buried, and close to lower section, the minimum depth line is buried when soil property is harder, ensures that various soil property situations are equal
With preferable embedded stability.
In the present embodiment, the maximum buried depth line 6 and the minimum depth line 7 be in the groove of indent brushing colored pigment obtain
Arrive.Guarantee is so facilitated not fade.
In the present embodiment, the regulation section available for regulation height is also set up between embedded section and warning section.
So, during convenient installation, warning pile height is according to circumstances adjusted, such as to be increased by its high in weeds higher field
Degree, to facilitate warning and inspection, the occasion of the more public is waited to reduce setting height(from bottom) to increase stability by the road.
In the present embodiment, the regulation section includes an inner cylinder 8, can slide vertically the outer barrel for coordinating and being socketed in outside inner cylinder 8
9, the lower end of inner cylinder 8 is connected with embedded section, and the upper end of outer barrel 9 is connected with warning section, each comfortable at least two phase between inner cylinder and outer barrel
To face on be respectively vertically provided with a vertical setting of types screw 10, and coordinate the fixation after realizing regulation by bolt 11 and screw 10.
So, there is the characteristics of simple in construction, regulation is fixed conveniently fast, and stability is high.
In the present embodiment, the cross sectional dimensions of outer barrel 9 is consistent with the cross sectional dimensions of embedded section and warning section.
So, it is more convenient to improve globality, it is more attractive in appearance and beneficial to transport.
In the present embodiment, warning sign 2 is to be recessed and apply coloured caution slogan.So it is not easy to fade and improve
Alarming effect.
Therefore there is the warning pile of said structure convenient improve to bury stability, is not easy to topple over, can adjust peace as needed
Dress height, has preferably alarming effect, the advantages that more facilitating patrol officer's inspection to observe.
Claims (10)
- It is to be provided with warning above pile 1. a kind of buried pipeline warning pile, including the pile of hollow structure made from fiberglass The warning section of sign, lower end are for embedded embedded section, it is characterised in that pile upper end end face is provided with warning lid, warning Cap surface is provided with the warning material of red.
- 2. buried pipeline warning pile as claimed in claim 1, it is characterised in that it is red night to warn the warning material covered Luminescent material.
- 3. buried pipeline warning pile as claimed in claim 1, it is characterised in that the warning lid surrounds upper for multiple inclined-planes Hold as the structure at tip.
- 4. buried pipeline warning pile as claimed in claim 1, it is characterised in that extended transversely through in embedded section and be provided with pre-buried steel Muscle cross-perforating.
- 5. buried pipeline warning pile as claimed in claim 4, it is characterised in that embedded bar cross-perforating is upper in embedded section Side is additionally provided with embedded bar slanted apertures.
- 6. buried pipeline warning pile as claimed in claim 1, it is characterised in that embedded section upper end is arranged at intervals with maximum buried depth Line and the minimum depth line.
- 7. buried pipeline warning pile as claimed in claim 6, it is characterised in that the maximum buried depth line and the minimum depth line are equal Obtained for brushing colored pigment in the groove of indent.
- 8. buried pipeline warning pile as claimed in claim 1, it is characterised in that also set up between embedded section and warning section available In the regulation section of regulation height.
- 9. buried pipeline warning pile as claimed in claim 8, it is characterised in that the regulation section includes an inner cylinder, can erect To the outer barrel that is socketed in outside inner cylinder of being slidably matched, inner cylinder lower end is connected with embedded section, and outer barrel upper end is connected with warning section, inner cylinder and A vertical setting of types screw is respectively vertically provided between outer barrel on each comfortable at least two relative face, and is coordinated in fact by bolt and screw Fixation after now adjusting.
- 10. buried pipeline warning pile as claimed in claim 9, it is characterised in that the outer barrel cross sectional dimensions and embedded section And the cross sectional dimensions of warning section is consistent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720703196.XU CN206789240U (en) | 2017-06-16 | 2017-06-16 | A kind of buried pipeline warning pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720703196.XU CN206789240U (en) | 2017-06-16 | 2017-06-16 | A kind of buried pipeline warning pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206789240U true CN206789240U (en) | 2017-12-22 |
Family
ID=60717729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720703196.XU Expired - Fee Related CN206789240U (en) | 2017-06-16 | 2017-06-16 | A kind of buried pipeline warning pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206789240U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020108004A1 (en) * | 2018-11-27 | 2020-06-04 | 广东电网有限责任公司 | Cable marker post |
-
2017
- 2017-06-16 CN CN201720703196.XU patent/CN206789240U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020108004A1 (en) * | 2018-11-27 | 2020-06-04 | 广东电网有限责任公司 | Cable marker post |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021010263A1 (en) | Stress monitoring device, stress monitoring system, and monitoring system | |
CN104295448A (en) | All-weather clean energy comprehensive electricity generating and energy saving method and facility manufacturing method thereof | |
US20140091100A1 (en) | Wind-Resistant Magnetic Trash Can | |
CN206789240U (en) | A kind of buried pipeline warning pile | |
CN113273399A (en) | Desert rice field with unmanned aerial vehicle connected with air pipe and rice box | |
CN207891760U (en) | Road sand storm protection system suitable for drift sand area | |
CN106171831A (en) | Mechanization of agriculture water-saving spray irrigation system | |
CN202489024U (en) | Cement pillar type greening shed | |
CN207733354U (en) | A kind of Multifunctional protective tree construction suitable for paved road | |
CN204682224U (en) | Plant modification Agasicles hygrophila facility is built | |
Pei | Planning a sustainable, green industrial road with an ecological recycling economy in mind | |
CN101874458A (en) | Novel light gutter-connected plastic tent | |
CN205138493U (en) | A warning device for surveying and draw in operation | |
CN209145313U (en) | A kind of means for mounting coupling parts of all bamboo structure column root | |
CN206978216U (en) | A kind of highway employment path tree pit safety guard | |
CN206091416U (en) | Multi -functional assembled suspension fretwork platform of ecological environment -friendly | |
RU136815U1 (en) | WINTER ROAD CONSTRUCTION | |
CN208029690U (en) | A kind of umbrella shape greenhouse | |
CN208055932U (en) | A kind of municipal administration road direction of traffic instruction Anti-collision barrel | |
CN104776828A (en) | Beach face gradient inclination observation system and application method thereof after closing of tailing warehouse | |
CN202559492U (en) | Natural drainage system for step of side slope | |
CN204370354U (en) | A kind of traffic guardrail of combined convenient dismounting | |
CN206363678U (en) | A kind of new marker peg | |
CN206554116U (en) | A kind of alternating expression underground traffic piping lane vehicle in and out port structure | |
CN103321417A (en) | Method for constructing earth-rock fences on high-altitude grasslands of Tibet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 |
|
CF01 | Termination of patent right due to non-payment of annual fee |