CN206784871U - Suspension type lifting working platform in steel bushing - Google Patents
Suspension type lifting working platform in steel bushing Download PDFInfo
- Publication number
- CN206784871U CN206784871U CN201720623863.3U CN201720623863U CN206784871U CN 206784871 U CN206784871 U CN 206784871U CN 201720623863 U CN201720623863 U CN 201720623863U CN 206784871 U CN206784871 U CN 206784871U
- Authority
- CN
- China
- Prior art keywords
- bracket
- scaffold board
- suspension rod
- steel bushing
- connecting portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses suspension type lifting working platform in a kind of steel bushing, including suspension rod, bracket and scaffold board, suspension rod is set along steel bushing vertical direction, scaffold board is circumferentially disposed along steel bushing, steel bushing fixed part is provided with suspension rod, bracket is fixed on suspension rod, and scaffold board both ends are separately positioned on bracket.The workbench that the present embodiment provides, bracket and steel bushing fixed part are provided with suspension rod, the width of carriage length and scaffold board can be designed as needed, first suspension rod is fixed on steel bushing by steel bushing fixed part during installation, then the both ends of scaffold board are arranged on just to complete on bracket and built, when being lifted to workbench, only need scaffold board removing can on the bracket for be installed to relevant position, first scaffold board is removed during dismounting, suspension rod is removed again and just completes dismounting, it is so designed that satisfaction being capable of fast construction and dismantlement work platform in less space.
Description
Technical field
It the utility model is related to a kind of aquatic building construction field, and in particular to suspension type liftable work in a kind of steel bushing
Make platform.
Background technology
In bridge foundation construction, it is frequently encountered and is constructed in shoal area, for the ease of shoal region bridge lower junction
Structure is constructed, and is intercepted water commonly using steel bushing cofferdam, and steel bushing cofferdam is a kind of the most frequently used sheet-pile cofferdam, steel bushing cofferdam intensity
Height, hard soil layer is easily squeezed into, can be in deep subaqueous work, water resistance is good, can form the cofferdam of various profiles on demand, and can
Repeatedly use, therefore, it widely used.
But the interior construction space of steel bushing is limited, but construction of ascending a height but unavoidably is needed, in the prior art generally use
Set up total sub-semigroup or set up split heads mode and constructed.But when this scheme is applied in small space, exist to basis
Intensity requirement is high, and scaffold building working space deficiency, scaffold installation is with removing the defects of difficult.
Utility model content
The purpose of this utility model is to provide suspension type lifting working platform in a kind of steel bushing, to solve prior art
In weak point.
To achieve these goals, the utility model provides following technical scheme:
Suspension type lifting working platform in a kind of steel bushing, including suspension rod, bracket and scaffold board, the suspension rod is described in
Steel bushing vertical direction is set, and the scaffold board is circumferentially disposed along the steel bushing, and being provided with steel bushing on the suspension rod fixes
Portion, the bracket are fixed on the suspension rod, and the scaffold board both ends are separately positioned on the bracket.
Above-mentioned workbench, the suspension rod have it is multiple, multiple suspension rods along steel bushing inside circumference direction set.
Above-mentioned workbench, the steel bushing fixed part are the hook-type fixed part for being arranged on suspension rod top.
Above-mentioned workbench, the bracket have multigroup, and multigroup bracket is set along the suspension rod vertical direction, and wantonly two
The distance between described bracket of group is between 100CM and 180CM.
Above-mentioned workbench, bracket number described in every group is consistent with the suspension rod number, and bracket described in every group is arranged on
Same level.
Above-mentioned workbench, the bracket include a support edge and a hypotenuse, and the hypotenuse is located on support edge
The end of side, the hypotenuse and support edge is each attached on the suspension rod.
Above-mentioned workbench, the width of the scaffold board are less than the length of the support edge, and the scaffold board is along length
Direction setting is cambered, and the radius of curvature of the radian is consistent with the radius of curvature on the inside of the steel bushing.
Above-mentioned workbench, the scaffold board both ends are outwards provided with extension through the bracket.
Above-mentioned workbench, the scaffold board one end set first connecting portion, and described scaffold board the other end is set
There is second connecting portion, the first connecting portion is the neck or snap ring being arranged on scaffold board, and the second connecting portion is corresponding
The fastener being arranged on the scaffold board, the first connecting portion and second connecting portion will be detachably connected solid between each scaffold board
It is fixed
In the above-mentioned technical solutions, suspension type lifting working platform in the steel bushing that the present embodiment provides, sets on suspension rod
It is equipped with bracket and steel bushing fixed part, the width of carriage length and scaffold board can be designed as needed, be put down in building
During platform, suspension rod is fixed on steel bushing by steel bushing fixed part, then the both ends of scaffold board are arranged on bracket, so
Just building for workbench is completed, it is necessary to when being lifted to workbench after a construction location terminates, it is only necessary to by pin
Palm removes can on the bracket for be installed to relevant position, when the whole construction of completion is dismantled to workbench, by pin hand
Plate is removed from bracket, then suspension rod is removed to the dismounting for just completing whole workbench from steel bushing, is so designed that full
Foot being capable of fast construction and dismantlement work platform in less space.
Brief description of the drawings
, below will be to institute in embodiment in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only described in the utility model
Some embodiments, for those of ordinary skill in the art, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the sectional view of suspension type lifting working platform in a kind of steel bushing of embodiment offer of the utility model;
Fig. 2 is the top view of suspension type lifting working platform in a kind of steel bushing of embodiment offer of the utility model;
Fig. 3 is the structural representation for the suspension rod that a kind of embodiment of the utility model provides;
Fig. 4 is the structural representation for the scaffold board that a kind of embodiment of the utility model provides.
Description of reference numerals:
1st, suspension rod;2nd, bracket;3rd, scaffold board;4th, steel bushing;5th, hook-type fixed part;6th, pier stud;7th, extension.
Embodiment
In order that those skilled in the art more fully understands the technical solution of the utility model, below in conjunction with accompanying drawing pair
The utility model is further detailed.
As Figure 1-4, suspension type lifting working platform in a kind of steel bushing that the utility model embodiment provides, bag
Suspension rod 1, bracket 2 and scaffold board 3 are included, suspension rod 1 is set along the vertical direction of steel bushing 4, and scaffold board 3 is circumferentially disposed along steel bushing 4, hangs
The fixed part of steel bushing 4 is provided with bar 1, bracket 2 is fixed on suspension rod 1, and the both ends of scaffold board 3 are separately positioned on bracket 2.
Specifically, suspension rod 1 is set along the inwall vertical direction of steel bushing 4, steel bushing fixed part, steel are provided with suspension rod 1
Sleeve fixed part can be provided in fixing hole or bolt on suspension rod 1, it is preferred that the top of suspension rod 1 is provided with hook-type and consolidated
Determine portion 5, when mounted, the hook-type fixed part 5 of the upper end of suspension rod 1 is hung over and completes tentatively to fix on steel bushing 4, then in steel bushing
Suspension rod 1 is fixed on the positioning on the job platform of cylinder 4, only needs to carry out suspension rod 1 on job platform in dismounting
Dismounting, in the present embodiment, suspension rod 1 has multiple, and multiple suspension rods 1 are arranged circumferentially along the inwall of steel bushing 4, the edge on each suspension rod 1
Vertical direction is provided with multiple brackets 2, and 2 numbers of bracket and corresponding bracket 2 on each suspension rod 1 are highly consistent, are thusly-formed
Multigroup bracket 2 from bottom to up, the number of every group of bracket 2 is consistent with 2 numbers of bracket, and every group of bracket 2 is in same level, support
Supporting plate that frame 2 can be provided on suspension rod 1 or the support ring being arranged on suspension rod 1, it is preferred that bracket 2 is three
Angular support, support by a reinforcing bar bend out it is acute angle-shaped after be welded on suspension rod 1, the hypotenuse of triangular supports is located at right angle
The upside on side, right-angle side are used to support scaffold board 3 perpendicular to suspension rod 1, and scaffold board 3 can be a supporting plate, it is preferred that pin hand
Plate 3 be by reinforcement welding into support frame, be provided with supporting plate on support frame, the width of scaffold board 3 is less than the width of bracket 2
Degree, the length direction of scaffold board 3 set cambered, the distance between more than two suspension rods 1 of length of scaffold board 3, after installation
The both ends of scaffold board 3 are through bracket 2 and protruding.When mounted, each suspension rod 1 is hung over by steel bushing 4 by hook-type fixed part 5
On, then each suspension rod 1 is fixed on steel bushing 4 according to certain distance in the upper end of steel bushing 4, after the installation of suspension rod 1, according to
The position constructed is needed, scaffold board 3 is arranged on the bracket 2 of the relevant position of suspension rod 1, when installing scaffold board 3, by scaffold board 3
Both ends through bracket 2 and protruding, extension 7, which divides, has certain length to ensure construction safety, can be on one group of bracket 2
Whole mounting brackets 2 form an annular overall scaffold board 3, also can install trick on the parts of carrier 2 of one group of bracket 2
Version, the overall scaffold board 3 of an arc is formed, when needing to lift workbench, scaffold board 3 is removed and installed down
On one group of bracket 2, when needing to dismantle workbench, first scaffold board 3 is dismantled, then the hook by the upper end of suspension rod 1
Shape fixed part 5 removes the dismounting for just completing workbench from steel bushing 4.
Suspension type lifting working platform in the steel bushing that the present embodiment provides, bracket 2 and steel bushing are provided with suspension rod 1
The width of 4 fixed parts, the length of bracket 2 and scaffold board 3 can be designed as needed, and in building platform, suspension rod 1 is led to
Cross the fixed part of steel bushing 4 to be fixed on steel bushing 4, then by the both ends installation of scaffold board 3 on carrier 2, so just complete work
Make building for platform, it is necessary to when being lifted to workbench after a construction location terminates, it is only necessary to which scaffold board 3 is taken
Under be installed to can on the bracket 2 of relevant position, when completing whole construction workbench being dismantled, by scaffold board 3 from
Removed on bracket 2, then suspension rod 1 is removed to the dismounting for just completing whole workbench from steel bushing 4, be so designed that satisfaction
Being capable of fast construction and dismantlement work platform in less space.
In the present embodiment, it is preferred that steel bushing fixed part comprises at least the hook-type fixed part 5 for being arranged on the top of suspension rod 1, hook
Shape fixed part 5 and suspension rod 1 are integral type structure, can hang over suspension rod 1 by hook-type fixed part 5 and are fixed on steel bushing 4, hook
The convenient installation and removal to suspension rod 1 of shape fixed part 5, optionally, the other positions on suspension rod 1 may also set up steel bushing 4
Fixed part.
In the present embodiment, it is preferred that bracket 2 have it is multigroup, multigroup bracket 2 along the vertical direction of suspension rod 1 set, wantonly two groups of brackets
The distance between 2 between 100CM and 180CM, and 2 numbers of every group of bracket are consistent with 1 number of suspension rod, and every group of bracket 2 is arranged on
Same level;It is so designed that every group of bracket 2 forms an annular distribution around the inwall of steel bushing 4, scaffold board 3 is placed on support
When on frame 2, the integral bracket 2 of a ring-type is formed, multigroup bracket 2 is set along the vertical direction of suspension rod 1, forms the side vertically of suspension rod 1
The bracket 2 of upward multiple annular spreads, being so designed that can be such that all angles of the workmen on steel bushing 4 apply
Work, distance reasonable in design between two groups of brackets 2 so that when needing to lift workbench, workmen is easy to disassemble
And installation.
In the present embodiment, it is preferred that bracket 2 includes a support edge and a hypotenuse, and hypotenuse is located on the upside of support edge, tiltedly
The end of side and support edge is each attached on suspension rod 1, and the width of scaffold board 3 is less than the length of support edge, and scaffold board 3 is along length side
Cambered to setting, the radius of curvature of radian is consistent with the radius of curvature of the inner side of steel bushing 4, the both ends of scaffold board 3 run through bracket 2 to
It is provided with extension 7 outside.Bracket 2 is made up of reinforcing bar, formed between support edge and hypotenuse a passage run through for scaffold board 3 or
Cavity, scaffold board 3 can be a supporting plates, it is preferred that scaffold board 3 be by reinforcement welding into support frame, on support frame
Supporting plate is provided with, the width of scaffold board 3 is less than the width of bracket 2, and the length direction setting of scaffold board 3 is cambered, and pin hand
The length of plate 3 is more than the distance between two suspension rods 1, when mounted can be with the both ends of scaffold board 3 through bracket 2 and to overhanging
Go out, extension 7 has certain length, so as to ensure the construction safety of workmen.
In the present embodiment, optionally, the one end of scaffold board 3 sets first connecting portion, and the other end of scaffold board 3 is provided with the
Two connecting portions, first connecting portion are the neck or snap ring being arranged on scaffold board 3, and second connecting portion is to be correspondingly arranged at scaffold board
Fastener on 3, first connecting portion and second connecting portion will be detachably connected fixation, first connecting portion, second between each scaffold board 3
Connecting portion and scaffold board 3 be integral type, and the length of first connecting portion and second connecting portion is twice of the length of extension 7, in company
When connecing, the first connecting portion of a scaffold board 3 is connected with the second connecting portion of another scaffold board 3, so by scaffold board 3
Connect into the overall scaffold board 3 of ring-type or the overall scaffold board 3 of arc.
Some one exemplary embodiments of the present utility model are only described by way of explanation above, undoubtedly, for
One of ordinary skill in the art, can be with a variety of in the case of without departing from spirit and scope of the present utility model
Mode is modified to described embodiment.Therefore, above-mentioned accompanying drawing and description are inherently illustrative, should not be construed as
Limitation to the utility model claims protection domain.
Claims (9)
1. suspension type lifting working platform in a kind of steel bushing, it is characterised in that described including suspension rod, bracket and scaffold board
Suspension rod is set along the steel bushing vertical direction, and the scaffold board is circumferentially disposed along the steel bushing, is provided with the suspension rod
Steel bushing fixed part, the bracket are fixed on the suspension rod, and the scaffold board both ends are separately positioned on the bracket.
2. workbench according to claim 1, it is characterised in that the suspension rod has multiple, and multiple suspension rods are along steel
Sleeve inside circumference direction is set.
3. workbench according to claim 2, it is characterised in that the steel bushing fixed part is to be arranged on suspension rod top
Hook-type fixed part.
4. workbench according to claim 2, it is characterised in that the bracket has multigroup, and multigroup bracket is along institute
The setting of suspension rod vertical direction is stated, the distance between bracket is between 100CM and 180CM described in wantonly two groups.
5. workbench according to claim 4, it is characterised in that bracket number described in every group and the suspension rod number one
Cause, bracket described in every group is arranged on same level.
6. workbench according to claim 1, it is characterised in that the bracket includes a support edge and one oblique
Side, the hypotenuse are located on the upside of support edge, and the end of the hypotenuse and support edge is each attached on the suspension rod.
7. workbench according to claim 6, it is characterised in that the width of the scaffold board is less than the support edge
Length, the scaffold board set cambered, the radius of curvature of the radian and the curvature on the inside of the steel bushing along its length
Radius is consistent.
8. workbench according to claim 7, it is characterised in that the bracket is run through to peripheral hardware in the scaffold board both ends
It is equipped with extension.
9. workbench according to claim 8, it is characterised in that the scaffold board one end sets first connecting portion,
Described scaffold board the other end is provided with second connecting portion, and the first connecting portion is the neck or card being arranged on scaffold board
Ring, the second connecting portion are the fastener being correspondingly arranged on the scaffold board, and the first connecting portion and second connecting portion will
Fixation is detachably connected between each scaffold board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720623863.3U CN206784871U (en) | 2017-06-01 | 2017-06-01 | Suspension type lifting working platform in steel bushing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720623863.3U CN206784871U (en) | 2017-06-01 | 2017-06-01 | Suspension type lifting working platform in steel bushing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206784871U true CN206784871U (en) | 2017-12-22 |
Family
ID=60714780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720623863.3U Expired - Fee Related CN206784871U (en) | 2017-06-01 | 2017-06-01 | Suspension type lifting working platform in steel bushing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206784871U (en) |
-
2017
- 2017-06-01 CN CN201720623863.3U patent/CN206784871U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858057B (en) | Method for rapidly mounting reinforced concrete crash barrier steel form | |
CN206784871U (en) | Suspension type lifting working platform in steel bushing | |
CN201793330U (en) | Gantry hanger frame device | |
CN106077518A (en) | For wind power hub high-strength combination energy saver | |
CN206108705U (en) | Gallows of frame isolated footing | |
CN207347107U (en) | Fork truck with jacklift | |
CN214326895U (en) | Steel reinforcement cage location installation suspension system | |
CN206784613U (en) | A kind of shape for hat steel-tube construction beam and the attachment structure in the middle part of square column | |
CN205530308U (en) | Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers | |
CN205998856U (en) | Instrument is stood up in a kind of Large Hydroelectric Set thrust collar runner plate lifting | |
CN211034888U (en) | Lifting appliance | |
CN204148776U (en) | The assembled moulding bed of bent cap framework of steel reinforcement | |
CN209686833U (en) | Operating platform support frame and operating platform | |
CN211143695U (en) | Operating platform for assisting assembly type tower crane in dismounting | |
CN209308414U (en) | A kind of builder's road formula stair step punching block | |
CN209618648U (en) | A kind of lifting lift hanger | |
CN209522513U (en) | A kind of hanging apparatus for Maintenance of Agricultural Machinery | |
CN102900023B (en) | A kind of combined type working platform | |
CN110577146A (en) | Lifting appliance and method for removing old bridge body | |
CN206971767U (en) | A kind of steel plate wall sliding erecting device of Super High Core Walls Structure | |
CN206707239U (en) | A kind of elevator Integral hoisting operating platform | |
CN206395795U (en) | Hydraulic type cable well lid easy opening device | |
CN219429516U (en) | Suspended bracket combined structure | |
CN204549893U (en) | A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing | |
CN107419057A (en) | A kind of method for changing refining furnace electrode mast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 |
|
CF01 | Termination of patent right due to non-payment of annual fee |