CN206784871U - Suspension type lifting working platform in steel bushing - Google Patents

Suspension type lifting working platform in steel bushing Download PDF

Info

Publication number
CN206784871U
CN206784871U CN201720623863.3U CN201720623863U CN206784871U CN 206784871 U CN206784871 U CN 206784871U CN 201720623863 U CN201720623863 U CN 201720623863U CN 206784871 U CN206784871 U CN 206784871U
Authority
CN
China
Prior art keywords
bracket
scaffold board
suspension rod
steel bushing
connecting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720623863.3U
Other languages
Chinese (zh)
Inventor
吴胜超
翟宏琛
闫振虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Original Assignee
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Friendship One 6th Engineering Co Ltd Of Public Office filed Critical Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority to CN201720623863.3U priority Critical patent/CN206784871U/en
Application granted granted Critical
Publication of CN206784871U publication Critical patent/CN206784871U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses suspension type lifting working platform in a kind of steel bushing, including suspension rod, bracket and scaffold board, suspension rod is set along steel bushing vertical direction, scaffold board is circumferentially disposed along steel bushing, steel bushing fixed part is provided with suspension rod, bracket is fixed on suspension rod, and scaffold board both ends are separately positioned on bracket.The workbench that the present embodiment provides, bracket and steel bushing fixed part are provided with suspension rod, the width of carriage length and scaffold board can be designed as needed, first suspension rod is fixed on steel bushing by steel bushing fixed part during installation, then the both ends of scaffold board are arranged on just to complete on bracket and built, when being lifted to workbench, only need scaffold board removing can on the bracket for be installed to relevant position, first scaffold board is removed during dismounting, suspension rod is removed again and just completes dismounting, it is so designed that satisfaction being capable of fast construction and dismantlement work platform in less space.

Description

Suspension type lifting working platform in steel bushing
Technical field
It the utility model is related to a kind of aquatic building construction field, and in particular to suspension type liftable work in a kind of steel bushing Make platform.
Background technology
In bridge foundation construction, it is frequently encountered and is constructed in shoal area, for the ease of shoal region bridge lower junction Structure is constructed, and is intercepted water commonly using steel bushing cofferdam, and steel bushing cofferdam is a kind of the most frequently used sheet-pile cofferdam, steel bushing cofferdam intensity Height, hard soil layer is easily squeezed into, can be in deep subaqueous work, water resistance is good, can form the cofferdam of various profiles on demand, and can Repeatedly use, therefore, it widely used.
But the interior construction space of steel bushing is limited, but construction of ascending a height but unavoidably is needed, in the prior art generally use Set up total sub-semigroup or set up split heads mode and constructed.But when this scheme is applied in small space, exist to basis Intensity requirement is high, and scaffold building working space deficiency, scaffold installation is with removing the defects of difficult.
Utility model content
The purpose of this utility model is to provide suspension type lifting working platform in a kind of steel bushing, to solve prior art In weak point.
To achieve these goals, the utility model provides following technical scheme:
Suspension type lifting working platform in a kind of steel bushing, including suspension rod, bracket and scaffold board, the suspension rod is described in Steel bushing vertical direction is set, and the scaffold board is circumferentially disposed along the steel bushing, and being provided with steel bushing on the suspension rod fixes Portion, the bracket are fixed on the suspension rod, and the scaffold board both ends are separately positioned on the bracket.
Above-mentioned workbench, the suspension rod have it is multiple, multiple suspension rods along steel bushing inside circumference direction set.
Above-mentioned workbench, the steel bushing fixed part are the hook-type fixed part for being arranged on suspension rod top.
Above-mentioned workbench, the bracket have multigroup, and multigroup bracket is set along the suspension rod vertical direction, and wantonly two The distance between described bracket of group is between 100CM and 180CM.
Above-mentioned workbench, bracket number described in every group is consistent with the suspension rod number, and bracket described in every group is arranged on Same level.
Above-mentioned workbench, the bracket include a support edge and a hypotenuse, and the hypotenuse is located on support edge The end of side, the hypotenuse and support edge is each attached on the suspension rod.
Above-mentioned workbench, the width of the scaffold board are less than the length of the support edge, and the scaffold board is along length Direction setting is cambered, and the radius of curvature of the radian is consistent with the radius of curvature on the inside of the steel bushing.
Above-mentioned workbench, the scaffold board both ends are outwards provided with extension through the bracket.
Above-mentioned workbench, the scaffold board one end set first connecting portion, and described scaffold board the other end is set There is second connecting portion, the first connecting portion is the neck or snap ring being arranged on scaffold board, and the second connecting portion is corresponding The fastener being arranged on the scaffold board, the first connecting portion and second connecting portion will be detachably connected solid between each scaffold board It is fixed
In the above-mentioned technical solutions, suspension type lifting working platform in the steel bushing that the present embodiment provides, sets on suspension rod It is equipped with bracket and steel bushing fixed part, the width of carriage length and scaffold board can be designed as needed, be put down in building During platform, suspension rod is fixed on steel bushing by steel bushing fixed part, then the both ends of scaffold board are arranged on bracket, so Just building for workbench is completed, it is necessary to when being lifted to workbench after a construction location terminates, it is only necessary to by pin Palm removes can on the bracket for be installed to relevant position, when the whole construction of completion is dismantled to workbench, by pin hand Plate is removed from bracket, then suspension rod is removed to the dismounting for just completing whole workbench from steel bushing, is so designed that full Foot being capable of fast construction and dismantlement work platform in less space.
Brief description of the drawings
, below will be to institute in embodiment in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only described in the utility model Some embodiments, for those of ordinary skill in the art, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the sectional view of suspension type lifting working platform in a kind of steel bushing of embodiment offer of the utility model;
Fig. 2 is the top view of suspension type lifting working platform in a kind of steel bushing of embodiment offer of the utility model;
Fig. 3 is the structural representation for the suspension rod that a kind of embodiment of the utility model provides;
Fig. 4 is the structural representation for the scaffold board that a kind of embodiment of the utility model provides.
Description of reference numerals:
1st, suspension rod;2nd, bracket;3rd, scaffold board;4th, steel bushing;5th, hook-type fixed part;6th, pier stud;7th, extension.
Embodiment
In order that those skilled in the art more fully understands the technical solution of the utility model, below in conjunction with accompanying drawing pair The utility model is further detailed.
As Figure 1-4, suspension type lifting working platform in a kind of steel bushing that the utility model embodiment provides, bag Suspension rod 1, bracket 2 and scaffold board 3 are included, suspension rod 1 is set along the vertical direction of steel bushing 4, and scaffold board 3 is circumferentially disposed along steel bushing 4, hangs The fixed part of steel bushing 4 is provided with bar 1, bracket 2 is fixed on suspension rod 1, and the both ends of scaffold board 3 are separately positioned on bracket 2.
Specifically, suspension rod 1 is set along the inwall vertical direction of steel bushing 4, steel bushing fixed part, steel are provided with suspension rod 1 Sleeve fixed part can be provided in fixing hole or bolt on suspension rod 1, it is preferred that the top of suspension rod 1 is provided with hook-type and consolidated Determine portion 5, when mounted, the hook-type fixed part 5 of the upper end of suspension rod 1 is hung over and completes tentatively to fix on steel bushing 4, then in steel bushing Suspension rod 1 is fixed on the positioning on the job platform of cylinder 4, only needs to carry out suspension rod 1 on job platform in dismounting Dismounting, in the present embodiment, suspension rod 1 has multiple, and multiple suspension rods 1 are arranged circumferentially along the inwall of steel bushing 4, the edge on each suspension rod 1 Vertical direction is provided with multiple brackets 2, and 2 numbers of bracket and corresponding bracket 2 on each suspension rod 1 are highly consistent, are thusly-formed Multigroup bracket 2 from bottom to up, the number of every group of bracket 2 is consistent with 2 numbers of bracket, and every group of bracket 2 is in same level, support Supporting plate that frame 2 can be provided on suspension rod 1 or the support ring being arranged on suspension rod 1, it is preferred that bracket 2 is three Angular support, support by a reinforcing bar bend out it is acute angle-shaped after be welded on suspension rod 1, the hypotenuse of triangular supports is located at right angle The upside on side, right-angle side are used to support scaffold board 3 perpendicular to suspension rod 1, and scaffold board 3 can be a supporting plate, it is preferred that pin hand Plate 3 be by reinforcement welding into support frame, be provided with supporting plate on support frame, the width of scaffold board 3 is less than the width of bracket 2 Degree, the length direction of scaffold board 3 set cambered, the distance between more than two suspension rods 1 of length of scaffold board 3, after installation The both ends of scaffold board 3 are through bracket 2 and protruding.When mounted, each suspension rod 1 is hung over by steel bushing 4 by hook-type fixed part 5 On, then each suspension rod 1 is fixed on steel bushing 4 according to certain distance in the upper end of steel bushing 4, after the installation of suspension rod 1, according to The position constructed is needed, scaffold board 3 is arranged on the bracket 2 of the relevant position of suspension rod 1, when installing scaffold board 3, by scaffold board 3 Both ends through bracket 2 and protruding, extension 7, which divides, has certain length to ensure construction safety, can be on one group of bracket 2 Whole mounting brackets 2 form an annular overall scaffold board 3, also can install trick on the parts of carrier 2 of one group of bracket 2 Version, the overall scaffold board 3 of an arc is formed, when needing to lift workbench, scaffold board 3 is removed and installed down On one group of bracket 2, when needing to dismantle workbench, first scaffold board 3 is dismantled, then the hook by the upper end of suspension rod 1 Shape fixed part 5 removes the dismounting for just completing workbench from steel bushing 4.
Suspension type lifting working platform in the steel bushing that the present embodiment provides, bracket 2 and steel bushing are provided with suspension rod 1 The width of 4 fixed parts, the length of bracket 2 and scaffold board 3 can be designed as needed, and in building platform, suspension rod 1 is led to Cross the fixed part of steel bushing 4 to be fixed on steel bushing 4, then by the both ends installation of scaffold board 3 on carrier 2, so just complete work Make building for platform, it is necessary to when being lifted to workbench after a construction location terminates, it is only necessary to which scaffold board 3 is taken Under be installed to can on the bracket 2 of relevant position, when completing whole construction workbench being dismantled, by scaffold board 3 from Removed on bracket 2, then suspension rod 1 is removed to the dismounting for just completing whole workbench from steel bushing 4, be so designed that satisfaction Being capable of fast construction and dismantlement work platform in less space.
In the present embodiment, it is preferred that steel bushing fixed part comprises at least the hook-type fixed part 5 for being arranged on the top of suspension rod 1, hook Shape fixed part 5 and suspension rod 1 are integral type structure, can hang over suspension rod 1 by hook-type fixed part 5 and are fixed on steel bushing 4, hook The convenient installation and removal to suspension rod 1 of shape fixed part 5, optionally, the other positions on suspension rod 1 may also set up steel bushing 4 Fixed part.
In the present embodiment, it is preferred that bracket 2 have it is multigroup, multigroup bracket 2 along the vertical direction of suspension rod 1 set, wantonly two groups of brackets The distance between 2 between 100CM and 180CM, and 2 numbers of every group of bracket are consistent with 1 number of suspension rod, and every group of bracket 2 is arranged on Same level;It is so designed that every group of bracket 2 forms an annular distribution around the inwall of steel bushing 4, scaffold board 3 is placed on support When on frame 2, the integral bracket 2 of a ring-type is formed, multigroup bracket 2 is set along the vertical direction of suspension rod 1, forms the side vertically of suspension rod 1 The bracket 2 of upward multiple annular spreads, being so designed that can be such that all angles of the workmen on steel bushing 4 apply Work, distance reasonable in design between two groups of brackets 2 so that when needing to lift workbench, workmen is easy to disassemble And installation.
In the present embodiment, it is preferred that bracket 2 includes a support edge and a hypotenuse, and hypotenuse is located on the upside of support edge, tiltedly The end of side and support edge is each attached on suspension rod 1, and the width of scaffold board 3 is less than the length of support edge, and scaffold board 3 is along length side Cambered to setting, the radius of curvature of radian is consistent with the radius of curvature of the inner side of steel bushing 4, the both ends of scaffold board 3 run through bracket 2 to It is provided with extension 7 outside.Bracket 2 is made up of reinforcing bar, formed between support edge and hypotenuse a passage run through for scaffold board 3 or Cavity, scaffold board 3 can be a supporting plates, it is preferred that scaffold board 3 be by reinforcement welding into support frame, on support frame Supporting plate is provided with, the width of scaffold board 3 is less than the width of bracket 2, and the length direction setting of scaffold board 3 is cambered, and pin hand The length of plate 3 is more than the distance between two suspension rods 1, when mounted can be with the both ends of scaffold board 3 through bracket 2 and to overhanging Go out, extension 7 has certain length, so as to ensure the construction safety of workmen.
In the present embodiment, optionally, the one end of scaffold board 3 sets first connecting portion, and the other end of scaffold board 3 is provided with the Two connecting portions, first connecting portion are the neck or snap ring being arranged on scaffold board 3, and second connecting portion is to be correspondingly arranged at scaffold board Fastener on 3, first connecting portion and second connecting portion will be detachably connected fixation, first connecting portion, second between each scaffold board 3 Connecting portion and scaffold board 3 be integral type, and the length of first connecting portion and second connecting portion is twice of the length of extension 7, in company When connecing, the first connecting portion of a scaffold board 3 is connected with the second connecting portion of another scaffold board 3, so by scaffold board 3 Connect into the overall scaffold board 3 of ring-type or the overall scaffold board 3 of arc.
Some one exemplary embodiments of the present utility model are only described by way of explanation above, undoubtedly, for One of ordinary skill in the art, can be with a variety of in the case of without departing from spirit and scope of the present utility model Mode is modified to described embodiment.Therefore, above-mentioned accompanying drawing and description are inherently illustrative, should not be construed as Limitation to the utility model claims protection domain.

Claims (9)

1. suspension type lifting working platform in a kind of steel bushing, it is characterised in that described including suspension rod, bracket and scaffold board Suspension rod is set along the steel bushing vertical direction, and the scaffold board is circumferentially disposed along the steel bushing, is provided with the suspension rod Steel bushing fixed part, the bracket are fixed on the suspension rod, and the scaffold board both ends are separately positioned on the bracket.
2. workbench according to claim 1, it is characterised in that the suspension rod has multiple, and multiple suspension rods are along steel Sleeve inside circumference direction is set.
3. workbench according to claim 2, it is characterised in that the steel bushing fixed part is to be arranged on suspension rod top Hook-type fixed part.
4. workbench according to claim 2, it is characterised in that the bracket has multigroup, and multigroup bracket is along institute The setting of suspension rod vertical direction is stated, the distance between bracket is between 100CM and 180CM described in wantonly two groups.
5. workbench according to claim 4, it is characterised in that bracket number described in every group and the suspension rod number one Cause, bracket described in every group is arranged on same level.
6. workbench according to claim 1, it is characterised in that the bracket includes a support edge and one oblique Side, the hypotenuse are located on the upside of support edge, and the end of the hypotenuse and support edge is each attached on the suspension rod.
7. workbench according to claim 6, it is characterised in that the width of the scaffold board is less than the support edge Length, the scaffold board set cambered, the radius of curvature of the radian and the curvature on the inside of the steel bushing along its length Radius is consistent.
8. workbench according to claim 7, it is characterised in that the bracket is run through to peripheral hardware in the scaffold board both ends It is equipped with extension.
9. workbench according to claim 8, it is characterised in that the scaffold board one end sets first connecting portion, Described scaffold board the other end is provided with second connecting portion, and the first connecting portion is the neck or card being arranged on scaffold board Ring, the second connecting portion are the fastener being correspondingly arranged on the scaffold board, and the first connecting portion and second connecting portion will Fixation is detachably connected between each scaffold board.
CN201720623863.3U 2017-06-01 2017-06-01 Suspension type lifting working platform in steel bushing Expired - Fee Related CN206784871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720623863.3U CN206784871U (en) 2017-06-01 2017-06-01 Suspension type lifting working platform in steel bushing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720623863.3U CN206784871U (en) 2017-06-01 2017-06-01 Suspension type lifting working platform in steel bushing

Publications (1)

Publication Number Publication Date
CN206784871U true CN206784871U (en) 2017-12-22

Family

ID=60714780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720623863.3U Expired - Fee Related CN206784871U (en) 2017-06-01 2017-06-01 Suspension type lifting working platform in steel bushing

Country Status (1)

Country Link
CN (1) CN206784871U (en)

Similar Documents

Publication Publication Date Title
CN101858057B (en) Method for rapidly mounting reinforced concrete crash barrier steel form
CN206784871U (en) Suspension type lifting working platform in steel bushing
CN201793330U (en) Gantry hanger frame device
CN106077518A (en) For wind power hub high-strength combination energy saver
CN206108705U (en) Gallows of frame isolated footing
CN207347107U (en) Fork truck with jacklift
CN214326895U (en) Steel reinforcement cage location installation suspension system
CN206784613U (en) A kind of shape for hat steel-tube construction beam and the attachment structure in the middle part of square column
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
CN205998856U (en) Instrument is stood up in a kind of Large Hydroelectric Set thrust collar runner plate lifting
CN211034888U (en) Lifting appliance
CN204148776U (en) The assembled moulding bed of bent cap framework of steel reinforcement
CN209686833U (en) Operating platform support frame and operating platform
CN211143695U (en) Operating platform for assisting assembly type tower crane in dismounting
CN209308414U (en) A kind of builder's road formula stair step punching block
CN209618648U (en) A kind of lifting lift hanger
CN209522513U (en) A kind of hanging apparatus for Maintenance of Agricultural Machinery
CN102900023B (en) A kind of combined type working platform
CN110577146A (en) Lifting appliance and method for removing old bridge body
CN206971767U (en) A kind of steel plate wall sliding erecting device of Super High Core Walls Structure
CN206707239U (en) A kind of elevator Integral hoisting operating platform
CN206395795U (en) Hydraulic type cable well lid easy opening device
CN219429516U (en) Suspended bracket combined structure
CN204549893U (en) A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing
CN107419057A (en) A kind of method for changing refining furnace electrode mast

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222

CF01 Termination of patent right due to non-payment of annual fee