CN107419057A - A kind of method for changing refining furnace electrode mast - Google Patents

A kind of method for changing refining furnace electrode mast Download PDF

Info

Publication number
CN107419057A
CN107419057A CN201710637443.5A CN201710637443A CN107419057A CN 107419057 A CN107419057 A CN 107419057A CN 201710637443 A CN201710637443 A CN 201710637443A CN 107419057 A CN107419057 A CN 107419057A
Authority
CN
China
Prior art keywords
transverse arm
column
lift cylinders
dust excluding
excluding hood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710637443.5A
Other languages
Chinese (zh)
Inventor
陈传盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Iron and Steel Group Co Ltd
Original Assignee
Laiwu Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Iron and Steel Group Co Ltd filed Critical Laiwu Iron and Steel Group Co Ltd
Priority to CN201710637443.5A priority Critical patent/CN107419057A/en
Publication of CN107419057A publication Critical patent/CN107419057A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The invention provides a kind of method for changing refining furnace electrode mast, the characteristics of this method, is, the dust excluding hood (5) above transverse arm (3) is removed first, increase working space, then handling is together carried out using transverse arm (3), column (7) and lift cylinders (9) as overall, after handling to spare part repair region, old column (7) is changed with new column (7), finally transverse arm (3), new column (7) and lift cylinders (9) are integrally returned and are attached to home position, and dust excluding hood (5) is moved back to.Compared with the method that tradition changes column, method provided by the invention overcomes the drawbacks of working space is narrow and small around transverse arm so that dismounting, installation and the adjustment work of transverse arm spend the time less, so as to be effectively improved the efficiency for changing column.

Description

A kind of method for changing refining furnace electrode mast
Technical field
The present invention relates to ladle refining furnace technical field, more particularly to a kind of side for being used to change refining furnace electrode mast Method.
Background technology
The electrode system of refining furnace includes the equipment such as transformer, short net, water-cooled cable, transverse arm, electrode mast, electrode mast For making electrode oscilaltion, two classes are divided into structure:Vertical columns formula and active column formula.In active column formula structure In, transverse arm and electrode mast connect into an inverted l-shaped structure, and electrode mast can be several to being lifted between directive wheel, electrode mast Lifting generally use hydraulic transmission mode.
As shown in figure 1, ladle 1 is located at the lower section of dust excluding hood 5, dust excluding hood 5 lifts across on the dedusting track 4 of both sides Cylinder 9 is in the lower section of building body 8, and the top of lift cylinders 9 is connected through building body 8 with column 7, and column 7 is connected to one with transverse arm 3 Rise, electrode 2 is arranged on transverse arm 3.
After production run for a period of time, the factor such as high temperature often results in column 7 and damaged, and in order to adapt to produce, needs blowing out to change Column 7.Column 7 is removed between transverse arm 3 and lift cylinders 9 and changes more difficulty, at present, changes below the generally use of column 7 Step:
In the positioned beneath jack instrument of dust excluding hood 5, the water-cooled cable 6 on transverse arm 3 is then removed, dismantles transverse arm 3 and column 7 Coupling part;
Transverse arm 3 is hung on one side in the confined space below dust excluding hood 5 using jack, then dismantles column 7 and lifting The coupling part of cylinder 9;
Column 7 is hung out, completes to remove;
Order is removed more than, then inverted order installs new column 7, and transverse arm 3 is adjusted, complete the replacing work of column 7 Make.
The drawbacks of above-mentioned replacing options, is that workload is larger, time-consuming longer, and workload is mainly reflected in the dismounting of transverse arm 3 And generally require 20 people mutual cooperation flower with the work such as jack integrated regulation, whole Renewal process after installation, and the installation of transverse arm 3 Take 20 hours and complete.Change the repair time it is longer manufacturing schedule can undoubtedly be had an impact, therefore, how to provide a kind of efficient The method for changing column, to reduce the time that Renewal process is spent, becomes those skilled in the art's technology urgently to be resolved hurrily Problem.
The content of the invention
In view of this, the invention provides a kind of method for changing refining furnace electrode mast, this method to improve The efficiency of column is changed, reduces the time that Renewal process is spent.
In order to achieve the above object, the present invention provides following technical scheme:
A kind of method for changing refining furnace electrode mast, including:
Step A, the dust excluding hood above transverse arm is removed, overlay area when making the dust excluding hood work is in open state;
Step B, the connection of the transverse arm and water-cooled cable and electrode is removed, removes and removes the directive wheel of the column, Lift cylinders and the connection of footing foundation and fluid pressure line are removed, using the transverse arm, the column and the lift cylinders as overall Together risen to hanging oneself, the bottom of the lift cylinders is higher by building body, transverse arm, the column and the lift cylinders described in handling are extremely Spare part repair region;
Step C, the transverse arm and the lift cylinders and the connection of the column are removed, and new column is installed to described In lift cylinders and the transverse arm;
Step D, using the transverse arm, the new column and the lift cylinders as overall together handling, according to step B's Handling path is reversely transported back to operating position, installs the lift cylinders and the connection of the footing foundation and the fluid pressure line, It is moved back to and the directive wheel is installed, the connection of the transverse arm and the water-cooled cable and the electrode is installed;
Step E, the dust excluding hood is moved back into operating position.
Preferably, in the above-mentioned methods, also include before the step A:
Electrode is enhanced from ladle, drives away and is loaded with the buggy ladle of the ladle, the ladle is left the electricity The underface region of pole.
Preferably, in the above-mentioned methods, the step A is specially:
Dust excluding hood above transverse arm is walked by traveling crane, overlay area when making the dust excluding hood work is in open state.
Preferably, in the above-mentioned methods, in the step B and/or the step D, handling is implemented using driving.
It can be seen from above-mentioned technical proposal, in the method provided by the present invention for changing refining furnace electrode mast, first The dust excluding hood above transverse arm is removed, increases working space, is then together hung using transverse arm, column and lift cylinders as overall Fortune, handling is waited old column to be changed with new column, finally transverse arm, new column and lifting to behind spare part repair region Cylinder, which integrally returns, is attached to home position (i.e. operating position), and dust excluding hood is moved back to.As can be seen here, whole Renewal process overcomes horizontal stroke The drawbacks of working space is narrow and small around arm, compared with the method that tradition changes column, method provided by the invention causes transverse arm Removing, install and adjust work spends the time less, so as to be effectively improved the efficiency for changing column.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is the arrangement schematic diagram of refining furnace electrode system.
In figure mark for:
1st, ladle;2nd, electrode;3rd, transverse arm;4th, dedusting track;5th, dust excluding hood;6th, water-cooled cable;7th, column;8th, building body; 9th, lift cylinders.
Embodiment
In order to make it easy to understand, the invention will be further described below in conjunction with the accompanying drawings.
It is provided in an embodiment of the present invention a kind of for changing essence for the arrangement schematic diagram of refining furnace electrode system referring to Fig. 1 The method of furnace electrode mast comprises the following steps:
S1, the dust excluding hood 5 of the top of transverse arm 3 is removed, overlay area when making the work of dust excluding hood 5 is in open state.
In working condition, dust excluding hood 5 is covered in the top of transverse arm 3, and the space that lifting effect is implemented in the lower section of dust excluding hood 5 is ten It is point limited, therefore, dust excluding hood 5 is removed first, lifting space can be made to become big, moreover, without the covering of dust excluding hood 5, just Transverse arm 3 can be lifted by crane upwards together with column 7 and lift cylinders 9.
S2, removes the connection of transverse arm 3 and water-cooled cable 6 and electrode 2, and the directive wheel removed and remove column 7 (is not marked in figure Note), the connection of lift cylinders 9 and footing foundation (not shown) and fluid pressure line (not shown) is removed, by transverse arm 3, is stood Post 7 and lift cylinders 9 together rise as overall to hanging oneself, and the bottom of lift cylinders 9 is higher by building body 8, handling transverse arm 3, the and of column 7 Lift cylinders 9 are to spare part repair region.
, it is necessary to first remove the connection between peripheral parts before lifting, including:Dismantled from transverse arm 3 He of water-cooled cable 6 Electrode 2, then keep water-cooled cable 6 well, hang away electrode 2;Directive wheel around column 7 is removed and removed, above building body 8 Space cleared up;Dismantle the fluid pressure line being connected in lift cylinders 9, and the connection of lift cylinders 9 and footing foundation is (general Pivot pin is connected for oscillating bearing) remove.
After removing the connection with peripheral parts, Integral lifting can be implemented, sling upwards first, as shown in figure 1, will lifting Cylinder 9 is retracted to the top of building body 8, then can be transverse arm 3, column 7 and lift cylinders 9 together handling to spare part repair region .
S3, transverse arm 3 and lift cylinders 9 and the connection of column 7 are removed, and new column 7 is installed to lift cylinders 9 and transverse arm 3 On.
In spare part repair region, old column 7 is removed from lift cylinders 9 and transverse arm 3, then changes new column 7, As can be seen that the disassembly and installation between transverse arm 3 and column 7 is completed in spare part repair region, due to spare part repair area Domain working space is spacious, so disassembly and installation transverse arm 3 is more convenient, taking less time to complete.
S4 is anti-according to step S2 handling path using transverse arm 3, new column 7 and lift cylinders 9 as overall together handling To transporting back to operating position, installation lift cylinders 9 and the connection of footing foundation and fluid pressure line, it is moved back to and directive wheel is installed, install The connection of transverse arm 3 and water-cooled cable 6 and electrode 2.
After new column 7 is installed in lift cylinders 9 and transverse arm 3, it is possible to according to the inverse of the operation order in step S2 Each parts are installed to original initial position (i.e. operating position) by sequence.To when returning installation, due to transverse arm 3, new column 7 and rise Drop cylinder 9 is as integral installation and adjustment, so component locations are easier to be adjusted in place, is spent in so as to be advantageous to saving Time in position adjustment.
S5, dust excluding hood 5 is moved back into operating position.
The dust excluding hood 5 for most starting to remove is moved back to original initial position (i.e. operating position), the Renewal process of column can be complete Into.
, can be before step S1 in order to go out bigger working space in land clearing first in specific practical application Implement the following:
Electrode 2 is enhanced from ladle 1, drives away and is loaded with the buggy ladle of ladle 1, make ladle 1 leave electrode 2 just under Square region.
During the entire process of column is changed, all links for being related to lifting job can be implemented to hang using driving Fortune, for example, in step sl, the dust excluding hood 5 of the top of transverse arm 3 can be walked by traveling crane, make the area of coverage during work of dust excluding hood 5 Domain is in open state.In step S2 and/or step S4, driving can also be used to implement handling.
In method provided by the present invention for changing refining furnace electrode mast, the dust excluding hood of the top of transverse arm 3 is removed first 5, increase working space, then together carry out handling using transverse arm 3, column 7 and lift cylinders 9 as overall, wait handling to be repaiied to spare part Behind region, old column 7 is changed with new column 7, finally transverse arm 3, new column 7 and overall return of lift cylinders 9 are attached to Home position (i.e. operating position), and dust excluding hood 5 is moved back to.As can be seen here, whole Renewal process overcomes the surrounding operation of transverse arm 3 The drawbacks of narrow space, compared with the method that tradition changes column, method provided by the invention causes the dismounting of transverse arm 3, installation And adjustment work spends the time less, so as to be effectively improved the efficiency for changing column.Practice have shown that side provided by the invention Method is simple to operate, easy to control, it is only necessary to which 14 people spend 16 hours can complete more changing jobs for column.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention. A variety of modifications to embodiment will be apparent for those skilled in the art, as defined herein general Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, the present invention will not Embodiment illustrated herein can be restricted to, and is to fit to consistent with principles disclosed herein and features of novelty most wide Scope.

Claims (4)

  1. A kind of 1. method for changing refining furnace electrode mast, it is characterised in that including:
    Step A, the dust excluding hood (5) above transverse arm (3) is removed, overlay area when making the dust excluding hood (5) work is in open-like shape State;
    Step B, the connection of the transverse arm (3) and water-cooled cable (6) and electrode (2) is removed, removes and removes the column (7) Directive wheel, lift cylinders (9) and the connection of footing foundation and fluid pressure line are removed, by the transverse arm (3), the column (7) and institute State lift cylinders (9) together to rise to hanging oneself as overall, the bottom of the lift cylinders (9) is higher by building body (8), horizontal stroke described in handling Arm (3), the column (7) and the lift cylinders (9) are to spare part repair region;
    Step C, the transverse arm (3) and the lift cylinders (9) and the connection of the column (7) are removed, and new column (7) is pacified It is attached in the lift cylinders (9) and the transverse arm (3);
    Step D, using the transverse arm (3), the new column (7) and the lift cylinders (9) as overall together handling, according to step Rapid B handling path is reversely transported back to operating position, installs the lift cylinders (9) and the footing foundation and the fluid pressure line Connection, be moved back to and the directive wheel be installed, the company of the transverse arm (3) and the water-cooled cable (6) and the electrode (2) is installed Connect;
    Step E, the dust excluding hood (5) is moved back into operating position.
  2. 2. according to the method for claim 1, it is characterised in that also include before the step A:
    Electrode (2) is enhanced from ladle (1), drives away and is loaded with the buggy ladle of the ladle (1), make the ladle (1) from Open the underface region of the electrode (2).
  3. 3. according to the method for claim 2, it is characterised in that the step A is specially:
    Dust excluding hood (5) above transverse arm (3) is walked by traveling crane, makes the overlay area during dust excluding hood (5) work in opening State.
  4. 4. according to the method for claim 3, it is characterised in that in the step B and/or the step D, using driving Implement handling.
CN201710637443.5A 2017-07-31 2017-07-31 A kind of method for changing refining furnace electrode mast Pending CN107419057A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710637443.5A CN107419057A (en) 2017-07-31 2017-07-31 A kind of method for changing refining furnace electrode mast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710637443.5A CN107419057A (en) 2017-07-31 2017-07-31 A kind of method for changing refining furnace electrode mast

Publications (1)

Publication Number Publication Date
CN107419057A true CN107419057A (en) 2017-12-01

Family

ID=60431632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710637443.5A Pending CN107419057A (en) 2017-07-31 2017-07-31 A kind of method for changing refining furnace electrode mast

Country Status (1)

Country Link
CN (1) CN107419057A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110567273A (en) * 2019-10-15 2019-12-13 莱芜钢铁集团有限公司 method for replacing water-cooling close-packed plate of 130-ton refining furnace

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201969720U (en) * 2011-04-08 2011-09-14 凯天环保科技股份有限公司 Smoke gathering device for ladle refining furnace
CN203238295U (en) * 2013-05-03 2013-10-16 武汉钢铁(集团)公司 Electrode regulating device of ladle refining furnace
CN106271586A (en) * 2016-08-30 2017-01-04 中国冶集团有限公司 The installation adjusting method of double refining furnace electric-pole horizontal arm collection heart circle
CN106340827A (en) * 2016-08-30 2017-01-18 中国冶集团有限公司 Installation method of water cooling cable of finery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201969720U (en) * 2011-04-08 2011-09-14 凯天环保科技股份有限公司 Smoke gathering device for ladle refining furnace
CN203238295U (en) * 2013-05-03 2013-10-16 武汉钢铁(集团)公司 Electrode regulating device of ladle refining furnace
CN106271586A (en) * 2016-08-30 2017-01-04 中国冶集团有限公司 The installation adjusting method of double refining furnace electric-pole horizontal arm collection heart circle
CN106340827A (en) * 2016-08-30 2017-01-18 中国冶集团有限公司 Installation method of water cooling cable of finery

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国机械工程学会设备与维修工程分会: "《设备管理、监测诊断及维修改造:第七届全国设备管理、第八届全国设备维修与改造学术会议论文集》", 30 November 2013 *
方震宇: "福建三钢90tLF炉的建设", 《连铸》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110567273A (en) * 2019-10-15 2019-12-13 莱芜钢铁集团有限公司 method for replacing water-cooling close-packed plate of 130-ton refining furnace
CN110567273B (en) * 2019-10-15 2021-06-01 莱芜钢铁集团有限公司 Method for replacing water-cooling close-packed plate of 130-ton refining furnace

Similar Documents

Publication Publication Date Title
CN106759845B (en) A kind of construction method of Steel corridor
CN110093869A (en) A kind of bridge decentralization dismounting device and bridge decentralization Demolition Construction method based on mobile support
CN103318774B (en) Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister
CN107419057A (en) A kind of method for changing refining furnace electrode mast
CN101660660B (en) Novel installing method of gas cabinet
CN107299191A (en) A kind of method for changing refining furnace rise fall of electrodes cylinder
CN201851123U (en) Sinking platform for concreting vertical shaft
CN204510777U (en) Converter building construction lift platform
CN203065965U (en) Bridge inspection vehicle capable of detaching and replacing frame automatically
CN207524830U (en) Hoisting bracket and handling mobile device
CN201873949U (en) Bride prestress stretch-draw trolley
CN106835984B (en) The reverse construction method of installation of slug matching bridge Bridge Erector
CN104947931A (en) Integral turnover formwork for vertical shaft
CN206051351U (en) Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
JP5252634B2 (en) Crane updating device and crane updating method using the same
CN204772354U (en) Frock is lifted to reducing
CN103145055A (en) Crane as well as arm section and truss arm thereof and installation method of truss arm
CN204549893U (en) A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing
CN204848003U (en) Novel gantry crane
CN107400754A (en) A kind of system and method for being used to change refining furnace rise fall of electrodes cylinder
CN105084207B (en) One kind can assembled mobile haulage equipment
CN102259801B (en) Folding arm support for truss arm crawler crane
CN110528398A (en) Across empty van beam construction method
CN205555924U (en) A system's device for high altitude dismantlement tower crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171201