CN206784412U - A kind of precipitation well construction - Google Patents
A kind of precipitation well construction Download PDFInfo
- Publication number
- CN206784412U CN206784412U CN201720322906.4U CN201720322906U CN206784412U CN 206784412 U CN206784412 U CN 206784412U CN 201720322906 U CN201720322906 U CN 201720322906U CN 206784412 U CN206784412 U CN 206784412U
- Authority
- CN
- China
- Prior art keywords
- water pipe
- pipe
- ppr water
- ppr
- well construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of precipitation well construction, it is related to underground construction dewatering device, including well, the hypomere ecto-entad of well is sequentially provided with galvanized wire filter screen, twines silk, pad muscle, PPR water pipe, the mesh number of galvanized wire filter screen is 60 ~ 100 mesh, PPR water pipe side wall is provided with permeable hole, is filled with mineral granule between PPR water pipe and pad muscle, cohesive soil is filled between well epimere inwall and PPR water pipe.This programme provides a kind of precipitation well construction, and structural strength is high, while has preferable water penetration and anti-bottom permeability performance, is not easily blocked, service life length.
Description
Technical field
Underground construction dewatering device is the utility model is related to, more particularly to a kind of precipitation well construction.
Background technology
In building foundation pit work progress, because foundation ditch constantly extends to underground, the underground water in water-bearing layer, which returns, pours in base
Hole, cause water burst, gush the husky or prominent accident such as gush.In order to prevent the generation of accident, precipitation operation often is carried out to foundation ditch, i.e., in base
The multiple dewatering well lowerings of watertable of arrangement in hole.Traditional construction method is used without sand drain pipe as dewatering well borehole wall material
Material, water body is filtered by the water penetration filtrate filled on the outside of the borehole wall between the soil body.Because the intensity without sand drain pipe is very low,
In dewatering construction is carried out, the drinking-water pipe of suction pump is stretched into downcast well pipe, and drinking-water pipe is constantly swung, and easily downcast well pipe is touched
It is bad, so that soil enters dewatering well, dewatering well and suction pump are silted up, cause dewatering well and suction pump to scrap, it has to weight
Dewatering well newly is set, great trouble is brought to construction.
Authorization Notice No. is that CN202247918U Chinese utility model discloses a kind of downcast well pipe, including by pvc pipe
Manufactured inner tube, inner tube periphery and water inlet set steel wire, install outer tube outside inner tube, steel wire between the inner and outer pipe sections,
Outer tube is used without sandpipe.Dewatering well tubing in the market is as the material of the downcast well pipe, mainly using pvc pipe, but
Pvc pipe intensity is relatively low, is easily destroyed in work progress.
Utility model content
The purpose of this utility model is to provide a kind of precipitation well construction so that the intensity of dewatering well is guaranteed, and improves
Dewatering effect.
Above-mentioned purpose of the present utility model technical scheme is that:A kind of precipitation well construction, including
Well, the hypomere ecto-entad of well are sequentially provided with galvanized wire filter screen, twine silk, pad muscle, PPR water pipe, galvanized wire filter screen
Mesh number is 60 ~ 100 mesh, and PPR water pipe side wall is provided with permeable hole, is filled with mineral granule between PPR water pipe and pad muscle, in well epimere
Cohesive soil is filled between wall and PPR water pipe, PPR water pipe bottom is provided with sealing part.
By using above-mentioned technical proposal, pvc pipe is replaced with the PPR pipe of high intensity, to strengthen the intensity of water pipe, makes it not
It is fragile, extend the service life of dewatering well;Simultaneously on the one hand galvanized wire filter screen can play a role in filtering, the corrosion-resistant, longevity
Life length, the structural strength of dewatering well on the other hand can also be improved as intermediate.Such a precipitation well construction, structural strength is high, together
When there is preferable water penetration and anti-bottom permeability performance.
Preferably, the outer wall of PPR water pipe is provided with along its circumferential equally distributed vertical reinforced.
By using above-mentioned technical proposal, vertical reinforced is set in the outer wall of PPR water pipe, on the one hand can strengthen water pipe
Intensity, reduces its impaired probability, on the other hand can play the vertical guide functions to current, improves dewatering effect.
Preferably, sealing part is steel plate for sealing water.
By using above-mentioned technical proposal, sealing part plays a part of sealing PPR pipe bottom, in case PPR pipe bottom intakes
Bring impurity particle into and block water pipe, influence the service life of dewatering well;Steel plate for sealing water is simple and convenient as sealing part, while steel
Plate good corrosion resistance.
Preferably, steel plate for sealing water is provided with the neck of annular, and neck agrees with PPR water pipe.
By using above-mentioned technical proposal, annular slot is set to fix PPR water to a certain extent on steel plate for sealing water
Pipe, PPR water pipe, which is connected in neck, is not susceptible to relative motion, therefore sealing improves.
Preferably, the both sides of neck are provided with spacing rib.
By using above-mentioned technical proposal, spacing rib is added in the both sides of neck, can further be improved to PPR water pipe
Spacing fixation, reduce the possibility of infiltration.
Preferably, jacket pipe untill sealing part, water-baffling sleeve pipe sleeve be located at PPR water pipe bottom and the mouth of pipe upward, PPR water pipe
The mouth of pipe is enclosed with two layers of gauze, and gauze is wrapped with two layers of nylon net cloth, and gauze is folded in PPR water pipe and sealing with nylon net cloth
Between sleeve pipe.
By using above-mentioned technical proposal, sealing part uses sealing sleeve pipe, and sealing is high and simple in construction, can quickly pacify
Assembly and disassembly are unloaded;Gauze and nylon net cloth are set between PPR water pipe and sealing sleeve pipe, in order to avoid during the sealing function forfeiture of sealing sleeve pipe,
The large particulate matters such as silt enter in PPR water pipe, and PPR water pipe is blocked.
Preferably, the mesh number of gauze is 120 mesh, and the mesh number of nylon net cloth is 80 mesh.
By using above-mentioned technical proposal, the effect of gauze and nylon net cloth is after sealing casing damage cracking two
Person can play a part of filtering large particulate matter, in case bulky grain enters oral siphon and blocked.
Brief description of the drawings
Fig. 1 is the schematic diagram of embodiment 1;
Fig. 2 is the sectional view of PPR water pipe in embodiment 1;
Fig. 3 is the sectional view of steel plate for sealing water;
Fig. 4 is the schematic diagram that embodiment 2 stops jacket pipe.
Reference:1st, well;2nd, galvanized wire filter screen;3rd, silk is twined;4th, muscle is padded;5th, PPR water pipe;6th, permeable hole;7th, it is green
Beans sand;8th, cohesive soil;9th, vertical reinforced;10th, steel plate for sealing water;1001st, neck;1002nd, spacing rib;11st, sealing sleeve pipe;12、
Gauze;13rd, nylon net cloth.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment 1
As shown in Fig. 1 ~ 3, a kind of precipitation well construction, including well 1, the hypomere ecto-entad of well 1 is sequentially provided with zinc-plated
Iron wire filter screen 2, silk 3, pad muscle 4, PPR water pipe 5 are twined, the mesh number of galvanized wire filter screen 2 is 80 mesh, between PPR water pipe 5 and pad muscle 4
Filled with mineral granule 7, cohesive soil 8 is filled between the epimere inwall of well 1 and PPR water pipe 5.
The side wall of PPR water pipe 5 is provided with permeable hole 6, porosity 20%, and outer wall, which is provided with along its circumference is equally distributed, vertically to be added
Muscle 9.
The bottom of PPR water pipe 5 is provided with sealing part, and sealing part is steel plate for sealing water 10, and steel plate for sealing water 10 is provided with the neck of annular
1001, neck 1001 agrees with PPR water pipe 5PPR, and the both sides of neck 1001 are provided with spacing rib 1002.
Water from soil successively by galvanized wire filter screen 2, twine silk 3, pad muscle 4, PPR water pipe 5PPR, and from PPR water pipe 5
Permeable hole 6 enter pipe in.
Embodiment 2
As shown in figure 4, a kind of precipitation well construction, the present embodiment and the difference of embodiment 1 are, jacket pipe untill sealing part
11, sealing sleeve pipe 11 be set in the bottom of PPR water pipe 5 and the mouth of pipe upward, the mouth of pipe of PPR water pipe 5 is enclosed with two layers of gauze 12, gauze
12 are wrapped with two layers of nylon net cloth 13, and gauze 12 and nylon net cloth 13 are folded between PPR water pipe 5 and sealing sleeve pipe 11, yarn
The mesh number of cloth 12 is 120 mesh, and the mesh number of nylon net cloth 13 is 80 mesh.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model
Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but
As long as all protected in right of the present utility model by Patent Law.
Claims (7)
1. a kind of precipitation well construction, including well(1), it is characterised in that:Well(1)Hypomere ecto-entad be sequentially provided with it is zinc-plated
Iron wire filter screen(2), twine silk(3), pad muscle(4), PPR water pipe(5), galvanized wire filter screen(2)Mesh number be 60 ~ 100 mesh, PPR water
Pipe(5)Side wall is provided with permeable hole(6), PPR water pipe(5)With padding muscle(4)Between be filled with mineral granule(7), well(1)Epimere inwall
With PPR water pipe(5)Between be filled with cohesive soil(8), the PPR water pipe(5)Bottom is provided with sealing part.
A kind of 2. precipitation well construction according to claim 1, it is characterised in that:The PPR water pipe(5)Outer wall be provided with edge
Its circumferential equally distributed vertical reinforced(9).
A kind of 3. precipitation well construction according to claim 1, it is characterised in that:Sealing part is steel plate for sealing water(10).
A kind of 4. precipitation well construction according to claim 3, it is characterised in that:The steel plate for sealing water(10)It is provided with annular
Neck(1001), neck(1001)With PPR water pipe(5)Agree with.
A kind of 5. precipitation well construction according to claim 4, it is characterised in that:The neck(1001)Both sides be provided with limit
Position rib(1002).
A kind of 6. precipitation well construction according to claim 1, it is characterised in that:Jacket pipe untill the sealing part(11),
Sealing sleeve pipe(11)It is set in PPR water pipe(5)The bottom and mouth of pipe is upward, PPR water pipe(5)The mouth of pipe be enclosed with two layers of gauze
(12), gauze(12)It is wrapped with two layers of nylon net cloth(13), gauze(12)With nylon net cloth(13)It is folded in PPR water pipe(5)
With sealing sleeve pipe(11)Between.
A kind of 7. precipitation well construction according to claim 6, it is characterised in that:The gauze(12)Mesh number be 120 mesh,
Nylon net cloth(13)Mesh number be 80 mesh.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720322906.4U CN206784412U (en) | 2017-03-29 | 2017-03-29 | A kind of precipitation well construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720322906.4U CN206784412U (en) | 2017-03-29 | 2017-03-29 | A kind of precipitation well construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206784412U true CN206784412U (en) | 2017-12-22 |
Family
ID=60706871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720322906.4U Expired - Fee Related CN206784412U (en) | 2017-03-29 | 2017-03-29 | A kind of precipitation well construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206784412U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978691A (en) * | 2018-08-17 | 2018-12-11 | 五冶集团上海有限公司 | Precipitation system in foundation pit |
CN109267561A (en) * | 2018-08-16 | 2019-01-25 | 温州大学 | The system and method for composite flocculation agent combined vacuum precompressed processing reclaimed ground |
-
2017
- 2017-03-29 CN CN201720322906.4U patent/CN206784412U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109267561A (en) * | 2018-08-16 | 2019-01-25 | 温州大学 | The system and method for composite flocculation agent combined vacuum precompressed processing reclaimed ground |
CN108978691A (en) * | 2018-08-17 | 2018-12-11 | 五冶集团上海有限公司 | Precipitation system in foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205154113U (en) | A sand control strainer for sandstone stratum deep well | |
CN206784412U (en) | A kind of precipitation well construction | |
CN105332384B (en) | Super pressure inhales joint pumping system and its method of work | |
CN205839777U (en) | Well-points dewatering well filter structure | |
CN201224887Y (en) | Well point tube for flexible soil foundation water drain consolidation | |
CN214940311U (en) | Pipe well structure | |
CN203924210U (en) | A kind of pumped well device of sand control | |
CN206721904U (en) | A kind of integrated precipitation pumping system | |
CN206101328U (en) | Bottom of pool drainage | |
CN211287608U (en) | Water stopper and water stopping device for layered water pumping of hydrogeology drilling | |
CN202247918U (en) | Downcast well pipe | |
CN206168053U (en) | Mining water pump water absorbing purifier that dives | |
CN207452926U (en) | A kind of instrument for improving Application of light well point precipitation efficiency | |
CN104421169B (en) | The vertical pump for mine that can be embedded under sandstone | |
CN204163092U (en) | Dewatering well bamboo cage chimney filter | |
CN106472292A (en) | Planting roof | |
CN108104145A (en) | A kind of down tube technique of the well double-wall corrugated filter pipes of DKPE | |
CN107514005A (en) | A kind of instrument and its construction method for improving Application of light well point precipitation efficiency | |
CN206352304U (en) | Pumping well-points dewatering system | |
CN207620082U (en) | A kind of drain structure for water in municipal administration gardens | |
CN208071456U (en) | A kind of special regulating tank of inverted well | |
CN207331724U (en) | A kind of precipitation well construction being used in subway foundation pit | |
CN219002297U (en) | Environment-friendly sewage multistage auxiliary device | |
CN220414293U (en) | Deep well point dewatering device | |
CN212477801U (en) | Retaining wall water filtering body mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 |