Prior art keywords
well point
branch pipe
water
self priming
priming pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710903538.7A
Other languages
Chinese (zh)
Inventor
贾国强
尹茂国
康国辉
岳齐贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO MCC20 CONSTRUCTION CO Ltd
China MCC20 Group Corp Ltd
Original Assignee
NINGBO MCC20 CONSTRUCTION CO Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO MCC20 CONSTRUCTION CO Ltd, China MCC20 Group Corp Ltd filed Critical NINGBO MCC20 CONSTRUCTION CO Ltd
Priority to CN201710903538.7A priority Critical patent/CN107514005A/en
Publication of CN107514005A publication Critical patent/CN107514005A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Abstract

Base pit dewatering construction field of the present invention, and in particular to a kind of instrument and construction method for improving Application of light well point precipitation speed, including, well point branch pipe, its lower end embedment underground;Chimney filter, it is connected with well point branch pipe lower end, and the chimney filter is used to filter off debris;Vacuum self priming pump, it is connected with well point branch pipe upper end;Water header, it is connected with vacuum self priming pump;The vacuum self priming pump will be dived under water after extraction comes up by chimney filter and well point branch pipe and is drained into water header.Well point branch pipe is made using common PVC U pipes, have the advantages that simple and easy to get, easy to make, application effect is good, device is used repeatedly, corresponded by using well point branch pipe and vavuum pump, well-point arrangement is flexible, make single well-points dewatering situation controllable, have and save construction cost, improve the advantages of precipitation efficiency.

Description

A kind of instrument and its construction method for improving Application of light well point precipitation efficiency
Technical field
The invention belongs to base pit dewatering construction field, and in particular to it is a kind of improve Application of light well point precipitation speed instrument and apply Work method.
Background technology
Be present the drawbacks of many technologies, economic aspect in traditional Application of light well point precipitation method, be mainly shown as:Pore-creating Cheng Jing Slowly, traditional pipe well drilling diameter is larger, impact drill or slewing drilling machine when pore-creating is into well, very flexible, borehole wall construction More complicated, cost is high;The slurry coat method that borehole wall surrounding enters in pore forming process, because condensing into mudcake and cohering in geotextiles mistake On filter screen, barrier film is formed, is not easy to rinse well, block the passage between precipitation area and dewatering well, reducing the borehole wall, nearby stratum is permeable Property, so that actual displacement does not reach estimated displacement much, have a strong impact on dewatering effect;Making well material can not reuse; Light well point Large Diameter Pipeline, high-capacity pump, it is disposable pump-out, big to original water environmental impact, the energy is both wasted, is also unfavorable for base Hole is stable.
Prior art literature is retrieved and found, above mentioned problem is still without good solution method at present.
The content of the invention
During it is an object of the invention to for the foundation pit construction precipitation such as the larger layer of sand of infiltration coefficient or mud burning into sand layer, carry Go out a kind of instrument and construction method for improving Application of light well point precipitation speed, so as to shorten precipitation time, realize rapid construction.
In order to achieve the above object, the present invention is achieved through the following technical solutions:One kind improves Application of light well point precipitation effect The instrument of rate, including,
Well point branch pipe, its lower end embedment underground;
Chimney filter, it is connected with well point branch pipe lower end, and the chimney filter is used to filter off debris;
Vacuum self priming pump, it is connected with well point branch pipe upper end;
Water header, it is connected with vacuum self priming pump;
The vacuum self priming pump will be dived under water after extraction comes up by chimney filter and well point branch pipe and is drained into water header.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, the well point branch pipe is managed for PVC-U, specification DN50 Millimeter (mm), the embedded depth of the well point branch pipe determine according to precipitation depth and reservoir bed position.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, the chimney filter is φ 48mm, and wall thickness 3mm's is seamless Steel pipe.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, the chimney filter bottom lock, the chimney filter top The flange for connection is provided between the branch pipe of well point.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, bore 15 φ's in the elongated scope of chimney filter tube wall Small sircle hole, pitch-row 25mm, filter screen of double-baging outside, the filter screen use woven cloth, and one layer of larger nylon yarn of mesh is wrapped in outside again Net, every 50~60mm 10# iron wire banding fixeds.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, the chimney filter needs to be embedded to water-bearing layer after completing It is interior, and should be than foundation ditch bottom depth 0.9m~1.2m.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, the vacuum self priming pump power 2.2KW is described true Set on empty self priming pump and be connected with two rubber hose, described vacuum self priming pump one end meets well point branch pipe, institute by rubber hose State the vacuum self priming pump other end and water header, rubber hose both ends junction 12# iron wires are connected to by rubber hose After fixation, then with preservative film bag 4-5 layers.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, the water header is managed for PVC-U, specification DN= 200mm, water inlet is stayed according to well point branch pipe position correspondence.
In a kind of above-mentioned instrument for improving Application of light well point precipitation efficiency, it is provided with and catchments at the water header convergence Well, the water header absolute altitude preferably try one's best close to phreatic line and along draw water water (flow) direction have 2.5 ‰ -5 ‰ the gradient, be easy to Converge to sump.
On the other hand, present invention also offers a kind of construction method for the instrument for improving Application of light well point precipitation efficiency, the party Method comprises the steps,
S1:According to foundation ditch scale and precipitation depth, calculate and determine well-point arrangement orientation, quantity;
S2:Along building side axis line, 1m × 0.8m groove is opened, for discharging punching recirculated water;
S3:It is a certain by φ 100mm flexible pipes and DN75mm fastener for connection, steel pipe alignment using high-pressure hydraulic pump punching, water pump Well point point position, water pump is opened, pore-forming is to calculating depth, then hole flushing, untill clear water is flowed out;
S4:It is put into the well point branch pipe that lower end is connected with chimney filter;
S5:Select particle diameter 1.2mm~1.5mm coarse sand, be uniformly densely filled to from aperture 1m positions stop, after sealed with clay Mouthful;
S6:Set on the vacuum self priming pump and be connected with rubber hose, the vacuum self priming pump one terminates well point branch pipe, separately One termination water header, after both ends are fixed with 12# iron wires, then with preservative film bag 4-5 layers;
S7:S3~6 are repeated, all well point branch pipes are accessed into water header by respective vacuum self priming pump;
S8:Debugging is drawn water;
S9:Formally draw water.
Compared with prior art, the invention has the advantages that:Well point branch pipe is made using common PVC-U pipes, tool Have the advantages that simple and easy to get, easy to make, application effect is good, device is used repeatedly, by using well point branch pipe and very Empty pump corresponds, and well-point arrangement is flexible, makes single well-points dewatering situation controllable, has and saves construction cost, improves precipitation effect The advantages of rate.
Brief description of the drawings
Fig. 1 is well-point arrangement plan;
Fig. 2 is A-A profiles.
In figure, well point branch pipe 1, chimney filter 2, flange 3, vacuum self priming pump 4, water header 5, rubber hose 6, sump 7, ditch Groove 8, coarse sand 9, clay 10.
Embodiment
It is the specific embodiment of the present invention and with reference to accompanying drawing below, technical scheme is further described, But the present invention is not limited to these embodiments.
Certain small-scale pit long 40m, wide 13.6m, foundation ditch center requirement reduction water level depth 4.9m, native infiltration coefficient take 0.173m/d, caliber 50mm, 2 long 1.2m of chimney filter, dewatering well quantity and spacing needed for calculating.
As shown in Figure 1 and Figure 2, a kind of instrument for improving Application of light well point precipitation efficiency, including:
Well point branch pipe 1, its lower end embedment underground;
Chimney filter 2, it is connected with the lower end of well point branch pipe 1, and the chimney filter 2 is used to filter off debris;
Vacuum self priming pump 4, it is connected with the upper end of well point branch pipe 1;
Water header 5, it is connected with vacuum self priming pump 4;
Diving imports water header 5 by the suction of vacuum self priming pump 4 along chimney filter 2 and well point branch pipe 1.On water header 5 Multiple link positions of vacuum self priming pump 4 are provided with, well point branch pipe 1 is linked into water header 5 by respective vacuum self priming pump 4, Displacement control can be carried out to single precipitation point, multiple precipitation points can improve precipitation efficiency in Precipitation Process is carried out.
Preferably, well point branch pipe 1 is managed for PVC-U, specification DN50 millimeters (mm), the embedded depth root of the well point branch pipe 1 Determined according to precipitation depth and reservoir bed position.The cost of well point branch pipe 1 is relatively low made of PVC-U materials, saves construction cost.
Preferably, chimney filter 2 is φ 48mm, wall thickness 3mm seamless steel pipe.Chimney filter 2 is arranged on the lower end of well point branch pipe 1, uses The material of high intensity is not easy to wear, and support effect is good.
Preferably, the bottom lock of chimney filter 2, the flange for connection is provided between the top of chimney filter 2 and well point branch pipe 1 3.The bottom of chimney filter 2 directly contacts well point bottom, it is not necessary to which permeable, enclosed construction uses more resistant to abrasion, chimney filter 2 and well point branch pipe 1 The connection of flange 3 is easy to dismount.
It is further preferred that 15 φ small sircle hole is bored in the elongated scope of the tube wall of chimney filter 2, and pitch-row 25mm, filter screen of double-baging outside, The filter screen uses woven cloth, and outside is wrapped one layer of larger nylon mesh of mesh, consolidated every 50~60mm with 10# iron wire colligations again It is fixed.The filter of the circular hole of suitable size, the outer nylon mesh for being provided with macropore filtering of pipe and aperture filtering is opened up on the tube wall of chimney filter 2 Net, multiple filtration effect is good, will not be brought into impurity in well point branch pipe 1 and cause the damage of vacuum self priming pump 4.
It is further preferred that chimney filter 2 needs to be embedded in water-bearing layer after completing, and should be than foundation ditch bottom depth 0.9m~1.2m. In the present invention, chimney filter 2 needs to be arranged on lowest part, after carrying out impurities in water filtering, dives under water under the drive of vacuum self priming pump 4 Discharge.
Preferably, the power 2.2KW of vacuum self priming pump 4, set on the vacuum self priming pump 4 and be connected with two rubber hose 6, Described one end of vacuum self priming pump 4 connects well point branch pipe 1 by rubber hose 6, and the other end of vacuum self priming pump 4 passes through rubber hose 6 are connected to water header 5, after the both ends junction of rubber hose 6 is fixed with 12# iron wires, then with preservative film bag 4-5 layers.For Reach the optimal using effect of vacuum self priming pump 4, to keep air-tight state in the junction of vacuum self priming pump 4, be reinforced using iron wire The outer rubber hose 6 for being surrounded by preservative film can ensure not produce gas leakage in certain elastic limit again, to ensure the pressure in pipeline Power reaches preset value, gets to the dewatering effect of design.
Preferably, water header 5 is managed for PVC-U, specification DN=200mm, water inlet is stayed according to well point position correspondence.Catchment House steward 5 laterally lays, and the diving in well point branch pipe 1 needs to be drained into water header 5, is managed using PVC-U, and perforate is convenient, pipe Road is thicker, and corresponding well point is provided with connector on water header 5, needed each vacuum self priming pump on well point when mounted 4 are connected on water header 5, and laying is neat, is easy to manage.
It is further preferred that being provided with sump 7 at the convergence of water header 5, the absolute altitude of water header 5 is preferably tried one's best close Phreatic line simultaneously has 2.5 ‰ -5 ‰ gradient along water (flow) direction of drawing water, and is easy to converge to sump 7.Water header 5 is laid to collection Well 7 has certain inclination, and flowing water can be driven by gravity and flow to sump 7, and water will not occur when vacuum self priming pump 4 is stopped Refluence situation.
On the other hand, present invention also offers a kind of construction method for the instrument for improving Application of light well point precipitation efficiency, the party Method comprises the steps,
S1:According to foundation ditch scale and precipitation depth, calculate and determine well-point arrangement orientation, quantity;
S2:Along building side axis line, 1m × 0.8m groove 8 is opened, for discharging punching recirculated water;
S3:It is a certain by φ 100mm flexible pipes and DN75mm fastener for connection, steel pipe alignment using high-pressure hydraulic pump punching, water pump Well point point position, water pump is opened, pore-forming is to calculating depth, then hole flushing, untill clear water is flowed out;
S4:It is put into the well point branch pipe 1 that lower end is connected with chimney filter 2;
S5:Select particle diameter 1.2mm~1.5mm coarse sand 9, be uniformly densely filled to from aperture 1m positions stop, after use clay 10 sealings;
S6:Set on the vacuum self priming pump 4 and be connected with rubber hose 6, the vacuum self priming pump 4 one terminates well point branch pipe 1, another termination water header 5, after both ends are fixed with 12# iron wires, then with preservative film bag 4-5 layers;
S7:S3~6 are repeated, all well point branch pipes 1 are accessed into water header 5 by respective vacuum self priming pump 4;
S8:Debugging is drawn water;
S9:Formally draw water.
Multi-hole pumping can reduce on overall structure influence, and beneficial to foundation ditch is stablized, the caliber of well point branch pipe 1 is small, into pore volume Easily, the coarse sand 9 and clay 10 for filling wellhole do not interfere with soil texture and water penetration, do not influence precipitation efficiency.
According to the workflow of the above example description present invention.
Required according to precipitation, open up multiple well points, be embedded to chimney filter 2 and well point branch pipe 1 in each well point, on well point branch pipe 1 Side connects vacuum self priming pump 4, and more 4 tie points of vacuum self priming pump, the connection diving of vacuum self priming pump 4 are provided with water header 5 Diving imports water header 5 by the suction of vacuum self priming pump 4 along well point branch pipe 1.
Need to bury well point branch pipe 1 to underground when drawing water, be punched out as desired with high-pressure hydraulic pump, in order to prevent arranging Impurities in water excessively causes drain line blockage during water, and hole flushing is carried out after pore-forming, and the water of hole flushing passes through building edge Groove 8 discharge, then the well point branch pipe 1 with chimney filter 2 is put into correspondence position, chimney filter 2 can effectively filter large granular impurity, Keep drainage channel smooth, reduce the damage to vacuum self priming pump 4, the space around well point branch pipe 1 is first filled out using coarse sand 8 Bury, sealed from aperture 1m opening positions clay 9, the position of well point branch pipe 1 is fixed.
The offer power of vacuum self priming pump 4 drinks up water is discharged into water header 5, the absolute altitude of water header 5 via well point branch pipe 1 Preferably try one's best have close to phreatic line and along water (flow) direction of drawing water 5 ‰ the gradient, be easy to converge to sump 7.
After engineering terminates, because the coarse sand 9 and clay 10 of sealing well water branch pipe can be removed easier, well point branch pipe 1 It can be reused after being taken out with chimney filter 2, dismounting is simple and convenient, and multiple well point branch pipes 1 can flexibly tackle different engine requests Arrangement installation, dewatering effect is good, and can regulate and control single well-points dewatering progress.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.

Claims (10)

  1. A kind of 1. instrument for improving Application of light well point precipitation efficiency, it is characterised in that including,
    Well point branch pipe, its lower end embedment underground;
    Chimney filter, it is connected with well point branch pipe lower end, and the chimney filter is used to filter off debris;
    Vacuum self priming pump, it is connected with well point branch pipe upper end;
    Water header, it is connected with vacuum self priming pump;
    The vacuum self priming pump will be dived under water after extraction comes up by chimney filter and well point branch pipe and is drained into water header.
  2. A kind of 2. instrument for improving Application of light well point precipitation efficiency according to claim 1, it is characterised in that the well point branch Manage and managed for PVC-U, specification DN50 millimeters (mm), the embedded depth of the well point branch pipe is true according to precipitation depth and reservoir bed position It is fixed.
  3. 3. a kind of instrument for improving Application of light well point precipitation efficiency according to claim 1, it is characterised in that the chimney filter is φ 48mm, wall thickness 3mm seamless steel pipe.
  4. A kind of 4. instrument for improving Application of light well point precipitation efficiency according to claim 3, it is characterised in that the chimney filter bottom Portion is closed, and the flange for connection is provided between the chimney filter top and well point branch pipe.
  5. A kind of 5. instrument for improving Application of light well point precipitation efficiency according to claim 4, it is characterised in that the chimney filter pipe 15 φ small sircle hole is bored in the elongated scope of wall, pitch-row 25mm, filter screen of double-baging outside, the filter screen uses woven cloth, outside to wrap again The larger nylon mesh of one layer of mesh, every 50~60mm 10# iron wire banding fixeds.
  6. A kind of 6. instrument for improving Application of light well point precipitation efficiency according to claim 5, it is characterised in that the chimney filter system Need to be embedded in water-bearing layer after the completion of work, and should be than foundation ditch bottom depth 0.9m~1.2m.
  7. 7. a kind of instrument for improving Application of light well point precipitation efficiency according to claim 1, it is characterised in that the vacuum is certainly Sucking pump power 2.2KW, set on the vacuum self priming pump and be connected with two rubber hose, described vacuum self priming pump one end passes through rubber Glue flexible pipe connects well point branch pipe, and the vacuum self priming pump other end is connected to water header, the rubber hose by rubber hose After both ends junction is fixed with 12# iron wires, then with preservative film bag 4-5 layers.
  8. 8. a kind of instrument for improving Application of light well point precipitation efficiency according to claim 7, it is characterised in that described to catchment always Manage and managed for PVC-U, specification DN=200mm, water inlet is stayed according to well point branch pipe position correspondence.
  9. 9. a kind of instrument for improving Application of light well point precipitation efficiency according to claim 8, it is characterised in that described to catchment always The poly- place of manifold is provided with sump, and the water header absolute altitude, which is preferably tried one's best close to phreatic line and along water (flow) direction of drawing water, to be had 2.5 ‰ -5 ‰ gradient, it is easy to converge to sump.
  10. 10. a kind of construction method for improving Application of light well point precipitation speed, this method comprise the steps,
    S1:According to foundation ditch scale and precipitation depth, calculate and determine well-point arrangement orientation, quantity;
    S2:Along building side axis line, 1m × 0.8m groove is opened, for discharging punching recirculated water;
    S3:Using high-pressure hydraulic pump punching, water pump is directed at a certain well point by φ 100mm flexible pipes and DN75mm fastener for connection, steel pipe Point position, opens water pump, pore-forming is to depth is calculated, then hole flushing, untill clear water is flowed out;
    S4:It is put into the well point branch pipe that lower end is connected with chimney filter;
    S5:Select particle diameter 1.2mm~1.5mm coarse sand, be uniformly densely filled to from aperture 1m positions stop, after sealed with clay;
    S6:Set on the vacuum self priming pump and be connected with rubber hose, the vacuum self priming pump one terminates well point branch pipe, the other end Water header is connect, after both ends are fixed with 12# iron wires, then with preservative film bag 4-5 layers;
    S7:S3~6 are repeated, all well point branch pipes are accessed into water header by respective vacuum self priming pump;
    S8:Debugging is drawn water;
    S9:Formally draw water.
CN201710903538.7A 2017-09-29 2017-09-29 A kind of instrument and its construction method for improving Application of light well point precipitation efficiency Pending CN107514005A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710903538.7A CN107514005A (en) 2017-09-29 2017-09-29 A kind of instrument and its construction method for improving Application of light well point precipitation efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710903538.7A CN107514005A (en) 2017-09-29 2017-09-29 A kind of instrument and its construction method for improving Application of light well point precipitation efficiency

Publications (1)

Publication Number Publication Date
CN107514005A true CN107514005A (en) 2017-12-26

Family

ID=60726843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710903538.7A Pending CN107514005A (en) 2017-09-29 2017-09-29 A kind of instrument and its construction method for improving Application of light well point precipitation efficiency

Country Status (1)

Country Link
CN (1) CN107514005A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736311A (en) * 2018-12-14 2019-05-10 东南大学 The light-duty intelligent insertion apparatus of base pit dewatering well-point pipe in a kind of river
CN109972643A (en) * 2019-05-06 2019-07-05 中国人民解放军空军工程大学 A kind of region of FuShui base pit engineering Trinity joint precipitation system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1264790A (en) * 1968-07-23 1972-02-23
CN104775443A (en) * 2015-04-28 2015-07-15 金中天集团建设有限公司 Well point dewatering method and device
CN205954648U (en) * 2016-08-22 2017-02-15 中国二十冶集团有限公司 Light well point precipitation device
CN207452926U (en) * 2017-09-29 2018-06-05 宁波二十冶建设有限公司 A kind of instrument for improving Application of light well point precipitation efficiency

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1264790A (en) * 1968-07-23 1972-02-23
CN104775443A (en) * 2015-04-28 2015-07-15 金中天集团建设有限公司 Well point dewatering method and device
CN205954648U (en) * 2016-08-22 2017-02-15 中国二十冶集团有限公司 Light well point precipitation device
CN207452926U (en) * 2017-09-29 2018-06-05 宁波二十冶建设有限公司 A kind of instrument for improving Application of light well point precipitation efficiency

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736311A (en) * 2018-12-14 2019-05-10 东南大学 The light-duty intelligent insertion apparatus of base pit dewatering well-point pipe in a kind of river
CN109972643A (en) * 2019-05-06 2019-07-05 中国人民解放军空军工程大学 A kind of region of FuShui base pit engineering Trinity joint precipitation system

Similar Documents

Publication Publication Date Title
CN107829425A (en) One kind tool circulation air emptying function column type forced-ventilated water pipe, device and method
CN102330424B (en) Vacuum preloading consolidation method for duplex vacuum tube well of blowing filling soft soil
CN102587352A (en) Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation
CN105178289A (en) Prefabricated downcast pipe pile in building foundation pit and use method thereof
CN202227357U (en) Water-reducing tube well structure
CN207452926U (en) A kind of instrument for improving Application of light well point precipitation efficiency
CN205954648U (en) Light well point precipitation device
CN107514005A (en) A kind of instrument and its construction method for improving Application of light well point precipitation efficiency
CN216170386U (en) Light well point filter tube structure
CN107956221A (en) Downcast well pipe proof protecting device and construction method
CN201224887Y (en) Well point tube for flexible soil foundation water drain consolidation
CN211228566U (en) Recoverable vacuum light well point dewatering system
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN107268364A (en) The construction method that mud bag builds road is filled on reclaimed ground
CN205917685U (en) Integral type well dotted arranges vacuum system
CN205917709U (en) Integral type well dotted arranges house steward vacuum system
CN206359968U (en) Bundle of capillary tubes drainpipe
CN105926577B (en) Vacuum preloading seepage consolidation method
CN105862716B (en) Integral type well point plastic strip pipe
CN104452734A (en) Rapid soft foundation separation preloading method
CN208266848U (en) A kind of device for soft base discharging consolidation and the device for being used for sludge dewatering
CN203213129U (en) Controllable non-return drainer
CN205917684U (en) Integral type well dotted calandria
CN214574009U (en) Precipitation device in foundation pit
CN105862714A (en) Soft foundation water cover type integrated well point plastic strip vacuum system

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Applicant after: Zhejiang 20 Smelter Construction Co.,Ltd.

Applicant after: CHINA MCC20 GROUP Corp.,Ltd.

Address before: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Applicant before: NINGBO MCC 20 CONSTRUCTION Co.,Ltd.

Applicant before: CHINA MCC20 GROUP Corp.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20171226

RJ01 Rejection of invention patent application after publication