CN206783059U - 一种框架装配式外加电梯井道 - Google Patents
一种框架装配式外加电梯井道 Download PDFInfo
- Publication number
- CN206783059U CN206783059U CN201720444788.4U CN201720444788U CN206783059U CN 206783059 U CN206783059 U CN 206783059U CN 201720444788 U CN201720444788 U CN 201720444788U CN 206783059 U CN206783059 U CN 206783059U
- Authority
- CN
- China
- Prior art keywords
- framework
- elevator hoistways
- section
- building
- additional elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 6
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims description 18
- 230000009545 invasion Effects 0.000 claims description 5
- 238000004458 analytical method Methods 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000007769 metal material Substances 0.000 claims description 2
- 229910052755 nonmetal Inorganic materials 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 210000003205 muscle Anatomy 0.000 claims 1
- 238000010008 shearing Methods 0.000 claims 1
- 238000002347 injection Methods 0.000 abstract description 3
- 239000007924 injection Substances 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 2
- 238000007493 shaping process Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 4
- 238000007726 management method Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 210000001015 abdomen Anatomy 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720444788.4U CN206783059U (zh) | 2017-04-26 | 2017-04-26 | 一种框架装配式外加电梯井道 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720444788.4U CN206783059U (zh) | 2017-04-26 | 2017-04-26 | 一种框架装配式外加电梯井道 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206783059U true CN206783059U (zh) | 2017-12-22 |
Family
ID=60707933
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720444788.4U Active CN206783059U (zh) | 2017-04-26 | 2017-04-26 | 一种框架装配式外加电梯井道 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206783059U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106892315A (zh) * | 2017-04-26 | 2017-06-27 | 万勇 | 一种框架装配式外加电梯井道 |
CN112551293A (zh) * | 2020-11-26 | 2021-03-26 | 江西省丰和泰重工科技有限公司 | 一种防高空坠物的施工升降机 |
-
2017
- 2017-04-26 CN CN201720444788.4U patent/CN206783059U/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106892315A (zh) * | 2017-04-26 | 2017-06-27 | 万勇 | 一种框架装配式外加电梯井道 |
CN112551293A (zh) * | 2020-11-26 | 2021-03-26 | 江西省丰和泰重工科技有限公司 | 一种防高空坠物的施工升降机 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106892315A (zh) | 一种框架装配式外加电梯井道 | |
CN201217898Y (zh) | 混凝土预制楼梯 | |
CN106703197B (zh) | 一种大跨度多层抗震框架结构体系及其施工方法 | |
CN203174767U (zh) | 型钢混凝土框架四角筒体双向大跨钢桁架混合结构 | |
CN201962792U (zh) | 大跨度预应力混凝土梁板拟框架结构 | |
CN111088859B (zh) | 一种装配式外墙结构及其安装方法 | |
CN206783059U (zh) | 一种框架装配式外加电梯井道 | |
CN111648555A (zh) | 层叠式预制混凝土电梯井道 | |
CN206267309U (zh) | 一种装配式钢‑混凝土框架‑核心筒结构体系 | |
CN105804232A (zh) | 一种空间模块建筑 | |
CN113737936B (zh) | 一种预制组合式双联阳台的连接结构及施工方法 | |
CN110565987A (zh) | 预制装配式高层住宅筒体模壳密肋预应力楼板结构体系 | |
CN203257090U (zh) | 外挑楼板的模板系统 | |
CN204475580U (zh) | 墙板组件及全装配式房屋 | |
CN108193800B (zh) | 一种装配式组合剪力墙及其与钢梁、楼板的连接构造 | |
CN214531068U (zh) | 一种装配式钢结构房屋 | |
CN104100000A (zh) | 型钢混凝土框架四角筒体双向大跨钢桁架混合结构 | |
CN109441031B (zh) | 结构梁隐藏式悬挑型开敞旋转楼梯结构及其施工方法 | |
CN209114648U (zh) | 一种装配式外墙结构 | |
CN209308156U (zh) | 一种可循环使用的装配式房屋 | |
CN204804129U (zh) | 一种建筑用全预制砼楼板 | |
CN111042430A (zh) | 一种四维榫卯结构砖及免拆浇筑型立柱 | |
CN212453063U (zh) | 装配浇注一体化剪力墙结构建筑体系 | |
CN211229646U (zh) | 预制装配式高层住宅筒体模壳密肋预应力楼板结构体系 | |
CN100371546C (zh) | 石膏空心大板灌注混凝土墙体及制作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180206 Address after: Yanziji street in Qixia District of Nanjing City, Jiangsu province 210038 and Yan Road, No. 371 Southeast University Science Park by building A505 room Patentee after: Nanjing Ruiyong Project Management Co. Ltd. Address before: 210028 201 Room 201, new village, No. 3, Maigaoqiao street, Qixia District, Qixia District, Jiangsu Patentee before: Wan Yong |
|
TR01 | Transfer of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Frame fabricated additional lift shaft Effective date of registration: 20180619 Granted publication date: 20171222 Pledgee: Bank of Nanjing, Limited by Share Ltd, Nanjing branch Pledgor: Nanjing Ruiyong Project Management Co. Ltd. Registration number: 2018320000088 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220406 Granted publication date: 20171222 Pledgee: Bank of Nanjing Limited by Share Ltd. Nanjing branch Pledgor: NANJING RUIYONG ENGINEERING PROJECT MANAGEMENT CO.,LTD. Registration number: 2018320000088 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220418 Address after: Building F2, No. 532-1, Zhongshan East Road, Qinhuai District, Nanjing City, Jiangsu Province Patentee after: Nanjing ruiyong Urban Renewal Research Institute Co.,Ltd. Address before: Room A505, Kechuang building, Science Park, Southeast University, No. 371, Heyan Road, Yanziji street, Qixia District, Nanjing, Jiangsu 210038 Patentee before: NANJING RUIYONG ENGINEERING PROJECT MANAGEMENT CO.,LTD. |
|
TR01 | Transfer of patent right |