Prior art keywords
cooling tower
tower body
module
controller
output end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720502498.0U
Other languages
Chinese (zh)
Inventor
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Blue Water Surrounding Equipment Science And Technology Ltd
Original Assignee
Guangzhou Blue Water Surrounding Equipment Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Blue Water Surrounding Equipment Science And Technology Ltd filed Critical Guangzhou Blue Water Surrounding Equipment Science And Technology Ltd
Priority to CN201720502498.0U priority Critical patent/CN206772123U/en
Application granted granted Critical
Publication of CN206772123U publication Critical patent/CN206772123U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses Novel cooling tower operation controller, including cooling tower body and higher level's external equipment, the side of the cooling tower body is connected with feeding spraying pump by pipeline, the sewage draining exit that opposite side is set is located at the lower section of controller body, the other end of the jet pipe of connection is located at the inside of cooling tower body at the top of the feeding spraying pump, and the bottom even of jet pipe is fixed with six shower nozzles, the inside of the controller body is provided with internal battery, and it is provided with display screen and control button on a side of controller body, the display location is in the side of control button, the surface cooler of the cooling tower body interior installation is located at the lower section of shower nozzle.The utility model uses single-chip microcomputer integration module mode, integrated temperature and conductivity measurement module, installed in cooling tower opening position, it is possible to provide RS485 modules carry out communication and used for upper level centralized Control, can greatly lift the control efficiency of existing cooling tower.

Description

Novel cooling tower operation controller
Technical field
It the utility model is related to control system part technical field, specially Novel cooling tower operation controller.
Background technology
Cooling tower (The cooling tower) be by the use of water as circulating coolant, absorbed from system heat dissipation to In air, to reduce the device of water temperature;It is to carry out cold and hot exchange after contacting with air flow using water to produce steam, steam that its is cold Volatilization takes away heat and reaches the principles such as evaporative heat loss, convection heat transfer' heat-transfer by convection and radiant heat transfer to disperse industrially or be produced in refrigeration air-conditioner Waste heat reduce the evaporating radiator of water temperature, to ensure the normal operation of system, device is generally tubbiness, therefore named for cooling Tower.Cooling tower is collection aerodynamics, thermodynamics, fluidics, chemistry, biochemistry, materialogy, quiet, dynamic structure mechanics, is added The condensation products that a variety of subjects such as work technology are integrated.Water quality be multivariable function, cooling it is even more multifactor, multivariable with it is more The process of effect synthesis.
At present, existing cooling tower startup and stop be traditional approach electric controling mode, that is, manually start or PLC control System, but PLC controls the basic need later stage artificially to increase, it is insufficient with system matches and convenience on probation, and small-sized cooling tower increases Addition is originally higher uneconomical.
Utility model content
The purpose of this utility model is to provide Novel cooling tower operation controller, to solve to propose in above-mentioned background technology The PLC control basic need later stages of traditional cooling tower artificially increase, insufficient and small-sized cold with system matches and convenience on probation But the tower increase higher uneconomic problem of cost.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:Novel cooling tower operation controller, Including cooling tower body and higher level's external equipment, the side of the cooling tower body is connected with feeding spraying pump by pipeline, another The sewage draining exit that side is set is located at the lower section of controller body, and the other end of the jet pipe connected at the top of the feeding spraying pump is positioned at cooling The inside of tower body, and the bottom even of jet pipe is fixed with six shower nozzles, the inside of the controller body is provided with built-in storage Battery, and display screen and control button are provided with a side of controller body, the display location is in control button Side, the surface cooler of the cooling tower body interior installation are located at the lower section of shower nozzle, and the blower fan that cooling tower bodies top is fixed Bottom be located at the setting of cooling tower body interior jet pipe top, the output end of higher level's external equipment communicates with RS485 The input connection of module, the output end of the RS485 communication modules are connected with the input of controller body, and the warming is visited The output end of head and the input of integrated temperature module connect, the output end of the integrated temperature module and conductivity measurement module Input with single-chip microcomputer integration module is connected, the output end of the single-chip microcomputer integration module respectively with feeding spraying pump and blower fan Input connection, the feeding spraying pump and blower fan with controller body be electrically connected with.
Further, the temperature sensitive probe is arranged on the inside of cooling tower body.
Further, the integrated temperature module, conductivity measurement module and single-chip microcomputer integration module are respectively positioned on controller The inside of body.
Further, the blower fan is fixedly connected with cooling tower body by fastener.
Further, it is provided with control valve on the sewage draining exit.
Compared with prior art, the beneficial effect that the utility model is reached is:The equipment, using single-chip microcomputer integration module Mode, integrated temperature and conductivity measurement module, installed in cooling tower opening position, it is possible to provide RS485 modules carry out communication for upper One-level centralized Control uses, and can greatly lift the control efficiency of existing cooling tower, can be reduced on small-sized and independent cooling tower Overall use and control cost.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and a part for constitution instruction, with this practicality New embodiment is used to explain the utility model together, does not form to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation of the utility model cooling tower body;
Fig. 2 is the structural representation of the utility model controller body;
Fig. 3 is theory diagram of the present utility model;
In figure:1st, feeding spraying pump;2nd, surface cooler;3rd, jet pipe;4th, blower fan;5th, cooling tower body;6th, shower nozzle;7th, controller sheet Body;8th, internal battery;9th, sewage draining exit;10th, display screen;11st, control button;12nd, temperature sensitive probe;13rd, integrated temperature module; 14th, higher level's external equipment;15th, RS485 communication modules;16th, conductivity measurement module;17th, single-chip microcomputer integration module.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides Novel cooling tower operation controller technical scheme:Novel cooling tower is run Controller, including cooling tower body 5 and higher level's external equipment 14, the side of cooling tower body 5 are connected with shower water by pipeline Pump 1, the sewage draining exit 9 that opposite side is set are located at the lower section of controller body 7, the other end of the jet pipe 3 of the top of feeding spraying pump 1 connection Bottom even positioned at the inside of cooling tower body 5, and jet pipe 3 is fixed with six shower nozzles 6, the inside installation of controller body 7 There is internal battery 8, and display screen 10 and control button 11 are provided with a side of controller body 7, display screen 10 In the side of control button 11, the surface cooler 2 of the inside of cooling tower body 5 installation is located at the lower section of shower nozzle 6, and cooling tower body 5 The bottom for the blower fan 4 that top is fixed be located at the top of the jet pipe 3 of the inside of cooling tower body 5 setting, higher level's external equipment 14 it is defeated Go out end to be connected with the input of RS485 communication modules 15, the output end of RS485 communication modules 15 and the input of controller body 7 End connection, the output end of temperature sensitive probe 12 are connected with the input of integrated temperature module 13, integrated temperature module 13 and electrical conductivity Input of the output end of measurement module 16 with single-chip microcomputer integration module 17 is connected, the output end point of single-chip microcomputer integration module 17 Input not with feeding spraying pump 1 and blower fan 4 is connected, and feeding spraying pump 1 and blower fan 4 are electrically connected with controller body 7.
Further, temperature sensitive probe 12 is arranged on the inside of cooling tower body 5.
Further, integrated temperature module 13, conductivity measurement module 16 and single-chip microcomputer integration module 17 are respectively positioned on control The inside of device body 7.
Further, blower fan 4 is fixedly connected with cooling tower body 5 by fastener.
Further, it is provided with control valve on sewage draining exit 9.
Operation principle:During work, internal battery 8 is connected with external power source, deposited electric energy by internal battery 8 Storage is got up, so as to provide electric energy for controller body 7, by RS485 communication modules 15 by controller body 7 with being set outside higher level Standby 14 connect, and detect the temperature inside cooling tower body 5 by temperature sensitive probe 12 and feed back to integrated temperature module 13, lead to Cross integrated temperature module 13 and send signal to single-chip microcomputer integration module 17 again, electrical conductivity is carried out by conductivity measurement module 16 Measurement, and measurement data is fed back into single-chip microcomputer integration module 17, then each electricity of control is realized by single-chip microcomputer integration module 17 The startup and stopping of property element, and the regulation and control of each parameter, in addition, higher level's external equipment 14 can also pass through RS485 communication modules 15 realize the centralized Control use to each module inside controller body 7, so as to improve control efficiency.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Carry out equivalent substitution.All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc., It should be included within the scope of protection of the utility model.

Claims (5)

1. Novel cooling tower operation controller, including cooling tower body(5)With higher level's external equipment(14), it is characterised in that:Institute State cooling tower body(5)Side feeding spraying pump is connected with by pipeline(1), the sewage draining exit of opposite side setting(9)Positioned at control Device body(7)Lower section, the feeding spraying pump(1)The jet pipe of top connection(3)The other end be located at cooling tower body(5)It is interior Portion, and jet pipe(3)Bottom even be fixed with six shower nozzles(6), the controller body(7)Inside built-in electric power storage is installed Pond(8), and controller body(7)A side on be provided with display screen(10)And control button(11), the display screen (10)Positioned at control button(11)Side, the cooling tower body(5)The surface cooler of inside installation(2)Positioned at shower nozzle(6)'s Lower section, and cooling tower body(5)The blower fan that top is fixed(4)Bottom be located at cooling tower body(5)The jet pipe that inside is set(3) Top, higher level's external equipment(14)Output end and RS485 communication modules(15)Input connection, the RS485 Communication module(15)Output end and controller body(7)Input connection, temperature sensitive probe(12)Output end and integrated temperature Spend module(13)Input connection, the integrated temperature module(13)With conductivity measurement module(16)Output end with list Piece machine integration module(17)Input connection, the single-chip microcomputer integration module(17)Output end respectively with feeding spraying pump(1) And blower fan(4)Input connection, the feeding spraying pump(1)And blower fan(4)With controller body(7)It is electrically connected with.
2. Novel cooling tower operation controller according to claim 1, it is characterised in that:The temperature sensitive probe(12)Installation In cooling tower body(5)Inside.
3. Novel cooling tower operation controller according to claim 1, it is characterised in that:The integrated temperature module (13), conductivity measurement module(16)With single-chip microcomputer integration module(17)It is respectively positioned on controller body(7)Inside.
4. Novel cooling tower operation controller according to claim 1, it is characterised in that:The blower fan(4)With cooling tower Body(5)It is fixedly connected by fastener.
5. Novel cooling tower operation controller according to claim 1, it is characterised in that:The sewage draining exit(9)Upper setting There is control valve.
CN201720502498.0U 2017-05-08 2017-05-08 Novel cooling tower operation controller Expired - Fee Related CN206772123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720502498.0U CN206772123U (en) 2017-05-08 2017-05-08 Novel cooling tower operation controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720502498.0U CN206772123U (en) 2017-05-08 2017-05-08 Novel cooling tower operation controller

Publications (1)

Publication Number Publication Date
CN206772123U true CN206772123U (en) 2017-12-19

Family

ID=60650085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720502498.0U Expired - Fee Related CN206772123U (en) 2017-05-08 2017-05-08 Novel cooling tower operation controller

Country Status (1)

Country Link
CN (1) CN206772123U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108519019A (en) * 2018-05-08 2018-09-11 江苏华塔冷却技术有限公司 A kind of cooling tower intelligence water regulating system and its adjusting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108519019A (en) * 2018-05-08 2018-09-11 江苏华塔冷却技术有限公司 A kind of cooling tower intelligence water regulating system and its adjusting method

Similar Documents

Publication Publication Date Title
CN205119873U (en) Compound cooling tower of high temperature flue gas
CN203687257U (en) Solar driving type indirect/direct evaporation cooling air conditioning unit
CN107560044B (en) Evaporative cooling air-conditioning system for providing electric energy by using industrial waste heat
CN105650787A (en) Solar heating and evaporative cooling combined air conditioner used in winter and summer
CN206772123U (en) Novel cooling tower operation controller
CN103759363A (en) Evaporative cooling air conditioner system combining passive cooling and heating
CN203744443U (en) Wind energy, solar energy and dry air energy combined air conditioner
CN204678566U (en) The energy-saving Evaporative Cooling Air-conditioning System of anti-freeze formula
CN102853494B (en) Evaporation cooling air conditioning system capable of providing electric energy by using industrial exhaust heat
CN208519900U (en) A kind of photovoltaic water cooling solution dehumidifying air-conditioning system
CN207179881U (en) Low energy consumption solution dehumidifying air-conditioning system
CN115790200A (en) Dry-wet combined defogging type closed cooling tower and working method
CN204786979U (en) Indirect evaporative cooling air -conditioning unit of vertical high efficiency
CN207166456U (en) A kind of intelligent remote manipulation photovoltaic heat pump combination hot-water heating system
CN202769854U (en) Evaporative cooling air conditioner utilizing industrial residual heat to supply electric energy
CN203628892U (en) Automatic-control solar power generation evaporative cooling air conditioner used for bus station
CN203571922U (en) Evaporative cooling and solar power generation combined air-conditioner applicable to sentry box
CN102832283A (en) Component structure for adjusting temperature of photovoltaic components by water circulation
CN202855786U (en) Solar photovoltaic and photothermal integrated device
CN207218634U (en) A kind of cooling heat radiator of photovoltaic plant
CN206459372U (en) A kind of industrial premises of solar energy photovoltaic utilization
CN205718059U (en) A kind of solar heat pump and water heating, cold air, heating installation all-in-one
CN220250736U (en) Cross-flow type high-temperature cooling tower
CN109539372A (en) Solar energy heating pump, multi-source heating refrigeration system
CN205843069U (en) Solar Enercy Fission Geyser

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219