CN206771912U - A kind of bioconversion medium test tube drying plant - Google Patents
A kind of bioconversion medium test tube drying plant Download PDFInfo
- Publication number
- CN206771912U CN206771912U CN201621389605.5U CN201621389605U CN206771912U CN 206771912 U CN206771912 U CN 206771912U CN 201621389605 U CN201621389605 U CN 201621389605U CN 206771912 U CN206771912 U CN 206771912U
- Authority
- CN
- China
- Prior art keywords
- test tube
- sliding block
- slide rail
- drying plant
- wind chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
It the utility model is related to a kind of drying plant, more particularly to a kind of bioconversion medium test tube drying plant.The technical problems to be solved in the utility model is to provide a kind of bioconversion medium of high safety test tube drying plant.In order to solve the above-mentioned technical problem, the utility model provides such a bioconversion medium test tube drying plant, includes base, wind chamber, breather pipe, air jet pipe, sponge, push pedal, the first mobile bar, sealing ring, the first slide rail, the first sliding block, spring, push rod etc.;The mode that base top passes on left mode connects for screw is connected with wind chamber, and wind chamber top left side is connected with breather pipe by way of flange connection, air jet pipe is all equably provided with left and right sides of breather pipe.When needing to dry test tube, student constantly makes push rod or so alternately move, and so as to the constantly jet into test tube, dries up test tube, while test tube can constantly alternate rotation clockwise and anticlockwise.
Description
Technical field
It the utility model is related to a kind of drying plant, more particularly to a kind of bioconversion medium test tube drying plant.
Background technology
Test tube is the conventional instrument of chemical laboratory, the reaction vessel of a small amount of reagent is served as, in normal temperature or heating(Add
It should be preheated before heat, not so test tube easily bursts)Use.Test tube divides common test tube, tool test tube, centrifuge tube etc. a variety of.
The specification of common test tube is with external diameter(mm)× length(mm)Represent, such as 15 × 150,18 × 180,20 × 200.
When needing to use test tube to carry out biological respinse or need test tube Sheng amount biological reagent, it is required for keeping test tube
Cleaning and dry, and student experiment when due to the number of student it is more, test tube be typically all be finished after cleaning reuse, clearly
Test tube must be dried after washing, this requires efficient drying plant to be dried for test tube, but has under lab
Many inflammable and explosive biological reagents, this just needs student and the especially careful electricity consumption of teacher, but existing drying plant is all adopted
Dried with electric power, this just adds potential safety hazard for student and teacher.
To sum up, need to research and develop a kind of bioconversion medium of high safety test tube drying plant at present, to overcome prior art
The shortcomings that middle potential safety hazard is big.
Utility model content
(1)Technical problems to be solved
The utility model in order to overcome the shortcomings that potential safety hazard is big in the prior art, ask by technology to be solved in the utility model
Topic is to provide a kind of bioconversion medium of high safety test tube drying plant.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the utility model provides such a bioconversion medium test tube drying plant,
Include base, wind chamber, breather pipe, air jet pipe, sponge, push pedal, the first mobile bar, sealing ring, the first slide rail, the first cunning
Block, spring, push rod, the second slide rail, the second sliding block, the 3rd sliding block, connecting rod, the second mobile bar, rack, top plate, bearing block, turn
Bar, gear, U-shaped frame, clamping device, right shelf, the mode that base top passes on left mode connects for screw are connected with wind chamber, wind chamber
Top left side is connected with breather pipe by way of flange connection, and air jet pipe is all equably provided with left and right sides of breather pipe, leads to
All equably bonding connection has sponge at left and right sides of tracheae, and with air jet pipe to be disposed adjacent, wind chamber inner sliding type connects sponge
There is push pedal, push pedal right side central has been welded to connect the first mobile bar, and wind chamber right side central is provided with aperture, and the first mobile bar passes through
Aperture, sealing ring is provided between the first mobile bar and aperture, right shelf, right shelf left side central portion have been welded to connect on the right side of base top
The first slide rail is connected with by bolted connection, and slidingtype is connected with the first sliding block, the first sliding block left side on the first slide rail
Spring is connected with by way of linking up with and connecting between the first slide rail, push rod has been welded to connect on the right side of the first sliding block, right shelf is left
Upper lateral part is connected with the second slide rail by bolted connection, and slidingtype is connected with the second sliding block on the second slide rail, and second slides
Block and the second slide rail coordinate, and the second mobile bar is connected with by way of being glued and connecting between the second sliding block and the first sliding block, the
Two slide rail left part slidingtypes are connected with the 3rd sliding block, and the 3rd sliding block and the second slide rail coordinate, the 3rd sliding block right side and the second sliding block
Connecting rod is connected between left side by way of being glued and connecting, the mode being connected by screw on front side of the 3rd sliding block connects with teeth
Bar, right shelf left upper portion have been welded to connect top plate, and top plate is located above the second slide rail, and top plate bottom left is bolted
Mode is connected with bearing block, is connected with bull stick by way of interference connection on the bearing of bearing block, is connected on bull stick by interference
The mode connect is connected with gear, wheel and rack engagement, and bull stick lower weld is connected with U-shaped frame, and U-shaped frame bottom is connected with clamping
Device, clamping device include the 3rd slide rail, Four-slider, steel wire rope, link, hook and clamping plate, the U-shaped frame bottom left and right sides
The 3rd slide rail is connected with by bolted connection, and slidingtype is connected with Four-slider on the 3rd slide rail, the left and right sides
Clamping plate has been welded to connect between Four-slider, has also been welded to connect clamping plate between the 3rd slide rail rear side of the left and right sides, the 4th slides
Steel wire rope is connected with by way of linking up with and connecting on rear side of block, be equably provided with link on steel wire rope, the of the left and right sides
Hook is fixedly connected with rear side of three slide rails, link coordinates with hook.
Preferably, also include rubber blanket, be glued on the inside of the clamping plate of front and rear sides and be connected with rubber blanket.
Preferably, also include support plate, support plate has been welded to connect at the top of wind chamber, groove, groove type are provided with the top of support plate
Shape is annular.
Preferably, cleat shapes are convex.
Preferably, the first mobile bar is shaped as L-shaped.
Preferably, base material is HT200.
Operation principle:When needing to dry test tube, test tube is entangled breather pipe by student, and now test tube is located at front and rear sides
Between clamping plate, Four-slider is then moved rearwards, is moved rearwards the clamping plate of front side, the clamping plate of front side is clamped test tube, currently
After the clamping plate of side clamps test tube, student hangs over the link of corresponding position on hook, and now test tube is fixed, then student to
Left promotion push rod, is moved to the left the first sliding block, is moved to the left push pedal by the effect of the first mobile bar, makes in wind chamber
Air sprays to inboard wall of test tube by breather pipe and air jet pipe, and so as to reach the purpose of drying test tube, while the first sliding block is to moving to left
The dynamic effect by the second mobile bar drives the second sliding block to be moved to the left, and effect the 3rd sliding block of drive by connecting rod is to moving to left
Dynamic, so as to be moved to the left with carry-over bar, because rack and pinion engages, rack is moved to the left band moving gear and turned counterclockwise
It is dynamic, so as to drive bull stick to rotate counterclockwise, and then drive clamping device to rotate counterclockwise, test tube also rotates counterclockwise therewith, when
After push rod pushes away the distance to make a motion to the left, student pulls to the right push rod, the first sliding block is moved right, and passes through the first mobile bar
Effect makes push pedal move right, while the first sliding block moves right and drives the second sliding block to move right by the effect of the second mobile bar
It is dynamic, drive the 3rd sliding block to move right by the effect of connecting rod, so as to be moved right with carry-over bar, because rack and pinion is nibbled
Close, so rack moves right, band moving gear rotates clockwise, and so as to drive bull stick to rotate clockwise, and then drives clamping device
Rotate clockwise, test tube also rotates clockwise therewith, and after push rod draws to the right the distance to make a motion, student pushes away to the left again
Bar.When drying test tube, student constantly makes push rod or so alternately move, so as to the constantly jet into test tube, drying
Test tube, at the same test tube can constantly alternate rotation clockwise and anticlockwise so that inboard wall of test tube constantly rubs with sponge, because
It is very soft and water imbibition is very strong for sponge quality, thus inboard wall of test tube test tube will not be constantly worn with sponge friction can also will
The water droplet of inboard wall of test tube adhesion is dried, so as to strengthen drying effect.After the completion of test tube drying, student stops mobile putter, so
Link is removed from hook afterwards, and moves forward Four-slider, after the clamping plate of front side is moved to correct position, student will hang
Ring is hung on hook, is then taken out test tube.
It is glued because also including rubber blanket, on the inside of the clamping plate of front and rear sides and is connected with rubber blanket, clamping plate can be prevented
Test tube is caused to damage when clamping test tube.
Because also including support plate, support plate is welded to connect at the top of wind chamber, has been provided with groove at the top of support plate, groove shapes are
Annular, when drying test tube, the bottom of test tube is set to be located in groove, test tube can provide support for test tube when rotating, increase is steady
It is qualitative.
(3)Beneficial effect
When needing to dry test tube, student constantly makes push rod or so alternately move, so as to constantly into test tube
Jet, dries up test tube, at the same test tube can constantly alternate rotation clockwise and anticlockwise so that inboard wall of test tube constantly with sea
Silk floss friction, the water droplet that inboard wall of test tube adheres to is dried, so as to strengthen drying effect.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is the first overlooking the structure diagram of the utility model clamping device.
Fig. 3 is second of overlooking the structure diagram of the utility model clamping device.
Fig. 4 is second of main structure diagram of the present utility model.
Fig. 5 is the overlooking the structure diagram of the utility model support plate.
Mark in accompanying drawing for:1- bases, 2- wind chambers, 3- breather pipes, 4- air jet pipes, 5- sponges, 6- push pedals, 7- first
Mobile bar, 8- apertures, 9- sealing rings, the slide rails of 10- first, the sliding blocks of 11- first, 12- springs, 13- push rods, the slide rails of 14- second,
The sliding blocks of 15- second, the sliding blocks of 16- the 3rd, 17- connecting rods, the mobile bars of 18- second, 19- racks, 20- top plates, 21- bearing blocks, 22- turn
Bar, 23- gears, 24-U shape framves, 25- clamping devices, 26- test tubes, 27- right shelfs, the slide rails of 28- the 3rd, 29- Four-sliders, 30- steel
Cord, 31- links, 32- hooks, 33- clamping plates, 34- rubber blankets, 35- support plates, 36- grooves.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of bioconversion medium test tube drying plant, as Figure 1-5, include base 1, wind chamber 2, breather pipe 3, spray
Tracheae 4, sponge 5, push pedal 6, the first mobile bar 7, sealing ring 9, the first slide rail 10, the first sliding block 11, spring 12, push rod 13,
Two slide rails 14, the second sliding block 15, the 3rd sliding block 16, connecting rod 17, the second mobile bar 18, rack 19, top plate 20, bearing block 21, turn
Bar 22, gear 23, U-shaped frame 24, clamping device 25, right shelf 27, the mode that the top left side of base 1 is connected by screw, which is connected with, takes out
Bellows 2, the top left side of wind chamber 2 are connected with breather pipe 3 by way of flange connection, and the left and right sides of breather pipe 3 is all equably
Air jet pipe 4 is provided with, all equably bonding connection has sponge 5 to the left and right sides of breather pipe 3, and sponge 5 sets with air jet pipe 4 to be adjacent
Put, the inner sliding type of wind chamber 2 is connected with push pedal 6, and the right side central of push pedal 6 has been welded to connect the first mobile bar 7, the right side of wind chamber 2
Middle part is provided with aperture 8, and the first mobile bar 7 passes through aperture 8, sealing ring 9, base 1 are provided between the first mobile bar 7 and aperture 8
Top right side has been welded to connect right shelf 27, and the left side central portion of right shelf 27 is connected with the first slide rail 10 by bolted connection, the
Slidingtype is connected with the first sliding block 11 on one slide rail 10, by linking up with connection between the left side of the first sliding block 11 and the first slide rail 10
Mode is connected with spring 12, and the right side of the first sliding block 11 has been welded to connect push rod 13, and the left upper portion of right shelf 27 is bolted
Mode is connected with the second slide rail 14, and slidingtype is connected with the second sliding block 15, the second sliding block 15 and the second slide rail on the second slide rail 14
14 coordinate, and are connected with the second mobile bar 18 between the second sliding block 15 and the first sliding block 11 by way of being glued and connecting, and second slides
The left part slidingtype of rail 14 is connected with the 3rd sliding block 16, and the 3rd sliding block 16 coordinates with the second slide rail 14, the right side of the 3rd sliding block 16 and the
Connecting rod 17, the side that the front side of the 3rd sliding block 16 is connected by screw are connected between the left side of two sliding block 15 by way of being glued and connecting
Formula is connected with rack 19, and the left upper portion of right shelf 27 has been welded to connect top plate 20, and top plate 20 is located at the top of the second slide rail 14, top plate 20
Bottom left is connected with bearing block 21 by bolted connection, is connected on the bearing of bearing block 21 by way of interference connection
Bull stick 22 is connected to, is connected with gear 23 by way of interference connection on bull stick 22, gear 23 engages with rack 19, under bull stick 22
Portion has been welded to connect U-shaped frame 24, and the bottom of U-shaped frame 24 is connected with clamping device 25, and clamping device 25 includes the 3rd slide rail 28,
Four-slider 29, steel wire rope 30, link 31, hook 32 and clamping plate 33, the side that the bottom of U-shaped frame 24 left and right sides is bolted
Formula is connected with the 3rd slide rail 28, and slidingtype is connected with Four-slider 29 on the 3rd slide rail 28, the Four-slider 29 of the left and right sides it
Between be welded to connect clamping plate 33, be also welded to connect clamping plate 33, Four-slider 29 between the rear side of the 3rd slide rail 28 of the left and right sides
Rear side is connected with steel wire rope 30 by way of linking up with and connecting, and link 31, the left and right sides are equably provided with steel wire rope 30
The rear side of the 3rd slide rail 28 be fixedly connected with hook 32, link 31 coordinates with hook 32.
Also include rubber blanket 34, the inner side of clamping plate 33 of front and rear sides, which is glued, is connected with rubber blanket 34.
Also include support plate 35, the top of wind chamber 2 has been welded to connect support plate 35, and the top of support plate 35 is provided with groove 36, groove
36 are shaped as annular.
Clamping plate 33 is shaped as convex.
First mobile bar 7 is shaped as L-shaped.
The material of base 1 is HT200.
Operation principle:When needing to dry test tube 26, test tube 26 is entangled breather pipe 3 by student, before now test tube 26 is located at
Afterwards between the clamping plate 33 of both sides, Four-slider 29 is then moved rearwards, is moved rearwards the clamping plate 33 of front side, makes the clamping plate of front side
33 clamp test tube 26, and after the clamping plate 33 of front side clamps test tube 26, student hangs over the link 31 of corresponding position on hook 32,
Now test tube 26 is fixed, and then student promotes push rod 13 to the left, is moved to the left the first sliding block 11, passes through the first mobile bar 7
Effect be moved to the left push pedal 6, the air in wind chamber 2 is sprayed to the inwall of test tube 26 by breather pipe 3 and air jet pipe 4, from
And reach the purpose of drying test tube 26, while the first sliding block 11 moves left through the cunning of effect drive second of the second mobile bar 18
Block 15 is moved to the left, and drives the 3rd sliding block 16 to be moved to the left by the effect of connecting rod 17, so as to be moved to the left with carry-over bar 19, because
Engaged for rack 19 with gear 23, so rack 19 is moved to the left band moving gear 23 and rotated counterclockwise, so as to drive bull stick 22 inverse
Hour hands rotate, and then drive clamping device 25 to rotate counterclockwise, and test tube 26 also rotates counterclockwise therewith, when push rod 13 promotes to the left
After one dynamic distance, student pulls to the right push rod 13, the first sliding block 11 is moved right, and is made by the effect of the first mobile bar 7
Push pedal 6 moves right, while the first sliding block 11 moves right and drives the second sliding block 15 to the right by the effect of the second mobile bar 18
It is mobile, drive the 3rd sliding block 16 to move right by the effect of connecting rod 17, so as to be moved right with carry-over bar 19, because rack 19
Engaged with gear 23, so rack 19 moves right, band moving gear 23 rotates clockwise, so as to drive bull stick 22 to rotate clockwise,
And then drive clamping device 25 rotate clockwise, test tube 26 also rotates clockwise therewith, when push rod 13 draw to the right make a motion away from
From rear, student promotes push rod 13 to the left again.When drying test tube 26, student constantly makes push rod 13 or so alternately move, from
And constantly the jet into test tube 26, drying test tube 26, while test tube 26 constantly can alternately it turn clockwise and anticlockwise
It is dynamic, so that the inwall of test tube 26 constantly rubs with sponge 5, because the quality of sponge 5 is very soft and water imbibition is very strong, test tube
26 inwalls constantly will not wear test tube 26 with the friction of sponge 5 and can also dry the water droplet that the inwall of test tube 26 adheres to, so as to increase
Strong drying effect.After the completion of the drying of test tube 26, student stops mobile putter 13, then removes link 31 from hook 32,
And Four-slider 29 is moved forward, after the clamping plate 33 of front side is moved to correct position, student hangs over link 31 on hook 32,
Then test tube 26 is taken out.
Because also including rubber blanket 34, the inner side of the clamping plate of front and rear sides 33, which is glued, is connected with rubber blanket 34, can be to prevent
Test tube 26 is caused to damage when only clamping plate 33 clamps test tube 26.
Because also including support plate 35, the top of wind chamber 2 has been welded to connect support plate 35, and the top of support plate 35 is provided with groove 36,
Groove 36 is shaped as annular, when drying test tube 26, the bottom of test tube 26 is located in groove 36, and test tube 26 can be when rotating
Test tube 26 provides support, increases stability.
Embodiment described above only expresses preferred embodiment of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area
For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all
Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (6)
1. a kind of bioconversion medium test tube drying plant, it is characterised in that include base(1), wind chamber(2), breather pipe
(3), air jet pipe(4), sponge(5), push pedal(6), the first mobile bar(7), sealing ring(9), the first slide rail(10), the first sliding block
(11), spring(12), push rod(13), the second slide rail(14), the second sliding block(15), the 3rd sliding block(16), connecting rod(17), second move
Lever(18), rack(19), top plate(20), bearing block(21), bull stick(22), gear(23), U-shaped frame(24), clamping device
(25), right shelf(27), base(1)The mode that top left side is connected by screw is connected with wind chamber(2), wind chamber(2)Top
The mode for passing on left flange connection is connected with breather pipe(3), breather pipe(3)The left and right sides is all equably provided with air jet pipe
(4), breather pipe(3)All equably bonding connection has sponge for the left and right sides(5), sponge(5)With air jet pipe(4)To be disposed adjacent,
Wind chamber(2)Inner sliding type is connected with push pedal(6), push pedal(6)Right side central has been welded to connect the first mobile bar(7), wind chamber
(2)Right side central is provided with aperture(8), the first mobile bar(7)Through aperture(8), the first mobile bar(7)With aperture(8)Between set
It is equipped with sealing ring(9), base(1)Top right side has been welded to connect right shelf(27), right shelf(27)Left side central portion is bolted
Mode be connected with the first slide rail(10), the first slide rail(10)Upper slidingtype is connected with the first sliding block(11), the first sliding block(11)
Left side and the first slide rail(10)Between link up with connect by way of be connected with spring(12), the first sliding block(11)Right side welding connects
It is connected to push rod(13), right shelf(27)Left upper portion is connected with the second slide rail by bolted connection(14), the second slide rail
(14)Upper slidingtype is connected with the second sliding block(15), the second sliding block(15)With the second slide rail(14)Coordinate, the second sliding block(15)With
First sliding block(11)Between be glued connect by way of be connected with the second mobile bar(18), the second slide rail(14)Left part slidingtype
It is connected with the 3rd sliding block(16), the 3rd sliding block(16)With the second slide rail(14)Coordinate, the 3rd sliding block(16)Right side and the second sliding block
(15)Between left side connecting rod is connected with by way of being glued and connecting(17), the 3rd sliding block(16)The side that front side is connected by screw
Formula is connected with rack(19), right shelf(27)Left upper portion has been welded to connect top plate(20), top plate(20)Positioned at the second slide rail(14)
Top, top plate(20)Bottom left is connected with bearing block by bolted connection(21), bearing block(21)Bearing on lead to
The mode of interference connection is connected with bull stick(22), bull stick(22)On interference connection by way of be connected with gear(23), tooth
Wheel(23)With rack(19)Engagement, bull stick(22)Lower weld is connected with U-shaped frame(24), U-shaped frame(24)Bottom is connected with clamping
Device(25), clamping device(25)Include the 3rd slide rail(28), Four-slider(29), steel wire rope(30), link(31), hook
(32)And clamping plate(33), U-shaped frame(24)The 3rd slide rail is connected with by bolted connection at left and right sides of bottom(28), the
Three slide rails(28)Upper slidingtype is connected with Four-slider(29), the Four-slider of the left and right sides(29)Between be welded to connect clamping plate
(33), the 3rd slide rail of the left and right sides(28)Also clamping plate has been welded to connect between rear side(33), Four-slider(29)Rear side is logical
The mode for crossing hook connection is connected with steel wire rope(30), steel wire rope(30)On be equably provided with link(31), the left and right sides
3rd slide rail(28)Rear side has been fixedly connected with hook(32), link(31)With hook(32)Coordinate.
2. a kind of bioconversion medium test tube drying plant according to claim 1, it is characterised in that also include rubber blanket
(34), the clamping plate of front and rear sides(33)Inner side, which is glued, is connected with rubber blanket(34).
3. a kind of bioconversion medium test tube drying plant according to claim 2, it is characterised in that also include support plate
(35), wind chamber(2)Top has been welded to connect support plate(35), support plate(35)Top is provided with groove(36), groove(36)It is shaped as
Annular.
A kind of 4. bioconversion medium test tube drying plant according to claim 3, it is characterised in that clamping plate(33)It is shaped as
Convex.
A kind of 5. bioconversion medium test tube drying plant according to claim 4, it is characterised in that the first mobile bar(7)
It is shaped as L-shaped.
A kind of 6. bioconversion medium test tube drying plant according to claim 5, it is characterised in that base(1)Material is
HT200。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621389605.5U CN206771912U (en) | 2016-12-19 | 2016-12-19 | A kind of bioconversion medium test tube drying plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621389605.5U CN206771912U (en) | 2016-12-19 | 2016-12-19 | A kind of bioconversion medium test tube drying plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206771912U true CN206771912U (en) | 2017-12-19 |
Family
ID=60646990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621389605.5U Expired - Fee Related CN206771912U (en) | 2016-12-19 | 2016-12-19 | A kind of bioconversion medium test tube drying plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206771912U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109654827A (en) * | 2018-10-25 | 2019-04-19 | 芜湖中义玻璃有限公司 | A kind of vial high efficiency drying device |
CN110425855A (en) * | 2019-08-27 | 2019-11-08 | 浙江郡琳自动化设备有限公司 | A kind of toy processing paper tube continuous drying equipment |
CN112782397A (en) * | 2020-12-24 | 2021-05-11 | 刘寿明 | Kit for stem cell detection |
CN113503699A (en) * | 2021-07-06 | 2021-10-15 | 济南凡凯芊生物科技有限公司 | Accelerate air-dried device of inside moisture after biological preparation test tube washs |
CN112782397B (en) * | 2020-12-24 | 2024-05-14 | 北京胞脉科技有限公司 | Kit for stem cell detection |
-
2016
- 2016-12-19 CN CN201621389605.5U patent/CN206771912U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109654827A (en) * | 2018-10-25 | 2019-04-19 | 芜湖中义玻璃有限公司 | A kind of vial high efficiency drying device |
CN109654827B (en) * | 2018-10-25 | 2020-10-02 | 芜湖中义玻璃有限公司 | High-efficient drying device of glass bottle |
CN110425855A (en) * | 2019-08-27 | 2019-11-08 | 浙江郡琳自动化设备有限公司 | A kind of toy processing paper tube continuous drying equipment |
CN110425855B (en) * | 2019-08-27 | 2023-08-04 | 浙江郡琳自动化设备有限公司 | Paper tube continuous drying equipment for toy processing |
CN112782397A (en) * | 2020-12-24 | 2021-05-11 | 刘寿明 | Kit for stem cell detection |
CN112782397B (en) * | 2020-12-24 | 2024-05-14 | 北京胞脉科技有限公司 | Kit for stem cell detection |
CN113503699A (en) * | 2021-07-06 | 2021-10-15 | 济南凡凯芊生物科技有限公司 | Accelerate air-dried device of inside moisture after biological preparation test tube washs |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206771912U (en) | A kind of bioconversion medium test tube drying plant | |
CN203917307U (en) | The diameter adjustable rust cleaning servicing unit of keeping a public place clean for oil pipe | |
CN206276688U (en) | A kind of cleaning device for cleaning beaker inside and outside wall | |
CN209379608U (en) | A kind of Experiment on Microbiology test tube cleaning equipment | |
CN108707541A (en) | A kind of microbial ferment device | |
CN206731739U (en) | A kind of cleaning device for quartz test tube | |
CN209464355U (en) | A kind of robot chlorination equipment | |
CN107824147A (en) | A kind of reactor for quenching medium production | |
CN107350207A (en) | Possesses the flooding nozzle of clamping cleaning function | |
CN207537273U (en) | A kind of plastic cleaning liquid waste treating apparatus | |
CN207401638U (en) | Motorcycle brake pad glue-spraying device | |
CN202725426U (en) | Water-based paint coating equipment | |
CN204417091U (en) | Full-automatic beer bucket cleaning and filling machine | |
CN204206976U (en) | A kind of Herbarium clip | |
CN208134651U (en) | One kind can the anti-remaining security protection unmanned plane shell cleaning device of cleaning trace | |
CN206104185U (en) | Capstan head formula coating machine | |
CN205021093U (en) | Joint welding frock of air ability water heater | |
CN208943992U (en) | A kind of student's chemical experiment shaking device | |
CN208500307U (en) | A kind of bottled water production and processing Jar opening sealer equipment | |
CN207859289U (en) | A kind of single conveying-type rubber gloves fingerprint cleaning dipping system | |
CN107187660B (en) | A kind of brake block manufacture station-service packing device | |
CN205448542U (en) | Quick drying device is used to erlenmeyer flask | |
CN204507496U (en) | A kind of inside hair brush structure of labelling machine | |
CN204749045U (en) | Fabric hose oven | |
CN206824353U (en) | A kind of unpowered self-stripping unit suitable for tank body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171219 Termination date: 20181219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |