CN206769919U - Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate - Google Patents

Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate Download PDF

Info

Publication number
CN206769919U
CN206769919U CN201720456609.9U CN201720456609U CN206769919U CN 206769919 U CN206769919 U CN 206769919U CN 201720456609 U CN201720456609 U CN 201720456609U CN 206769919 U CN206769919 U CN 206769919U
Authority
CN
China
Prior art keywords
dividing plate
steel plates
gunite concrete
rectangular steel
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720456609.9U
Other languages
Chinese (zh)
Inventor
刘同斌
李保军
贺敏刚
别大华
沈天喜
杨卓
刘顺超
蔡瑞波
张帆
杜庆轩
隰艳青
李金科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201720456609.9U priority Critical patent/CN206769919U/en
Application granted granted Critical
Publication of CN206769919U publication Critical patent/CN206769919U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses one kind to be suitable to tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate, including the rectangular steel plates being inserted into for level at bow member arch springing, the rectangular steel plates side offers the open slot being engaged with bow member arch springing, rectangular steel plates opposite side is provided with rotary-type handheld ring, and rectangular steel plates surface is welded with a plurality of a diameter of 16mm round steel along cartridge insertion direction interval.It is provided by the utility model to be suitable to tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate, it is simple in construction, it is easy to use, the phenomenon that arch springing gunite concrete lower surface bonds dregs can be prevented completely, and a batch face can be connect in concrete and leave clearly indenture, it is easy to and subordinate's step steel arch-shelf gunite concrete strong bonded, guarantee construction quality.

Description

Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate
Technical field
Construction of road and bridge technical field is the utility model is related to, is suitable to tunnel benching tunnelling method construction middle arch rack more particularly, to one kind Gunite concrete dividing plate.
Background technology
Tunnel benching tunnelling method construction, i.e., in tunneling, carry out, often excavate one layer, i.e., steel is set in tunnel stage by stage Simultaneously casting concrete as temporary support, prevents from caving in bow member.Due to the limitation of construction condition, first branch bow member is sprayed mixed After solidifying soil, the arch springing lower surface of bow member easily bonds with dregs, and it is tight between subordinate step steel arch-shelf gunite concrete to influence it , often there is weak intercalated layer in close combination, so as to produce serious quality problems between the two.Therefore, it is necessary to put into more people The dregs that the power cost more time bonds to first branch bow member gunite concrete surface is cleared up.
The content of the invention
Used to solve the above problems, the utility model provides a kind of tunnel benching tunnelling method construction middle arch rack gunite concrete that is suitable to Dividing plate.
To achieve the above object, the utility model can take following technical proposals:
It is described in the utility model to be suitable to tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate, including for level The rectangular steel plates being inserted at bow member arch springing, the rectangular steel plates side offer the open slot being engaged with bow member arch springing, square Shape steel plate opposite side is provided with rotary-type handheld ring, and rectangular steel plates surface is welded with a plurality of a diameter of 16mm along cartridge insertion direction interval Round steel.
The open slot is two, and the round steel is five.
The rectangular steel plates thickness is 10-20mm, and rectangular steel plates width is more than bow member concrete width 50-60mm.
It is provided by the utility model be suitable to tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate, it is simple in construction, make The phenomenon of dregs is bonded with arch springing gunite concrete lower surface conveniently, can be prevented completely, and a batch face can be connect in concrete and stayed Under clearly indenture, be easy to and subordinate's step steel arch-shelf gunite concrete strong bonded, ensure construction quality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
By taking the dividing plate suitable for H230 type grid steel arch-shelfs as an example, as shown in figure 1, described in the utility model be suitable to tunnel Benching tunnelling method construction middle arch rack gunite concrete dividing plate, include long 600mm, wide 370mm, thick 10mm rectangular steel plates 1, its left side Long side is spaced apart the open slot 2 for being provided with and being engaged with two steel arch-shelf arch springings, and right side long side is provided with rotary-type handheld ring 3, with The side surface that gunite concrete is in contact is welded with 5 φ 16mm round steel 4 along cartridge insertion direction, and above-mentioned round steel 4 is by open slot 2 2,1,2 Packet State is separated into, for leaving indenture on gunite concrete surface, in favor of the superior and the subordinate's step steel arch-shelf injection Combining closely between concrete.The thickness of above-mentioned rectangular steel plates 1 can meet the requirement that dividing plate is reused, and be advantageous to save Cost;Its width is more than bow member concrete width 50mm, is easy to peel off on dividing plate and gunite concrete.Above-mentioned rotary-type handheld ring 3 do not influence gunite concrete, are easily installed, remove dividing plate.
Before dividing plate is installed, the high wooden units of 10cm are first padded above the junction steel plate of grid steel arch-shelf arch springing both sides as place mat, Then it is the open slot 2 of dividing plate and arch springing level is plug-in, make with hole slag to isolate below dividing plate, afterwards rotary-type portable The drop handle of ring 3, which is turned down, to be protected;After dividing plate installation, baffle surface earthing must be wiped clean, ensure no soil, avoid spraying Penetrate concrete surface and bond loosened soil slag, influence isolation effect;After lower circulation bench excavation, artificial hand hammer taps the exposed portion of dividing plate Point, after dividing plate loosening, rotary-type handheld ring 3 is pulled, is re-used after drawing out partition plate is removed into surface irregularities.
Removal steel diaphragm after construction gunite concrete, it is found that concrete joint part concrete is pollution-free, and use surface Smooth molding round steel, therefore steel diaphragm is easy to remove, and concrete surface impression is clear, is easy to and subordinate's step steel arch-shelf spray Concrete strong bonded is penetrated, meets construction speed and quality requirement.

Claims (3)

1. one kind is suitable to tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate, it is characterised in that:Including being inserted for level Rectangular steel plates at bow member arch springing(1), the rectangular steel plates(1)Side offers the open slot being engaged with bow member arch springing (2), rectangular steel plates(1)Opposite side is provided with rotary-type handheld ring(3), rectangular steel plates(1)Welded along cartridge insertion direction interval on surface There is a plurality of a diameter of 16mm round steel(4).
2. according to claim 1 be suitable to tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate, it is characterised in that: The open slot(2)For two, the round steel(4)For five.
3. according to claim 1 be suitable to tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate, it is characterised in that: The rectangular steel plates(1)Thickness is 10-20mm, rectangular steel plates(1)Width is more than bow member concrete width 50-60mm.
CN201720456609.9U 2017-04-27 2017-04-27 Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate Expired - Fee Related CN206769919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720456609.9U CN206769919U (en) 2017-04-27 2017-04-27 Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720456609.9U CN206769919U (en) 2017-04-27 2017-04-27 Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate

Publications (1)

Publication Number Publication Date
CN206769919U true CN206769919U (en) 2017-12-19

Family

ID=60634102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720456609.9U Expired - Fee Related CN206769919U (en) 2017-04-27 2017-04-27 Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate

Country Status (1)

Country Link
CN (1) CN206769919U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915177A (en) * 2019-04-28 2019-06-21 中交一公局第四工程有限公司 A kind of first branch top bar arch junction steel plate protective device in tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915177A (en) * 2019-04-28 2019-06-21 中交一公局第四工程有限公司 A kind of first branch top bar arch junction steel plate protective device in tunnel
CN109915177B (en) * 2019-04-28 2024-03-08 中交一公局第四工程有限公司 Protection device for steel plate for connecting primary support with upper step arch frame of tunnel

Similar Documents

Publication Publication Date Title
CN106436777B (en) A kind of subway station skin-type waterproof construction and its construction method
CN206769919U (en) Suitable for tunnel benching tunnelling method construction middle arch rack gunite concrete dividing plate
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN108019054A (en) A kind of wall hole to be provided antiseep plugging device
CN203403670U (en) Formwork system without support
CN105507607A (en) Method for repairing crack in ancient building wall
CN202510847U (en) Hole-plugging construction structure for pipeline passing through floor slab in waterish room
CN104100278A (en) Construction method for demolishing original arch frames and primarily supporting windings of transition sections of tunnels
CN105421808A (en) Method for repairing crack in historic building wall
CN104405420B (en) The method processed for gas tunnel air-tight water-proof
CN103243912A (en) Multilayer no-board frame structure constructing method
CN203270646U (en) Additional shovel blade device for trenching machine
CN107859350A (en) The renovation technique of old concrete post and its structure of transvers plate used
CN203856222U (en) Dismountable device used for protecting stairsteps
CN204983655U (en) Reserved pipe cover of floor poling hole
CN104195958B (en) The guard method of aqueduct side wall top board Channel Maker via hole
CN110195475A (en) A kind of concrete structure large pool contracting seam Antiseep method
CN206005134U (en) A kind of portable quick soil restoring device
CN205743923U (en) A kind of urgent support apparatus of tunnel excavation vault
CN204870927U (en) Building site washing equipment
CN204895412U (en) Slag transport vehicle washing equipment
CN204676561U (en) A kind of side slope holdfast supporting and protection structure
CN102704954A (en) Construction method for waterproof system of tunnel
CN204059204U (en) Aqueduct side wall top board Channel Maker via hole protective device
CN209760279U (en) Concrete foundation capable of being circulated and quickly assembled for temporary building enclosure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

CF01 Termination of patent right due to non-payment of annual fee